MANAGEMENT INFORMATION SYSTEM Quality Assurance

Embed Size (px)

Citation preview

  • 8/7/2019 MANAGEMENT INFORMATION SYSTEM Quality Assurance

    1/24

    MANAGEMENT INFORMATION SYSTEM

    Version 2.0

    May 9, 2006

    INTRODUCTION

    1-100 SCOPE. This section prescribes the functional aspects of the Quality Assurance

    Management Information System (QA MIS) relative to reporting a number of QA

    activities at contractor facilities under DCMA cognizance.

    1-101 PURPOSE. To describe the data elements to be reported, assign responsibilities,

    and outline the method for collecting the data required to maintain the QA MIS. One of

    the main purposes of the QA MIS is to track QA Only contract workload since thesecontracts are not included in the Contract Management Database.

    1-102 GENERAL

    a. Managers at all organizational levels, as well as Quality Assurance Representatives

    (QARs), need reliable information to effectively perform and evaluate QA operations.

    b. The QA MIS provides continuing information to managers, staff, and in-plant

    personnel that may be used for evaluation of workload and application of government

    Quality Assurance (QA) procedures. The QA MIS may also be utilized for determiningthe adequacy of resource allocations. Failure to input timely and accurate data into the

    QA MIS may result in incorrect resourcing information.

    c. Two types of data are included in the QA MIS:

    (1) Facility Profile: This record contains attribute data (i.e., QAR code, facility type,commodity code, QA organization code, and QA provision code) and other descriptive

    data for a contractor facility. The QA MIS provides the QAR with a Facility Profile

    (Report UNML720A) whenever Facility Profile information is initially input orchanged/updated.

    (2) Contract Data: This record contains detailed information for each multifunctional

    contract delegated for QA action and for each QA only contract. A multifunctionalcontract is a contract primarily input by the Defense Finance and Accounting Service

    (DFAS) personnel that requires effort by more than one functional area within the same

    Contract Management Office (CMO). QA only contracts that are rarely multifunctionalare primarily input by the QAR. The QA MIS provides the QAR with a QA Contract

    Worksheet (UNML750A) for each contract requiring QA action. The QA Contract

    Worksheet and Facility Profile together can provide evidence of contract review, and inDCMA activities, is used in lieu of the DD Form 1904, Contract Review and Planning

    Document, which has been canceled. QARs need to continue to complete DD Form

    1904-1, Computer Software Contract Review and Planning Document.

  • 8/7/2019 MANAGEMENT INFORMATION SYSTEM Quality Assurance

    2/24

    NOTE: The two data files are dependent on each other. The Facility Profile shall be

    established before contact data can be input for a facility. Similarly, a Facility Profile

    cannot be deleted until all contracts for a facility have expired or been deleted.

    d. The QA MIS obtains records or data from two related data files. They are:

    (1) The Address File (ADRS File): This file contains QA attribute data for each

    Contractor and Government Entity (CAGE). Attribute data shall be established in the

    Address File before a Facility Profile can be entered.

    (2) The Contract Management Database maintained by the DFAS: This file is the source

    of most multifunctional contracts in the QA MIS Database. Modifications and changes

    for multifunctional contracts are transferred by the system to the QA MIS Database dailyto update QA contract files provided the functional limitation code of that contract

    remains blank.

    e. The QA MIS has two processes: on-line and batch. The on-line process is used for allinput, change, and delete functions, for requesting reports, making inquiries, maintaining

    the Address File, and maintaining the QAR Code to Name (NPQS) File. The batchprocess is an overnight function used to download Defense Logistics Information Service

    (DLIS) CAGE information to the Address File, update the QA MIS with changes made to

    the Address File, generate reports requested in the on-line system, and update and

    transfer multifunctional contracts from the Contract Management Database.

    1-103 RESPONSIBILITIES

    a. The Team Chief, Product and Manufacturing Assurance Team, DCMA-OCT, is

    responsible for:

    (1) Overall management of the QA MIS.

    (2) Maintenance of the QA MIS Tables.

    b. The Operations Chiefs at the Districts, DCMDs, are responsible for:

    (1) Effective implementation of the QA MIS policy.

    (2) Establishing and maintaining procedures for efficient data collection and file

    maintenance.

    (3) Assuring that adequate automated data processing (ADP) resources, including

    computer terminals and printers, are identified and requested to support the QA MIS.

    (4) Establishing, maintaining, and implementing analysis techniques for District

    management use, such as analysis of data for possible resourcing and/or workload

    allocation.

  • 8/7/2019 MANAGEMENT INFORMATION SYSTEM Quality Assurance

    3/24

    (5) Training as required to maintain an efficient QA MIS data flow.

    (6) Providing the District security organization with QA MIS security requirements and

    assuring that all District personnel comply with District ADP security procedures.

    (7) Appointing a District QA MIS data monitor.

    c. District QA MIS Data Monitors are responsible for:

    (1) Assigning Quality Assurance Specialist (QAS) codes and maintaining the QAR

    Names/Codes on-line.

    (2) Providing technical assistance to CMO Data Monitors in such areas as data input,

    inquiries, on-line printing, and report requests, as necessary.

    (3) Forwarding program and documentation problems and table updates to theappropriate source (e.g.; DCMA Help Desk, DCMA-OCT, and applicable Functional

    Support Team (FST) member for correction.

    (4) Coordinating with field personnel and the Office of Management Support those

    actions that affect data input and report processing schedules.

    (5) Retaining a soft copy of monthly District level system generated reports for 12

    months.

    (6) Notifying the CMO TASO (Terminal Area Security Officer) of the need for

    additional Reading Group Specialist (RGS or USER IDs) codes, and of the need for a

    change or deletion of access to QA MIS programs as individuals enter/leave or changepositions within the organization.

    d. The Operations Chiefs at CMOs are responsible for:

    (1) Assuring the timeliness and accuracy of QA MIS data.

    (2) Maintaining the accuracy of the QA portion of the Address File.

    (3) Assuring adequate ADP resources, including computer terminals and printers, are

    identified and requested to support the QA MIS.

    (4) Analyzing QA MIS data for possible resourcing and/or workload allocation.

    (5) Assuring that all personnel comply with District ADP security procedures.

    (6) Appointing a CMO QA MIS Data Monitor.

  • 8/7/2019 MANAGEMENT INFORMATION SYSTEM Quality Assurance

    4/24

    e. Group Chiefs/Team Leaders are responsible for:

    (1) Assuring accurate, timely, and complete reporting by subordinates.

    (2) Assuring that, as a minimum, semiannual reviews of Facility Profile data are

    accomplished, and changes/updates are made, as required.

    (3) Reviewing/analyzing data output products (reports and on-line screens) to detect

    errors, inconsistencies, and trends and taking corrective actions, as necessary.

    (4) Notifying the CMO QA MIS Data Monitor of any changes required to CAGE, QA

    Attribute data, Facility Profiles, and QAR Names/Codes.

    (5) Retaining a soft copy of monthly group/team (branch/section) level system generated

    reports for 12 months.

    f. CMO QA MIS Data Monitors are responsible for:

    (1) Identifying program and documentation problems to the DCMA Help Desk, DistrictData Monitor, and applicable FST member.

