46
Health and Safety Executive Health and Safety Executive Managing manual handling risks in construction work Jane Beckmann Health Risk Management Unit Construction Sector

Managing manual handling risks in construction work - IOSH€¦ · Avoid manual handling operations which involve a risk of injury so far as reasonably practicable • Take appropriate

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Managing manual handling risks in construction work - IOSH€¦ · Avoid manual handling operations which involve a risk of injury so far as reasonably practicable • Take appropriate

Health and Safety Executive

Health and Safety Executive

Managing manual handling

risks in construction work

Jane BeckmannHealth Risk Management UnitConstruction Sector

Page 2: Managing manual handling risks in construction work - IOSH€¦ · Avoid manual handling operations which involve a risk of injury so far as reasonably practicable • Take appropriate

What I Will Cover

• Why manual handling is an HSE priority

• What are Musculoskeletal Disorders (MSDs)

• How to control the risk

– Identifying high risk tasks

– Control strategies

• Going forward

Page 3: Managing manual handling risks in construction work - IOSH€¦ · Avoid manual handling operations which involve a risk of injury so far as reasonably practicable • Take appropriate

Why a priority?

• Lifting and Carrying

– Handling is most common over 7-

day injury in the industry

– Skilled construction and building

trades have one the highest

estimated rates of back and upper

limb disorders

Page 4: Managing manual handling risks in construction work - IOSH€¦ · Avoid manual handling operations which involve a risk of injury so far as reasonably practicable • Take appropriate

Why a priority?

Ill-health statistics – construction

• 1.2m working days lost

• Over 60% due to MSDs

• Over 3/4m days to MSDs

Page 5: Managing manual handling risks in construction work - IOSH€¦ · Avoid manual handling operations which involve a risk of injury so far as reasonably practicable • Take appropriate

What are MSDs

• Upper Limb

Disorders

• Lower Limb

Disorders

• Back pain

• Aches & pain

• Stiffness

• Weakness

• Tingling

• Numbness

• Cramp

• swelling

Page 6: Managing manual handling risks in construction work - IOSH€¦ · Avoid manual handling operations which involve a risk of injury so far as reasonably practicable • Take appropriate

Upper limb disorders

• Osteoarthritis

• Tennis elbow

• Carpel tunnel syndrome

• Repetitive strain injury

Page 7: Managing manual handling risks in construction work - IOSH€¦ · Avoid manual handling operations which involve a risk of injury so far as reasonably practicable • Take appropriate

Lower limb disorders

• Osteoarthritis

• Knee bursitis including beat knee

• Meniscal lesions & tear damage

• Stress fracture & reaction injuries

• Varicose veins

Page 8: Managing manual handling risks in construction work - IOSH€¦ · Avoid manual handling operations which involve a risk of injury so far as reasonably practicable • Take appropriate

Back pain

Page 9: Managing manual handling risks in construction work - IOSH€¦ · Avoid manual handling operations which involve a risk of injury so far as reasonably practicable • Take appropriate

Manual handling operation

Involves a load being

• Lifted

• Lowered

• Carried

• Pushed

• pulled

Page 10: Managing manual handling risks in construction work - IOSH€¦ · Avoid manual handling operations which involve a risk of injury so far as reasonably practicable • Take appropriate

How to avoid manual handling risk

(and other health risks)

Page 11: Managing manual handling risks in construction work - IOSH€¦ · Avoid manual handling operations which involve a risk of injury so far as reasonably practicable • Take appropriate

Common Principles

• Assess

• Control

• Review

Page 12: Managing manual handling risks in construction work - IOSH€¦ · Avoid manual handling operations which involve a risk of injury so far as reasonably practicable • Take appropriate

Assess

Identify your high risk tasks:

Think about the:

• Load

• Task

• Frequency

• Working area

• Individual

• Other factors

Page 13: Managing manual handling risks in construction work - IOSH€¦ · Avoid manual handling operations which involve a risk of injury so far as reasonably practicable • Take appropriate

Assess: MSD toolkits

RAPP tool

Page 14: Managing manual handling risks in construction work - IOSH€¦ · Avoid manual handling operations which involve a risk of injury so far as reasonably practicable • Take appropriate

Assess: Case Study

• This is a grade II list

building which has

been gutted and now

on fit out stage.

