4
MANPOWER DEPLOYMENT STATUS OF 2X600 MW, JITPL, ANGUL, ODISHA Oct-2013 SL NO PACKAGE DISCIPLINE AGENCY 1-Oct-13 3-Oct-13 T A T A 1 TG-1 & PH-1 Civil SPCL 100 84 100 65 2 TG-2 & PH-2 Civil SPCL 100 188 100 176 3 Control Building Civil SPCL 135 54 135 57 4 Guard Pond Civil SPCL 10 0 10 0 5 Fire Station Civil SPCL 0 0 0 0 6 ESP-1 & 2 Civil SPCL 0 0 0 0 7 Boiler-1 & 2 Civil SPCL 50 48 50 48 8 Structural SPCL 200 204 200 200 9 TG#1 Painting Structural SPCL 35 54 35 54 10 Fabrication U#1 Fabrication SPCL 0 0 0 0 11 Fabrication U#2 Fabrication SPCL 100 74 100 74 12 ID Fan Unit #1 & 2 Civil SPCL 10 0 10 0 13 Bowl Mill # 2 Civil SPCL 0 0 0 0 14 Service Building Civil SPCL 100 82 100 82 15 Canteen Building Civil SPCL 20 12 20 12 16 Storage Shed Civil/Ern SPCL 70 37 70 37 17 Civil SPCL 80 136 80 136 18 SA Fan Foundation Civil SPCL 0 0 0 0 19 PA Fan Foundation Civil SPCL 0 0 0 0 20 FD Fan Foundation Civil SPCL 0 0 0 0 21 Cable Rack & trench Civil SPCL 10 0 10 0 22 Cable Rack Mech SPCL 40 53 40 58 23 Drain & Road Civil SPCL 12 0 12 0 24 Siemens SwitchYard Civil SPCL 0 0 0 0 25 Air Compressor Building Civil SPCL 10 9 10 9 SPCL 1082 1035 1082 1008 Night Shift Civil SPCL 0 0 26 BOILER-1 ERECTION BHEL/PCP 540 250 540 250 Fitters BHEL/PCP 25 8 25 8 Welders BHEL/PCP 55 15 55 15 Ducting BHEL/PCP 120 68 120 69 Mill BHEL/PCP 35 0 35 0 Fans & APH BHEL/PCP 15 26 15 26 Night Shift BHEL/PCP 0 0 27 ERECTION BHEL/UBEL 540 390 540 370 Fitters-PP BHEL/UBEL 20 7 20 7 IBR Welders BHEL/UBEL 10 2 10 2 Ducting BHEL/UBEL 120 70 120 71 Mill BHEL/UBEL 40 0 40 0 Fans & APH BHEL/UBEL 15 26 15 26 28 POWER CYCLE PIPING-1 ERECTION BHEL/B&R 602 563 602 579 29 LINING & INSULATION -1 ERECTION BHEL/B&R 240 219 240 205 B & R 842 782 842 784 Night Shift B & R 0 0 30 LINING & INSULATION -2 ERECTION BHEL/PowerMech 150 75 150 75 31 POWER CYCLE PIPING-2 ERECTION BHEL/PowerMech 250 70 250 70 PowerMech 400 145 400 145 Night Shift PowerMech 0 0 32 BTG-Electrical Erection BHEL/Vasavi 180 180 180 180 33 BTG-C&I Erection U#01 75 72 75 72 TG #1 & 2 & Control Building Misc (Store, Batching plant, QC,survey, steel yard,etc) BOILER-2 BHEL/Auto Trical

Manpower Report 03.10.2013

Embed Size (px)