    (2) Providing assistance to Operations Group personnel, first line supervisors (FLS),

    QARs, and clerical personnel in the areas of report requests, inquiries, data input, anddistribution of reports as necessary.

    (3) Assuring all required CAGE, QA attribute data, Facility data, Contract data, and QARName/Code updates are processed.

    (4) Retaining a soft copy of monthly CMO level system generated reports for 12 months.

    (5) Notifying the CMO TASO of the need for additional Reading Group Specialist (RGS

    or USER IDs) codes, and of the need for a change or deletion of access to QA MISprograms as individuals enter/leave or change positions within the organization.

    g. QARs/QAAs are responsible for:

    (1) The timely and accurate reporting of data.

    (2) Retaining a soft copy of the latest QA Contract Worksheet for each active contract.

    (3) Retaining a soft copy of the latest Facility Profile, UNML720A, for each facility

    under their cognizance (QARs only).

    (4) Reviewing the QAR level reports to ensure that data entered is input correctly.

    (5) Reviewing and updating the Facility Profiles, UNML720As, at least semiannually.

  • 8/7/2019 MANAGEMENT INFORMATION SYSTEM Quality Assurance

    5/24

  • 8/7/2019 MANAGEMENT INFORMATION SYSTEM Quality Assurance

    6/24

    (c) Foreign government multifunctional contracts.

    (d) All subcontracts (contractor-to-contractor procurement agreements). This includes

    subcontracts for which QA actions at the subcontract level have been requested by the

    QAR assigned cognizance of the issuing contractor's facility. This includes requests forQA from other DCMA components.

    (e) All interplant work orders issued by one plant or division of a multiplant corporationto another plant or division, provided that the point of performance has a different CAGE

    code, and is not within the same basic management unit. A management unit is defined

    as:

    (1) A resident facility (including those with multiple or widely scattered facilities/CAGEs

    under the cognizance of the same QAR).

    (2) A group of facilities assigned to a nonresident QAR.

    c. QARs will receive a weekly UNML750B report listing the multifunctional contractswith 99 inspection requirements that were input by DFAS personnel and transferred

    into the QA MIS Database during the preceding week. The first three UNML750B

    reports each month contain mutually exclusive data. The last report each month contains

    cumulative data for the month with an asterisk beside contracts that had not previouslyappeared on a weekly report. Contracts that are received by Military Standard Contract

    Administration Procedures (MILSCAP) has a M beside the contract number, and those

    that are received by Electronic Commerce/Electronic Data Interchange (EC/EDI) has anE beside the contract number, to alert QARs that his/her copy of the contract may be

    delayed in arriving. The mutually exclusive weekly reports have a Requester Code of

    AUTOW; the last report of the month containing the cumulative data has a RequesterCode of AUTOM. The correct inspection requirements shall be entered before any

    count/credit is given for these contracts. When contracts are input or changed in the QA

    MIS, a QA Contract Worksheet (UNML750A) is generated. Detailed guidance onreading and processing the QA Contract Worksheet is contained in the Data Collection

    section of this guidance.

    1-105 REPORTS. The QA MIS provides a limited number of system-generated reportson a daily, weekly, and monthly basis. A larger number of predesigned exception reports

    are available on an as required basis. Requests for these reports can be entered on-line

    at any terminal with access to the QA MIS Database. The requested reports are processedovernight, and are available for review the following morning in Reveal.

    a. System Generated Reports. The system produces daily reports whenever a change orupdate is made to the Address File or to the QA MIS Database. Weekly and Monthly

    reports are scheduled to be run on a routine basis; weekly reports are generated each

    Friday evening and appear in Reveal on the first workday of the new week; monthly

  • 8/7/2019 MANAGEMENT INFORMATION SYSTEM Quality Assurance

    7/24

    reports are generated during the evening of the 4th working day of the new month, and

    appear in Reveal the next working day. System generated reports are:

    (1) Daily:

    a UNML710A-(Coded) Facility Profile: Received whenever a new prime multifunctionalcontract is brought over to the QA MIS Database as a 99 from the Contract

    Management Database and there are no QA Attributes in the Address File; receipt

    indicates need to add QA Attribute data to the Address File and Change Facility Profile;QAR level report; sorted by CMO and CAGE.

    b UNML720A-(Uncoded) Facility Profile: Received whenever a change is made to an

    existing facility profile or when a new Facility Profile is input; QAR level report; sortedby CMO and CAGE.

    c UNML750A-Contract Data Worksheet: Received whenever an existing contract is

    changed in the QA MIS Database, or whenever a new QA Only is input; QAR levelreport; sorted by CMO, QA-ORG, CAGE and Contract Number.

    (2) Weekly:

    a UNML380A-NPQS by QAR Code: Received every first working day of the new week;

    it displays all of the QAR Codes and Names for that MOC (District Database). The EastDistrict UNML380A reports are found in both the MOC-H and the MOC-G; CMO level

    report; sorted by QAR code.

    b UNML750B-Summary of Multifunctional Contracts with Inspection Requirements of

    99: Received every first working day of the new week; it displays all of the new prime

    multifunctional contracts that were transferred from the Contract Management Databaseduring the prior week; the first three reports contain mutually exclusive data for the

    preceding week; it has a Requester Code of AUTOW; it also displays a M in the left

    column of the report if the contract was a MILSCAP contract, and it displays an E inthe left column if the contract was received via EC/EDI methods; QAR level report;

    sorted by CMO, QA-ORG, CAGE and Contract Number.

    (3) Monthly:

    a UNML380B-NPQS by QAR Name: Received on the morning of the 5 th working day of

    the new month; it displays the same data as the weekly except that this report is sorted byQAR Name and then lists the QAR Code; it displays all of the QAR Names and Codes

    for that MOC (District Database). The East District UNML380A reports are found in

    both the MOC-H and the MOC-G; CMO level report.

    b UNML400A-Contract Codes Unmatched to the Address File: Received on the morning

    of the 5th working day of the new month when applicable; it lists CAGEs which have

    dropped out of the Address File, but are still in the QA MIS with open contracts; CAGEs

  • 8/7/2019 MANAGEMENT INFORMATION SYSTEM Quality Assurance

    8/24

    listed shall be reentered into the Address file; CMO level report; sorted by CMO, QA-

    ORG and CAGE.

    c UNML410A-QA Prime Contract Completion Reconciliation Notification: Received on

    the morning of the 5th working day of the new month when applicable; it lists

    multifunctional contracts which are closed in the Contract Management Database, but areopen in the QA MIS Database, and that will be purged from the QA MIS during the next

    month end cycle; QAR level report; sorted by CMO, QA-ORG, QAR, and CAGE.

    d UNML470A-Unprocessed Contractor CAGE Changes: Received on the morning of the

    5th working day of the new month when applicable; it lists DLIS originated CAGE

    changes where the QA organization codes of the old CAGE and the new CAGE are

    different; CMO level report; sorted by CMO and CAGE.

    e UNML630F-Resident Facility Summary: Received on the morning of the 5 th working

    day of the new month; it displays dollar amounts, and lists Contract Counts for active

    facilities by QA-ORG and by CAGE for the current month and 5 prior months, with a 6month and a 12 month average for each resident facility assigned to the team; QAR level

    report; sorted by CMO, QA-ORG and CAGE.

