Page 0 of 63 MANGALORE ELECTRICITY SUPPLY COMPANY LIMITED (CIN): U40109KA2002SGC030425 Tender No: MESCOM/2017-18/IT005 Dated 04-12-2017 Bid Document For Design, Development, Supply of “Distribution Transformer Management” Software & GIS Survey of DTCs for condition assessment, tracking etc. ISSUED BY Executive Engineer (Ele.) (IT) MESCOM Corporate office, MESCOM Bhavan, Post Box No. 1130, Kavoor Cross Road, Bejai Mangalore -575 004. Ph.: 0824-2885839 Fax: 0824-2211396 Mobile: 9480880496 E-Mail: [email protected], [email protected]

MANGALORE ELECTRICITY SUPPLY COMPANY …e) Specifications: Specification shall mean collectively all the terms & stipulations contained in those portions of the bid document & such

  • Upload
    others

  • View
    4

  • Download
    0

Embed Size (px)

Citation preview

Page 1: MANGALORE ELECTRICITY SUPPLY COMPANY …e) Specifications: Specification shall mean collectively all the terms & stipulations contained in those portions of the bid document & such

Page 0 of 63

MANGALORE ELECTRICITY SUPPLY COMPANY LIMITED

(CIN): U40109KA2002SGC030425

Tender No: MESCOM/2017-18/IT005 Dated 04-12-2017

Bid Document

For

Design, Development, Supply of “Distribution Transformer Management”

Software & GIS Survey of DTCs for condition assessment, tracking etc.

ISSUED BY

Executive Engineer (Ele.) (IT)

MESCOM Corporate office, MESCOM Bhavan,

Post Box No. 1130, Kavoor Cross Road, Bejai

Mangalore -575 004.

Ph.: 0824-2885839

Fax: 0824-2211396

Mobile: 9480880496

E-Mail: [email protected], [email protected]

Page 2: MANGALORE ELECTRICITY SUPPLY COMPANY …e) Specifications: Specification shall mean collectively all the terms & stipulations contained in those portions of the bid document & such

Page 1 of 63

INDEX

Contents

Section Description Page No.

1 Notification Inviting Tender (NIT) 2 - 5

2 Instruction to Bidders (ITB) 6 – 12

3 Scope of Work (SW) 13 – 45

4 General Terms & Conditions (GTC) 46 – 57

5 Annexure - I ( Division wise DTCs Details) 58

5 Annexure- II ( Specification of Hardware) 59

6 Annexure-III (Acceptence Of Terms & Conditions) 60

7 Annexure IV (Format of Qualification Details of

Bidders). 61

8 Annexure V (Format of Financial Business & Technical

Capability of Bidders) 62

9 Annexure VI (Notarized Declaration) 63

Page 3: MANGALORE ELECTRICITY SUPPLY COMPANY …e) Specifications: Specification shall mean collectively all the terms & stipulations contained in those portions of the bid document & such

Page 2 of 63

SECTION: 1

Notification Inviting Tender (NIT)

(E-TENDERING MODE)

NIT 1.0 Bid Enquiry No: MESCOM/2017-18/IT 005 Dated 04-12-2017

NIT 2.0 Cost of Tender

Document

Refer E-Procurement Portal.

NIT 3.0 Earnest Money

Deposit (EMD)

All bids must be accompanied with a refundable earnest

money of as mentioned in the E-Procurement portal. Up to

Rs.5.00 Lakhs (Rupees Ten Lakhs only) shall be paid

electronically through any of the four e-payment modes

mentioned in the E-Procurement Portal.

NIT 4.0 Tender System Two Part Tender.

NIT 5.0 Goods/Services Design, Development, Supply of “Distribution Transformer

Management” Software & GIS Survey of DTCs for condition

assessment, tracking etc.

NIT 6.0 Contract Period The total contract period will be for 3 years from the date of

issue of DWA including implementation period till role out &

maintenance/ application support in MESCOM.

NIT 7.0 Qualifying

requirement of Prime

Bidder

Qualifying Requirements:

(a) The Bidder should be Information Technology (IT)

Company / Firm registered in India under relevant Act &

shall be in existence from past 5 years from the date of

bid.

Self-attested copies of the relevant documents should be

uploaded.

(b) The Bidder must have carried out Web based GIS

mapping of distribution transformer centres in at least 3

Government owned power distribution utilities in India in

any of the preceding 6 years (from FY 2011-12 to 2016-17)

for a total number of 1,00,000 DTCs and a combined

amount of not less than Rs. Ten Crores (i.e. amount put to

tender). Copy of necessary purchase orders/ work

awards/service order should be submitted.

Self-Attested copy of the Work Orders / Awards along with

satisfactory performance certificates issued by the officer not

below the rank of Executive Engineer / equivalent should be

uploaded.

(c) Certificates for satisfactory performance/bill certification

copy for the works mentioned under clause NIT 7 sub

clause (b) shall be submitted for at least two government

utilities. The certificate issuing authority shall not be below

the rank of the Executive Engineer/ Equivalent rank. It

should contain the details like Nature of work, work award

number and date.

Self-Attested copy of the satisfactory performance/bill

certificates issued by the officer not below the rank of Executive

Page 4: MANGALORE ELECTRICITY SUPPLY COMPANY …e) Specifications: Specification shall mean collectively all the terms & stipulations contained in those portions of the bid document & such

Page 3 of 63

Engineer / equivalent should be uploaded.

(d) The Bidder should have ISO 9001:2015 & ISO 27001

certificates related to Software Development / IT enabled

services.

Self-attested copies of the ISO certificates should be uploaded.

(e) The Bidder should have obtained SEI/CMMI level 3 or

above certification from the authorized institute at the

time of participation in the bid.

Self-attested copies of the SEI/CMMI level 3 or above

certificates should be uploaded.

(f) The Bidder should have annual turnover of at least

Rs. 10.00 Crores in any one of the previous three financial

years (for the year 2014-15, 15-16 & 16-17)

Self-attested copies of audited Balance sheet, P & L Statement

of the above financial years should be uploaded.

(g) The Bidder should have received the above mentioned

work awards directly from the Government power

distribution Utility or ESCOM and not through any

contractor, consortium or joint venture partner.

Self-attested copy of work awards should be uploaded.

(h) The Solvency certificate / Credit facilities to the extent of

minimum Rs. 2.50 Crores, sanctioned not earlier than 3

months from the date of submission of bid.

Self-attested copy of Solvency certificate / Credit facility should

be uploaded.

(i) The Bidder should not be under a Declaration of Ineligibility

for corrupt or fraudulent practices or blacklisted with any

of the Government / PSUs / Esteemed Organizations and

who‟s work order have been short closed due to non-

performance or who‟s LOA is withdrawn by the owner due

to inefficiency of the bidder in performing or implementing

assigned project in technically / financially / based on

such poor performance whose bids have been rejected

at the technical evaluation stage itself by any ESCOMs are

not eligible to participate in this bid.

Self-declaration by the authorized signatory of the bidder duly

notarized on Rs. 200/- Stamp Paper should be uploaded in

Annexure-VI.

(j) The bidder should have all applicable Registration

certificates viz., Company Registration certificates

including GST, PAN card, PF, ESI, Statutory License, Shops &

Commercial establishment, subsequent 3 years Income

Tax return filed etc.

Self-attested copies of the relevant documents should be

uploaded.

NIT 8.0 Bid Documents Bid documents in the following format will be available on the

Web site.

Instructions to Bidders & General Terms & Conditions of tender.

Page 5: MANGALORE ELECTRICITY SUPPLY COMPANY …e) Specifications: Specification shall mean collectively all the terms & stipulations contained in those portions of the bid document & such

Page 4 of 63

NIT 9.0 Calendar of Events

NIT 9.1 Date & Time of Pre-bid meeting Refer E-Procurement portal

NIT 9.2 Last Date & time for receipt of Bids through e-

Procurement portal only

Refer E-Procurement portal

NIT 9.3 Date & time of opening of Electronic Bid Sheets

(Techno – Commercial Bids)

Refer E-Procurement portal

NIT 9.4 Date of opening of Price bid Refer E-Procurement portal

Note:

i. The Bidder should upload documentary evidence in support of the qualifying requirements

stipulated as above. The required documents for fulfilling the above PQR‟s criteria shall be

scanned & uploaded.

ii. Even though the Bidders meet above qualifying criteria, as per their statements they are

subject to be disqualified if they have,

a) Made misleading or false representations in statements and attachments submitted as

proof of the qualification requirement and/or.

b) Record of poor performance such as poor quality of product, not properly completing

the contract, inordinate delays in supply completion, or financial failures etc.,

iii. The tender not submitted through e-procurement mode & also non-submission of EMD is

liable to be rejected.

iv. The offers shall be in general conformity with the specifications. Any Technical /

Commercial deviations from the specifications shall be clearly brought out in techno-

commercial sheet of the offer. If deviation certificate is left unfilled, it will be treated as

there are no deviations and the contractor has accepted the tender conditions and

specifications.

v. MESCOM reserves the right to cancel or withdraw or modify the bid without assigning any

reason for such decision. Such decision will not incur any liability whatsoever on the part of

MESCOM consequently.

vi. MESCOM will not be responsible for not getting internet connection while downloading

the Electronic Bid sheets/documents or while uploading their offers.

vii. If the successful bidder fails in executing the work within the stipulated / specified time

frame as per the LOI/LOA/PO/DWA, the firm will be terminated due to the breach of

contract conditions. Then MESCOM will forfeit the Performance Security and EMD amount.

viii. The Consortium & Joint Ventures or Trusts & Societies formed for the purpose of this project

are not eligible to bid in this project.

ix. The Sub-contract works executed if any, will not be considered for pre-qualification

criteria.

General Conditions:

1. All the hardware items to be provided by the Successful Bidder shall be brand new with

requisite licenses.

2. If the date of the opening of tender happens to be a holiday, the same will be opened on

the next working day.

Validity of the tender shall be 240 days from the date of opening of the tender. A bid, valid for

a shorter period shall be rejected by MESCOM as non-responsive.

3. The bidder shall quote for all items in the tender. Bids not covering the entire scope will be

treated as incomplete and are liable to be rejected in terms of the “Karnataka

Transparency in Public Procurement Act”. Vague offers are liable to be rejected without

any further correspondence.

Page 6: MANGALORE ELECTRICITY SUPPLY COMPANY …e) Specifications: Specification shall mean collectively all the terms & stipulations contained in those portions of the bid document & such

Page 5 of 63

4. The bidder shall upload all the required documents as required in Annexure VII – IX.

5. Price bid of only technically qualified bidders will be opened later.

6. The orders on Successful Bidders not adhering to delivery schedule is likely to be

transferred to the eligible lowest bidder who can comply with requirements of MESCOM.

7. MESCOM reserves the right to assess the Successful Bidders capability to perform the work

should the circumstances warrant such assessment in the overall interest of MESCOM.

The interested Bidders can log on to www.eproc.karnataka.gov.in & register their firms.

Page 7: MANGALORE ELECTRICITY SUPPLY COMPANY …e) Specifications: Specification shall mean collectively all the terms & stipulations contained in those portions of the bid document & such

Page 6 of 63

SECTION: 2

INSTRUCTION TO BIDDERS (ITB)

ITB 1.0 DEFINITION OF TERMS:

The terms and the words used in these general conditions & the annexed

specifications shall have the meaning as stated below:

a) Company: Mangalore Electricity Supply Company Limited.

b) Purchaser/Owner: Mangalore Electricity Supply Company Ltd., Mangalore /

Executive Engineer (Ele.) (IT), MESCOM Corporate Office, Mangalore.

c) Bidder shall mean the firm submitted the bid through e-procurement portal against an

enquiry.

d) Service Provider: shall mean the successful bidder whose bid has been accepted by

the Company & shall include his heirs, legal representatives, successors & permitted

assigns.

e) Specifications: Specification shall mean collectively all the terms & stipulations

contained in those portions of the bid document & such amendments, deletion,

additions, revisions as may be made in the agreement in regard to the method &

manner of supply of equipments & support to be furnished under this „contract‟.

f) Goods: shall mean the equipment / machinery / materials which Bidder is required to

supply under contract.

g) Inspection: shall mean the authorized representatives appointed by the Company for

the purpose of inspection of material/equipment/works.

h) Instruction: shall mean the direction, details & explanation issued by the Company

from time to time during the contract period.

i) Month: Month shall mean the calendar month & Day shall mean the calendar day.

j) Destination: Destination means F.O.R destination delivery at locations.

k) Writing: Writing shall include any manuscript typewritten, printed statement under or

over signature and seal as the case may be.

l) E.M.D: Earnest Money Deposit Means Bid Security.

ITB 2.0 GENERAL INFORMATION:

a) Mangalore Electricity Supply Company (MESCOM) is responsible for carrying out

distribution of Electricity Supply in Four Districts viz Dakshina Kannada, Udupi,

Shivamogga and Chickmaglur.

b) The Mangalore Electricity Supply Company Ltd., Mangalore represented by the

Executive Engineer (Ele.) (IT), MESCOM Corporate Office, Mangalore will receive the

bids from eligible firms for Design, Development, Supply of “Distribution Transformer

Management” Software & GIS Survey of DTCs for condition assessment, tracking etc, as

per the scope of proposal & technical specification as detailed in this bid document.

Bids shall be prepared & uploaded in accordance with instructions.

c) The prospective bidders should carefully go through the scope of work in tender

document and all other terms & conditions of the tender before quoting.

d) 64122 Nos. of different rated / capacities of Distribution Transformers in MESCOM. It is

very much needed to have efficient Transformer Management System for transformer

tracking, condition assessment, maintenance & smooth operation of the distribution

system under MESCOM jurisdictional area.

Page 8: MANGALORE ELECTRICITY SUPPLY COMPANY …e) Specifications: Specification shall mean collectively all the terms & stipulations contained in those portions of the bid document & such

Page 7 of 63

e) Details of distribution transformers centers of various capacity present in MESCOM is as

per Annexure I.

f) The total no. of distribution transformers (Field, Stores, repair centers, etc.,) will be more

than the number of Distribution Transformer Centers as detailed in Annexure 1.

ITB 3.0 QUALIFYING REQUIREMENTS:

The qualifying requirements are specified in Notification Inviting Tenders (NIT) including

note & general conditions.

ITB 4.0 E-PAYMENT MODES:

The Bidder should pay the Earnest Money Deposit (EMD) & Tender Fee in the e-

Procurement portal using any of the following payment modes:

a) Credit Card.

b) Direct Debit.

c) Over the Counter (OTC).

d) National Electronic Fund Transfer (NEFT).

Note:

a) In e-Procurement Portal, Bidder has the option of withdrawing the Bid by digitally

signing to withdraw/cancel bid before the bid submission time/date.

b) Earnest Money Deposit paid by the unsuccessful Bidders will be returned as soon

as possible after the tender has been finalized.

c) Earnest Money Deposit of the Successful Bidder will be refunded after fulfillment

of the Security Deposit / Performance Guarantee Clause.

d) The deposit towards EMD shall not carry any interest.

e) Permanent EMD will not be considered.

ITB 5.0 TWO PART TENDER:

a) The tender shall be submitted through e-tendering mode only, tender should be

in two parts namely Part-I: Techno-Commercial Bid & Part-II: Price Bid.

b) The eligible bidders should carefully go through the scope of works and all other

terms & conditions of the tender before quoting.

c) The Technical documents are to be uploaded in e-Procurement Portal.

ITB 5.1 Information Required With Technical Proposal:

The documentary evidence in respect of qualifying requirements as specified in

Notification Inviting Tenders (NIT) shall be uploaded in the form Electronic / Scanned copies

in e-Procurement Portal by the participated bidders.

Note: Non-submission of required documents in e-procurement portal will lead to

disqualification.

ITB 5.2 Part II: Price Proposals

The Bidder shall upload Unit computed FORD price on e-procurement portal in “item

wise bid commercial offers” Option as per the format furnished in the bid document on e-

procurement portal.

ITB 6.0 PRE-BID MEETING:

a) A pre-bid meeting will be held as notified in bid notification & all the bidders who have

downloaded the bid documents could attend the pre-bid meeting.

b) The purpose of the pre-bid meeting is to clarify the Commercial & Technical Conditions

Page 9: MANGALORE ELECTRICITY SUPPLY COMPANY …e) Specifications: Specification shall mean collectively all the terms & stipulations contained in those portions of the bid document & such

Page 8 of 63

of the bid document, if any.

c) The clarification as sought by the bidders through e-procurement portal & the

clarification issued by MESCOM will be published in e-procurement portal & it shall form

a part of the bid document.

d) The clarification or questions raised in the pre-bid meeting & the answer or clarification

issued by MESCOM shall also be included in the pre-bid meeting recordings that form a

part of bid document.

ITB 7.0 CLARIFICATIONS ON BID DOCUMENTS:

a) Prospective bidders requiring any further information or clarification on the bidding

documents may notify in writing to MESCOM as per calendar of events of the tender.

b) MESCOM will respond to any request for information or clarification on the bidding

documents.

c) MESCOM response / clarification will be posted in e-procurement portal. These

responses / clarifications furnished by MESCOM will form a part of bidding document.

d) Verbal clarification & information given by owner or his employee(s) or his

representative(s) shall not in any way be binding on owner.

ITB 8.0 AMENDMENT TO BIDDING DOCUMENT:

At any time prior to the dead line for submission of bids, MESCOM may, for any reason,

whether on its own initiative, or in response to a clarification requested by the prospective

bidders, modify the bidding document by an amendment which will be notified in e-

procurement portal & this amendment will be binding on them.

ITB 9.0 SUBMISSION OF BIDS:

a) All the Tender Documents shall be uploaded through e-Procurement Portal on or

before last date of bid submission as mentioned in e-Procurement Portal.

b) The Techno-commercial bids will be opened on the date mentioned in the

e-Procurement Portal. Date of opening of Price Bids will be at a later date.

ITB 10.0 SIGNATURE OF BIDS:

a) The Bid must contain the name, designation & place of business of the person or

persons submitting the bid and must be signed.

b) Bids by a Company / Firms shall be signed by the authorized persons of the bidding

business entity indicating their proper legal name.

c) The Bidder‟s name stated in the proposal shall be the exact legal name of the firm.

d) Erasures or other changes in the bid shall be initialed by the person signing the bid.

e) Bids not conforming to the above requirements are liable to be rejected.