• House has 3 floors

plus attic

Page 15: Managing manual handling risks in construction work - IOSH€¦ · Avoid manual handling operations which involve a risk of injury so far as reasonably practicable • Take appropriate

Assess

New sash windows are to be fitted. Most are

already in house but still need to be installed.

Page 16: Managing manual handling risks in construction work - IOSH€¦ · Avoid manual handling operations which involve a risk of injury so far as reasonably practicable • Take appropriate

Assess

What do you need to know?

• Load weight

• Task

• frequency

• Work area

• Individual

Page 17: Managing manual handling risks in construction work - IOSH€¦ · Avoid manual handling operations which involve a risk of injury so far as reasonably practicable • Take appropriate

Assess

• Load weight

– 90-120 kg each

• Task

– 2 men carried

windows up stairs

• Frequency

– Over 50 windows

• Work area

– Narrow stairs &

through doors

Page 18: Managing manual handling risks in construction work - IOSH€¦ · Avoid manual handling operations which involve a risk of injury so far as reasonably practicable • Take appropriate

Assess

MAC

Page 19: Managing manual handling risks in construction work - IOSH€¦ · Avoid manual handling operations which involve a risk of injury so far as reasonably practicable • Take appropriate

Assess

MAC

Page 20: Managing manual handling risks in construction work - IOSH€¦ · Avoid manual handling operations which involve a risk of injury so far as reasonably practicable • Take appropriate

Assess: What happened!

• PN served on site

• Follow up visit to PC

• Track back visit to designer

Page 21: Managing manual handling risks in construction work - IOSH€¦ · Avoid manual handling operations which involve a risk of injury so far as reasonably practicable • Take appropriate

Assess

• Involve workers

Page 22: Managing manual handling risks in construction work - IOSH€¦ · Avoid manual handling operations which involve a risk of injury so far as reasonably practicable • Take appropriate

Control

Law requires:

• Avoid manual handling operations which

involve a risk of injury so far as reasonably

practicable

• Take appropriate steps to reduce risk of injury

to lowest level reasonably practicable

• Take appropriate steps to provide weight of load

Page 23: Managing manual handling risks in construction work - IOSH€¦ · Avoid manual handling operations which involve a risk of injury so far as reasonably practicable • Take appropriate

Control: Elimination

• Design Out

• Work processes

Page 24: Managing manual handling risks in construction work - IOSH€¦ · Avoid manual handling operations which involve a risk of injury so far as reasonably practicable • Take appropriate

Eliminate

Page 25: Managing manual handling risks in construction work - IOSH€¦ · Avoid manual handling operations which involve a risk of injury so far as reasonably practicable • Take appropriate

Lightweight kerbs

Page 26: Managing manual handling risks in construction work - IOSH€¦ · Avoid manual handling operations which involve a risk of injury so far as reasonably practicable • Take appropriate

Control: Mechanical handling

Photo courtesy of Loughborough University

Page 27: Managing manual handling risks in construction work - IOSH€¦ · Avoid manual handling operations which involve a risk of injury so far as reasonably practicable • Take appropriate

Control: Mechanical handling

Page 28: Managing manual handling risks in construction work - IOSH€¦ · Avoid manual handling operations which involve a risk of injury so far as reasonably practicable • Take appropriate

• Specify blocks less than 20kg

• Deliver close to the point of

use and keep dry

• Prevent work above shoulder

height

• Reduce lay rate for feet level

• Adjust scaffold height and use

spot boards

Control: blocks

Page 29: Managing manual handling risks in construction work - IOSH€¦ · Avoid manual handling operations which involve a risk of injury so far as reasonably practicable • Take appropriate

Control: plasterboard

Weight of 1200 x 2400 x 12.5 mm?