    f UNML650E-Nonresident Facility Summary: Received on the morning of the 5 th

    working day of the new month; it displays dollar amounts, and lists totals of contracts on

    hand and related contract data for the current month and 5 prior months with a 6 monthaverage; it displays QA Attributes and Contract Counts for active facilities by in-plant

    person; QAR level report; sorted by CMO and QAR Code.

    g UNML650F-Nonresident Facility Summary by Facility: Received on the morning of

    the 5th working day of the new month; it displays dollar amounts, and lists totals of

    contracts on hand and related contract data for the current month and 5 prior months witha 6 month and a 12 month average; it displays QA Attributes and Contract Counts for

    each active nonresident facility assigned to the team; QAR level report; sorted by CMO,

    QA-ORG and CAGE Code.

    h UNML670 Series Reports-Aggregate Totals: Received on the morning of the 5th

    working day of the new month; the UNML670A is a Team level report; the UNML670B

    is a Branch level report; the UNML670C is a Division level report; and the UNML670Dis a District level report; each is a one page aggregate summary of contract and dollar

    amount totals for all resident and nonresident facilities within the organization, except for

    the Team and Branch level reports which are multiple pages if there are multiple CAGEswithin the organization; organization level reports; sorted by CMO and QA-ORG.

    i UNML750B-Summary of Multifunctional Contracts with Inspection Requirements of99: Received on the morning of the 5th working day of the new month; it lists the

    multifunctional contracts with INSP-RQMTS of 99 which transferred from the

    Contract Management Database to the QA MIS Database during the prior month; it has a

    Requester Code of AUTOM; it has an asterisk beside contracts that did not previously

  • 8/7/2019 MANAGEMENT INFORMATION SYSTEM Quality Assurance

    9/24

    appear on a weekly report; it also displays a M in the left column of the report if the

    contract was a MILSCAP contract, and it displays an E in the left column if the

    contract was received via EC/EDI methods; QAR level report; sorted by CMO, QA-ORG, CAGE and Contract Number.

    j UNML850A-QA Only Contracts Expiration Notice: Received on the morning of the 5th

    working day of the new month; it lists all QA Only contracts in the organization with a

    FDD (Final Delivery Date) in the next month; it is broken down by in-plant person with

    contracts listed by CAGE; the QAR needs to review this report to determine if any of theFDDs need to be extended before the contract is closed and drops out of the system; QAR

    level report; sorted by CMO, QA-ORG, CAGE and Contract Number.

    b. Requestable Reports: These reports can be requested at anytime during the reportingperiod except on the 4th working day. If a date or span of time is not specified, then the

    system provides current month data from the first working day until the last working day

    of the month depending upon the date the report is requested. Reports can be requested

    individually for up to12 prior months and for the current month. All requestable reportsrequire certain mandatory data elements. The District DoDAAC is mandatory on most

    screens. It designates the District to which the CAGE is assigned for ContractManagement. Also, the Requester Code and Routing Code are mandatory on all screens.

    The Requester Code identifies the person requesting the report. The CMO QA MIS

    Monitor would determine how Requester Codes are assigned in the Division. The

    Requester Code is a five-position field. The Routing Code is the DoDAAC for the CMOrequesting the report so that the report can be routed to the correct CMO Reveal server.

    This DoDAAC is the same DoDAAC as the requesters organization.

    (1) UNML630 Series Reports: These reports are Resident Facility Summaries that

    contain the same information as the system generated UNML630 reports; they contain

    data for each resident facility in the organization indicated; sorted by CMO, QA-ORGand CAGE.

    (2) UNML650 Series Reports: These reports contain data for each nonresident facility inthe organization indicated; the UNML650E is sorted by CMO and QAR Code; the

    UNML650A-D are sorted by CMO, QA-ORG and CAGE while the UNML650F is

    sorted by CMO and QA-ORG.

    (3) UNML670 Series Reports: These are a single page report providing cumulative data

    and totals for all resident and nonresident facilities for the organization specified; sorted

    by CMO, QA-ORG and CAGE.

    (4) UNML680 C and D Reports-Aggregate Totals of Facility by Commodity: Displays

    same information as on the UNML670 reports except that they are requested byCommodity; sorted by CMO, QA-ORG, Commodity Code and CAGE.

    (5) UNML720A-Facility Profile: Displays the facility profile data in the clear; sorted by

    CMO and CAGE.

  • 8/7/2019 MANAGEMENT INFORMATION SYSTEM Quality Assurance

    10/24

    (6) UNML730C and D Reports-Facility Summaries by Commodity: Displays one page of

    contract and dollar amount data, along with 6 month and 12 month averages for eachfacility with a specified commodity code in the organization indicated; sorted by CMO,

    QA-ORG, QAR and Commodity.

    (7) UNML750A-Contract Data Worksheet: Displays contract data for each contract

    assigned to a CAGE; sorted by CMO, QA-ORG, CAGE and Contract Number.

    (8) UNML890A and C Reports-QA Contract Inquiry: Displays data by organization level

    based on up to three input criteria and Boolean expressions input on the request screen;

    sorted by CMO, QA-ORG, and CAGE.

    (NOTE: Boolean expressions include possible operations such as: LT-less than; GT-

    greater than; LE-less than or equal to; GE-greater than or equal to; EQ-equal to;

    and NE-not equal to.)

    (9) UNML640A-Facility Data Report: Displays CAGE, Contractor Name, and Facility

    Profile information by organization based on up to three input criteria and Booleanexpressions input on the request screen; sorted by CMO, QA-ORG, CAGE and

    Commodity Code.

    (10) UNML600A-Facility Telephone Listing: For each organization requested, displaysContractor Name and Address, QA Attributes, QAR Phone Number, CAGE, CMO Name

    and whether or not the facility is the QAR Duty Station; sorted by CMO, QA-ORG and

    either Contractor Name, CAGE or QAR Code.

    c. Prior Month Reports: Prior month reports are available on a request basis. Data is

    available for the previous 12 months. Only reports showing totals or aggregates areavailable because facility performance data is available on-line for the previous 12

    months. A report requested on a prior month basis may not agree with the original report

    for that month due to updates to workload reassignments or organizational changes. Forexample, a UNML670A report for January 2001 shows 30 facilities assigned to a specific

    team. The team was reorganized in February 2001 to include only 28 facilities. Several

    months later, in August 2001, a UNML670A report for January 2001 was requested. The

    report for January 2001 that was received as a result of the August 2001 request onlyincluded data for the 28 facilities now in the team. Reports available on a prior month

    basis are:

    (1) UNML670A Team Aggregate Totals(2) UNML670B Branch Aggregate Totals

    (3) UNML670C Division Aggregate Totals

    (4) UNML670D District Aggregate Totals(5) UNML680C CMO Aggregate Totals of Facilities by Commodity

    (6) UNML680D District Aggregate Totals of Facilities by Commodity

    DATA COLLECTION

  • 8/7/2019 MANAGEMENT INFORMATION SYSTEM Quality Assurance

    11/24

    1-200 PURPOSE. To provide instruction for completion of the data input forms. It

    explains the actions required to maintain an accurate Facility Profile and how to read andprocess the QA Contract Worksheet.

    1-201 FORMS

    a.DLA Form 1770a, Facility Profile Data.

    b. DLA Form 1770b, Contract Data.