ITB 11.0 EARNEST MONEY DEPOSIT:

The Bidders shall pay EMD for an amount of Rs. 5,00,000/- through any of the four online

modes in e-Procurement portal before the last date of bid submission.

a) Bids not accompanied by the requisite EMD shall be summarily rejected.

b) If the bidder withdraws his bid before the expiry of the bid validity period prescribed in

the bid then EMD will be forfeited as liquidated damages.

c) The EMD furnished by unsuccessful bidders will be returned, only after the award of

contract & entering into agreement with the successful bidder.

d) For the successful bidder, the EMD will be returned, only after entering into contract

with MESCOM as per the agreement format enclosed.

e) No interest is payable to the bidders for the Earnest Money Deposit amount.

Page 10: MANGALORE ELECTRICITY SUPPLY COMPANY …e) Specifications: Specification shall mean collectively all the terms & stipulations contained in those portions of the bid document & such

Page 9 of 63

ITB 11.1 The E.M.D / Bid Guarantee May Be Forfeited:

i. In case of Successful Bidder, fails to sign the Contract; or

ii. In case of Successful Bidder, fails to furnish the Performance Guarantee / Security

Deposit.

ITB 12.0 INFORMATION REQUIRED WITH THE BID:

a) Any bid not containing sufficient descriptive material to describe accurately the

equipment, shall be treated as incomplete & is liable to be rejected as per terms of

Karnataka Transparency in Public Procurement (KTPP) Act. Such descriptive material &

drawings submitted by the Bidder shall be retained by MESCOM.

b) The departure from the specifications is not normally acceptable unless it is found

advantageous to MESCOM.

c) Oral statements made by the bidder or his representatives at any time regarding the

quality, quantity of equipment or any other matter shall not be considered.

d) Standard catalogue pages & other documents of the bidder may be used in the bid to

provide additional information & data as deemed necessary by the bidder.

ITB 13.0 BID OPENING:

a) Technical bid will be opened first in the presence of bidders who choose to be present

at the time of bid opening at the date, time & the address as indicated in the notice

inviting bids / brief bid notification.

b) Documents furnished will be scrutinized to determine the bidders meeting the

qualification criteria. The price bid of only those Bidders who are qualified as per

qualification criteria stipulated in the NIT, would be opened.

c) If the bid opening day turns out to be a holiday for some reason, then the bids will be

opened on the following working day at the same time & location.

d) The Bidders name, technical offers made, presence / absence of EMD & other details

as MESCOM or Bidder may consider appropriate will be read out during opening of

technical bid and prices of main & alternative Bids (if any), discount offered if any will

be read out during opening of price bid.

e) MESCOM reserves the right to request for additional information & also reserves the right

to reject the proposal of any bidders, if the qualification & other data are incomplete.

f) No electronic recording devices will be permitted during bid opening.

ITB 14.0 PRELIMINARY EXAMINATION:

a) Owner will examine the bids to determine whether they are complete, whether any

computational errors have been made, whether required sureties / documents have

been furnished, whether the documents have been properly signed, & whether the

bids are generally in order.

b) Owner may waive any minor informality or non-conformity or irregularity in a bid which

does not constitute a material deviation, provided such waiver does not prejudice or

affect the relative ranking of any Bidder.

c) Prior to the detailed evaluation, MESCOM will determine the substantial responsiveness

of each bid to the bidding documents.

d) The substantial responsiveness will be in terms of the Karnataka Transparency in Public

Procurement (KTPP) Act & incomplete bids are liable to be rejected.

e) The tenders will be evaluated based on the price bids only without considering the

commercial deviations taken by different bidders.

f) If the lowest bidder does not agree to withdraw the deviations, MESCOM reserves the

right to negotiate with the next lowest bidder.

Page 11: MANGALORE ELECTRICITY SUPPLY COMPANY …e) Specifications: Specification shall mean collectively all the terms & stipulations contained in those portions of the bid document & such

Page 10 of 63

g) Bidders shall have no claim for consideration on the ground that notwithstanding their

higher price; they are fully compliant with commercial conditions.

ITB 15.0 POLICY FOR BIDS UNDER CONSIDERATION:

a) Bids shall be deemed to be under consideration immediately after they are opened &

until such time official intimation of award / rejection is made by MESCOM to the

Bidders.

b) While the Bids are under consideration, Bidders and/or their representatives or other

interested parties are advised to refrain from contacting by any means, MESCOM

and/or its employees on matters related to the bids under consideration.

c) MESCOM, if necessary will obtain clarifications on the bids by requesting such

information from any or all the bidders as may be necessary.

d) The Bidder shall not be permitted to change the substance of the bid after the bid has

been opened.

ITB 16.0 COST OF BIDDING:

The Bidder shall bear all costs & expenses associated with preparation & submission of

its bid including post-bid discussions, technical & other presentations etc. MESCOM will in no

case be responsible or liable for those costs, regardless of the conduct or outcome of the

bidding process.

ITB 17.0 MODIFICATION & WITHDRAWAL OF BIDS:

a) The Bidder may modify or withdraw its bid after the bid‟s submission provided that

written notice of the modification or withdrawal is received by owner prior to the

deadline prescribed for submission of bids.

b) No bid may be modified subsequent to the deadline for submission of bids.

ITB 18.0 LANGUAGE OF THE BID:

The bid prepared by the bidder & all correspondence / documents relating to the bid

exchanged by the bidder shall be in the English language. Failure to comply with this will

disqualify the bid.

ITB 19.0 CONTENT OF BIDDING DOCUMENTS:

a) The details of materials & services required, bidding procedures & contract terms are

prescribed in the bidding documents.

b) Any amendment, errata or addendum issued by the Owner/purchaser prior to bid

opening shall constitute integral part of the bid.

ITB 20.0 UNDERSTANDING OF BID DOCUMENTS:

a) A prospective Bidder is expected to examine all instructions, forms, terms &

specifications in the Bid documents and fully inform himself as to all the conditions &

matters which may in any way affect the scope of work or the cost thereof.

b) Failure to upload all information required by the Bid document or submission of a Bid

not substantially responsive to the Bid document in every respect will be at the Bidder‟s

risk & may result in the rejection of its bid as per the terms of the Karnataka

Transparency in Public Procurement (KTPP) Act.

ITB 21.0 DOCUMENTS COMPRISING THE BID:

a) The Bidder shall complete the bid form inclusive of Price Schedules, Technical Data

Requirements etc., uploaded in the Bidding Documents as detailed above, indicating

the services to be rendered, a brief description of items, services, quantity & prices.

Page 12: MANGALORE ELECTRICITY SUPPLY COMPANY …e) Specifications: Specification shall mean collectively all the terms & stipulations contained in those portions of the bid document & such

Page 11 of 63

b) The Bidder shall also upload documentary evidence in e-Procurement Portal to

establish that the Bidder meets the Qualification Requirements as detailed above &

accompanying Special Conditions of Contract if any.

c) The EMD shall be uploaded / furnished in accordance with the EMD Clause.

ITB 22.0 BID PRICES:

a) Rates quoted shall be valid for at least 240 days from the date of opening of Techno-

Commercial bid of the tenders; otherwise, the offer is liable to be rejected.

b) The final acceptance of the tender will rest with the Owner / Purchaser who does not

bind himself to accept the lowest or any tender, without assigning any reason thereof.

c) The Owner / Purchaser reserves the rights to increase or decrease the total quantities of

items (up to 25%) in DTC or DTR without any change in unit prices or other terms &

conditions of contract.

ITB 23.0 EVALUATION / COMPARISON OF PRICE BIDS:

a) After opening the price bids, price evaluation will be done.

b) The price comparison shall be with the base rates & any discounts offered by the

Bidder.

c) However, while quoting the prices the bidder shall include all the statutory levies &

order will be placed on the lowest bidder.

ITB 24.0 TAXES & DUTIES:

The Bidders have to quote all applicable taxes including GST prevailing as on the date

of bid opening & the same shall be clearly spelt out in the offer. If no mention is made, then

the prices quoted will be evaluated as inclusive of all taxes in the event of an order.

a) Taxes & duties will be paid as indicated by the bidder in the Price Bid.

b) If there is any concession / reduction in any statutory taxes by the change in policy of

the Central Government or State Government the same shall be availed & passed on

to MESCOM.

c) If there is any enhancement / new in the statutory taxes due to change in policies by

the Central / State Government then such enhanced taxes will be payable by

MESCOM.

ITB 25.0 NEGOTIATIONS:

It is absolutely essential for the bidders to quote the price at the time of making the

offer in their own interest. MESCOM reserves the right to negotiate the prices with the lowest

quoting bidder, whose offer is found to be fully technically compliant.

ITB 26.0 FURNISHING LETTER OF ACCEPTANCE:

The Successful Bidder shall furnish letter of acceptance within 15 days from the date of

LOI.

ITB 27.0 EXECUTION OF CONTRACT AGREEMENT:

The Successful Bidder shall execute an agreement on a Rs. 200/- stamp paper with the

Executive Engineer (Ele.) (IT), MESCOM within 30 days from the date of LOI.

ITB 28.0 FURNISHING PERFORMANCE SECURITY DEPOSIT:

The Successful Bidder shall furnish the performance security in the form of Bank

Guarantee from a Nationalized Bank/ scheduled commercial Bank for an amount equal to

10% of the contract value valid for 42 months within 30 days from the date of LOI. No interest

is payable on the contract performance guarantee.

Page 13: MANGALORE ELECTRICITY SUPPLY COMPANY …e) Specifications: Specification shall mean collectively all the terms & stipulations contained in those portions of the bid document & such

Page 12 of 63

ITB 29.0 VALIDITY OF BIDS:

The bids shall be kept valid for a period of 240 days from the date of opening the bids

Techno-Commercial bid. MESCOM may seek extension of validity period of the bid & validity

period of B.G furnished towards EMD from the bidders for the completion of the evaluation, if

it is not completed within the initial validity period of the bid.

Page 14: MANGALORE ELECTRICITY SUPPLY COMPANY …e) Specifications: Specification shall mean collectively all the terms & stipulations contained in those portions of the bid document & such

Page 13 of 63

SECTION: 3

SCOPE OF WORK (SW)

SW 1.0 NAME OF THE WORK:

Design, Development, Supply of “Distribution Transformer Management” Software & GIS

Survey of DTCs for condition assessment, tracking etc., to MESCOM.

SW 2.0 INTRODUCTION:

Distribution Transformers represent one of the key elements in the Electricity Network &

can become strategic bottleneck in the power distribution process. Distribution Transformers

Management Software (DTMS) brings all the elements of the DTCs & their assessments into

the system for achieving failure free operation & life-time extension of the assets. DTMS

involves GIS based mapping of all assets with the images taken for conditional assessments

resulting in achieving goals of distribution system & way forward to Online Distribution

Transformer Monitoring. DTMS shall have vital role in Distribution Transformers Life Cycle

Management System as scope of the project.

MESCOM wishes to introduce the best-practiced processes & techniques in Distribution

Transformer Management for its Electrical assets. For improving the maintenance & tracking

of Distribution transformers, MESCOM wishes to use a Web enabled centralized solution with

security features. The new technology and practices in the area of TRANSFORMER

MANAGEMENT SYSTEM should enable the MESCOM to achieve the objectives of operation

efficiency, tracking of transformers with GIS, conditional assessment of the Distribution

transformer center, maintenances of DTCs & updation of DTRs and DTC‟s in work flow

automation in respect of O & M functions.

The project will be implemented & operated through MESCOM‟s Data Centre Only. The

Distribution Transformer Management software should be a centralized web based solution

accessible from all the Offices of the MESCOM on existing network.

Currently no IT solution is present in MESCOM to manage distribution transformers. The

proposed DTMS solution will be used to bring the DTC assets & their conditional assessments

into the online system. DTC Code & DTR Codes are assigned; images are captured & GIS

Survey is done to locate the assets. Conditional assessment of all DTC equipment/accessories

is done during GIS Survey.

The intention of the system is to increase the life-cycle of transformers, decrease the

failure rate of transformers, conditional monitoring of DTCs, maintenance scheduler,

accounting of DTCs & DTRs etc. Requirement specifications/statements in this document are

both functional & non-functional.

SW 3.0 PROJECT SCOPE:

a) The Service Provider should comply the MESCOM requirements & furnish the details as

specified in bid document.

b) The Successful Bidder shall mandatorily give training to specified MESCOM Officials as

specified in bid document & MESCOM requirements.

c) The Successful Bidder should upload the PERT chart for entire project implementation

covering all the aspects of the project.

d) On-site guarantee on Design, Development, Supply of “Distribution Transformer

Page 15: MANGALORE ELECTRICITY SUPPLY COMPANY …e) Specifications: Specification shall mean collectively all the terms & stipulations contained in those portions of the bid document & such

Page 14 of 63

Management” Software & GIS Survey of DTCs for condition assessment, tracking etc,

including maintenance for a period of Three years from the date of DWA.

e) Periodical maintenance of Distribution Transformer Management System including

Servers, Software‟s, Licenses etc., from the date of satisfactory installation &

commissioning during the contract period.

f) The Service Provider shall furnish the description & make / model of materials /

components, all the supporting documents as desired such as technical / product

brochures, manuals, designs, data sheets, standard catalogues, drawings, working

functionalities of equipment‟s offered for Design, Development, Supply of “Distribution

Transformer Management” Software & GIS Survey of DTCs for condition assessment,

tracking etc.

g) The Service Provider shall make necessary freight charges, insurance & safety of

equipments till successful installation & commissioning of Design, Development, Supply

of “Distribution Transformer Management” Software & GIS Survey of DTCs for condition

assessment, tracking etc.,

h) The Service Provider shall bear all the integration charges required for the entire

project.

SW 3.1 Note:

i. No deviation whatsoever either in full or in part to the conditions as specified in the

bidding documents is permitted and the bidders are advised that while quoting prices,

these conditions may appropriately be taken into consideration. If “no deviation

certificate” is left unfilled, it will be treated as there are no deviations & the contractor

has accepted the tender conditions & specifications.

ii. Bids not covering requirements of the total scope of work may be treated as

incomplete & hence such bids will be rejected.

SW 4.0 SYSTEM ENVIRONMENT:

The Transformer Management Software shall be capable of handling any no. of

concurrent users by logging into the application. Approximate no. of active users is about

DTR

Database

DTC

Database

Distribution Transformer Management System

Existing

MESCOM

ERP

Solutions

Integration with

other Solutions

GIS platform

SERVERs

Dynamic GUI Web page

Middleware

Security

Dash Boards, MIS, Analytics etc,

Page 16: MANGALORE ELECTRICITY SUPPLY COMPANY …e) Specifications: Specification shall mean collectively all the terms & stipulations contained in those portions of the bid document & such

Page 15 of 63

500 active users. The application software should not have the constraint in respect of the

additional concurrent users if added. The users will be logged through the existing ERP system

with organization hierarchy. The integration with the ERP shall be made with a single sign in &

integration with other IT software‟s by the Service Provider as per requirement of MESCOM.

The distribution network mapping hierarchy consisting of MUSS, Feeders & Transformer

Centre‟s shall be created in consultation with MESCOM. Field survey of all the existing DTC‟s &

MESCOM offices is to be carried out and plotted on the GIS platform which is universal & shall

be capable of migration & adopting the data with R-APDRP, IPDS, K-GIS applications etc.

Field Survey includes capturing GIS attributes, multiple images of DTC‟s & do the conditional

assessment of the DTC‟s equipment‟s. The users of MESCOM shall be provided with an option

to upload the thermal images of DTCs. The system should have the provision of storing the

details of Transformers. The painting of the DTC code on the transformer structure is to be

carried out.

The unique codes generated in the system will be embedded on DTRs & painted on

DTCs.

SW 5.0 ROLL OUT PLAN:

The contract period of the work will be for 12 months + 2 year for Maintenance &

Support. The Successful Bidder shall carry out the following activities.

The indicative Roll out plan for DTMS Solution is provided below;

Pilot run at One Division having One Urban & One Rural Sub-Division (Phase -1).

Go-Live Implementation in all the remaining areas of MESCOM (Phase-2)

Maintenance and Support (Phase-3)

Implementation will be staggered into the following activities:

Sl. No Activity Timeline from issue of DWA

SW 5.1

Requirement Gathering & Creation of

Database of DTR’s in Pilot Divisional Store &

repair Centre.

1st Week

SW 5.2 Requirement Gathering & Creation of

Database of DTC’s Pilot SDOs. 1st Week

SW 5.3

Generation & embedding the DTR’s Unique ID

on Distribution Transformers of Divisional Store &

repair Centre

1+3 Weeks

SW 5.4 Submission of Software Requirement

Specification (SRS) 4 Weeks

SW 5.5 SRS vetting by MESCOM after submission by the

Service Provider 4 + 4 Weeks

SW 5.6 Delivery of UAT for Web application & Mobile

Application

8 + 3 Weeks from the date of SRS

Sign-off

SW 5.7 Delivery of Hardware & related software and

deployment in MESCOM Data Centre.

11 + 2 Weeks from the date of UAT

Sign-off

SW 5.8

Painting of the unique DTC code, Generation &

embedding the DTR’s Unique ID on Distribution

Transformers on DTC’s along with GIS Survey &

conditional assessment along with Validation

in Pilot SDO.

13 + 4 Weeks from the date of

Delivery of Hardware & Software

SW 5.9 Deployment & Training before pilot run 17 + 1 Weeks from the date of

Survey Validation Sign-off

Page 17: MANGALORE ELECTRICITY SUPPLY COMPANY …e) Specifications: Specification shall mean collectively all the terms & stipulations contained in those portions of the bid document & such

Page 16 of 63

SW 5.10 Pilot Run

4 weeks (1 month) for pilot run

from the date of pilot run

deployment completion including

compliance of Audit observations

SW 5.11 Roll out in rest of MESCOM ( Go-Live

declaration by MESCOM)

30 Weeks from pilot Sign-off (Total

52 weeks from the date of the

DWA)

SW 5.12 Operation, Maintenance, Support & Exit

Management

2 years from the date of Go-live

declaration by MESCOM

The Service Provider is required to provide onsite support till implementation of full

project. Roll out scheduled is indicative only. The work completed will be acceptable to

MESCOM.