DESCRIPTION

d

Citation preview

Page 1: Manpower Report 03.10.2013

Page 1 of 4

MANPOWER DEPLOYMENT STATUS OF 2X600 MW, JITPL, ANGUL, ODISHA Oct-2013

SL NO PACKAGE DISCIPLINE AGENCY 1-Oct-13 3-Oct-13T A T A

1 TG-1 & PH-1 Civil SPCL 100 84 100 65

2 TG-2 & PH-2 Civil SPCL 100 188 100 176

3 Control Building Civil SPCL 135 54 135 57

4 Guard Pond Civil SPCL 10 0 10 0

5 Fire Station Civil SPCL 0 0 0 0

6 ESP-1 & 2 Civil SPCL 0 0 0 0

7 Boiler-1 & 2 Civil SPCL 50 48 50 48

8 TG #1 & 2 & Control Building Structural SPCL 200 204 200 200

9 TG#1 Painting Structural SPCL 35 54 35 54

10 Fabrication U#1 Fabrication SPCL 0 0 0 0

11 Fabrication U#2 Fabrication SPCL 100 74 100 74

12 ID Fan Unit #1 & 2 Civil SPCL 10 0 10 0

13 Bowl Mill # 2 Civil SPCL 0 0 0 0

14 Service Building Civil SPCL 100 82 100 82

15 Canteen Building Civil SPCL 20 12 20 12

16 Storage Shed Civil/Ern SPCL 70 37 70 37

17 Civil SPCL 80 136 80 136

18 SA Fan Foundation Civil SPCL 0 0 0 0

19 PA Fan Foundation Civil SPCL 0 0 0 0

20 FD Fan Foundation Civil SPCL 0 0 0 0

21 Cable Rack & trench Civil SPCL 10 0 10 0

22 Cable Rack Mech SPCL 40 53 40 58

23 Drain & Road Civil SPCL 12 0 12 0

24 Siemens SwitchYard Civil SPCL 0 0 0 0

25 Air Compressor Building Civil SPCL 10 9 10 9

SPCL 1082 1035 1082 1008

Night Shift Civil SPCL 0 0

26 BOILER-1 ERECTION BHEL/PCP 540 250 540 250

Fitters BHEL/PCP 25 8 25 8

Welders BHEL/PCP 55 15 55 15

Ducting BHEL/PCP 120 68 120 69

Mill BHEL/PCP 35 0 35 0

Fans & APH BHEL/PCP 15 26 15 26

Night Shift BHEL/PCP 0 0

27 ERECTION BHEL/UBEL 540 390 540 370

Fitters-PP BHEL/UBEL 20 7 20 7

IBR Welders BHEL/UBEL 10 2 10 2

Ducting BHEL/UBEL 120 70 120 71

Mill BHEL/UBEL 40 0 40 0

Fans & APH BHEL/UBEL 15 26 15 26

28 POWER CYCLE PIPING-1 ERECTION BHEL/B&R 602 563 602 579

29 LINING & INSULATION -1 ERECTION BHEL/B&R 240 219 240 205

B & R 842 782 842 784

Night Shift B & R 0 0

30 LINING & INSULATION -2 ERECTION BHEL/PowerMech 150 75 150 75

31 POWER CYCLE PIPING-2 ERECTION BHEL/PowerMech 250 70 250 70

PowerMech 400 145 400 145

Night Shift PowerMech 0 0

32 BTG-Electrical Erection BHEL/Vasavi 180 180 180 180

33 BTG-C&I Erection U#01 BHEL/Auto Trical 75 72 75 72

Misc (Store, Batching plant,QC,survey, steel yard,etc)