    1-202 GENERAL INSTRUCTIONS

    a. The QAR normally prepares the data input form for the Facility Profile and any

    required Contract Data forms or enter the data directly into the QA MIS.

    b. When used, the input forms are designed to facilitate reporting by allowing markappropriate block for many data elements. Personnel should be careful to ensure that

    marks are placed clearly in only the appropriate blocks and that erasures are clean so thatinput errors are minimized.

    c. The input forms are designed for use in three different modes: input, change, or delete.

    The function codes on the forms correspond to the functions on the QA MIS Data InputMenu. The input function code should be used to report new Facility Profiles and new

    QA only contracts. The change function code should be used to report changes in data

    elements previously reported. However, changes made to a blank Facility Profile aswell as adding or changing supplemental data are also considered changes. The

    delete function code should be used only to delete entire records, e.g., the entire

    Facility Profile or the entire contract record. While many individuals are assignedresponsibility to input data, the change and delete functions should be limited through

    password assignment. The change function is limited to CMO QA MIS Monitor and

    alternate, and the delete function is limited to the District QA MIS Monitor and alternate.

    1-203 FACILITY PROFILE

    a. UNML710A and UNML720A Reports. A DLA Form 1770a, Facility Profile Data,shall be prepared for each facility when it becomes active, after the CAGE and QA

    attribute data are entered in the Address File. No further input is required unless the

    Facility Profile data changes; however, a review of this data is required semiannually. AFacility Profile, Report UNML720A, is automatically generated whenever new or

    changed Facility Profile Data is entered into the QA MIS. A Facility Profile, Report

    UNML710A, is automatically generated when a contract is transferred from the ContractManagement Database to the QA MIS Database and no Facility Profile data exists for the

    contractor. The UNML710A just contains the contractor name, address, and attribute data

    with Zs. The QAR shall contact the CMO Monitor to add QA Attributes to the Address

    File before Facility Data can be input into the QA MIS. A Facility Profile, Report

    http://opt/scribd/conversion/tmp/scratch6144/1770a.dochttp://opt/scribd/conversion/tmp/scratch6144/1770a.dochttp://opt/scribd/conversion/tmp/scratch6144/1770b.dochttp://opt/scribd/conversion/tmp/scratch6144/1770b.dochttp://opt/scribd/conversion/tmp/scratch6144/1770a.doc
  • 8/7/2019 MANAGEMENT INFORMATION SYSTEM Quality Assurance

    12/24

    UNML720A, with a Requester Code of IS/WAS, is generated after the QA Attribute data

    is input and a daily cycle is run. After review of the new UNML720A, a DLA Form

    1770a, Facility Profile Data form can be completed with the missing Facility Data if theQAR is not the inputter, or the QAR can enter the new Facility Data directly onto the

    input screen. This generates a new Facility Profile with a Requester Code of AUTO that

    should also be reviewed for accuracy once received. If the UNML720A that is received isgenerated because of a blank Facility Profile (QA Attributes may be in the Address File

    but no previous Facility Data was ever entered), a change function to the Facility Data

    record shall be executed, again by either completing a DLA Form 1770a or by directinput into the Change Facility Profile Record screen. The latest Facility Profile, Report

    UNML720A, shall be retained in the QAR's files for each facility where QA is

    performed. The accuracy of the entries in the Facility Profile shall be verified at least

    semiannually. Evidence of verification is based on the date of the current UNML720A,Facility Profile, or a statement Accuracy verified on (date) by (name of

    QAR/Supervisor) on a copy of or print out of the UNML720A.

    b. Missing QA Attribute Data. If a Facility Profile is received with Zs appearing forany of the QA attribute data, the CMO QA MIS Data Monitor needs to input the missing

    QA attribute data into the Address File. An updated Facility Profile, UNML720A, isgenerated after the missing QA attribute data is input. The UNML720A shall be updated

    before contract data can be input.

    c. Changed QA Attribute Data. When QA attribute data are changed in the Address File,a UNML720A report with a Requester Code of IS/WAS is automatically generated.

    When a Requester Code is IS/WAS, only the QA attribute data (CAGE, contractor name

    and address, QA organization code, quality provision, QAR code, commodity code, andfacility type) need be reviewed.

    1-204 FACILITY PROFILE DATA (DLA Form 1770a). The following are block-by-block instructions for the preparation of the DLA Form 1770a including interpretations of

    abbreviated codes used in data entry. Entries are made by circling the appropriate

    information or filling in the blanks. Do not zero fill entries. The system automaticallyzero fills after the data is input. Enter facility name, QAR name, organization, and

    telephone number in the blocks at the top of the form.

    (NOTE: All entries that apply to the facility are Mandatory except for Block 10,

    District Optional Codes.)

    a. Block 1 - FUNCTION CODE. The function code identifies the purpose for preparingthe DLA Form 1770a.

    01 = Input. Used to add a new Facility Profile to the database.

    02 = Change. Used to add, change, or delete data elements in an existing Facility Profile.

    Only the CAGE, function code (02), and the data elements affected, are required on the

    data input form.

  • 8/7/2019 MANAGEMENT INFORMATION SYSTEM Quality Assurance

    13/24

    03 = Delete. Used to delete, in its entirety, an existing Facility Profile. A Facility Profile

    cannot be deleted until all the contracts against that facility have been deleted. Do not usethe delete function to remove a data element from the Facility Profile; use the change

    function instead.

    b. Block 2 - CAGE - Contractor and Government Entity. Enter the CAGE for the facility

    being described in the profile.

    c. Block 3 - QA-CMDTY-CD-P - Quality Assurance Commodity Code - Primary.

    System generated from the Address File. This code represents the commodity that

    requires the greatest amount of effort in the facility. Changes to this code shall be made

    in the Address File.

    d. Block 4 - QA-PVN-CD-P - Quality Assurance Provision Code - Primary. System

    generated from the Address File. This code should reflect the highest order QA provision

    contractually required at the facility. This code is automatically updated each monthbased on the highest inspection requirement in the contract data file for each CAGE. If

    the only QA provision is Other, such as STANAG4107, code C should be selected. QApersonnel no longer report secondary QA provision codes, but they continue to appear on

    the UNML720A; these codes are automatically updated each month based on the second,

    third, and fourth highest inspection requirements in the contract data file for each CAGE.

    If a change to this code is necessary, changes to this code shall be made in the AddressFile.

    e. Block 5 - OPER-TY-CD - Contractor Operation Type Code. Describes contractoroperation. Up to two different codes may be selected. The codes are:

    A = Designer/ManufacturerB = Manufacturer

    C = Overhaul/Repair

    D = Distributor

    f. Block 6 GOVT-VERFN Government QA Product Verification. Describes the type

    of activity being performed at a contractors facility. Up to five different codes may be

    selected. If none apply leave blank. The codes are:

    A = Procurement Contracting Officer Imposed

    F = SPC (Statistical Process Control)T = Third Party Surveillance

    P = Production Surveillance

    G = ARP (Alternate Release Procedures)I = Program Surveillance

    J = Standard Surveillance

    K = Limited Surveillance

  • 8/7/2019 MANAGEMENT INFORMATION SYSTEM Quality Assurance

    14/24

    g. Block 7 - P-DUTY-STA - Primary Duty Station. Enter an asterisk if the facility type is

    R (Resident Facility) or if the facility is a NR (nonresident) duty station; otherwise leave

    blank.

    h. Blocks 8 - 10 - COML-TPHONE/EXTENSION/DSN - Facility Telephone Number.