SW5.1 Requirement Gathering & Creation of Database Of DTR’s In Pilot Divisional

Store & Repair Centre:

The Service Provider shall provide the data model & schema for creation of Database

to MESCOM for approval. On selection of the data structure, the available data is to be

migrated to database from existing ERP, WAMS, Divisional Stores & Repair Centers. The Store

Officer of the concerned O & M Division, MESCOM shall validate the data & will be handed

over to the Service Provider for creation of the database. Data to be migrated / integrated

shall be cleansed, rationalized, transformed & reconciled. The available data of the

transformer in the database shall be migrated at the first instance. The remaining data shall

be updated into the database after field survey.

The data model of the DTR database should have all the parameters indicated below

& the same shall be incorporated in the software. Provision should be made to add

additional parameters if any:

Name of manufacturer

Serial Number

Year of Manufacturer

Procured through PO/PTK or any related details

Supply date

Repair date

Invoice date

Guarantee period

Number of Phases

kVA or MVA rating

Frequency

Voltage rating

Tap voltages

Connection diagram

Cooling class

Rated temperature in Celsius

Polarity (For single phase Transformers)

Phasor or vector diagram (For Poly phase or Three Phase

Transformers)

% impedance

Approximate mass or weight of the transformer

Type of insulating liquid

Conductor material of each winding

Page 18: MANGALORE ELECTRICITY SUPPLY COMPANY …e) Specifications: Specification shall mean collectively all the terms & stipulations contained in those portions of the bid document & such

Page 17 of 63

Oil volume (of each transformer Container/Compartment)

Instruction for Installation & Operation

Bushings

Arching horns

Breather

Explosion vent diaphragm

Name Plate Details

Any other parameters required by MESCOM.

The unique code shall be generated in the system which will be Distribution Transformer

code (DTR Code) – the logic for generating the code shall be finalized in consultation with

MESCOM.

SW 5.2 Requirement Gathering & Creation of Database of DTC’s In Pilot SDOs:

The Service Provider shall provide the data model & schema for creation of Database

to MESCOM for approval. On selection of the data structure, the available data is to be

migrated to database from existing ERP, WAMS / GIS & Section Officer. The Validation of the

data is to be verified by Section officer & Assistant Executive Engineer of Sub-Divisional Office

(SDO). The finalized data shall be migrated into the Database.

The data model of the DTC database should have all the parameters indicated below

& the same shall be incorporated in the software. Provision should be made to add

additional parameters if any:

Source Substation name

Source Feeder name

Type of Feeder

Name of Zone, Circle, Division, Subdivision, Section & Lineman

Legacy DTC code

Asset ID if any

Longitude & Latitude

Photos (1 photo of DTR code & 1 photo of DTC code mandatory)

Commission date

Last Failure date

Accidents occurred if any with details of accident

Type of Structure / Support

Insulator & fitting conditions like Broken / chipped, Tilted insulators, Excessive

deposits of dust, coal etc, Excessive rusting.

Scheduled inspection date & time by Section Officer (SO)

Off-Scheduled inspection date & time by SO

Special inspection date & time by Section Officer (SO)/Assistant Executive

Engineer (AEE)

Night inspection date & time by SO/AEE

Emergency Inspections date & time by SO/AEE

Fallow-up Inspection date & time by SO/AEE

Check Inspection date & time by SO/AEE

Fuses (High Tension (HT) / Low Tension (LT))

Earthing

Danger plate & Anti Climbing Device

LT switch / LT protection Kit

Lightning arrestors

Page 19: MANGALORE ELECTRICITY SUPPLY COMPANY …e) Specifications: Specification shall mean collectively all the terms & stipulations contained in those portions of the bid document & such

Page 18 of 63

Group Operating Switches (GOS)

Connections

Stays

Cross-Arms

Jumpers & line accessories

Tree trimming

Auxiliary Fuses

Paint & Danger plate

MCB

Meter details

Modem Details

Current Transfomer (CTs) & Potential Transformer (PTs).

Metering Box

Mechanisms

Number of circuits

Load on each phase

Number of Street lights

Category wise number of LT customers

First RR number connected to the DTC

Condition of DTC location

Any other parameters are required by MESCOM

The unique code shall be generated in the system which will be Distribution Transformer

Centre code (DTC Code) - the logic for generating the code shall be finalized in consultation

with MESCOM.

SW 5.3 Embedding the DTR’s Unique Id on Distribution Transformers of Pilot Divisional

Store & Repair Centre:

Sample of the Stainless Steel name plate with unique ID for MESCOM shall be submitted

for approval. The size of the Stainless Steel name plates shall be 5 Inch (L) x 2 Inch (W) x 1

MM (T). The unique ID along with the name MESCOM has to be engraved & painted with

black enamel paint on the name plate.

The size of the word MESCOM & the unique ID shall be 10 MM (H) x 8 MM (W). The

number plate shall be welded on all the existing DTRs in MESCOM at field, Repair center‟s &

also in Divisional Stores / Transformer Bank.

The design for SS plates to be welded is given below:

The name plate shall be welded on the all transformers supplied to Stores before issuing

to the field. The name plate shall be also be welded on the transformers installed / energized

under various schemes viz DCW, SEW, IPDS, PTK, TTK etc., by the Service Provider during the

contract period.

No transformers shall be issued without name plate by the respective Store Officers.

MESCOM

KA012345678910

Page 20: MANGALORE ELECTRICITY SUPPLY COMPANY …e) Specifications: Specification shall mean collectively all the terms & stipulations contained in those portions of the bid document & such

Page 19 of 63

The following point‟s needs to be taken care for developing Unique ID of DT‟s on

Stainless Steel (SS) plate:

a) All the Transformer IDs & location IDs generated should be Unique.

b) The Transformer Code punched on Unique ID SS plate should be consistent & the letters

should clearly visible.

c) The black enamelled paint used on punched letters of Unique ID SS plate should be

weather proof (considering field situations).

d) Adequate care should be taken for fixing of Unique ID SS plate & any damage, defect

or failure arising on Transformer (DTRs) due to fixing will be sole responsibility of the

Service Provider & all the cost for its repair or/and replacement will be borne by the

Service Provider.

e) All cost related to manufacturing, designing, installation, distribution, fixing,

transportation & cost of experienced welder, equipments etc., will be borne by the

Service Provider.

f) Prefix & Nos. specified above are variable & the DTs generated Unique ID to be

punched on the basis of Transformer details fed as input. The logic for deriving DTRs

Unique ID is tentative & the Service Provider has to finalize/take formal approval

regarding the same before its implementation.

g) The Service Provider shall ensure the Serial Number of the Distribution transformers with

make along with name plate details. In case if NNP transformer is available for repair,

the Store Officer of the respective O & M Division, MESCOM shall make arrangement to

issue serial number of the distribution transformer with make to the Service Provider.

SW 5.4 Software Requirement Specification (SRS) Submission:

Software Requirement Specification (SRS) document shall contains the software Service

Provider understands the MESCOM‟s software requirements and it is a deliverable by the

Service Provider. This document ensures that Service Provider & MESCOM are in agreement

as to the features required in the software system being built. SRS is created after the initial

requirement elicitation phase in which Service Provider / Implementation Agency interacts

with the MESCOM to understand the software needs. An SRS is written in precise, clear &

plain language so that it can be reviewed by a MESCOM with minimal technical expertise.

However, it also contains analytical models (use case diagrams, entity relationship diagrams,

data dictionary etc.) which can be used for the detailed design & the development of the

software system for DTMS. SRS document is used by the MESCOM to determine whether the

Service Provider have provided all the features in the delivered software system. SRS should

precisely define project scope; it ensures that MESCOM expectations don‟t change during

software development. SRS document should comply Standard of IEEE 830.

SRS shall be provided for both Web application & Mobile application. Software

Requirement Specification (SRS) shall contain project scope section, functional & operational

requirements (ER diagrams, use cases, etc), requirement analysis models, data dictionary,

Entity Relationship diagrams, external interface requirements & non-functional requirements.

SW 5.5 SRS Vetting by MESCOM:

IT team along with selected officers of MESCOM will go through an in-depth vetting

process to assure state-of-the-art technology in DTMS solution. The requirements of MESCOM

shall be complied. Service provider shall explain the process & shall get the SRS sign-off.

MESCOM has right to change the requirement as & when needed & service provider shall

comply the same.

Page 21: MANGALORE ELECTRICITY SUPPLY COMPANY …e) Specifications: Specification shall mean collectively all the terms & stipulations contained in those portions of the bid document & such

Page 20 of 63

SW 5.6 Delivery of UAT for Web Application & Mobile Application:

The Web application & Mobile application is to be developed as per Software

Requirements Specification (SRS) document. The Service Provider shall be responsible for

interfacing the proposed solution with the existing ERP & migration of data from the existing

legacy systems to the new proposed system. The Service Provider is expected to propose

only one module which shall be integrated with existing ERP application solution. The

Distribution Transformer Management Software (DTMS) application should integrate with the

existing MESCOM IT Solutions like ERP, TRM, R-APDRP, MESCOM Website, HT/LT application &

any other developed / changed solutions related to DTCs & DTRs. Functional, Technical &

Other requirements should be as per SRS document. User Acceptance Test (UAT) shall be

delivered on the Test Server environment at the Service Provider‟s cost. UAT will be witnessed

by the dedicated committee from MESCOM for sign-off. Any changes if felt necessary during

implementation shall be accommodated by the Service Provider at no extra cost during the

contract period. The DTMS should give solution for tracking of transformers from the date of

procurement up to the scrap disposal.

On UAT sign-off the Service Provider has to handover the latest version of the DTMS

software to MESCOM along with the following deliverables:

Documentation on Architecture, SRS document, Design Logic, Security & Program

Development.

Software Package with system document after customization.

Production Hardware, Operating System Software, RDBMS (installation &

commissioning), Licenses & other suite with related documents.

User & Quick reference manuals.

Operator Reference manuals for each operator task.

Error messages manuals.

Documentation on troubleshooting.

File / Table structures, Schemas, Indexes & Relations.

On-line tutorials & help documentation.

Data Dictionary.

Test Cases for User Acceptance Test (UAT), Detailed acceptance testing plan.

Testing Reports

Security Audit Reports

Detailed Backup & archival Policy

Escalation matrix/Escalation Mechanism.

Training to end users on the application software, DBA, System Admins, Server

configuration, RDBMS configuration etc. Training Plan, Training Manuals & literature

User Administration Manuals (For System Administrators) in English & Operational

Manual for User in English.

All copies should be delivered in hard & soft media.

Exit Management Plan.

Document containing detailed requirement captured & analysis including

functional requirement, Interface Specifications, application security requirements &

process workflows.

High Level Software Design document including Software Architecture design,

Logical and Physical Database Design, source code, administrative passwords, Test

Plans & Test cases at overall level etc.

Page 22: MANGALORE ELECTRICITY SUPPLY COMPANY …e) Specifications: Specification shall mean collectively all the terms & stipulations contained in those portions of the bid document & such

Page 21 of 63

Detailed Project Plan, with week-wise activities, including, but not limited to,

detailed timelines for customization & acceptance testing of the modules,

submission of deliverables etc.

Monthly Reports during operations period (These reports must include the details of

the maintenance activities especially backup, modifications in the software, release

of new versions (if any), Analysis of the incident / call statistics in that particular

month. Also, the SLA compliance matrix for the respective month shall be present in

this report).

Any other requirement of MESCOM related to DTMS project.

SW 5.7 Delivery of Hardware & Related Software:

The Service Provider should provide the server & install, configure, commission the

proposed hardware before implementation in pilot offices. The Software developed shall be

hosted in the Servers supplied & installed at Data Center of MESCOM. The Service Provider

will be responsible for installing & commissioning of complete hardware, Operating System

(OS) software, Database Software, Server Antivirus Software, Application Software & its

licenses etc. shall be procured in the name of MESCOM & handed over to designated

MESCOM official during the implementation phase itself.

The software licenses procured shall be genuine, perpetual, full use & should provide

patches, fixes, security updates directly from the OEM at no additional cost to MESCOM for

the entire period of contract.

The Service Provider shall provide the entire details of the software are being used in

the project. The open source software if used shall not have any limitations & shall ensure

100% support on the software.

The following infrastructure available at MESCOM Data Centre, Mangalore shall be

utilized for the DTMS project. The Service Provider shall design the software & hardware

accessories according to the infrastructure which is already available with MESCOM:

a) Smart Cabinet storage space for installing required Servers.

b) Firewall Gateway device along with required configuration.

c) Internet connectivity for software updates & configuration purpose.

d) On-line UPS connectivity to the Servers.

The service provider shall deliver the tabs to concerned divisional stores for the use of

MESCOM officers only. The SP should not use these equipment‟s for executive the work in

contract period.

SW 5.8 Painting Of The Unique DTC Code, Generation & Embedding The DTR’s Unique

ID On Distribution Transformers On DTC’s Along With GIS Survey & Conditional

Assessment Along With Validation In Pilot SDO:

DTMS shall generate the unique DTC codes for Distribution Transformer Centre (DTC) as

detailed in Para 5.2. The illustrative design to be painted on DTC (structure) is given below:

MESCOM 012345678910

DTMS

Page 23: MANGALORE ELECTRICITY SUPPLY COMPANY …e) Specifications: Specification shall mean collectively all the terms & stipulations contained in those portions of the bid document & such

Page 22 of 63

The Service Provider has to carry out the field survey of all the DTC‟s & offices and plot

them on the GIS platform which is universal & shall be capable of migration & adopting the

data with R-APDRP, IPDS, K-GIS applications etc.

The following activities are to be carried out by the Service Provider during the Field

survey:

Paint the Unique DTC Codes on the DTC‟s Structure with stencils to maintain

uniformity (letter/Number size 5 cm painted on yellow background with black letters

& DTMS on right bottom with blue colour size 2 cm)

The DTC Codes painted on the DTC structure should be consistent & the letters

should be clearly visible.

Weld the SS plate containing the DTR Code on the distribution Transformer. The

location code/DTCs code existing in the structure or assigned code in R-APDRP

shall be integrated to DTMS Software.

Care should be taken that old numbers existing on the structure should not be

erased or altered & should be visible.

Adequate care should be taken while painting in DTC structure by taking safety

measures. The Service Provider will be wholly responsible for any untoward incidents

/ accidents occur while carrying out the work.

All cost related to painting of DTCs & fixing SS plate, transportation, cost of painter

etc., will be borne by the Service Provider.

The IS standard materials shall be used wherever applicable.

Capture all the required data mentioned in SRS document for the DTMS application

through the Mobile app loaded in the tab.

Capture multiple images of DTC‟s & do a conditional assessment of the Distribution

Transformer & all the equipment‟s of DTC structure.

The Mobile application should work offline while on survey & data should be pushed

to Central Server system when the equipment is online.

Geo-location is captured & uploaded automatically.

Thermal image of DTC will be captured by MESCOM staff & provision shall be made

to upload to system.

LT Rating team of MESCOM will co-ordinate to update the rating details of Meters &

modem communication.

MESCOM authorities are empowered to inspect the work being carried out by the

Service Provider round the clock.

SW 5.9 Deployment & Training Before Pilot Run:

The data migration from the existing applications of MESCOM, the data captured

during the field survey & through the template shall be complete in all respect before

implementation of the pilot. Any updation to the database shall be done through the front

end UI once the application is made in pilot run.

The pilot locations & users shall be finalized in consultation with MESCOM. Any errors &

bugs reported during pilot implementation shall be suitably fixed as per the SLA.

The Service Provider shall provide the training as detailed in bid document.

SW 5.10 Pilot Run:

The Service Provider should make sure that DTMS solution should run independently

without any backend access using MESCOM Servers. The Application should run smoothly

Page 24: MANGALORE ELECTRICITY SUPPLY COMPANY …e) Specifications: Specification shall mean collectively all the terms & stipulations contained in those portions of the bid document & such

Page 23 of 63

without any bugs & errors. The Service Provider should update the incremental data along

with MESCOM staff during the contract period. The pilot sign off shall be issued after

successful completion by the committee consisting of officers of MESCOM & IT team which

will be intimated during the pilot run.

SW 5.11 Roll out in Rest of MESCOM (Go-Live declaration by MESCOM):

Unless the pilot sign off is made by MESCOM, the project should not be extended /

implemented in any of the other locations / offices of MESCOM.

Roll out plan to other Divisions & Sub-Divisions shall be submitted to MESCOM by the

Service Provider. On approval from MESCOM, the project shall be implemented as per roll

out plan in other offices. The application shall be accessible to all staff & officers as decided

by MESCOM.

SW 5.12 Operations, Maintenance, Support & Exit Management:

From Pilot Run Sign off to last date of DWA, the Bidder should maintain the hardware &

DTMS software properly during the maintenance/support period as per the conditions

stipulated in pilot run and the bid document.

Further, the Bidder should update the data of DTRs, DTCs added, deleted, DTRs

procured, DTRs allotted from Corporate office/Zones/Circle or changed during the month

accordingly before 10th of the subsequent month for which no additional payment will be

made by MESCOM.

During the maintenance/ support period the successful bidder has to submit the reports

to the respective Executive Engineers of, O&M Divisions within 15th in hard and soft copy of

the DTRs, DTCs added/ removed / enhanced along with generation of Unique ID‟s to the

DTRs, DTCs code and design and development of unique ID plate with fixing & painting of

DTCs as per bid document wherever not available with no extra cost other than the support

cost.

The bidder should maintain the complaint log register at respective Division office in the

prescribed format as shown below:

Sl No Complaint

Description

Complaint

Logged

Solution

Provided

Signature of

the firm

Signature of

the AEE(O)

Date Time Date Time

Four months prior to the end of contract period, the Service Provider shall carry out the

following activities as part of exit management:

Code walk through, Functional & Technical Knowledge Transfer of all the modules of

the application to the MESCOM team identified.

Execute all the documents that may be necessary to effectively transfer the

ownership & title including OEM warranties in respect of all equipment / software,

licenses etc.

All the related documentation, source codes, patches & other configurable items

etc., if any, in the possession of the Service Provider.

List of all IT Assets, passwords etc., of all the locations of MESCOM.

