DPMANPOWER DEPLOYMENT STATUS OF 2X600 MW, JITPL, ANGUL, ODISHA
March-2013696169747068SL
NOPACKAGEDISCIPLINEAGENCY1-Mar-132-Mar-134-Mar-13TATATA1TG-1 &
PH-1CivilSPCL1251481251511251332TG-2 &
PH-2CivilSPCL8010480110801123Control
BuildingCivilSPCL5010850110501324Guard Pond
GCW-ICivilSPCL5035503550205Fire StationCivilSPCL1501501506ESP-1
& 2 CivilSPCL4004004007TG-1 & Control
BuildingStructuralSPCL1753631753661753608Fabrication
YardFabricationSPCL1507115068150719Duct
SupportCivilSPCL600600601210Bowl Mill #
2CivilSPCL25025025011Service
BuildingCivilSPCL759675967510812Canteen
BuildingCivilSPCL15121512151413Storage Shed25025025014Misc (Store,
Batching plant,QC,survey, steel
yard,etc)CivilSPCL40160401594016015SA Fan Foundation
CivilSPCL12121216Air Compressor
BuildingGCW-ICivilSPCL206206206SPCL945111594511259451140Night
ShiftCivilSPCL80777517BOILER-1ERECTIONBHEL/PCP640456
Planning01: Planning01:Including total workers and supporting
staff640452
Planning01: Planning01:Including total workers and supporting
staff640428
Planning01: Planning01:Including total workers and supporting
staffFitters-PPBHEL/PCP202020202018IBR
WeldersBHEL/PCP126126126Night ShiftBHEL/PCP26242218BOILER-2
ERECTIONBHEL/UBEL510340
Planning01: Planning01:Including Total workers and supporting
Staff510335
Planning01: Planning01:Including Total workers and supporting
Staff510330
Planning01: Planning01:Including Total workers and supporting
StaffFitters-PPBHEL/UBEL207207207IBR
WeldersBHEL/UBEL10410410319POWER CYCLE
PIPING-1ERECTIONBHEL/B&R15018515018515017320LINING &
INSULATIONERECTIONBHEL/B&R15019150181501821POWER CYCLE
PIPING-2ERECTIONBHEL/B&R00000022BTG-ElectricalErectionBHEL/Vassavi75657565757823PHB
CladdingErectionLloyd
Insulation108108101024TURBINE-1ERECTIONBHEL/UBEL10010410010410012325TURBINE-2ERECTIONBHEL/UBEL000000UBEL610444610439610453Night
ShiftUBEL001626ESP-1 & DuctingERECTIONBHEL/Golden
Edge300295300295300290Night ShiftBHEL/Golden Edge75758027ESP-2
& DuctingERECTIONBHEL/Rukmani200170
Planning01: Planning01:Including Total Workers and supporting
Staff.200172
Planning01: Planning01:Including Total Workers and supporting
Staff.200170
Planning01: Planning01:Including Total Workers and supporting
Staff.28Mill
Bunker-2FabricationRukmani100461004910044ERECTIONRukmani000Night
Shift FabricationRukmani552Rukmani30021630022130021429ESP Control
Room & ID fanGCW-IIICivilGammon12015412014212014230ChimneyCIVIL
Gammon154154154ERECTIONGammon50425041504431CW Pump House & SG
BldgGCW-IICIVIL Gammon755975407540Fab/ErnGammon35353515351932Water
treatment plantGCW-IIICIVIL Gammon27530527532527531533CW Side
Stream Filtration Unit & Chlorination BuildingCIVIL
Gammon40664059406634Air Washer BuildingCIVIL
Gammon20122014201435Fuel Oil Pump HouseGCW-IICIVIL
Gammon60906082607936Pipe rackGCW-IIICIVIL
Gammon807480688038Fab/ErectionGammon60526056606037Raw Water Pump
HouseGCW-IICIVIL Gammon40514044405938CW PipingGCW-IICIVIL
Gammon505250335040ERECTIONGammon250250251539TOWNSHIPCIVIL
Gammon30011830014030012840Transformer
yardGCW-IIICivilGammon10082100791009741River Water PH,channel &
forebay &
CofferdamGCW-IICivilGammon12013012014212012042Fabrication
YardFabricationGammon43Misc (Store, batching plant,QC,survey
etc)MiscGammon501255012550125GAMMON171015101710146417101475Night