    Enter the commercial government office telephone number including area code for thisCAGE. Additionally, enter the digital switched network telephone number if there is one.

    If there is an extension where the QAR can usually be reached when at this facility, enter

    it also.

    1-205 QA CONTRACT WORKSHEET. The QA Contract Worksheet (UNML750A) is a

    report displaying selected data elements for a contract: CAGE, contract number, contract

    received date, final delivery date, total dollar value, and other technical requirements. AQA Contract Worksheet is generated whenever a new contract is entered into the

    Database by QA personnel (usually QA only contracts). Both DFAS and QA personnel

    also can enter changes to existing contracts. There is a way to differentiate between

    multifunctional and QA only contracts when reviewing a QA Contract Worksheet. Onmultifunctional contracts input by DFAS personnel into the Contract Management

    Database, the functional limitation code appearing on the QA Contract Worksheet isblank. QA only contract original inputs or changes using the on-line system, are defaulted

    to a functional limitation code of 1. QARs need to check the QA Contract Worksheet

    against the DLA Form 1770b, or the screen print of either the input or change Contract

    Data screen to verify that changes were correctly input.

    1-206 READING AND PROCESSING THE UNML750B AND/OR QA CONTRACT

    WORKSHEET FOR MULTIFUNCTIONAL CONTRACTS (Functional LimitationCode is Blank.)

    a. Open vs. Closed Multifunctional Contracts. The Contract Administration Report(CAR) Section Number (CAR-SEC-NO) determines whether a multifunctional contract

    is open or closed. Multifunctional contracts in CAR Section 1 are open. Any

    multifunctional contract in a CAR Section other than 1 is closed for QA MIS purposes.

    b. New Multifunctional Contracts. QARs receive a weekly system generated UNML750B

    report listing the new multifunctional contracts with a 99 inspection requirement. These

    contracts were input by DFAS personnel and transferred into the QA MIS Databaseduring the preceding week. The first three UNML750B reports each month contain

    mutually exclusive data. The last report each month contains cumulative data for the

    month with an asterisk beside contracts that had not previously appeared on a weeklyreport. Contracts that are received by MILSCAP have a M beside the contract number,

    and those that are received by EC/EDI have an E beside the contract number to alert

    QARs that their copy of the contract may be delayed in arriving. The mutually exclusiveweekly reports have a Requester Code of AUTOW; the last report of the month

    containing the cumulative data has a Requester Code of AUTOM. However, there may

    be instances when the QAR may need to input the multifunctional contract before it is

    input into the Contract Management Database. The QAR would have to enter the contract

  • 8/7/2019 MANAGEMENT INFORMATION SYSTEM Quality Assurance

    15/24

    on contract input screens, and change the Functional Limitation Code from a 1

    (default) to a blank. Once both screens have been completed with the required

    information and the contract entered into the QA MIS, the contract would be treated justas any 99 that had come across and had been opened by the QAR in the QA MIS. Any

    changes made in the Contract Management Database would reflect in the QA MIS for

    that contract. If the QAR decides to maintain the contract himself/herself(NOTE: thisshould be the exception, not the rule), the Functional Limitation Code should be left as

    1. Any changes to the prime multifunctional contract in the Contract Management

    Database are not reflected in the QA MIS for this contract. It is treated as a QA Onlycontract in the QA MIS.

    c. Changed Multifunctional Contracts. If QA Contract Worksheets are received for

    multifunctional contracts, and the INSP-RQMTS are not 99, and the FunctionalLimitation Code is blank, then usually the QA Contract Worksheets represent changes

    to contracts already in the QA MIS Database.

    d. Requester Codes. In the upper left of the QA Contract Worksheet, there is a blockcalled Requester Code. This code determines that the QA Contract Worksheet was

    generated for a changed contract.

    (1) On QA Contract Worksheets for multifunctional contracts, the Requester Code is

    usually IS/WAS or AUTO. If the Requester Code is IS/WAS, one or more of the QA

    attribute data elements changed. Check the CAGE, QA-ORG-CD, QAR-CD, TYPEFACIL, QA-CMDTY-CD-P, CONTRACTOR NAME, and CITY-STATE-ZIP. If the

    Requester Code is AUTO, if the inspection requirement is not 99, and the Functional

    Limitation Code is blank, then the change was made by the QAR, or the contract hasbeen reopened by DFAS or by someone with access to the Contract Management

    Database. The only fields that the QAR could possibly change and should be reviewed

    for accuracy are: FMS Indicator; QA Commodity Code; Inspection Requirement, SpecialProgram Code, or Other Coded Remarks. If the contract has been reopened, the CAR-

    SEC-NO could only have changed to 1 indicating the contract was reopened. The CAR-

    SEC-NO can go directly from 1 to 5, and does not necessarily progress from 1 to 2 to 3,etc. If the DFAS personnel change data in DLA Form 1770b blocks 5-13 on

    multifunctional contracts, QARs do not receive an updated QA Contract Worksheet, but

    the updated data appears on the QA MIS screens and reports; these printouts were

    eliminated to reduce the paperwork burden on QARs. For the same reason, QARs nolonger receive a QA Contract Worksheet when a contract leaves CAR-SEC-1; however,

    the QAR receives a QA Contract Worksheet for the contract if it is reopened. The QA

    Contract Worksheet should be compared with the DLA Form 1770b or screen print if themultifunctional contract was changed from 99. If the contract has been reopened by

    DFAS or the ACO (Administrative Contracting Officer), all of the data elements should

    be checked for accuracy.

    (2) On QA Only contracts (Functional Limitation Code is a 1), if the Requester Code is

    AUTOI, the QAR has input a new QA Only contract into the QA MIS and all of the data

    should be compared to the DLA Form 1770b or the screen print to verify data accuracy.

  • 8/7/2019 MANAGEMENT INFORMATION SYSTEM Quality Assurance

    16/24

    If the Requester Code is AUTOC, the QA Only contract previously in the QA MIS, was

    updated by the QAR. Again, data on the report should be compared to the DLA Form

    1770b or to the screen print to verify data accuracy.

    (3) When the Requester Code is not IS/WAS, AUTO, AUTOI or AUTOC, an individual

    identified by the Requester Code has requested the report.

    e. Processing the UNML750B Report and/or QA Contract Worksheet when the Contract

    is available

    (1) If a copy of the contract is available, QARs shall review it to determine if QA is

    required at the facility designated by the CAGE. If QA is not required, the QAR may do

    nothing if local policy permits. If QA is required and the contract appears on theUNML750B report, then the inspection requirement of 99 shall be changed to reflect

    the appropriate inspection requirement within 90 days. A Contract Assignment Code of

    P should be entered in block 5 for applicable multifunctional contracts. Contracts are

    not counted as received or on-hand in the QA MIS Database until the INSP-RQMTS of99 are updated. Failure to update the INSP-RQMTS of 99 within 90 days from the

    contract received date results in the contract being purged from the QA MIS Database.QA personnel shall then reenter the contract on-line. (See paragraph 1-206i for a possible

    exception to the requirement to update the 99 inspection requirement on every contract

    where QA is required.)