Page 25: MANGALORE ELECTRICITY SUPPLY COMPANY …e) Specifications: Specification shall mean collectively all the terms & stipulations contained in those portions of the bid document & such

Page 24 of 63

SW 6.0 FLOW CHART FOR ROLLOUT:

Creation of Database of DTRs & DTCs in Pilot Sub-Division Office & Divisional Store

Fixing DTR code on Transformers in Pilot

Stores & Repair Centre’s

Submission of SRS document

Information gathering from MESCOM

SRS Sign off No

Delivery of UAT as per SRS

Field survey of DTCs along with painting of DTC code & fixing DTR code along

with conditional assessment of DTCs in Pilot SDO

Yes

UAT Sign off

No

Yes

Validation

Yes

No

Pilot deployment & Pilot Run

Pilot Run Sign off

No

Yes

Implementation rollout in remaining Divisions & SDOs

Maintenance & Exit Management

Delivery of Hardware & Software

Page 26: MANGALORE ELECTRICITY SUPPLY COMPANY …e) Specifications: Specification shall mean collectively all the terms & stipulations contained in those portions of the bid document & such

Page 25 of 63

SW 7.0 SCHEDULE OF REQUIREMENTS:

The bid should comprise of the following schedule:

Schedule

No. Name of the Schedule Quantity & Details

A Hardware Cost

1 Servers including all the required

accessories, Operating System, antivirus

software, RDBMS software, middleware,

licenses etc with installation and

commissioning.

MESCOM desires to have 3 tier

architecture with 2 nos. of Servers i.e

Application Server & RDBMS Server.

The Service Provider should clearly

specify the requirement of actual no.

of servers, licenses etc., required for

project implementation & the same

shall be uploaded along with the bid

document.

Hardware is required to be deployed

with High Availability in cluster

(Active/Active) mode. All cables,

patch cord, drivers & other relevant

accessories are to be required to be

supplied.

The Service Provider to submit letter

from Original Equipment

Manufacturer (OEM) that proposed

hardware is not out of sale & Service

Provider to undertake support of the

offered make & model of the servers

for next 5 years.

The Service Provider has to quote the

prices in E-procurement portal in in

order to fulfill the requirements of

MESCOM without any deficiency.

Minimum Specification as per

annexure II

2 Tablet PCs compatible with mobile app of

DTMS with rugged case and accessories.

14 Nos. (One per O & M Division & on

for Corporate Office IT wing)

Minimum Specification as per

annexure II

B Fixing of SS Unique ID Plate & Painting of DTCs code on DTC Structure with

Survey

3 Field survey, condition assessment &

painting of Distribution Transformer Centers

(DTCs) codes on Distribution Transformer

Centers including all the materials, labour

and transportation etc.

67,000 Nos. (approximate)

The Service Provider has to quote the

prices in E-procurement portal in in

order to fulfill the requirements of

MESCOM without any deficiency.

Page 27: MANGALORE ELECTRICITY SUPPLY COMPANY …e) Specifications: Specification shall mean collectively all the terms & stipulations contained in those portions of the bid document & such

Page 26 of 63

4 Manufacture, Supply & Fixing of SS name

plate containing Distribution Transformer

codes on all the Transformers (DTR) in the

field, stores, repair centers etc. including all

the materials, labour and transportation etc.

80,000 Nos. (approximate)

The Service Provider has to quote the

prices in E-procurement portal in in

order to fulfill the requirements of

MESCOM without any deficiency.

C Software Cost

5 Distribution Transformer Management

Software for both Web based & Mobile

applications. Any other Licensed software (If

Required), the description of such licenses

shall be furnished & uploaded along with

the bid document.

1 No.

The Service Provider has to quote the

prices in E-procurement portal in in

order to fulfill the requirements of

MESCOM without any deficiency.

D Maintenance and Application Support Cost

6 Maintenance & Application support for 2

years as per tender document.

Includes Technical, Functional,

Training and Project Management

etc. and works mentioned in the bid

document.

The requirements as stated above or mentioned in this tender is indicative only &

MESCOM reserves the right to accept or reject any quotation as also alter any or all the terms

& conditions without assigning any reason thereof.

The Service Provider shall take the responsibility of installing, commissioning the

necessary IT infrastructure. Every component of IT infrastructure supplied shall accompany a

complete licensed copy in the name of MESCOM of all the operating systems, software /

drivers installed on the system.

In case, if the Service Provider has not indicated any peripherals / equipment in their

proposed solution & is required for implementation of solution, the Service Provider has to

provide required peripherals / equipment‟s, without charging any extra amount, apart from

order value.

SW 8.0 GIS SURVEY OF DISTRIBUTION TRANSFORMER CENTRE & OFFICES OF MESCOM:

The Service Provider must carry out the field survey & collect all the information along

with painting of DTC code on DTC structure & fixing of SS name plates of DT codes on

Transformer.

The following activities are to be carried out by the Service Provider:

Capturing Office image & address with Geo Location.

One photo of each side of the DTC (Close image).

One photo of the DTC code painted.

One photo which captures the DTC along with a nearby landmark for easy

identification with first pole installation (RR No).

Capture GIS data (latitude & longitude).

Page 28: MANGALORE ELECTRICITY SUPPLY COMPANY …e) Specifications: Specification shall mean collectively all the terms & stipulations contained in those portions of the bid document & such

Page 27 of 63

Executing conditional assessment of the transformer centre by checking availability

of GOS, Lightning arrester, HG Units/DOLO, LTP kits, LT Distribution box, Meter,

Modem, Oil leaks, Corrosion of body, painting etc., as required by MESCOM.

The size of the image/photo to be uploaded shall be finalized in consultation with IT

team of MESCOM.

Any other technical parameters as specified by MESCOM.

SW 9.0 EQUIPMENT TO BE UTILIZED FOR CARRYING OUT FIELD SURVEY & AUDIT:

The following equipment‟s are used for carrying out Field survey;

Tablet PCs with high end cameras

The image captured along with the data has to be uploaded to the central server

in batch / Online real time mode.

Co-ordinates of all offices, stations & DTCs on the field shall be collected using Tablet

PCs with high accuracy Lat-Long capturing applications,

Any other technical parameters as specified by MESCOM.

Fixing of DTR code on the DTRs shall be done with good quality industrial grade

adhesive that offers excellent, shear, peel and impact performance. The adhesive

should provide excellent adhesion to transformer body and SS plate with durability,

oil surface adhesion, toughened and adhesion even when exposed to high

temperature and humidity environments.

SW 10.0 DESIGN, DEVELOPMENT, SUPPLY OF DISTRIBUTION TRANSFORMER

MANAGEMENT SOFTWARE:

The software licenses procured shall be genuine, perpetual, full use & should provide

patches, fixes, security updates directly from the OEM at no additional cost to MESCOM for

the entire period of contract.

The Service Provider shall provide the entire details of the software are being used in

the project. The open source software if used shall not have any limitations & shall ensure

100% support on the software. The Service Provider will be responsible for all the upgrades,

updates, installation of patches and overall maintenance of the DTMS.

All the licenses & support should be in the name of Executive Engineer, IT, MESCOM. The

Service Provider shall suitably modify the software by providing patches to generate the

required reports as per the requirement of MESCOM.

The IT hardware procurement & its maintenance is part of the Service Provider scope.

The Service Provider has to provide Detailed Technical architecture including hardware

sizing, hardware / server specification & detailed costing in its proposal. The Service Provider

shall provide SSL certificate (if desired), Servers, hardware (any other hardware) & networking

equipment required to connect the servers to the Data Centre set-up all the cost related to

hardware shall be accounted in the bid price.

The DTMS shall be deployed in the MESCOM Data Centre or space provided by

MESCOM using the hardware / server infrastructure procured by the software Service

Provider. The server side infrastructure bill of quantity & associated costs shall be separately

shown in the bidder‟s proposal.

The data to be migrated / integrated shall be cleansed, rationalized, transformed &

reconciled by deploying adequate no. of resources for co-ordination with all stake holders.

Page 29: MANGALORE ELECTRICITY SUPPLY COMPANY …e) Specifications: Specification shall mean collectively all the terms & stipulations contained in those portions of the bid document & such

Page 28 of 63

The integration of DTMS with existing application should be done in such a manner if a

DTR data is updated/created in R-APDRP application i.e. a new transformer is created in R-

APDRP application, the same is updated on real-time basis in DTMS & vice-versa. The

integration is expected to be on-line real time or batch where appropriate & shall operate in

an automated fashion without manual intervention. Similarly, with the ERP application.

DTMS shall be integrated with E-mail / Short Messaging System (SMS), R-APDRP

application, TRM application, ERP application & Transformer Enumeration application.

Transactional as well as standing or master data to & from the offered system will be required

to be interfaced / integrated.

Data to be integrated must be validated by the developed interfaces. The data to be

integrated will be mapped, transformed (if required) & reconciled automatically.

All interfaces are to be self-checking so that any exceptions or data validation errors

are reported by the system. In addition, integration logs should be maintained that confirm

the success or otherwise of the interface, complete with control totals.

SW 10.1 Software Should Provide Suitable User Interface For The Following Activities:

Adding/Deleting/Modification of DTRs & DTCs.

Ability to monitor the condition of the DTCs.

Ability to Map DTC with Substation, Feeder.

Map the DTC with Zone, Circle, Division, SDO, Section office, Lineman.

Ability to Map DTC equipment/accessories with DTCs.

Ability to view DTC locations on Web Map/Mobile Map.

Notification from ERP, CCC, R-APDRP etc & vice versa

The attributes of DTRs & DTCs captured through DTMS shall flow to ERP/R-APDRP

system etc, in order to enable the end user to update the completion reports etc.

The DTMS shall capture the details of DTRs along with accessories from ERP/R-

APDRP system etc.

Generate the MIS reports & real time reports.

Ability to Update DTC Rating by Rating Staff of MESCOM.

Notification of Maintenance Schedule.

Alerts on abnormal functioning of Transformer on basis of various parameters.

SW 10.2 Proposed Features in Application:

The User will be logged with the user name & password with required security

features in the MESCOM Web site login section. The user ID shall be created on

considering the Organisation structure of MESCOM with proper hierarchy.

On logging in the user will be directed to the Main page which will be having tabs

linking to ERP & DTMS. After a successful login, the officers have the options of

selecting Existing ERP and DTMS. On selection of DTMS, the officer will be able to see

the dashboard of the DTMS. And all the functionality options should be made visible

based on user role. The user may either search for DTCs / DTRs from inventory or

browse through a list of the items on GIS map. The officers may only view items/edit

allowed by their authority level.

After the Officer login, the officer may be allowed for operations in the system like

adding assets to inventory, adding asset properties, view properties, edit properties

etc.

Page 30: MANGALORE ELECTRICITY SUPPLY COMPANY …e) Specifications: Specification shall mean collectively all the terms & stipulations contained in those portions of the bid document & such

Page 29 of 63

The user with certain permission level can review assets (view audit options, audit

logs, produce report as well as output review).

Authorized users may audit the database. During an audit, the history of all

transactions of any database object (user, location, department, item, etc.) may be

viewed, and double-checked with the data obtained from other objects for internal

consistency.

DTMS system should have the option to be integrated and provisions shall be made

to integrate with Real Time Applications like Monitoring of Transformers/ MDM/

Outage Management etc. APIs should be developed to send & receive data from

modems/communication devices installed at the site. All the real time properties of

DTRs such as load, temperatures etc. are to be communicated in the APIs.

Mobile application shall have same functionalities as of web application.

The officers should be able to fetch the details on clicking the GIS view.

SW 10.3 Maintenance Scheduler

DTMS should be designed for the DTC maintenance as per the KPTCL manual for

maintenance of Distribution system & as per Standard of Performance (SOP) of Karnataka

Electricity Regulatory Commission (KERC). In addition, Service Provider has to comply any

other requirements from MESCOM.

SW 10.4 Rating of Transformer Center by MT Staff/TA & QC/Vigilance etc.

The system should have ability to update & view latest & past data of rating/TA&

QC/Vigilance etc., done on the DTC. The alerts should be generated on variation in

parameters on rating/inspection.

SW 10.5 Key Features in Web Application

User Dashboard with Analytics & notification.

Distribution Transformer Master.

Distribution Transformer Centre Master.

Distribution Repair Centre Master.

Distribution Transformer Rating Centre.

DTC Conditional Monitoring Master.

DTC location on Map view.

Create/Approve/ Updation of DTR & DTC.

Create Service Request for ERP, R-APDRP on conditional assessment like DTC failure,

period maintenance, breakdown etc.

Process of DTR scrap.

Process of DTRs on WGP & AGP.

Bulk uploads of the required Data to DTMS.

DTC‟s locations on GIS mapping.

Forms page for updating of data manually by the end user.

Maintenance Scheduler.

Transformer Tracking.

MIS & Reports system.

Any other requirements as desired by MESCOM.

SW 10.6 Features in Mobile App Application

All users must be able to access the mobile app with Android, Windows & IOS

mobile/Tab phones.

Page 31: MANGALORE ELECTRICITY SUPPLY COMPANY …e) Specifications: Specification shall mean collectively all the terms & stipulations contained in those portions of the bid document & such

Page 30 of 63

Tab App should have ability of Self-Registration, Device Authentication, Device

Configuration.

Ability for attribute entry for DTR & DTCs with required form input type. The forms

need to be predefined so that all parameters required shall be captured &

updated.

Ability to capture the Geo-location, images with time stamping.

Ability to work offline while survey & upload on network availability.

Ability to work as per departmental work flow in process of updation.

Tab/Mobile app will be used for capturing DTRs data initially during creation of DTR

DB creation & whenever the DTR is commissioned / decommissioned the app will

capture DTC code & DTR code with time stamp & geo location.

The updated DTR & DTC data needs to be approved by the concerned authority in

case of repairs/maintenance/commissioning/Decommissioning.

The Tab/Mobile app shall have functionality for multilevel workflow & approval

matrix so that field official can send request through mobile app & approval can

also be given through this app only.

Note: The Service provider has to carry out the entire work during the contract period and

Service Provider has to make own arrangements for the necessary Tabs/Mobiles to carry out

the work.

SW 11.0 FUNCTIONAL REQUIREMENTS:

It shall be finalized in consultation with MESCOM, however the broad scope of

functional requirements as detailed below in addition to requirements mentioned in this bid

document:

Sl.no. Requirement

(A) User Administration

1

Ability for role & access based, wherein a user designated as Administrator shall

have the rights to assign & remove roles to a user by integration with existing ERP or

as desired by MESCOM.

2 The user types envisaged are:

(a) Admin Users (b) MESCOM Users (c) Other Users

3

Ability to create User ID shall be created in the name of designation based on

MESCOM hierarchy, organization structure of Corporate, Zonal, Circle, Division

Office, Sub-division Office & Section office.

4 Ability to change the name, address & contact information of users after logging

into the system.

5 Ability of the System to send e-mail password details to the e-mail address of the

person registered during User ID creation.

6 Ability to generate auto-email for notifying user about the User ID & password.

7

A user will have the “Forgot password” option, which when exercised will send a

password reset link to the e-mail address of the user registered in the system. The

user shall necessarily key in a new password while acting on the link.

8 “Admin” user will have the provision to reset password and generate a new

password for a user.

9 The geographical hierarchy of all the offices under MESCOM & Transformer Repair

Centre shall be separately built into the system.

10 Admin user shall have the provision to tag a user to a zone or a circle or a division

etc. The user thus tagged can update data and perform actions only pertaining to

Page 32: MANGALORE ELECTRICITY SUPPLY COMPANY …e) Specifications: Specification shall mean collectively all the terms & stipulations contained in those portions of the bid document & such

Page 31 of 63

Sl.no. Requirement

the assigned Geography. If a user is tagged to a zone, he/she can access & act

on records as per the powers assigned to all geography (i.e. circle, division, etc.)

underneath the zone.

11 Admin user can disable a user ID & edit / remove powers assigned to a user.

12 The system must have proper security & maintenance facility which limits access to

the system & its various functions to the users delegated with appropriate authority.

13

Access to functions within DTMS should be restricted to authorized users. It should

provide logging by user and terminal, the date & time of all transactions with

details of creation, reading, updating & deletion of records.

(B) Integration & Data Migration

1

The solution should support export & import of data possible from different

Existing systems / databases in different file formats (Text, Excel, MS-Word, PDF,

XML) & on specified time intervals & Should support standard transport protocols

like HTTP, HTTPS, FTP, FTPS, IMPA & SMTP.

2

The solution shall provide application architecture which can be integrated with

existing applications like WAMS, MIS, CCB, GIS, Thermal Imaging of DTCs on GIS,

Enumeration of IP sets & DTCs in GIS & any other software developed by MESCOM

related to DTCs & DTRs.

3

The System shall have ability to integrate & extract Distribution Transformers related

data from existing system like WAMS, MIS, GIS & ERP of DTCs on GIS & Enumeration

of IP sets & DTCs on GIS system & any other software developed by MESCOM.

4 The system should support automatic extraction of data.

(C) Transformer Master

1

The system shall have ability to create Transformer with at least 50 attributes, following are

some of the attributes:

Location details: Sub Division, O&M Unit, Sub-station, Feeder Name, Feeder Code,

Village, Location (Longitude, Latitude), Urban, Rural, R-APDRP, Non-RAPDRP

Technical Details: Capacity, Mixed Load, Availability of GOS, Availability of Lightning

Arresters, Availability of DTC Meters, Availability of HT protection, Availability of LT

protection, Availability & status of Grounding in DTCs etc.

Existing Codes: DTCS code, Asset ID, Component ID, Location ID & Serial No.

Service Provider /Manufacturer Details: Make, Year of Manufacture

Project/Scheme: Water supply , Ganga kalyana, R-APDRP etc

HT Line Length, LT Line Length.

Financial Details: Warranty, Insurance, Original Cost, depreciation etc.

General information (e.g. description, make/model, quantity, acquisition date).

Posting information (e.g. commissioning date, expected life of transformer).

Purchasing information (e.g. Service Provider no., purchase order no., receiving no.).

Maintenance Details: Date of Maintenance, Oil Level etc.

Repairs Details: Last Repair (Major or Minor), Date of Repair, Cost of Repair.

Remarks.

As part of initial master data creation during the fixing of nameplate on DTRs and painting

of Unique IDs on DTCs the photographs along with Latitude & Longitude, timestamp, along

with User ID will also be captured.