BOILER-2

Page 2: Manpower Report 03.10.2013

Page 2 of 4

MANPOWER DEPLOYMENT STATUS OF 2X600 MW, JITPL, ANGUL, ODISHA Oct-2013

SL NO PACKAGE DISCIPLINE AGENCY 1-Oct-13 3-Oct-13T A T A

34 BTG-C&I Erection U#02 50 27 50 27

35 PHB Cladding Erection Lloyd Insulation 50 34 50 34

36 TURBINE-1 ERECTION BHEL/UBEL 200 194 200 190

37 TURBINE-2 ERECTION BHEL/EEPL 100 42 100 50

UBEL 740 584 740 560

Night Shift UBEL 0 0

38 ESP-1 & Ducting ERECTION BHEL/Golden Edge 321 304 321 304

Night Shift 72 70

39 ESP-2 & Ducting ERECTION BHEL/Rukmani 250 171 250 166

40 Mill Bunker-2Fabrication/ Erection Rukmani 20 21 20 22

Fabrication/ Erection Omega 200 167 200 179

Rukmani/Omega 470 359 470 367

Night Shift Rukmani/Omega 21 21

41 ESP Control Room & ID fan Civil Gammon 75 85 75 90

42 ChimneyCIVIL Gammon 15 4 15 4

ERECTION Gammon 20 24 20 24

43 CW Pump House & SG BldgCIVIL Gammon 15 11 15 12

Fab/Ern Gammon 0 0 0 0

44 Water treatment plant CIVIL Gammon 175 171 175 179

45 CIVIL Gammon 50 25 50 26

46 Air Washer Building CIVIL Gammon 10 5 10 5

47 Fuel Oil Pump House CIVIL Gammon 50 25 50 26

48 Pipe rackCIVIL Gammon 0 0 0 0

Gammon 10 12 10 10

49 Raw Water Pump House CIVIL Gammon 45 25 45 28

50 CW PipingCIVIL Gammon 20 0 20 0

ERECTION Gammon 30 25 30 25

51 TOWNSHIP CIVIL Gammon 335 261 335 298

52 ACW Piping Fabrication/ Erection Gammon 0 0 0 0

53 Transformer yard Civil Gammon 135 98 135 102

54 Transformer yard-Drain Civil Gammon 30 10 30 10

55 Civil Gammon 90 71 90 71

56 Raw Water Pump House Fabrication Gammon 0 0 0 0

57 Misc Gammon 130 125 130 126

GAMMON 1295 1022 1295 1090

Night Shift Civil GAMMON 95 95

58 0 0 0 0

59 TRANSMISSION LINECIVIL GAMMON 100 25 100 25

ERECTION GAMMON 400 200 400 200

500 225 500 225

60CIVIL SIEMENS 50 30 50 30

ERECTION SIEMENS 0 0 0 0

61 E BOPCIVIL SIEMENS 70 19 70 20

ERECTION SIEMENS 100 128 100 131

BHEL/Powertronics

BHEL/Golden Edge

CW Side Stream Filtration Unit & Chlorination Building

Fab/Erection & Painting

River Water PH,channel & forebay & Cofferdam

Misc (Store, batching plant,QC,survey etc)

Overhead Service Tank-Township

Abhinav Construction

GAMMON-TR LINE

Bays at Angul pooling station with metering yard

G60
Planning 02: including deptt staff-27 nos
I60
Planning 02: including supporting staff-27 nos
G62
Planning 02: including staff -24 nos
I62
Planning 02: including staff -24 nos
G93
BOP06: Upto LiLo-405 After LiLo-55
I93
BOP06: Upto LiLo-405 After LiLo-55
Page 3: Manpower Report 03.10.2013