    (2) Occasionally, a contract on a UNML750B report has Zs in one or more QA

    attribute data fields. This occurs because one or more QA attribute data elements were

    missing from the Address File when the contract was established. If Zs appear in any ofthe QA attribute data fields, the CMO QA MIS Data Monitor needs to input the missing

    QA attribute data in the Address File, and Facility Profile data shall be input to establish

    the Facility Profile. These actions shall be taken before the inspection requirement can beupdated and the contract counted as received and on hand in the QA MIS Database.

    (3) Continue review of the contract and input data for blocks 1-4 and 14-16 of the DLAForm 1770b as applicable. Detailed instructions for inputting data identified on the DLA

    Form 1770b are in paragraph 1-209 of this guidance.

    (4) Depending on local procedures the completed DLA Form 1770b or the Contract Datascreen print should be should be used to verify that all data was input correctly. If the

    data is correct, the QA Contract Worksheet is filed with the contract information in the

    EDW (Electronic Data Workflow) folder if there is one, or in a separate folder on thehard disk of the QARs PC. If errors are found, another DLA Form 1770b shall be

    completed for submission/data correction.

    (5) When reviewing the UNML750B/QA Contract Worksheet, errors discovered in the

    following fields can currently be corrected only after changing the Functional Limitation

    Code from blank to a 1: CON-ASGM-CD, INSP-ACPT, CON-RCVD-DT, NOUN,

    FUNC-LIM-CD, TOTAMT-CONTR, FNL-DVY-DT, ACO-CDD-RMKS, and SPC-

  • 8/7/2019 MANAGEMENT INFORMATION SYSTEM Quality Assurance

    17/24

    CON-PVN. CAGE and PIIN/SPIIN can only be changed by DFAS. To make a correction

    to a protected field, the QAR shall first change the functional limitation from a blank to

    a 1 which changes the contract from a multifunctional to a QA Only. Once thefunctional limitation has been changed, the QAR may change any field in the QA

    Contract Data Worksheet except the CAGE and the PIIN/SPIIN. Once the necessary

    changes have been completed, then the functional limitation should be changed back to ablank so that any modifications or changes that occur to the contract via the Contract

    Management Database can update the contract in the QA MIS. If the QAR chooses to

    keep the functional limitation code as a 1, then he/she is responsible to maintain theaccuracy of the contract himself/herself since the updates made in the Contract

    Management Database ignore the QA Only contract. This requires the QAS to enter all

    contract modifications. The benefit of changing the code back to blank allows only

    personnel, knowledgeable of the QA MIS system, to make changes to the file and providefor automatic transfer of all modification data into QA MIS upon DFAS input.

    f. UNML750B Report Received Without Hard Copy Contract. Often the UNML750B

    report arrives before the contract does. These UNML750B reports are held in suspenseawaiting the hard copy of the contract. Usually the hard copy arrives within 15 calendar

    days. If the contract is not received within a reasonable amount of time, QARs shouldnotify their point of contact for contract distribution. The contractor's copy of the contract

    may be used in the interim. In any case, do not update the inspection requirement of 99

    until a hard copy of the contract has been received and reviewed to assure that QA effort

    is required.

    g. Hard Copy Contract but NO UNML750B Report. If the UNML750B report is not

    received within 11 workdays after receipt of the hard copy of a multifunctional contract,the QAR needs to input the contract on-line.

    h. Reopening a Closed Multifunctional Contract. When a multifunctional contract ismoved to a CAR Section Number other than 1 and QA actions are still required, the

    contract shall be reopened in order to be included in the contracts on hand count. The

    QAR needs to reopen the contract by inputting it into the QA MIS, by leaving theFunctional Limitation code as a 1 and by assigning a FDD that is 90 days from the

    contract input date.

    i. Basic Ordering Agreements (BOAs). BOAs and Indefinite Delivery Agreementstransfer over from the Contract Administration Database. They can be identified by

    having a number in the seventh and eighth positions of the contract number, and the letter

    A, D, G, or H appearing in the ninth position of the contract number. For example,SP0500-87-G-1234 is a Basic Ordering Agreement. Calls or orders issued against these

    Agreements are identified by four alphanumeric characters appearing in the Supplemental

    Procurement Instrument Identification Number (SPIIN) field. The Agreements are notcontracts; the calls or orders are contracts. If any of these types of Agreements appear on

    the UNML750B, and the QA on the orders is being done at just the one facility, and the

    orders have the same INSP-RQMTS as the Agreement, then the QAS may update the

    INSP-RQMTS of the Agreement. This causes the Agreement to be entered into the QA

  • 8/7/2019 MANAGEMENT INFORMATION SYSTEM Quality Assurance

    18/24

    MIS without it being added to the on hand count. The QA MIS detects the Agreement

    from the structure of the contract number. As calls or orders are transferred to the QA

    MIS from the Contract Management Database, the system checks to see if there is amatching Agreement for the same CAGE. If there is, the QA MIS automatically picks up

    the INSP-RQMTs from the Agreement. This feature can be overridden by simply not

    updating the Agreement with a valid inspection requirement. QASs need to override thisfeature if the inspection requirements are on a call-by-call basis, or if the QA on the calls

    is being performed at several locations.

    j. Other Order Type Contract. There is an order-type contract for which individual orders

    or calls cannot be issued in advance of the delivery of the product or the performance of

    the services. On Into-Plane Fueling Contracts, purchases are made using a credit card,

    and the contractor bills the Government monthly. Orders or calls cannot be issued inadvance for Into-Plane Fueling contracts since it is not known when an aircraft may be in

    a particular area, or if it would require fueling while in the area. In this case, the contract

    should be entered into the QA MIS Database as a QA Only (with a Functional Limitation

    Code of 1) and a Final Delivery Date 90 days from the contract input date. This wouldensure the contract is counted as on hand and received the first month, and would count

    as closed the second month. Also, after 60 days, the contract would appear on aUNML850A report, QA Only Contract Expiration Notice giving the QAR at least 30

    days notice that the contract drops out of the QA MIS.