2

Ability to automatically or manually allocate unique IDs upon creation of the DTRs master

record. The System shall generate Unique Asset ID & Location ID for DTRs & shall record and

maintain any previous name/ID under any existing application for eg: it should map the

unique ID with existing R-APDRP (Asset ID, Component ID, Location ID).

3 Ability to automatically or manually allocate a unique Location IDs for all existing location

for DTRs whether in field, stores, transformer banks & repair centers & also upon creation of a

Page 33: MANGALORE ELECTRICITY SUPPLY COMPANY …e) Specifications: Specification shall mean collectively all the terms & stipulations contained in those portions of the bid document & such

Page 32 of 63

Sl.no. Requirement

new location i.e., Field, transformer repair. The System shall generate Unique Location ID for

DTRs & shall record & maintain any previous name under any existing application for eg: it

should map the unique ID with existing R-APDRP (Asset ID, Component ID, Location ID).

4

The system shall automatically pull and process Transformer data fields from external IT

systems such as WAMS, ERP, TRM etc. If there are discrepancies between the data provided

by external IT system & the Transformer master, such discrepancies shall be identified and

shown to a designated user for further action.

5

The system shall allow designated user to perform following modifications:

Transformer Master record creation.

Deactivate master record (this should be automatic upon scraping of asset).

Change to location/reporting unit.

Change in assignment of asset to asset class.

Change in asset useful lives.

6

Ability to carry out mass changes automatically to a large extent for user-definable

asset record selection criteria:

Mass change to depreciation methods.

Mass change in depreciation rates.

Mass change in expected life of transformer.

Mass change in Transformer Serial Number, ID etc.

Mass change in locations/reporting units.

7 Provide audit trail for creation, amendments, transfer and deletion for all asset

group and sub groups

8

Ability to capture disposal information such as:

Date of disposal.

Cost, accumulated depreciation and net book values written off.

Sales proceeds.

Gain/loss on disposal.

Reasons for disposal.

(D) DTMS Mobile App

1 All users must be able to access the application with Android, Windows & IOS

mobile phones. All users must be able to access.

2

The mobile Based web page should have following functionalities:

Self-Registration: Device application will have self-registration form (with

generic user registration fields) to send request to server application for

authorizing the device. Once the request submitted to server, the administrator

or other authorize person will take action of received requests.

Device authentication: The tablet/mobile application should have functionality

to authenticate itself from server to unlock for various operations and it will be

based on device IMEI number. The application will send request to server with

device IMEI number for authorization. If device IMEI number is registered and

activated in the system for data collection task, then device application will

unlock for various operations.

Device Configuration: Application will have functionality to configure itself

automatically based on the device IMEI number. Each device will be

authorized to work in particular administrative unit (i.e., sub-division, O&M etc).

Once device authorize for DTMS operations, the device specific master data

and forms should be downloaded automatically from the server. Also, for future

downloads only differential data should be downloaded from the server to

Page 34: MANGALORE ELECTRICITY SUPPLY COMPANY …e) Specifications: Specification shall mean collectively all the terms & stipulations contained in those portions of the bid document & such

Page 33 of 63

Sl.no. Requirement

conserve bandwidth and processing at device & server end.

3 Support for typical data Entry features: This must include text, selections, photos,

Geo tagging and time stamping of reports & images.

4 Advanced form based data entry with ability for pre-loaded Transformer

IDs/project names/ location/Capacity/Make village lists etc.

5

Ability to work offline while taking reports in remote areas, save multiple reports

temporarily until data is sent later via mobile network (GPRS data capability) or

WLAN (WiFi).

6 Ability to work offline is a key requirement and all other features must work on

offline datasets with synchronization aspects being automatically taken care of.

7

Web based multi role managerial login to allow the system to function as a report

viewing interface & communication platform. This needs to be customized as per

departments‟ processes.

8

Ability to generate Reports in PDF/MS office format. As required, the agency would

be instructed to create report templates in specified formats and layouts with

appropriate header graphics. Changes to such templates will be done without

additional cost till contract period.

9 Support for commonly available Android, windows and IOS mobile phones.

10

Ability to Automated, manual & push based synchronization mechanism must be

employed to ensure that the datasets such as list of schemes are up to date on

the mobile devices.

11

DTRs Tracking & data capturing: The mobile based app will be used to capture DTR

data initially during DTMS database creation and also whenever the DTRs is

commissioned/decommissioned the mobile app will capture the photograph of

DTR with Unique DTC (location ID) & DTR ID with time stamp & geo-location

(Latitude longitude). The data should be stored in encrypted mode in device local

cache.

12

The uploaded DTR data need to be approved by concern authority in case of

repairs/ maintenance/commissioning/Decommissioning. The mobile app should

have functionality for multilevel workflow and approval matrix so that field official

can send a request through mobile app and approval can also be given through

mobile app.

(E) Integration with existing ERP Store operations & Repairs Management

1 Ability to categorize stores as Central Stores, Divisional store & transformer Banks.

2

Ability to undertake following workflow based store activities as per MESCOM processes:

Receipt of DTRs, Issuance of Transformer & Maintenance of Daily Transformer Register

(DTR).

Preparation of Gate pass for Transformer issued and supervision over issue of material,

loading of trucks and checking thereof with Gate pass.

Physical verification of DTRs.

Ability to maintain DTRs receipt.

Ability to capture the details of DTRs receipt such as DTRs Receipt number, date, supplier

details, Delivery challan number and date, Part/Full supply should be captured as part

of DTRs receipt in addition.

Ability to associate DTRs receipt to Purchase Order number.

Ability to capture details of DTRs like code, description, quantity received, quantity

accepted should also be captured.

Ability for quality checking process for the received DTRs.

Ability to generate receipt of items internally returned by the employees along with

Page 35: MANGALORE ELECTRICITY SUPPLY COMPANY …e) Specifications: Specification shall mean collectively all the terms & stipulations contained in those portions of the bid document & such

Page 34 of 63

Sl.no. Requirement

details like receipt no, date, employee details, department, stores, item, description,

quantity & reason.

Ability to identify the indent by a unique indent number.

Ability to capture the details of the Indent like Date of Indent, Item code, Description,

Quantity requested, Quantity Delivered, Required Ability to record Date of delivery,

indenter etc.

Ability to maintain the status of the indent.

Ability to maintain the DTRs registers.

Ability to capture the details of defected/under repair DTRs & provision to maintain the

purchase return details.

Ability to make adjustments to inventory after physical audit.

Ability to capture details of issue of DTRs like DTRs issue number, date, issued by, issued

from store, received by & indent number.

Ability to record and maintain details of Material like code, description, requested

quantity, quantity issued & quantity pending should also be captured.

To maintain register of transformer under scrap, failed transformer beyond guarantee

period and sending for repairs.

Inter Store transfers.

Maintenance of time stamp based receipts on issuance & receipts of DTRs.

The provision of above features shall be incorporated in the software in consultation with

IT Team of MESCOM before finalization of SRS document.

3

Ability to undertake following Maintenance/Repairs Activities:

Ability to upload the list of routine maintenance plan as well as minor/major repairs.

Ability to view the list of pending routine maintenance plan/minor/major repairs.

Ability to raise maintenance execution orders pending list as SMS alerts at defined

intervals to concerned officials/repair centers to assist proactive work plans.

Ability to raise the flags to the concerned officials/repair centers assigned for the Routine

maintenance & repairs.

Ability to receive the details of DTRs faults in the database.

Ability to list and raise the alerts to the concerned personnel allocated for handling the

repairs & also generating alerts in case of delays.

4

Provide a tracking feature to monitor & record information about the location &

movement of DTRs.

Record information about movements including: • unique IDs (nameplates) of the DTRs;

• current location as well as a user-defined number of previous locations (locations

should be user-defined); • date item/time stamp sent/moved from location; • date item

received at location (for transfers); & • user responsible for the move (where

appropriate).

Support tracking of DTRs by the provision of request, check-out & check-in facilities that

reflect the current location of the DTRs concerned.

Ability to generate various tracking reports.

System should automatically prioritize the repair of transformer/auto scheduling of

repairs based on type of DTC/need based. (based on operation section prioritization

matrix) Manual scheduling option also should be given.

Page 36: MANGALORE ELECTRICITY SUPPLY COMPANY …e) Specifications: Specification shall mean collectively all the terms & stipulations contained in those portions of the bid document & such

Page 35 of 63

Sl.no. Requirement

5

Ability to track the movement of DTRs from field to Store to Repair centre based on

Mobile app and generating time stamp receipts for movements between fields to

Store to Repair centre. For example (illustration purpose)

Detailed Track Events For Transformer ID KA0123456789.

Date Time

Stamp Details Status

01/10/2017 11:23:56 LOCATION ID 0123456789 Failed (complaint Docket

no.)

01/10/2017 13:00:56 LOCATION ID 0123456789 Transformer Decommissioned

by USER ID

01/10/2017 16:05:26 DIVISIONAL STORE (ID) Transformer Received

02/10/2017 10:25:28 DIVISIONAL STORE (ID) Dispatched to Minor Repair

Centre (ID)

02/10/2017 12:00:20 Minor Repair Centre (ID) Transformer Received

04/10/2017 10:30:25 Minor Repair Centre (ID) Transformer Ready for Testing

05/10/2017 12:30:05 Minor Repair Centre (ID) Transformer Tested

05/10/2017 16:30:00 DIVISIONAL STORE (ID) Transformer Received

06/10/2017 10:21:21 DIVISIONAL STORE (ID) Transformer Issued to USER ID

06/10/2017 14:00:21 LOCATION ID Transformer Commissioned

by USER ID

6

Ability to show exact location and status of transformer/s i.e., under transition, In

stores, Under minor repairs/major repairs, commissioned etc. with exact time stamp

of the status.

7 Ability to raise SMS/Emails alerts in case of any delays in transitions, repairs etc. as

per standard operating procedure.

8

Ability to show/track status of transformer movement & link to particular location

i.e., under transition to Central Stores, In repairs in Repairs Centers.

(F) Alerts & Notification

1

Ability to generate following alerts & send notification/alert messages to MESCOM

officials as per approved escalation matrix.

Delay in repairs/transformer maintenance.

Delay in movement/transition of DTRs from stores/repair centers/stores.

In case of missing nameplates from field/repair centre.

Failure of transformer with Guarantee period & warranty.

The failure rate higher than 5% of the repaired good Transformer repaired by

the firm in particular geography/Division/Sub-Division.

Delays in collection of DTRs from repair centers.

2 Alert Messages/Notification to be generated in following ways:

SMS on the user registered mobile & higher official/s as per escalation matrix.

Page 37: MANGALORE ELECTRICITY SUPPLY COMPANY …e) Specifications: Specification shall mean collectively all the terms & stipulations contained in those portions of the bid document & such

Page 36 of 63

Sl.no. Requirement

App based notification/alert on user mobile phone.

E-mail on registered email IDs.

Alert/Notification with DTMS application.

3 Ability to send reminder against the alerts/notification in case of non-performance,

delays etc in resolution of alerts/notifications

(G) Dashboard & MIS

1

Ability to generate following reports:

Total number of transformer failure per month per geography

(O&M/Subdivision/Division/Circle/Zone in MESCOM).

Total number of DTRs on daily basis ((O&M/Subdivision/Division/ Circle/Zone in

MESCOM).

Performance of Repair Centre in terms for number of days taken for repairs,

transformer failed within guarantee period.

Total expenditure on DTR repairs / office wise including the oil usage,

maintenance – need balance sheet.

Any additional requirements as per the directions of MESCOM shall be

provided.

2

Ability to show the consolidated statement/MIS showing the status of transformer

failed with exact status of O&M activities i.e., DTR replaced, DTR yet to be

replaced with time stamps, DTR ID, Date of Failure, Docket Number, DTR Capacity

& Concerned Official. The Consolidated statement should have drill down options

so that the Concerned Official can see all the status of failed transformers under

his/her jurisdiction.

3 Ability to show Alert Messages/Notification generated.

4 Ability to send reminder against the alerts/notification in case of non-performance,

delays etc., in resolution of alerts/notifications.

(H) Workflow

1

The DTMS will have all the workflows for all the following processes:

DTRs creation along Unique ID (Web Based & app based application).

Location ID creation (Web Based & Mobile app based application).

Integration with ERP Store Management workflows (Web Based application).

Repairs Management Workflows i.e Minor/Major/Mass Repairs & preventive

maintenance (Mobile app & Web based application) and Scrap workflows.

Field activities i.e commissioning/decommissioning of DTRs ((Mobile app and

Web based application) with integration of ERP.

Bill Generation for DTRs repairs (Web Based application) integrated with ERP.

It is clarified that Service Provider will change/modify the workflows in case of

any changes/modification in workflow till the Go-Live.

2 Ability to a parallel routing functionality in business processes.

3 Ability to support for simple single step workflows for review & approval.

4 Ability to associate workflows with different Document Types.

5 Ability to obtain collective review feedback on a document from multiple

reviewers.

6 Ability to trigger a document workflow manually or automatically (for example

upon upload or edit).

7 Ability to support for recording and displaying Workflow History.

8 Ability to support for assigning, viewing tasks and alerting users on tasks.

Page 38: MANGALORE ELECTRICITY SUPPLY COMPANY …e) Specifications: Specification shall mean collectively all the terms & stipulations contained in those portions of the bid document & such

Page 37 of 63

Sl.no. Requirement

9

Ability to support for common workflow actions such as sending e-mail

notifications, copying, moving documents, conditional branching and looping of

actions, and others as per MESCOM requirement.

10 Ability to support for Work Queues and task prioritizations

11

The DTMS will have following functionalities:

Should have the functionality of the design, implementation,

simulation, optimization and re-deployment of business

processes.

Should have the functionality of public mailboxes allocation &

management of group work tasks.

Should have the functionality of the private mailboxes for the

award and manage individual work tasks.

Should be supported to carry out simple (review, approve)

the business processes

(I) Repairs Billing

1

DTMS shall be designed such it has the following provisions -

Provision to generate bills for DTRs repaired as per the approved Rates (Minor

Repairs & Major Repairs) and as per the prescribed of MESCOM (MESCOM will

provide the format for Bill Generation as per the approved rates).

View MESCOM Repairs rates for Minor/Major Repairs activities or Rate

Contracts.

Provision to attach scan copy of bills with system generated bills.

Ability to send the bills as per the workflow to designated official of MESCOM &

also send reminders.

Ability to take transformer ID repair details the approved rates directly based on

actual repairs rather than manually adding the details.

2 Ability to show the status of bill generated as pending, under process, approved,

rejected, additional information required etc.

3

Ability to send additional information request by Accounts Officer to Transformer

Repair Centre in case of discrepancy. Ability to issue notifications/alerts in case of

delays in processing of Bills to designated officials as per escalation matrix

(approved by MESCOM).

4 Ability to generate monthly MIS of total bills generated & approved, Average time

taken to approve bills (MESCOM Wise, Zone/Circle/Division/Sub-division wise).

5 The provision of above features shall be incorporated in the software in

consultation with IT Team of MESCOM before finalization of SRS document.

SW 12.0 NON-FUNCTIONAL REQUIREMENTS:

The DTMS should meet the following non-functional requirements.

SW 12.1 Usability:

The web interface of the system will be designed to be concise & user-friendly, with a

graphical interface to help users identify the proper choice on the screen. An online help will

be provided for the users. Users are expected to be able to use the system productively with

minimal or no training.

Page 39: MANGALORE ELECTRICITY SUPPLY COMPANY …e) Specifications: Specification shall mean collectively all the terms & stipulations contained in those portions of the bid document & such

Page 38 of 63

SW 12.2 Reliability & Robustness:

The system should be available at all times (24 x 7) except for monthly maintenance of

not more than 10 minutes. The system backup onto a second server will be performed during

the maintenance time as well as once daily (at midnight) & system recovery will only be

executed as necessary. In addition, it should be able to have the provision to meet the

requirement to help recover in the event of hardware failure, if secondary server is present.

SW 12.3 Verifiability:

All critical transactions will be recorded in a separate table in order to allow for auditing

the database system, such that all suspicious records may be easily tracked and the

appropriate record double-checked as necessary. The audits must be performed by an

authorized user, with special privileges granted to allow visibility of the auditing function and

associated records in the database.

SW 12.4 Performance:

All pages should be loaded within three seconds or less, assuming a broadband

connection on the client side. Therefore, response time for transactions will be three seconds

or less. The system should support as many as 500 online users simultaneously with negligible

response delay.

SW 12.5 Portability & Interoperability:

As a web-based application, the system will support the latest version of the majority of

browsers such as Internet Explorer, Firefox, Chrome and Safari, as well as common mobile

operating systems (Android, Windows, iOS, etc.). In addition, the system should be easily

migrated to other platform in case of hardware failure in both servers.

SW 12.6 Security:

Only authorized users will be permitted to access the system. The system will provide

additional security means to protect itself from automated attacks by using methods such as

“CAPTCHA” when processing login requests in special cases (when the user has elevated

privileges, or when a user repeatedly attempts to login without success). The system will

provide the users with a secure way to change their passwords, whether when initializing a

new account or by user request. If requested, we will upgrade the system to use the HTTPS

protocol in subsequent iterations in order to prevent unauthorized third-party viewing of the

contents, though the university would be responsible for providing the proper certificates in

such a scenario.

SW 12.7 Maintainability:

The standardized design and implementation documents will be provided in order to

maintain the system. All changes will be documented. A standard architecture will be

applied and therefore the system should be easy expandable, allowing for quick evolution of

the software to adapt to possible situations in the future. In addition, these documents should

allow third parties to be consulted should the inventory system exhibit abnormal behavior.