ShiftCivilGAMMON14511513744Overhead Service Tank-TownshipAbhinav
Construction15121512151245TRANSMISSION LINECIVIL
GAMMON175245175245175245ERECTIONGAMMON170270
BOP06: BOP06:Stringing-50 nos +Erection-200 nos170270
BOP06: BOP06:Stringing-50 nos +Erection-200 nos170270
BOP06: BOP06:Stringing-50 nos +Erection-200 nosGAMMON-TR
LINE34551534551534551546Bays at Angul pooling station with metering
yardCIVIL SIEMENS753575357535ERECTIONSIEMENS00000047E BOP41CIVIL
SIEMENS100521005210052ERECTIONSIEMENS505350535053SIEMENS22514022514022514048LP
PIPINGERECTIONUNITECH20172017201249FIRE PROTECTION
SYSTEMERECTIONNEW FIRE ENGG.40484048404250DG BuildingCIVIL
Petron15181518152551Mill Bunker-1& Bowl Mills-1CIVIL
Petron125117125115125133ErectionPetron60576057604852Duct Support
& ID fanCIVIL Petron10011210012610012053ESP control room-2CIVIL
Petron10025100271003754PA, FD fan foudationCIVIL
Petron25325225055Structural
Erection-TG-2ERECTIONPetron01501501556Structural
FabricationFabricationPetron17515517515917515857Infrastructure
& Misc (Store, batching plant,QC,survey ,steel yard
etc)MiscPetron406840594059Petron640570640578640595Night Shift
Petron51253058COOLING TOWER-1CIVIL
PCTL125125125120125122ERECTIONPCTL12596125961259659COOLING
TOWER-2CIVIL
PCTL200171200170200168ERECTIONPCTL000000PCTL450392450386450386Night
ShiftCivil/MechPCTL62060CHP CIVIL
TECPRO250161250168250190ERECTIONTECPRO20011620011120014061MINE
CONVEYOR SYSTEM CIVIL
TECPRO752875277530ERECTIONTECPRO000000TECPRO525305525306525360Night
ShiftCivil/MechTecpro4462C W PUMPsERECTIONKBL20102011201563RIVER
WATER PipingCIVILRAUNAQERECTIONRAUNAQ705270587079CW makeup
lineERECTIONRAUNAQ201320132014RAUNAQ906590719093Haul Road-River
Water SystemCIVILSAMARPITA00000064WATER TREATMENT
PLANTERECTIONIEL25252525251865FLY ASH SYSTEMCIVIL MACAWBER
170170170170170170ERECTIONMACAWBER 10055100561005566BOTTOM ASH
HANDLING SYSTEMCIVIL
BSBK30103010301028ERECTIONBSBK501550165015MBPL/BSBK35025035025235025067COMPRESSED
AIR SYSTEM ERECTIONATLAS COPCO10510510468FUEL OIL
SYSTEMERECTIONTHERMOSYSTEMS251125325369AIR CONDITIONING
SYSTEMCIVILSPCL000000ERECTIONSTERLING & WILSON70EOT CRANE
105/15 T-2NDERECTIONWMI00000071EOT CRANE -30
TERECTIONSAFEX20820820372HYDROGEN GENERATION PLANT GCW-IIICIVIL
Gammon402040204028ERECTIONAirox Nigen00000073SEWAGE TREATMENT PLANT
GCW-IIICIVIL Gammon000000ERECTIONIon Exchange00000074Ambient Air
Quality Monitoring SystemERECTIONCHEMTROL00000075COLTCS
ERECTIONGEA-BGR00000076WORKSHOP EQUIP.-IERECTIONHMT
00000077WORKSHOP EQUIP.-II (BATLIBOI)ERECTIONBATLIBOI
00000078WORKSHOP EQUIP.-IIIERECTIONPATHAK00000079Raw Water
reservoir -2CivilSinhotia20011720015720015780Peripheral
Drainage-ICivilMonalisha15530155321554781Peripheral
Drainage-IICivilR K Associates00000082Roads & DrainsCivilR K
Associates250128250136250137CivilGammon15539155351554283Ash
Dyke`CivilSinhotia000000R K
Associates250128250136250137Monalisha155301553215547Sinhotia20011720015720015784EOT
CRANE ERECTIONElectromech000000TOTAL829569618295697482957068Night
Shift (Total)382387366
Note:(i) Agency wise night shift manpower is included in above report.Total manpower in night shift as on 02.03.2013 - 366 heads(ii) In PCP, 428 manpower reported at site in the forenoon but the work is affected as the manpower left site and was not available in afternoon.