    1-207 READING AND PROCESSING THE QA CONTRACT WORKSHEET FOR QAONLY CONTRACTS (Functional Limitation Code 1)

    a. Open vs. Closed. QA only contracts are considered closed in the QA MIS when thefinal delivery date is reached. However, the contract can be reactivated within 90 days of

    the final delivery date by extending the final delivery date. If the final delivery date is not

    extended within 90 days, the contract drops entirely out of the QA MIS and shall be re-entered like a new QA only contract.

    b. New QA Only Contracts. When a QAR receives a QA only contract, he/she needs tocomplete a DLA Form 1770b and input it directly, or forward it to input personnel

    depending on local procedures. Once the data is entered in the QA MIS Database, a QA

    Contract Worksheet with a Requester Code of AUTOI is generated. QARs need to verify

    that the QA Contract Worksheet was input correctly by using the completed DLA Form1770b or the Contract Data Input screen print, and compare the data with the

    UNML750A. The QA Contract Worksheet is then filed with the contract in the EDW

    folder if there is one, or on the QARs PC.

    c. Changes to QA Only Contracts. Any changes or modifications to QA only contracts

    shall be reported on a DLA Form 1770b or if the QAR is the inputter, directly onto inputscreens. Once entered into the QA MIS Database, a QA Contract Worksheet

    (UNML750A) with a Requester Code of AUTOC is generated. Data entry personnel may

    make an error on the input of a dollar value change by failing to erase the old dollar value

    before entering a new dollar value. When this occurs, the dollar value in the TOTAMT-

  • 8/7/2019 MANAGEMENT INFORMATION SYSTEM Quality Assurance

    19/24

    CONT field is unusually large and probably wrong. This error shall be immediately

    attended to by informing the QAR/input clerk by telephone since this error affects both

    the undelivered dollar value and dollar value shipped for both the facility, and the entireDistrict.

    d. The UNML850A Report, QA Only Contract Expiration Notice. This report is providedon a monthly basis as a reminder identifying the QA only contracts expiring in the month

    following the date of this report. If required, final delivery dates should be extended by

    entering the revised delivery date on a DLA Form 1770b, or directly onto change contractdata screens for each contract involved. In the absence of a written modification

    extending the final delivery date, in-plant personnel should never extend the final

    delivery date more than 90 days at a time. In any discussions with a contractor, QARs

    should make it clear that they are seeking information only, and that they are not grantingthe contractor permission to ship late.

    e. Reopening of Closed QA Only Contracts. If a QA only contract has expired less than

    90 days ago, it can be reopened by simply entering a revised final delivery date. If thefinal delivery date of a QA only contract is extended before it expires, no adjustment in

    dollar value is required. The system automatically prorates the remaining dollar valueover the time period of the extension. When a QA contract has been expired more than 90

    days, it is purged from the QA MIS Database. It is reopened by completing a DLA Form

    1770b, or inputting directly into contract data input screens as if it were a new QA only

    contract using the original contract received date and the new final delivery date.However, no entry should be made for contract dollar value unless a modification has

    increased the original dollar value of the contract. In this case, only the amount of the

    increase should be entered. The system automatically prorates the amount of increaseover the time period of the extension. Also, when the UNML750A report is received, it

    will have a Requester Code of AUTOI, and should be reviewed for accuracy by

    comparing it to the completed DLA Form 1770b or the screen print of the contract datainput screens. If the data on the report is correct, a soft copy should be exported and

    stored in the EDW folder if there is one, or on the QARs hard drive.

    1-208 AUTOMATIC DELEGATIONS. An automatic delegation occurs when the point

    of performance CAGE is different from the prime CAGE. When a single point of

    performance CAGE is specified in the contract, the contract should appear on the

    UNML750B for only the point of performance CAGE. Occasionally, the point ofperformance CAGE is overlooked. When this occurs, the contract appears on the

    UNML750B for the prime CAGE. The prime QAR may do nothing, or may delete the

    contract from the QA MIS depending on local procedures. The point of performanceQAR shall then input the contract as a QA only. If multiple points of performance are

    specified, each QAR at the multiple points of performance shall enter the contract as a

    QA only.

    1-209 CONTRACT DATA (DLA Form 1770b). When utilized, the facility name, QAR

    name, organization, and telephone number in the blocks at the top of the form, and blocks

    1-3 shall always be completed on the DLA Form 1770b. When entering supplemental

  • 8/7/2019 MANAGEMENT INFORMATION SYSTEM Quality Assurance

    20/24

    data for a multifunctional contract for the first time, QA-CMDTY-CD, block 13, or QA-

    CMDTY-CD-P can be changed if the commodity on the contract is different than the

    prime commodity for the facility. INSP-RQMTS, block 14, shall be completed in orderfor the contract to count as on hand in the QA MIS Database. SPCL-PROG, block 15,

    should be completed if applicable. While entering a QA only contract, complete blocks 1-

    16 as applicable. The following are block-by-block instructions for preparation of theContract Data input form including definitions of abbreviations used. When a block

    contains 1 or more choices, the entry is completed by Xing the appropriate code.

    Alpha, numeric or alphanumeric entries are required in the other blocks. Where numericentries are indicated, enter whole numbers. Do not use fractions or decimal fractions.

    Supplemental data input to contract data files may be made by any QAR/supervisor/

    Engineer/technical or safety specialist/team member.

    a. Block 1 - FUNCTION CODE. The Function Code identifies the purpose for preparing

    the DLA Form 1770b.

    08 = Input. Used to add a new contract to the database.

    09 = Change/Update. Used to change, delete, or add data elements to an existing contractin the database. Only the CAGE, function code 09, PIIN/SPIIN, and the data elements

    affected are required on the DLA Form 1770b. Data elements to be deleted should be

    circled in red or clearly identified by some other means.

    10 = Delete. Used to delete in its entirety an existing contract already in the QA MIS

    Database. Deleting a contract from the QA MIS Database does not affect the Contract

    Management Database.

    b. Block 2 - CAGE - Contractor and Government Entity. Enter the CAGE for the facility

    where the contract is assigned.

    c. Block 3 - PIIN - Procurement Instrument Identification Number - (Same as Contract

    Number). When the document is a DoD contract, enter the number from the contract.When the document being entered is a subcontract/interplant workorder, enter the 6

    position DODAAD code of the initiating CMO; then enter a 3 position code identifying

    the contractor issuing the subcontract or order, e.g., Brown Engineering Co. = BEC; then

    use the 4 positions of Block 3 along with the 4 positions available in Block 4 to enter upto the last 8 characters of the purchase order number. If there are less than 8 characters in

    the purchase order number, the characters should be placed to the right and the remaining

    blank positions should be 0 filled. Example: Purchase Order No. AF4-12-0068 isreceived from Marcos Shoe Company in CMO Atlanta, S1103A, a PIIN/SPIIN number

    would be constructed as follows: S1103AMSCF4120068. Purchase Order No. GMA-12-

    03 is received from Havana Cigar Factory in CMO Cleveland, S3603A, a PIIN/SPIINnumber would be constructed as follows: S3603AHCF0GMA1203. For other non-DoD

    and foreign government contracts (not processed through the central control point), use

    the following contract number prefixes:

  • 8/7/2019 MANAGEMENT INFORMATION SYSTEM Quality Assurance

    21/24

    (1) Canadian = CANADA------- -----

    (2) NASA = 000NAS---------- -----

    (3) Dept. of Energy = 00DEEX--------- ------

    (4) Dept. of Transportation = 000DOT--------- ------

    (5) U.S. Postal Service = 00USPS--------- ------

    (6) U.S. Treasury = 000UST--------- ------

    (7) Small Business Administration = 0000SB--------- ------

    (8) Simplified Nonstandard Item Acquisition Program = SNAP00-------

    Only the first 6 positions are controlled. The remaining 7 positions of block 3 and the 4positions of block 4 are filled with the last 11 positions of the procurement document

    number. When fewer than 11 positions are provided, the available numbers should beplaced to the far right and the blank positions remaining should be 0 filled. For foreign

    government contracts processed through the DoD central control point, enter the FCAS

    number. Examples of reimbursable and nonreimbursable numbers are

    FCASATRBFB001 and FCASNCGY18086 (NC after FCAS means no charge).

    d. Block 4 - SPIIN - Supplementary Procurement Instrument Identification Number.