SW 13.0 TECHNICAL REQUIREMENT OF DTMS SOFTWARE:

The Service Provider should implement robust framework by keeping in mind the

importance of DTMS software. The DTMS application will be integrated with the existing ERP,

R-APDRP, Enumeration of IP sets, CCC & DTCs on GIS, ERP of DTCs on GIS, Feeder Master

Data Management (MDM), Total Revenue Management Application & any other related

Page 40: MANGALORE ELECTRICITY SUPPLY COMPANY …e) Specifications: Specification shall mean collectively all the terms & stipulations contained in those portions of the bid document & such

Page 39 of 63

newly developed / changed software in MESCOM to get the related data. The framework is

structured in three layers:

a) Presentation Layer

This layer is responsible for interacting with the users. This layer comprises of the GUI

screens that act a media for accepting & validating the input data, for depicting required

information, for showing reports etc. This layer should bring a clear separation between the UI

design & the underlying business logic. The presentation layer should be designed in such a

way that any customization / changes in the UI design will not have an impact on the

business logic or vice versa.

b) Business Layer

All the business processes of the application should be addressed through the number

of components, entities, agents & interfaces in the business layer consisting off:

i. Business Components - Business components are the software realization of business

concepts. They are the primary units of design, implementation, deployment,

maintenance & management for the life cycle of the business application. Business

components encapsulate the business logic, also called business rules.

ii. Business Entities - Business entities are data containers. They encapsulate and hide

the details of specific data representation formats. The changes to the underlying

data formats will not affect the data consumers.

iii. The external system like Billing & CIS will be integrated at this level using custom

integration components.

c) Data Access Layer

The business components can access the data available in the data repositories only

through the data layer. The data layer consists of Data Access Components. Data access

components available in this layer are responsible for exposing the data stored in the

databases to the business layer. These components isolate the business layer from the details

of the specific data storage.

d) Integration Gateway

The Service Provider shall use/integrate with MESCOM‟s existing gateways such as Email

to send out alerts & notifications. The online users will receive an e-mail notification with the

transaction details (DTRs Repairs/maintenance/store transactions etc). The Service Provider

will have to develop the required interfaces for user & business layer to get integrated to SMS

& emails. Service Provider shall procure, install & implement the SSL Web Server certificates for

online security.

SW 14.0 OTHER REQUIREMENTS

1

Proposed solution shall be combination of web & mobile based solution. The

application required at a central server shall be remotely accessible through

web interface. The system shall be made available purely as a web interface

for client machines, and should not require any special installation etc. It should

be browser independent, and work on all the browsers (both on mobile &

computers), i.e. Chrome, Firefox, Internet Explorer, Netscape & Dolphin.

The App for tablet/phones should be available on the web application & can

be downloaded & installed on tablet/phones. Mobile application shall be an

Android based native application which would work even in the absence of

network. Web application should be accessible using standard Web-Browser

Page 41: MANGALORE ELECTRICITY SUPPLY COMPANY …e) Specifications: Specification shall mean collectively all the terms & stipulations contained in those portions of the bid document & such

Page 40 of 63

without any need for extra application client software. Application should be

compatible with all leading browsers i.e. Chrome, IE (9.0 to 11 minimum),

Mozilla, Safari etc.

2 The system should be designed in manner that operational data is not lost in

case of any failure of equipment or communication network.

3 The system shall be role based such that Admin user has the flexibility to assign

& remove powers to the various users

4

The Service Provider shall implement Transport Layer security using Secure

Sockets Layer (SSL). The cost of SSL certificate shall be accounted in the bid

price.

5

The DTMS shall be deployed in the MESCOM Data Centre or space provided by

MESCOM using the server infrastructure procured by the software Service

Provider. The server side infrastructure bill of quantity & associated costs shall be

separately shown in the bidder‟s proposal.

6

The servers should be sized to handle the entire software functionality &

workload envisaged in this document. The DTMS application must support up to

500 (concurrent) users at any point of time and should be capable of

accommodating additional concurrent users of MESCOM in future. The user

includes Store officers, O&M Staff, Accounts Officers, etc.

7

The system shall be deployed in a load balanced mode with redundancy in

web & application layers with Active-Active configuration. The database shall

be replicated with Active-Passive configuration.

8

The system shall not have any license restrictions on the number of users or

number of CPU‟s or Cores and in any other scalability aspect. The Service

Provider is strongly recommended to use open source system software & Use an

open source database such as Postgre SQL (same shall be considered for

quoting the prices in the price schedule).

9 The system shall have robust Identity & Access Management (IDAM) controls,

wherein the access rights assigned to a user will be verified during login.

10

The system shall have the provision to send e-mails as a result of certain pre-

defined set of actions (e.g. send password activation link in case of forgot

password).

11 The system shall be role based such that Admin user has the flexibility to assign

& remove powers to the various users.

12 The proposed solution should have necessary security & non-editable audit trail

features.

13

The solution architecture shall be based on Open Industry standards and

Protocol. The Service Provider shall purchase at least 24 x 7 support for open

source software for a period of 3 years.

14 The solution shall provide an application architecture that is integrated using a

middleware technology.

15

The source code of application with prologue comments shall be provided

along with documentation. Intellectual Property Rights (IPR) of this DTMS

application shall rest with MESCOM only. MESCOM reserves the right to make

this software freely available to any agency of its choice with no restrictions

whatsoever in near future.

16 The solution shall provide all the relevant leading technology (e.g. XML, Flat file,

messaging etc.) to meet the integration requirements.

Page 42: MANGALORE ELECTRICITY SUPPLY COMPANY …e) Specifications: Specification shall mean collectively all the terms & stipulations contained in those portions of the bid document & such

Page 41 of 63

17 The solution shall maintain integration logs that confirm the success or otherwise

of the interface, complete with control totals etc.

SW 15.0 BROAD SECURITY REQUIREMENTS FOR DTMS:

The Security features should be compliant with the e-Governance Security Guidelines

(e-Govt. Security Standards Framework).

i. All systems should have integrated security features that are configurable by the

system administrator to control access to the application, functional modules,

transactions & data.

ii. The applications should require the use of unique user IDs & passwords for

authentication purposes.

iii. The application should allow for the following:

a) The enforcement of password standards.

b) The establishment of a specified period for password expiration.

c) The prohibition of recent password reuse.

iv. System administrator should be able to define functional access rights & data access

rights by assigned user ID, functional role & owner organization.

v. The systems should permit the system administrator to assign multiple levels of rights to a

single user.

vi. System administrator should be able to restrict access to sensitive data elements by

named user, groups of users or functional role.

vii. System should be auditable as per requirements from time to time.

viii. System should have audit logging capability to record access activity, including the

following:

a) All log-in/log-out attempts by user & workstation.

b) User-submitted transactions.

c) Initiated processes.

d) System override events; and direct additions, changes etc.

ix. System should provide the ability to query the audit log by type of access, date & time

stamp range, user ID or terminal ID.

x. Proper protection against malicious software should be ensured. This would include

implementation of an effective anti-virus solution, scanning viruses at regular intervals or

on certain triggers & updating the solution as & when new patch is received from the

anti-virus solution provider.

xi. It should have proper logical access security for all the information assets. Entire

network including servers, communication links, database etc., should be logically

segregated from rest of the networks.

As per IT Industry standards, MESCOM will undertake an exercise of Audit & Certification

of DTMS through a third party agency, after the completion of system implementation. The

following methodology should be adopted by the Service Provider:

i. MESCOM will nominate a suitable, neutral & technically competent third party

agency or agencies for conducting audit & certification for DTMS Software, upon

intimation by the Service Provider that the system implementation is complete.

ii. The system shall be audited through a CERT-IN enrolled audit agency. MESCOM

shall pay for the Third Party Audit.

iii. The agencies nominated by MESCOM shall establish appropriate processes for

notifying the Service Provider of any deviations from the norms, standards or

Page 43: MANGALORE ELECTRICITY SUPPLY COMPANY …e) Specifications: Specification shall mean collectively all the terms & stipulations contained in those portions of the bid document & such

Page 42 of 63

guidelines at the earliest instance, after noticing the same, to enable the Service

Provider to take corrective action.

iv. Such an involvement & guidance by the agencies shall not, however, absolve the

Service Provider of the fundamental responsibility of designing, developing,

installing, testing & commissioning the various components of the DTMS project to

deliver the services in conformity with the SLA & the agreement.

v. All the changes suggested by the third party audit agency should be

implemented by the Service Provider upon acceptance & approval by MESCOM.

The Service Provider should extend all the support to MESCOM nominated Third

Party Audit Agency (TPAA) for all the activities related to audit & certification.

SW 16.0 PROJECT MANAGEMENT UNIT & MANPOWER RESOURCES:

The Service Provider shall provide separate resources for different tracks of the project.

The entire project team will report to Executive Engineer (IT) & the software shall be

developed in consultation with IT Team or any other official designated by MESCOM. The

activities under “Pre Rollout” tracks have been clubbed as these activities/tracks are

overlapping with respect to timelines. An illustrative team with requirements are given below.

However, the Service Provider will have to adhere to the minimum qualification of the

personnel mentioned below. An indicative team is given below:

Personnel Responsibilities Min. Qualification Pre Rollout ( Up

to Pilot Sign off)

Post Rollout

Project Manager

(For all meetings /

discussion with

MESCOM)

Program

Management

Responsible for overall

stakeholder

management &

managing different

tracks of Program

office Single Point of

Contact for DTMS

Fluency in Kannada

& English. (Speaking,

reading & writing)

At least 5 years of

experience in

managing IT

projects (Preferably

in Government

Sector projects)

B.E./B.Tech./MCA+

MBA,

PMP Certification will

be an added

advantage

First one month

on full time

basis in

MESCOM

During Contract

Period as and

when required

by MESCOM

Implementation

Manager

(Minimum 1

resources) placed

in each Division

Managing the entire

fixing of name plates

& day-to-day

operations of the

project

Monitoring

performance &

efficiency of various

Fluency in Kannada

& English (Speaking,

reading & writing)

At least 3 years‟ of

experience in

managing IT

projects (Preferably

in Government

Full time basis

in Pilot project(

shall be

finalized in

consultation

with MESCOM)

During Contract

Period as and

when required

by MESCOM

Page 44: MANGALORE ELECTRICITY SUPPLY COMPANY …e) Specifications: Specification shall mean collectively all the terms & stipulations contained in those portions of the bid document & such

Page 43 of 63

activities

Reporting to

concerned MESCOM

regarding progress of

the project on

periodic basis

Sector)

B.E./B.Tech./MCA+

MBA

Development

Lead (For all

meetings/discussi

on with MESCOM)

Software / Application

Integration with

existing application,

Transformer Database

creation

Development &

leading the

development team

At least 5 years of

professional

software

development

experience

should have in

depth knowledge

about the

technology

proposed in the

solution.

Experience in

working with a team

of developers.

Excellent problem

solving abilities &

detail orientation.

Should have

excellent verbal &

written

communication skill

B.E/B.Tech (IT/CS) /

MCA

Full time basis

till pilot sign off.

During Contract

Period as and

when required

by MESCOM

The Service Provider should provide details of the proposed project structure identifying

key individuals, e.g., Project Managers & their roles, including the number & location of

proposed analysis/development personnel. Resumes or a personal profile, certificates etc.,

should be provided for key personnel of his organization for the project.

SW 17.0 OPERATIONS & MAINTENANCE:

The Service Provider shall provide Operations & Maintenance for the entire DTMS

including Application, IT & Non-IT infrastructure for a period of Two years from the date of

final Go-Live of entire MESCOM during normal working hours of MESCOM offices. The support

will address all user level queries, fixing bugs, data backup & archiving, enhancements,

changes to configurations, customizations, patch updates, upgrades, database

administration, security etc. At least one software developer and one on-site project

management resource person shall be dedicatedly deployed in the project during the

maintenance phase in corporate office MESCOM. The cost of these two resources shall be

Page 45: MANGALORE ELECTRICITY SUPPLY COMPANY …e) Specifications: Specification shall mean collectively all the terms & stipulations contained in those portions of the bid document & such

Page 44 of 63

included in the bid price. The Operation & Maintenance of the Overall System Solution

(including but not limited to Hardware, System Software, Application Software & other

Infrastructure). These services shall be accessed through a Single Point of Contact (SPOC).

The Service Provider is expected to plan for contingencies.

The Service Provider shall provide the following:

a) Technical Support for reporting field user incidents / issues / problems & also online users.

b) Provide necessary channels for reporting issues. The incident reporting channels could

be the following:

i) Specific E-Mail account.

ii) Online reporting through a web based form.

iii) Provide mobile/telephone numbers for logging complaints.

c) Escalate the calls, to the appropriate levels, if necessary as per the escalation matrix

agreed between the Service Provider & MESCOM. The escalation matrix shall be

developed by the Service Provider in discussion with MESCOM.

d) Co-ordinate with respective O&M for closure of calls.

e) Creation of knowledge base on frequently asked questions to assist field user

departments in resolving basic issues themselves.

f) Providing feedback to callers.

g) Service Provider will be required to maintain daily backups of the database on reliable

backup media like DAT drives, CDs, tape etc.

The Service Provider shall provide support services to track & route requests for service

& to assist end users in answering questions & resolving problems, at field offices.

SW 18.0 KNOWLEDGE TRANSFER:

The Service Provider should ensure that the entire data & application software along

with source code is smoothly transferred to the MESCOM requirement at the end of the

contract period and as mentioned in bid document clause no SW 6.12. Necessary Technical

support should be ensured by Service Provider in such an event for smooth functioning of the

application software at MESCOM.

SW 19.0 TRAINING:

The Service Provider shall be responsible for providing training to various target groups

consisting of core IT Team, System Administrator (IT), Database Administrator (IT), End-Users

etc. Training should be provided covering all the contents of the package. The Service

Provider should explain how it is proposed to conduct the training program by outlining

course contents & duration. This includes the training required for users as well as for IT Wing

MESCOM.

The Training programs will cover all the information and instruction necessary to permit

System Administrators, System Users and Management Users, to perform designated

operational and maintenance activities safely and efficiently over the course of the

contract. The Service Provider must provide the training courses for the type of audience with

a maximum class size of 30 per course. Preceding implementation, the Service Provider will

be required to deliver two instances of System Administrator training (separate session days),

two instances of System User training (separate session days), and one instances of

Management Users (separate session days).

Page 46: MANGALORE ELECTRICITY SUPPLY COMPANY …e) Specifications: Specification shall mean collectively all the terms & stipulations contained in those portions of the bid document & such

Page 45 of 63

Training shall be provided to various teams of the MESCOM personnel in the following

areas:

a. Training in system software.

b. Full-fledged training on workflow and the application software operation.

c. Training on fault reporting procedures for the DTMS Software.

d. User training

On the job training to the SDOs/Section Officers.

On the job training to the Division/Circle/Zonal/Management.

All required infrastructure for the training will be provided by the MESCOM and venue

of the training shall be decided by the MESCOM. The Training Server shall be set up by the

Service Provider at MESCOM‟s Data Centre. All training shall include practical sessions in

which live hands on experience is required to be given to the trainees.

The GIS Survey and capturing of the required attributes for assessment of DTC‟s is to be

given on the batches of Division offices on live.

MESCOM reserves the right to change reasonably the number of training

programs/batches, team size, Training Dates, Venue etc.

Training Study material for each program in soft copy and hard copy shall be provided

by Service Provider to the MESCOM. Self e-learning training kits of the entire solution to be

provided by the Service Provider to the MESCOM. Training could have multiple

sessions/stages as per the need and requirement of the project/application. There should be

sufficient number of trainers in every training session for conducting the training program.

Training methodology will be an interactive workshop. The success of the training will be

determined by the ability of the participants to clearly understand how to use the system

with minimal help. The content of the training plan & schedule shall be mutually decided by

the MESCOM and the Service Provider later at an appropriate time period.

The Service Provider shall ensure that all the training documentation in Hard copy and

Softcopy is in place (user training, operation procedures, visual help-kit etc.) MESCOM will be

responsible for approving training & course content, including initial training (preceding

implementation) and refresher sessions (post implementation). The Service Provider must

submit the course syllabus, schedule, all training related resources and

handout/supplementary materials (in electronic format), and the names and qualifications

of the instructors to MESCOM, for approval, at least 10 working days in advance of the first

training session.

Page 47: MANGALORE ELECTRICITY SUPPLY COMPANY …e) Specifications: Specification shall mean collectively all the terms & stipulations contained in those portions of the bid document & such

Page 46 of 63

SECTION: 4

GENERAL TERMS AND CONDITIONS OF TENDER (GTC)

GTC 1.0 GENERAL INSTRUCTIONS:

a) The Bidders shall bear all costs associated with the preparation & uploading of bids to

e-procurement portal & MESCOM shall in no case be responsible or liable for these

costs.

b) Bids submitted within the scheduled date & time shall only be eligible for further

processing of the bids.

c) Any bid submitted after the last date & time specified will be rejected even, if it is

accepted by the e-procurement portal.

d) Date & time stamp of the e-procurement portal system shall be final in deciding the

time of submission of bid. Decision of MESCOM in this regard shall be final & acceptable

to all the bidders.

e) MESCOM at its discretion may extend the last date for the submission of bids and / or

may amend the bidding.

f) The bid documents uploaded shall bear the signature, address & company seal at the

bottom of each page of the bid including the schedule in which the rates are entered.

g) For any deviation, the bidder may give an alternative offer, but the bidder shall quote

for the base offer as specified. However, the option to consider the alternate bid lies

with the MESCOM.

h) Bids with major deviations are not acceptable. Deviation against terms of payment,

delivery schedule, force majeure, Contract agreement & performance security, suit or

proceedings, performance particulars of goods to be supplied, performance

guarantee clauses of bid document constitutes major deviation.

i) No enhancement of rates once accepted will be considered during the currency of

contract, except as provided in the contract.

j) MESCOM reserves the right to accept any or reject any/or all the bids. However,

reasons for rejection would be recorded as per KTPP act.

k) Bidders shall quote in Indian Rupees only.

l) MESCOM reserves the right to verify the information / documents furnished by the

bidders.

m) The original documents should be produced for verification at any stage of tender

process as & when sought for, failing which, the bids are liable for disqualification.

n) MESCOM on detailed verification / investigation finds the bidder not satisfying the

qualification requirement, the bid will be rejected & the EMD furnished by such bidders

will be forfeited.

o) If the Prospective Bidder has not uploaded the required documents as per the tender

conditions will be summarily rejected.

GTC 2.0 PERIOD OF CONTRACT:

Initially One Year from the date of Detailed Work Award (DWA) for Design,

Development and Implementation of Distribution Transformer Management Software i.e., till

Go-live in all the offices and Maintenance and Application support for Two years from Go-

Live of Entire MESCOM (Declaration of project completion). This contract period includes

Completion Period plus 2 years Guarantee period including maintenance. However, the

satisfactory performance & maintenance will be evaluated every year.