Page 3 of 4

MANPOWER DEPLOYMENT STATUS OF 2X600 MW, JITPL, ANGUL, ODISHA Oct-2013

SL NO PACKAGE DISCIPLINE AGENCY 1-Oct-13 3-Oct-13T A T A

SIEMENS 220 177 220 181

Night Shift SIEMENS

62 LP PIPING ERECTION Zeromm 100 80 100 75

63 ERECTION NEW FIRE ENGG. 100 70 100 70

64 DG Building CIVIL KSSIIPL 10 1 10 0

65 Mill Bunker-1 CIVIL KSSIIPL 15 11 15 11

Erection KSSIIPL 300 261 300 301

66 Duct Support & ID fan CIVIL KSSIIPL 0 0 0 0

67 ESP control room-2 CIVIL KSSIIPL 120 110 120 110

68 PA, FD fan foundation CIVIL KSSIIPL 0 0 0 0

69 Structural Erection-TG-2 ERECTION KSSIIPL 0 0 0 0

70 Structural Fabrication Fabrication KSSIIPL 175 120 175 121

71 Misc KSSIIPL 55 19 55 19

KSSIIPL 675 522 675 562

Night Shift KSSIIPL 41 74

72 COOLING TOWER-1CIVIL PCTL 20 15 20 18

ERECTION PCTL 0 0 0 0

73 COOLING TOWER-2CIVIL PCTL 200 143 200 142

ERECTION PCTL 80 30 80 30

PCTL 300 188 300 190

Night Shift PCTL 0 0

74CIVIL TECPRO 150 92 150 95

ERECTION TECPRO 200 178 200 200

75CIVIL TECPRO 40 15 40 18

ERECTION TECPRO 30 12 30 8

TECPRO 420 297 420 321

Night Shift Tecpro 8 8

76 C W PUMPs ERECTION KBL 30 22 30 22

77 River Water Piping RAUNAQ 50 31 50 5

78 Raw Water Pump house ERECTION RAUNAQ 15 9 15 9

79 River Water Pump House ERECTION RAUNAQ 15 11 15 12

80 CW makeup line ERECTION RAUNAQ 10 9 10 9

RAUNAQ 90 60 90 35

81 CIVIL SAMARPITA 0 0 0 0

82 ERECTION IEL 110 45 110 45

83 FLY ASH SYSTEMCIVIL MACAWBER 100 55 100 74

ERECTION MACAWBER 90 70 90 73

84

CIVIL BSBK 65 58 65 70

ERECTION BSBK 40 47 40 47

Refractory ERECTION BSBK 0 0 0 0

MBPL/BSBK 295 230 295 264

Night Shift MBPL/BSBK 0 0

85 ERECTION ATLAS COPCO 10 0 10 5

86 FUEL OIL SYSTEM ERECTION 20 23 20 22

87 ERECTION 40 34 40 34

88 EOT CRANE 105/15 T-2ND ERECTION WMI 0 0 0 0

FIRE PROTECTION SYSTEM

Infrastructure & Misc (Store, batching plant,QC,survey ,steel yard etc)

CHP

MINE CONVEYOR SYSTEM

CIVIL/ERECTION

Haul Road-River Water System

WATER TREATMENT PLANT

BOTTOM ASH HANDLING SYSTEM

COMPRESSED AIR SYSTEM

THERMOSYSTEMS

AIR CONDITIONING SYSTEM

STERLING & WILSON

G100
Planning 02: Includes manpower of Zeromm & other vendors
I100
Planning 02: Includes manpower of Zeromm & other vendors
G134
Planning 02: includes 27 manpower in electrical
I134
Planning 02: includes 27 manpower in electrical
Page 4: Manpower Report 03.10.2013

Page 4 of 4

MANPOWER DEPLOYMENT STATUS OF 2X600 MW, JITPL, ANGUL, ODISHA Oct-2013

SL NO PACKAGE DISCIPLINE AGENCY 1-Oct-13 3-Oct-13T A T A

89 EOT CRANE -30 T ERECTION SAFEX 15 4 15 1

90CIVIL Gammon 40 40 40 41

ERECTION Airox Nigen 0 0 0 0

91CIVIL Gammon 0 0 0 0

ERECTION Ion Exchange 0 0 0 0

92 ERECTION CHEMTROL 0 0 0 0

93 COLTCS ERECTION GEA-BGR 0 0 0 0

94 WORKSHOP EQUIP.-I ERECTION HMT 0 0 0 0

95 ERECTION BATLIBOI 0 0 0 0

96 WORKSHOP EQUIP.-III ERECTION PATHAK 0 0 0 0

97 Raw Water Reservoir Civil Sinhotia 350 341 350 355

98 Roads

Civil Nanda 30 5 30 15

Civil RK Associates 25 6 25 17

Civil Pradhan 25 7 25 13

Civil Monalisha 25 0 25 0

99 Civil Monalisha 60 0 60 82

100 Peripheral Drainage-II Civil R K Associates 50 0 50 0

101 Internal DrainsCivil R K Associates 95 51 95 85

Civil Gammon 20 5 20 13

102 Ash Dyke` Civil Sinhotia 100 0 100 0

145 51 145 85

60 0 60 82

Sinhotia 450 341 450 355

Night Shift Sinhotia 110 0

103 EOT CRANE ERECTION Electromech 5 0 5 0

TOTAL 9835 7223 9835 7490

Night Shift (Total) 347 268

Note:

HYDROGEN GENERATION PLANT

SEWAGE TREATMENT PLANT

Ambient Air Quality Monitoring System

WORKSHOP EQUIP.-II (BATLIBOI)

Peripheral Drainage-I + Internal drain

R K Associates( Drain)

Monalisha(Drains)

(i) Agency wise manpower includes night shift manpower also. Total manpower in night shift as on 01.10.2013 - 268 heads(ii) Less Manpower in night shift on 01.10.2013 due to rains.