    Enter the 4 position alphanumeric SPIIN only when provided. For example, when themultifunctional contract is a Basic Ordering Agreement (BOA), each call or order are

    identified by a SPIIN.

    e. Block 5 - CON-ASGM-CD - Contract Assignment Code. X the code that identifies the

    type of document being entered.

    P = Prime. Represents a multifunctional contract.

    S = Support of Prime. Represents a Government multifunctional contract where the point

    of performance is in a CMO other than the CMO cognizant for administration of thecontract. Multifunctional contracts with multiple points of performance outside of the

    basic management unit should be given this code.

    T = Subcontract Surveillance. A subcontract/interplant workorder from any source

    covered by a request for subcontract QA.

    (WARNING: Interplant workorders within the same basic management unit should not

    be entered as QA only contracts.)

  • 8/7/2019 MANAGEMENT INFORMATION SYSTEM Quality Assurance

    22/24

    f. Block 6 - INSP-ACPT - Inspection Acceptance Code. This is a 1-position code for

    identifying inspection/acceptance points as shown below. This field shall be validly filled

    in order for a contract to be successfully saved into the QA MIS.

    INSPECTION ACCEPTANCE

    1 Source Source

    3 Source Destination (CONUS)

    4 CoC Source

    6 Combination of Above (Different for some Line Items)

    C Source Destination (PORT)

    D Destination Source

    L Source Destination (OVERSEAS)

    g. Block 7 - CON-RCVD-DT - Contract Received Date. The date the contract/order was

    received by the QAR. Numeric entry in year/month/day sequence, e.g., January 14, 2001,

    is coded 01 01 14.

    h. Block 8- NOUN - Name. Short name of contract item(s). When the contract has

    several different items, VAR ELEC or VAR MECH is often used. This entry is limited toeleven positions and often contains abbreviations. This field shall be filled in order for a

    contract to be successfully saved into the QA MIS.

    i. Block 9 - FUNCTIONAL LIMITATION CODE - Currently, this field is system

    generated as blank on multifunctional contracts input by DFAS and 1 on contracts

    input on-line by field personnel. Users are able to change all fields, with the exception ofCAGE and PIIN/SPIIN, by changing the functional limitation code from blank to 1 on

    any of these screens.

    j. Block 10 - TOTAMT-CONT - Total Amount Contract. This is the face dollar value ofthe contract. Enter to nearest whole dollar only (do not include cents). If the contract does

    not have a face value, the total dollar amount should be estimated.

    k. Block 11 - FNL-DVY-DT - Final Delivery Date. If this is not system generated, enter

    the scheduled final delivery date for the last item(s) to be delivered. This element shall be

    changed whenever it is necessary to extend the life of a QA only contract. Failure to doso results in the loss of this contract from the database. Use standard date format

    year/month/day, e.g., 16 Dec 01 is coded 01 12 16. The final delivery date shall 90 days

    from the contract received date. This is necessary to ensure that a contract on hand and a

    contract received count are calculated in the current month and to ensure that a contract

  • 8/7/2019 MANAGEMENT INFORMATION SYSTEM Quality Assurance

    23/24

    completed count is calculated in the next month. It also ensures that an UNML850A

    report is generated after 60 days giving the QAR at least 30 days notice that the contract

    final delivery date will expire. If a contract is received with a FDD in the same month,the FDD should reflect a date that is 90 days from the contract received date. If a final

    delivery date is not defined in the contract, the FNL-DVY-DT entered should not be

    greater than 12 months after the contract received date (CON-RCVD-DT). (WARNING:The final delivery date should only be extended when work still remains on the

    contract.)

    l. Block 12 - ACO-CDD-RMK - Administrative Contracting Officer Coded Remarks.

    These are coded remarks providing in-the-clear attributes of a contract. Up to 25 codes

    may be displayed/input. On multifunctional contracts, these codes are system generated,

    i.e., appearing without any work by the QAR. On QA Only contracts, personnel are notrequired to input in this field, but can if they find the information useful. The codes of

    primary interest to QA personnel are provided on the form.

    m. Block 13 - QA-CMDTY-CD - Quality Assurance Commodity Code. This field issystem generated from the Primary QA Commodity Code field in the Address File. If the

    commodity code generated is not the most accurate code to describe the items in thecontract, then the QAR shall update this block to reflect the most accurate contract

    commodity code. The Commodity Code Listing may be used as a guideline in selecting

    the most accurate commodity code, but it should be used with common sense and not

    followed blindly. If the commodity on a new contract becomes the commodity requiringthe greatest amount of effort in the facility, then the CMO QA MIS Monitor should be

    informed and update the commodity code in the Address File.

    n. Block 14 - INSP-RQMTS - Inspection (QA) Requirements. X the appropriate

    number indicating the highest level of quality requirement specified by the contract. A

    contract with INSP-RQMTS of 99 does not count as on hand until the INSP-RQMTSare updated. If the quality requirement for a new contract is higher than the QA Provision

    Code on the Facility Profile and/or the Address File, or if the last contract on hand for the

    highest inspection requirement in the facility expires during the month, then the systemautomatically updates the Facility Profile during the month-end processing. The QA MIS

    also automatically updates the Address File during the night after the month-end

    processing.

    o. Block 15 - SPCL-PROG - Special Programs. These are high visibility programs used

    to identify contractors or important subcontractors for those programs. Only 1 program

    may be selected. Currently, the only valid special programs that personnel shall report ifthey are cited in a contract are as follows:

    CODE SPECIAL PROGRAM CODE SPECIAL PROGRAM

    N1 Nuclear Core Facility L1 Level 1/Subsafe

    N2 Nuclear Principle Supplier S1 NASA Prime Contractor

    http://opt/scribd/conversion/tmp/scratch6144/COMMODITYQAMIS.pdfhttp://opt/scribd/conversion/tmp/scratch6144/COMMODITYQAMIS.pdf
  • 8/7/2019 MANAGEMENT INFORMATION SYSTEM Quality Assurance

    24/24

    N3 Navy Propulsion Program S2 NASA Subcontractor

    N4 Nuclear Plant Material F1 Fly by Wire Ship Controls

    N5 Deep Submergence System Program K1 Safety of Flight

    p. Block 16 OTH-CDD-RMKS Other QA Standard Coded Remarks. These areQuality Assurance Standard Coded Remarks which describe specific contract

    requirements. Twentyfour are available for selection, and all may be selected if they

    apply or this field may be left blank. The codes are as follows:

    20 = Reliability and Maintainability

    27 = Computer Software

    28 = Configuration Management

    30 = Material Review Board40 = Specialized Safety

    61 = Soldering65 = Dye Penetrant

    66 = Radiography

    67 = Magnetic Particle

    68 = Ultrasonic78 = Eddy Current Test

    79 = First Article

    81 = MIL-STD-965 Parts Control Program85 = Design Authority

    87 = Critical Application Item

    88 = Specialty Metals89 = Radiofrequency Identification

    90 = Sustainmant Contact

    91 = Program Contract92 = Unique Item Identification

    93 = Alternate Release Procedures

    94 = Critical Safety Item

    95 = Naval Special Emphasis Program (Frequent)96 = Naval Special Emphasis Program (Infrequent)