Page 48: MANGALORE ELECTRICITY SUPPLY COMPANY …e) Specifications: Specification shall mean collectively all the terms & stipulations contained in those portions of the bid document & such

Page 47 of 63

The Service Provider is solely responsible for completing the project as per the

schedule. In case project gets extended due to the delay attributable to service provider the

contract period gets extended to that extent. The Service Provider shall extend the bank

guarantee etc at his own cost for the entire contract period without any extra cost to

MESCOM. However, the SLA will be applicable for the delay.

GTC 3.0 COMPLETION PERIOD:

The Roll out to all the offices of MESCOM shall complete with in 1 year from the date of

issue of DWA or successful implementation of the entire project as per the requirement of

MESCOM whichever is later and the Roll out plan is as below;

Pilot run at One Division having One Urban & One Rural Sub-Division (22 Weeks).

Go-Live Implementation (30 Weeks)

GTC 4.0 TIME SHEDULE:

The basic consideration and the essence of the Contract is strict adherence to the Time

Schedule in performing the specified Works.

i. The work Contract is valid for Three years from the date of DWA.

ii. The successful Bidder should prepare detailed PERT chart for the quantity of DTRs & DTCs

awarded Division wise with covering 12 months of Phase I&2 (not Bar chart) and submit to the

MESCOM within 15 days from the date of LOI.

GTC 5.0 GUARANTEE:

a) The Supply & Installation shall be guaranteed for satisfactory performance during the

contract period. The Service Provider shall furnish an undertaking letter.

b) The Service Provider shall guarantee quality, efficiency & performance standards of the

equipment amongst other things as per the latest Industry Standards.

c) The Service Provider shall provide on-site comprehensive guarantee for the contract

period on Design, Development, Supply of “Distribution Transformer Management”

Software & GIS Survey of DTCs for condition assessment, tracking etc, from the date of

satisfactory installation & commissioning against any manufacturing defects or of poor

quality, non-functioning / malfunctioning.

d) The Service Provider shall furnish copies of test certificates of materials used for the

equipment wherever applicable.

e) The Service Provider shall be liable for the prompt replacement of any defective parts

without extra cost to MESCOM.

GTC 6.0 REPLACEMENT OF DEFECTIVE / DAMAGED PARTS & MATERIALS DURING PRE-

COMMISSIONING PERIOD:

i. The Service Provider shall be totally responsible for all loss or damage to the equipment

until the equipment is commissioned.

ii. If the material / equipment or any portion thereof is damaged or lost during transit the

Service Provider shall immediately arrange to supply these material / equipment

without waiting for insurance or any other claims without unnecessary delay in putting

the equipment in use.

GTC 7.0 TERMS OF PAYMENT:

The Service Provider selected shall be paid based on completion of milestones. The

payment to be made for completion of the various milestones which are listed in the Table as

shown below:

Page 49: MANGALORE ELECTRICITY SUPPLY COMPANY …e) Specifications: Specification shall mean collectively all the terms & stipulations contained in those portions of the bid document & such

Page 48 of 63

GTC 7.1 Payment for the Software and Hardware (Schedule A & C):

Payment pertaining to Supply of Hardware and Software will be made in Corporate

office.

GTC 7.2 Payment for DTRs works & Survey of DTCs works (Schedule B):

The Service Provider has to submit the invoices/bills to the respective Executive

Engineers of O & M Divisions on completion of all works of DTCs & DTRs. Payment pertaining

to work involving DTRs & DTCs will be paid in Divisional Office after completion of the DTRs &

DTCs quantity mentioned in DWA.

GTC 7.3 Payment of Contract period of Maintenance & Support of DTMS Project

(Schedule D):

The Service Provider shall submit the bill for 2 years contract period on Quarterly basis

after Declare Go-Live in MESCOM. After the certification from the Executive Engineer on the

bills along with counter sign of SEEs of O & M Circles. Then the bills shall be forwarded to

EE(IT) & in turn the bills will be send to CFO, Corporate office, MESCOM for payment.

Milestone Activity TimeLine Payment Breach of SLA

I II III IV V

M 1 On successful Sign-

off of SRS

8 Weeks 15% of Software Cost 15% of allowable

Software cost (col

IV) for each week

delay.

M 2 On successful Sign-

off of UAT

M1+3 Weeks 15% of Software Cost 15% of allowable

Software cost (col

IV) for each week

delay.

M 3 Delivery of

Hardware after UAT

Sign-Off

M2+2 Weeks 90% of Hardware

Supplied

15% of allowable

Hardware cost

(col IV) for each

week delay.

M 4 Pilot Run Sign-Off M3+9 Weeks [30% of Software +

Actual Quantity of work

as specified in Schedule

B (3) of SW 8.0 + Actual

Quantity of work as

specified in Schedule B

(4) of SW 8.0] in pilot

area, only after

completion of 100%

quantities as specified in

the DWA. However,

payment will be made as

per actuals of survey

beyond the quantities

mentioned in DWA

subject to clause no

4% per Number of

uncompleted

DTR‟s & DTCs

allocated per

division per week

delay.

Page 50: MANGALORE ELECTRICITY SUPPLY COMPANY …e) Specifications: Specification shall mean collectively all the terms & stipulations contained in those portions of the bid document & such

Page 49 of 63

22(c) ITB.

M 5 Roll out in Divisions

after complete Pilot

Run

M4+30

Weeks

(1 Year)

[Actual Quantity of work

as specified in Schedule

B (3) of SW 8.0 + Actual

Quantity of work as

specified in Schedule B

(4) of SW 8.0], only after

completion of 100%

quantities as specified in

the DWA. However,

payment will be made as

per actuals of survey

beyond the quantities

mentioned in DWA

subject to clause no

22(c) ITB.

4% per Number of

uncompleted

DTR‟s & DTCs

allocated per

division per week

delay.

M 6 After Go-live

declaration in

MESCOM

M5

( 1 Year)

20% of Software cost. -

M 7 Maintenance and

Support of DTMS

Project during the

contract period.

2 Years after

Go-Live

declaration

(20% Software + 10%

Hardware +

Maintenance cost) for 2

years on half yearly basis

after Declaration of Go-

Live in MESCOM.

Penalty of 5% of

quarterly

maintenance

charges (col IV)

for not complying

the condition as

per SW 5.12, GTC

20.0 & other works

mentioned in Bid

document on

each week delay.

The Service Provider has to submit the tax invoices to the respective Executive

Engineers of O&M only after completion of all the works in the respective divisions. The

payments will be made as per milestones.

For arranging the payment, following documents will have to be furnished by the Service

Provider:

a. Tax Invoice comprising of GSTIN of the Supplier & MESCOM (29AADCM7029H1ZA) duly

indicating the IGST, SGST & CGST whichever is applicable separately in duplicate,

stamped & pre-receipted.

b. The arrangement for payment of “Tax Amount” will be made only after the Invoice

details of the respective month are uploaded in GSTR-1 by the Service Provider.

Note:

a) The penalty in SLA shall be limited not more than 10 % of total awarded cost.

b) At least one on-site resource with technical expertise and project management skills

shall be deployed during the maintenance phase.

Page 51: MANGALORE ELECTRICITY SUPPLY COMPANY …e) Specifications: Specification shall mean collectively all the terms & stipulations contained in those portions of the bid document & such

Page 50 of 63

c) At least one development resource shall be available on call to address any change

requirements MESCOMs would require during the implementation phase. No additional

payment will be made to implement changes for functional requirements broadly

covered under this document.

d) The payments under maintenance phase will be made once in a quarter subject to

penalty deductions.

e) MESCOM will not pay for any intra-State travel expenditure incurred by the Service

Provider.

GTC 8.0 ANNUAL MAINTENANCE CHARGES (AMC):

MESCOM may decide to extend the maintenance phase beyond the envisaged 2

years of maintenance year to an extent of not more than 2 years on yearly renewal basis

after the completion of the contract period at the discretion of MESCOM & on satisfactory

performance of the Service Provider during the contract period.

The comprehensive AMC per year shall be limited to 10% of awarded software cost

and shall be paid on quarterly basis.

During the AMC period, the Service Provider shall provide Technical support for the

software/hardware/other-suits supplied as envisaged in the tender document. The AMC

period will start after the completion of contract period.

During the entire AMC Contract, the Service Provider shall

update/upgrade/modify/enhance the software and shall also provide any new versions

released, including implementation, with no extra cost to the MESCOM. Service Provider

shall not raise any change request cost during this period.

GTC 9.0 PENALTY:

GTC 9.1 Server Up-time

Performance Requirement Penalty

Baseline > 98.5% uptime, calculated on a

quarterly basis

None

Lower

performance

97-98.5% uptime, calculated on a

quarterly basis

5% of quarterly

maintenance fee

Breach < 97% uptime, calculated on a

quarterly basis

8% of quarterly

maintenance fee

Note:

i. The Service Provider / implementation agency is required to implement the requisite

tools to automatically generate reports on up-time of DTMS application.

ii. The up-time SLA will be implemented only during the maintenance phase.

In case of breach of condition stipulated, MESCOM may issue a show cause notice

seeking explanation from the Service Provider. MESCOM may choose to terminate the

contract if response is not found satisfactory.

Page 52: MANGALORE ELECTRICITY SUPPLY COMPANY …e) Specifications: Specification shall mean collectively all the terms & stipulations contained in those portions of the bid document & such

Page 51 of 63

GTC 9.2 TIMELY RESOLUTION OF ERRORS:

The MESCOM will classify all errors in to three categories:

(I) Critical errors defined as the Errors that causes the shutdown of DTMS server or stop all

services through the server.

(II) High Level Errors defined as those errors that are not the Critical Errors as defined above

but cause great inconvenience or operational difficulties to the MESCOM.

(III)Low Level Errors defined as those other errors that are not the Critical errors or the High

Level Errors as defined above.

Type of Error Requirement Penalty

Critical Within 24 hours of

reporting

Penalty of Rs. 500/-(Rupees Five hundred only) per

hour exceeding 24 hours resolution time apart from

replacement of the respective hardware/software

at SP‟s own cost for solving the errors. If the issue is

not resolved with in the 4 days the penalty at 0.25%

of the total contract value will be levied and

MESCOM reserve the right to terminate the

contract.

High within 48 hours of

reporting

Penalty of Rs. 500/-(Rupees Five hundred only) per

hour exceeding 48 hours resolution time apart fom

replacement of the respective hardware/software

at SP‟s own cost for solving the errors.

If the issue is not resolved with in the 7 days the

penalty at 0.25% of the total contract value will be

levied and MESCOM reserve the right to terminate

the contract.

Low Within 7 days of

reporting

Penalty of Rs. 500/-(Rupees Five hundred only) per

hour exceeding 7 days resolution time apart from

replacement of the respective hardware/software

at SP‟s own cost for solving the errors.

If the issue is not resolved with in the 10 days the

penalty at 0.25% of the total contract value will be

levied and MESCOM reserve the right to terminate

the contract.

Note:

This error resolution SLA will be implemented only during the maintenance phase.

The time taken for error resolution will be calculated as follows (B-A), wherein:

A = MESCOM reports an error by e-mail providing error details.

B = The time at which Implementation Agency/ Service Provider confirms by e-mail

that the error has been resolved.

In case of breach condition, MESCOM may issue a show cause notice seeking

explanation from the Service Provider. MESCOM may choose to terminate the contract

if response is not found satisfactory.

Page 53: MANGALORE ELECTRICITY SUPPLY COMPANY …e) Specifications: Specification shall mean collectively all the terms & stipulations contained in those portions of the bid document & such

Page 52 of 63

GTC 10.0 ORDER CANCELLATION:

MESCOM reserves its right to cancel the entire / unexecuted part of the Purchase

Order at any time by assigning appropriate reasons in the event of one or more of the

following conditions:

1. Delay in delivery beyond the specified period for delivery.

2. Delay in installation, customization and implementation beyond the specified period.

3. Serious discrepancy noticed during the reference checks.

4. Repetitive software/hardware failures/poor service after the delivery and/or live-run but

before the warranty period expiration.

5. Delay in extraction and conversion of legacy data, and uploading converted data to

proposed HRMS Database beyond the stipulated period.

6. Major breach of trust is noticed during any stage of the project

7. Any other appropriate reason in view of the MESCOM.

In addition to the cancellation of contract order, the MESCOM reserves the right to forfeit

the Bank Guarantee.

GTC 11.0 SPARE PARTS

The Service Provider will make the spare parts for the hardware systems available for

the entire contract period. If any of the peripherals / components is not available during the

contract period, the genuine substitution shall be carried out with peripherals/ components

of equivalent or higher capacity arranged by Service Provider.

GTC 12.0 MEAN TIME BETWEEN FAILURES (MTBF)

If during the contract period, any specific server / part of Hardware fails on four or

more occasions in a quarter, it shall be replaced by equivalent / superior new server / part

by the Service Provider at no additional cost to the MESCOM.

GTC 13.0 COMPLIANCE WITH STATUTORY AND REGULATORY PROVISIONS

It shall be the sole responsibility of the Service Provider to comply with all statutory,

regulatory & Law of Land and provisions while delivering the services mentioned in this RFP.

GTC 14.0 LEGAL COMPLIANCE

The Service Provider(SP) hereto agrees that it shall comply with all applicable union,

state and local laws, ordinances, regulations and codes in performing its obligations

hereunder, including the procurement of licenses, permits and certificates and payment of

taxes where required. If at any time during the term of this agreement, the MESCOM is

informed or information comes to the MESCOM‟s attention that the Successful bidder is or

may be in violation of any law, ordinance, regulation, or code (or if it is so decreed or

adjudged by any court, tribunal or other authority), the MESCOM shall be entitled to

terminate this agreement with immediate effect.

The SP shall maintain all proper records, particularly but without limitation accounting

records, required by any law, code, practice or corporate policy applicable to it from time

to time including records, returns and applicable documents under the Labour Legislation.

The SP shall ensure payment of minimum wages to persons engaged by it as fixed

from time to time under the Minimum Wages Act, 1948. In case the same is not paid, the

liability under the act shall solely rest with the SP.

Page 54: MANGALORE ELECTRICITY SUPPLY COMPANY …e) Specifications: Specification shall mean collectively all the terms & stipulations contained in those portions of the bid document & such

Page 53 of 63

GTC 15.0 INDEMNITY

Service Provider shall indemnify, protect and save the MESCOM against all claims,

losses, costs, damages, expenses, action suits and other proceeding, resulting from

infringement of any patent, trademarks, copyrights etc. or such other statutory

infringements in respect of software/hardware/Data base/OS etc. and all the packages,

services offered by SP.

In the event of termination or expiry of the Contract, both the Service Provider &

MESCOM shall comply with the provisions of Exit Plan. During the exit management period,

the Service Provider shall use its best efforts to continue delivery of all regular services. In

addition, the Service Provider shall ensure that complete handover of the processes,

products, software, licenses, source codes, reports, documents, manuals, data, web content

& other Intellectual Property Rights to the replacing Service Provider and/or MESCOM.

GTC 16.0 INTELLECTUAL PROPERTY RIGHTS (IPR):

The DTMS software is entirely the property of MESCOM & it should not be replicated

anywhere without obtaining the prior permission from competent authority of MESCOM.

MESCOM reserves the right to change / modify the existing procedure to suit the future

requirement / best practices in the industry & benchmark the same.

GTC 17.0 PRE-DISPATCH INSPECTION:

a) The Service Provider shall arrange for pre-delivery inspection of all the Hardwares etc.

required for the implementation of the project. The cost of conducting inspection at

factory premises / warehouse shall be borne by SP. However, the cost incurred towards

deploying MESCOM Officers / Engineers for inspection will be on account of MESCOM.

b) DISPATCH CLEARANCE: The equipment‟s shall be dispatched only after issue of

dispatch clearance by the Executive Engineer (Ele.) (IT), MESCOM.

c) ADVANCE INFORMATION OF DISPATCH PARTICULARS: The dispatch documents like

lorry receipt, invoice, packing list shall be sent well in advance to the consignee to

facilitate clearing & obtaining delivery. Advance information of the dispatch of

equipment‟s shall be sent telegraphically / fax to the Executive Engineer (Ele.) (IT),

MESCOM

d) If hardwares received at the site is not found as per the order, Service Provider is liable to

replace the same immediately without any additional cost.

GTC 18.0 FINAL CERTIFICATE

The contract shall not be considered as complete until a final certificate is issued by the

Executive Engineer(Ele), of all the O& M Divisions of MESCOM, to the effect that the Service

Provider has fulfilled all the obligations in the matter provided in the contract not

withstanding any previous entry on the works or taking possession of working or using any

part of the work by MESCOM. Such a final certificate shall be issued within one month of the

physical completion of the work.

GTC 19.0 BACKUP & ARCHIVING:

The backup and archiving shall be done by the Service Provider during the contract

period. The bidder should provide a suitable backup solution to the MESCOM. The bidder will

however be responsible to liaison with MESCOM and to provide all integration required for

backup into external hard disk etc and implementation at other location at DC. Service

Provider shall be responsible for restoration of backup as and when required by MESCOM.

The tapes for taking backup will be provided by the MESCOM.

Page 55: MANGALORE ELECTRICITY SUPPLY COMPANY …e) Specifications: Specification shall mean collectively all the terms & stipulations contained in those portions of the bid document & such

Page 54 of 63

GTC 20.0 DISASTER RECOVERY & BUSINESS CONTINUITY PLAN:

The proposed system must be capable of and compatible for Disaster Recovery and

Business continuity plan Implementation as and when required by MESCOM. The Service

Provider should highlight the provisions for disaster recovery and show that the application

facilitates disaster recovery.

The SP shall provide the document indicating the arrangements made for disaster

recovery and Business continuity plan during the contract period at his cost.

GTC 21.0 PREVENTIVE MAINTENANCE:

The bidder should provide onsite preventive maintenance on quarterly basis. Providing

of all deliverables including warranty services etc. shall be the sole responsibility of the

Service Provider. MESCOM will not be responsible for any delays/violation from third party

OEMs.

GTC 22.0 TECHNICAL INSPECTION & PERFORMANCE EVALUATION:

MESCOM reserves its right to carry out technical inspection and performance

evaluation (bench-marking) of Distribution Transformer Management software and proposed

GIS survey with production Hardware for DTC‟s Data Centre, offered by the Service Providers,

as per discretion of the MESCOM.