• Standard

• Fire board

• Soundbloc

• Lifeboard

Page 30: Managing manual handling risks in construction work - IOSH€¦ · Avoid manual handling operations which involve a risk of injury so far as reasonably practicable • Take appropriate

Control: plasterboard

Weight of 1200x2400x12.5mm?

• Standard 23kg

• Fire board 28kg

• Soundbloc 30kg

• Lifeboard 34kg

Page 31: Managing manual handling risks in construction work - IOSH€¦ · Avoid manual handling operations which involve a risk of injury so far as reasonably practicable • Take appropriate

Reduce – manual handling

Page 32: Managing manual handling risks in construction work - IOSH€¦ · Avoid manual handling operations which involve a risk of injury so far as reasonably practicable • Take appropriate

Control: Loading out

Page 33: Managing manual handling risks in construction work - IOSH€¦ · Avoid manual handling operations which involve a risk of injury so far as reasonably practicable • Take appropriate

Control: handling solutions

Page 34: Managing manual handling risks in construction work - IOSH€¦ · Avoid manual handling operations which involve a risk of injury so far as reasonably practicable • Take appropriate

Control: Installing

Page 35: Managing manual handling risks in construction work - IOSH€¦ · Avoid manual handling operations which involve a risk of injury so far as reasonably practicable • Take appropriate

Review:

• Have work procedures

• Check controls working

• Maintenance

• Supervision

Page 36: Managing manual handling risks in construction work - IOSH€¦ · Avoid manual handling operations which involve a risk of injury so far as reasonably practicable • Take appropriate

Operational Guidance

• Transparent decision making

Page 37: Managing manual handling risks in construction work - IOSH€¦ · Avoid manual handling operations which involve a risk of injury so far as reasonably practicable • Take appropriate

Operational Guidance

• Transparent and proportionate

• http://www.hse.gov.uk/foi/internalops/og/og-00049.htm

Page 38: Managing manual handling risks in construction work - IOSH€¦ · Avoid manual handling operations which involve a risk of injury so far as reasonably practicable • Take appropriate

Risk Gap

• Difference between:

– Expected standards

– On-site conditions

Page 39: Managing manual handling risks in construction work - IOSH€¦ · Avoid manual handling operations which involve a risk of injury so far as reasonably practicable • Take appropriate

Guidance

Page 40: Managing manual handling risks in construction work - IOSH€¦ · Avoid manual handling operations which involve a risk of injury so far as reasonably practicable • Take appropriate

Guidance

Page 41: Managing manual handling risks in construction work - IOSH€¦ · Avoid manual handling operations which involve a risk of injury so far as reasonably practicable • Take appropriate

Guidance

Page 42: Managing manual handling risks in construction work - IOSH€¦ · Avoid manual handling operations which involve a risk of injury so far as reasonably practicable • Take appropriate

Guidance

• Being revised

• Published 2016

• Will include:

– MAC

– ART

– RAPP

Page 43: Managing manual handling risks in construction work - IOSH€¦ · Avoid manual handling operations which involve a risk of injury so far as reasonably practicable • Take appropriate

Health Remains a Priority

“Tackling ill health” is a strategic theme in the new

strategy

Page 44: Managing manual handling risks in construction work - IOSH€¦ · Avoid manual handling operations which involve a risk of injury so far as reasonably practicable • Take appropriate

Wider Developments

Page 45: Managing manual handling risks in construction work - IOSH€¦ · Avoid manual handling operations which involve a risk of injury so far as reasonably practicable • Take appropriate

Be Inspired!

https://player.vimeo.com/video/151709341

Page 46: Managing manual handling risks in construction work - IOSH€¦ · Avoid manual handling operations which involve a risk of injury so far as reasonably practicable • Take appropriate

Any questions?

Jane Beckmann

Health risk management unit

[email protected]