GTC 23.0 SAFETY & ACCIDENTS:

The Service Provider should arrange to carry out the fixing of Unique ID for the existing

transformers & painting of DTC code on existing DTCs structure safely with using all good

safety equipments. In case any accident occurs while carrying out fixing of Unique ID for the

existing transformers & painting of existing DTCs structure in the field during the period of

contract to the employees/workers employed by the Service Provider, MESCOM will not be

responsible for any injury that may occur and will not pay any compensation to the workers.

The bidder is sole responsible for any liabilities. Service provider shall arrange to replace the

assets of MESCOM if any damaged while carrying out the works.

GTC 24.0 PERMITS & LICENCE:

All costs incurred in obtaining permits, licenses, specifications or for manufacture,

import, export, testing covered by the „Contract‟ shall be met by the Service Provider.

GTC 25.0 TRANSPORTATION:

Transportation of equipment‟s up to destination inclusive of packing, forwarding, freight

& insurance shall be the responsibility of the Service Provider. The equipment‟s shall be

transported to the consignee‟s by recognized / reputed transport services only.

GTC 26.0 MAINTENANCE:

Following are the minimum maintenance duties in addition to the works mentioned

scope of work in this bid document.

a) Prime shift hours of coverage: The Service Provider shall provide round the clock

maintenance services.

b) Escalation Matrix: The Service Provider shall furnish the escalation matrix indicating the

procedure for lodging of complaints during the guarantee period with at least three

support level contact details.

Page 56: MANGALORE ELECTRICITY SUPPLY COMPANY …e) Specifications: Specification shall mean collectively all the terms & stipulations contained in those portions of the bid document & such

Page 55 of 63

GTC 27.0 FORCE MAJEURE:

a) For the purpose of this contract „Force Majeure‟ means, an event which could not

reasonably, have been avoided by a diligent party in the circumstances, which is

beyond the reasonable control of a party & which makes a party‟s performance of its

responsibilities hereunder impossible or so impractical as reasonably to be considered

impossible in the circumstances & includes, but is not limited to war risks, civil disorder,

earthquake, strikes, lockouts or other industrial action, electrical failure, confiscation or

any other action by Government Agencies.

b) Force Majeure shall not include any event, which is caused by the negligence or

intentional action of a party or such party‟s sub-contractors or agents or employees or

by a failure to observe good engineering practices.

c) Force Majeure shall not include insufficiency of funds or failure to make any payment

required hereunder.

GTC 28.0 TERMINATION OF CONTRACT:

GTC 28.1 Consequences of Termination for Default:

The MESCOM, without prejudice to any other remedy for breach of Contract, by

written notice of default sent to the Bidder, may terminate this Contract in whole or in part, if

the Bidder fails to perform any obligation(s) under the Contract. In the event of the MESCOM

terminating the Contract in whole or in part, the MESCOM may procure, upon such terms

and in such manner, as it deems appropriate, services similar to those undelivered, and the

Bidder shall be liable to the MESCOM for any excess costs for such similar services. In the

event of termination of the Contract due to any cause whatsoever, (whether consequent to

the stipulated term of the Contract or otherwise), MESCOM shall be entitled to impose any

such obligations and conditions and issue any clarifications as may be necessary to ensure

an efficient transition and effective business continuity of the Service(s) which the selected

bidder shall be obliged to comply with and take all available steps to minimize loss resulting

from that termination/breach, and further allow the next successor Vendor to take over the

obligations of the erstwhile Vendor in relation to the execution/continued execution of the

scope of the contract. In the event that the termination of the Contract is due to the expiry

of the term of the Contract, a decision not to grant any (further) extension by MESCOM, the

selected bidder herein shall be obliged to provide all such assistance to the next successor

Bidder or any other person as may be required and as MESCOM may specify including

training, where the successor(s) is a representative/personnel of MESCOM to enable the

successor to adequately provide the Service(s) hereunder, even where such assistance is

required to be rendered for a reasonable period that may extend beyond the term/earlier

termination hereof.

a) Nothing herein shall restrict the right of MESCOM to invoke the Performance Bank

Guarantee and other guarantees, securities furnished, enforce the Deed of Indemnity

and pursue such other rights and/or remedies that maybe available to MESCOM under

law or otherwise.

b) The termination hereof shall not affect any accrued right or liability of either Party nor

affect the operation of the provisions of the Contract that are expressly or by implication

intended to come into or continue in force on or after such termination.

MESCOM or the successful bidder may terminate the contract in full or in parts by giving

a written notice of THREE months to the other party against acknowledgement. The parties

shall make full endeavour for a smooth transition/provide all support to the new vendor and

other party so as to ensure continued customer service and minimum disruption.

Page 57: MANGALORE ELECTRICITY SUPPLY COMPANY …e) Specifications: Specification shall mean collectively all the terms & stipulations contained in those portions of the bid document & such

Page 56 of 63

GTC 28.2 Condition of Termination of Contract:

In case of any default as per the terms and conditions of contract, the MESCOM shall

exercise its discretionary powers on any or all the following:

a) To recover from the bidder, as agreed, liquidated damages or by way of penalty, the

amount as per penalty clause above.

b) The bidder shall not be entitled to any saving on purchase made against default.

c) To cancel the work award.

d) To forfeit the amount equivalent in the particular contract order from the performance

bank guarantee furnished.

e) To blacklist or not to consider future offers for a specified period.

f) The decision of the company shall be final as regards the acceptability or otherwise of

materials/equipment supplied.

g) The breach of agreement of any clause or clauses as stated above is liable for

termination of agreement by giving one month‟s notice.

GTC 29.0 DISPUTES RESOLUTION:

In case of any claim / dispute / disagreement arising out of this, the same shall be

resolved by both the parties through one or more Arbitrators appointed under Karnataka

Arbitration Centre (Domestic & International) Rules 2012.

In case of disputes, the laws applicable to the contract shall be Indian laws in force.

The court of Mangalore shall have exclusive jurisdiction in all matters arising under this

contract.

GTC 30.0 SUB-CONTRACTS:

The Service Provider shall not assign to others, in whole or in part, their obligation to

perform under the contract for maintenance during the contract period.

GTC 31.0 PATENT RIGHTS & ROYALTIES:

a) Royalties & fees for patents covering materials, articles, apparatus, devices, equipment‟s

or processes used in the „works‟ shall be deemed to have been included in the contract

prices.

b) The Service Provider shall satisfy all demands that may be made at any time for such

royalties or fees and he alone shall be liable for any damages or claims for patent

infringements & shall keep the MESCOM indemnified in that regard.

c) The Service Provider shall at his own cost & expense, defend all suits or proceedings that

may be initiated for alleged infringement of any patent involved in the „works‟ & in case

of any award of damages, the Service Provider shall pay for such award.

d) In the event of any suit or proceedings instituted against MESCOM, the same shall be

defended at the cost & expenses of the Service Provider who shall also satisfy / comply

any decree, order or award made against MESCOM.

e) Final payment or any payment to the Service Provider by MESCOM will not be made

while any such suit or claim remains unsettled.

f) In the event any apparatus or equipment or any part thereof furnished by the Service

Provider is in such suit or proceedings held to constitute infringement, & its use is enjoyed,

the Service Provider shall at his opinion & at his own expense, either procure for MESCOM

the right to continue use of said equipment or part thereof, replace it with non-infringing

equipment or modify it, so it becomes non infringing.

g) The Service Provider shall indemnify & keep indemnified MESCOM its successors &

assignees for and against any and all claims, suits, damages, losses, action, demands,

Page 58: MANGALORE ELECTRICITY SUPPLY COMPANY …e) Specifications: Specification shall mean collectively all the terms & stipulations contained in those portions of the bid document & such

Page 57 of 63

costs, charges, royalties & expenses arising from or for infringement real or claimed, copy

rights or other protected rights, if any, of designs, plans, devices, machine drawings or in

respect of the material supplied by the Service Provider for the construction or the

constructed portion of the „project‟ or for the operation of the constructed portion of the

project are found to have infringed any rights.

h) In the event of any claim being made or action being brought against MESCOM in

respect of any of the matters referred in clause above, the Service Provider shall

promptly be notified and he shall at his own expense conduct all negotiations &

settlement of the same and any litigation that may arise there from.

GTC 32.0 DEATH, BANKRUPTCY ETC.

If the Contractor commits any act of bankruptcy or being a firm commences to be

wound up except for reconstruction purposes or carries on its business under a receiver the

executors, successors or other representatives in law, liquidator or any person in whom the

contract may become vested, shall forthwith give notice thereof in writing to the Engineer

and shall take all reasonable steps to prevent stoppage of works for one month during which

period be shall have the option of carrying out this contract or providing such guarantee as

the Engineer may require but not exceeding the value of the work for the time being

remaining unexecuted. In the event of stoppage of works, the period of option shall be

fourteen days only. Provided that should the above action be not exercised the contract

may be terminated by the CGM(OP), on recommendation from the respective Executive

Engineer C,O & M Division and SEEs of C, O & M Circles the retention moneys be forfeited to

MESCOM, except in case of termination caused by the death of the Contractor.

GTC 33.0 DEVIATION IN TERMS OF PAYMENT

17.1 No deviation in the clauses of the terms of the payment shall be accepted. Bids offered

with different terms of payment are liable for rejection.

17.2 The items of work mentioned in the Schedule of Prices are only indicative and will be

considered for evaluation purpose. In case any item of work is not quoted by the Bidder and

the same is essentially required to be done for satisfactory performance of the Work, then the

same shall be done by the Bidder at no extra cost to the MESCOM.

Sd/-

Executive Engineer (Ele.) (IT)

Corporate Office, MESCOM

Mangalore

Page 59: MANGALORE ELECTRICITY SUPPLY COMPANY …e) Specifications: Specification shall mean collectively all the terms & stipulations contained in those portions of the bid document & such

Page 58 of 63

Annexure I

Details of Division Wise Distribution Transformer Centers as on January 2018

Bid Enquiry No. MESCOM/2017-18/IT005 Dated 04-12-2017

Name of the Division 15

KVA

25 KVA 50 KVA 63 KVA 100

KVA

160

KVA

200

KVA

250

KVA

315

KVA

500

KVA

750

KVA

Total

Mangalore-1 4 345 0 1833 1174 3 8 654 3 118 4 4146

Mangalore-2 16 686 3 2081 908 0 11 176 3 22 2 3908

Puttur 4 2446 2 1946 576 0 11 26 4 9 0 5024

Bantwal 11 2779 4 2603 692 0 13 58 0 18 0 6178

Udupi 10 2091 4 2651 1098 0 13 308 1 70 9 6255

Kundapura 10 1472 0 1357 371 0 2 37 0 2 0 3251

Shimoga 0 3229 2 2581 1158 0 10 269 3 0 0 7252

Bhadravathi 0 1719 0 909 262 0 18 65 0 8 0 2981

Sagar 0 3728 1 1210 177 1 4 21 0 1 0 5143

Shikaripura 0 3827 0 1616 545 0 0 10 0 0 0 5998

Chikmagalur 0 2147 9 1389 361 0 25 98 1 14 3 4047

koppa 0 1250 10 760 166 0 9 16 0 3 0 2214

Kadur 0 4046 0 2779 869 1 9 18 1 2 0 7725

Total 55 29765 35 23715 8357 5 133 1756 16 267 18 64122

Page 60: MANGALORE ELECTRICITY SUPPLY COMPANY …e) Specifications: Specification shall mean collectively all the terms & stipulations contained in those portions of the bid document & such

Page 59 of 63

Annexure II

Specification of Hardware

Bid Enquiry No. MESCOM/2017-18/IT005 Dated 04-12-2017

1. Minimum Hardware Specification for Servers (2 Nos):

Make: Reputed make like DELL/HP/IBM etc.

Rack mountable Servers.

Dual 64-bit 12 core Processor with 2Ghz or above, Minimum of 64 GB RAM

expandable upto 256 GB.

Raw 600 GB x 2 nos. of Storage.

12 TB of internal storage on existing NAS of MESCOM.

Raid Controller supporting RAID 0, 1, 5.

Minimum of 2 x 1Gbps and 2 x 10GBPS Network ports.

The CPU utilization of each server on full/peak load should not exceed 70% &

average CPU utilization over the day should not exceed 30% Database Server disk sizing

should also take into account the number of years of data to be made available on-line.

2. Tablet PCs compatible with mobile app of DTMS(14Nos).

Make: Reputed make like Samsung/Lenovo/Windows/Apple etc.,

It shall be rugged mobile computer / tablet of reputed make.

Preloaded with latest OS.

Processor: Octo-core up to 1.8 Ghz or above CPU Speed.

RAM size: 3GB or above.

Battery: 10-20 Hrs Backup

Display: 10.1‟ with full HD with 10-point multitouch

Storage: Up to 64 GB internal storage and scalable upto 128GB including microSD

Connectivity: Bluetooth, Wifi, 2G/3G/4G-enabled.

Camera: 8 MP auto-focus rear camera

Ports: microSD slot, combo audio jack

Colors: Aurora Black

Location Technology: GPS, Glonass

Sensors: Accelerometer, Fingerprint sensors etc.

Warranty period: 3 Years

Page 61: MANGALORE ELECTRICITY SUPPLY COMPANY …e) Specifications: Specification shall mean collectively all the terms & stipulations contained in those portions of the bid document & such

Page 60 of 63

Annexure-III

ACCEPTENCE OF TERMS & CONDITIONS

Bid Enquiry No. MESCOM/2017-18/IT005 Dated 04-12-2017

Design, Development, Supply of “Distribution Transformer Management”

Software & GIS Survey of DTCs for condition assessment, tracking etc.

To,

Executive Engineer(Ele)(IT)

MESCOM Corporate Office, MESCOM BHAVANA,

Post Box No. 1130, Kavoor Cross Road, Bejai,

MANGALORE - 575 004.

Sir,

Having examined the Bidding documents including Addenda

Nos……………………(Insert Number of sheets), the receipt of which is hereby duly

acknowledged, we, the undersigned, offer to supply and delivery “Design, Development,

Supply of “Distribution Transformer Management” Software & GIS Survey of DTCs for condition

assessment, tracking etc.(description of goods and services in conformity with the said

bidding documents and as per the price schedules furnished in a separate sealed price

bid).

We undertake if our bid is accepted, to Supply & Installation of UTM Firewall & Server

Antivirus Software to MESCOM as per the terms & conditions of the bid / tender document as

per requirements of MESCOM.

We agree to abide by this bid for a period of 240 days from the date fixed for bid

opening under the clauses of Instructions to Bidders (ITB) and it shall remain binding upon us

& may be accepted at any time before the expiration of that period.

Until a formal contract is prepared and executed, this bid together with your written

acceptance thereof and the notification of award shall constitute a binding contract

between us.

Date: Name of the Firm

Place:

Page 62: MANGALORE ELECTRICITY SUPPLY COMPANY …e) Specifications: Specification shall mean collectively all the terms & stipulations contained in those portions of the bid document & such

Page 61 of 63

Annexure-IV

Format of Qualification Details of Bidders

Bid Enquiry No. MESCOM/2017-18/IT005 Dated 04-12-2017

Design, Development, Supply of “Distribution Transformer Management”

Software & GIS Survey of DTCs for condition assessment, tracking etc.

Please fill only in the light blue coloured cells.

The bidder must submit the qualification details along with the information in the following format

together with relevant documentation while submitting their bids.

1 Name & address of Bidder (office)

2 Contact Nos. Phone:

Fax:

E-Mail

3 Performance

I. Name & Address of the Bidder

II. Classification (Please state clearly

the Following):-

(a) Firm

(b) Authorized Agent

(c) Dealer

(d) Others

4 Details of Organization:

(a) No. of Engineering Personnel

(b) No. of Accounting Personnel

(c) No. of skilled employees

(d) No. of unskilled employees

5. Names of three utilities to whom similar

Services are rendered in the past and

to whom reference may be made by

MESCOM regarding the bidder‟s

technical and delivery ability (please

enclose copies of orders obtained).

Performance certificates from these

utilities shall also be submitted.

Name & Signature of the Bidder:____ ____________

Company seal with full address: _________________

Place:

Date:

Page 63: MANGALORE ELECTRICITY SUPPLY COMPANY …e) Specifications: Specification shall mean collectively all the terms & stipulations contained in those portions of the bid document & such

Page 62 of 63

Annexure –V

MESCOM

Bid Enquiry No. MESCOM/2017-18/IT005 Dated 04-12-2017

Design, Development, Supply of “Distribution Transformer Management”

Software & GIS Survey of DTCs for condition assessment, tracking etc.

Format of Financial Business & Technical Capability of Bidders

Please fill only in the light blue coloured cells.

Order

placed by

Full

Address of

Purchaser*

Order

No. &

Date

Description

& Quantity

ordered by

Utility

Value

of

Order

Date of

Completion of

Delivery/Service

Remarks

indicating

reasons for late

delivery/Delayed

completion if

any,

Has the Service was

functioning

satisfactorily? (Attach

a certificate from

competent authority)

As per

contract Actual

NOTE: * Any additional details can be submitted in the same format in a separate sheet.

Name & Signature of the Bidder:________________

Company seal with full address:_________________

Place:

Date:

Page 64: MANGALORE ELECTRICITY SUPPLY COMPANY …e) Specifications: Specification shall mean collectively all the terms & stipulations contained in those portions of the bid document & such

Page 63 of 63

Annexure – VI

MESCOM

Bid Enquiry no: MESCOM/2017-18/ IT005 Dated 04-12-2017

Design, Development, Supply of “Distribution Transformer Management”

Software & GIS Survey of DTCs for condition assessment, tracking etc.

NOTORIZED DECLARATION

(Declaration by the bidder shall be duly signed by the Notary on Rs. 200/- stamp

paper purchased in Karnataka).

I, _____________________________________________________________________ declare that

M/s.____________________________________________ have not been subject to Ineligibility for

corrupt or fraudulent practices or blacklisted with any of the Government / PSUs / Esteemed

Organizations and who‟s work order have been short closed due to non-performance or

who‟s LOA is withdrawn by the owner due to inefficiency of the bidder in performing or

implementing assigned project in technically / financially / based on such poor performance

whose bids have been rejected at the technical evaluation stage itself by any ESCOMs are

not eligible to participate in this bid.

Signature of the Bidder:________________________

Name:________________________________________

Designation:__________________________________

Company seal with full address:________________

Place:

Date: