MANPOWER DEPLOYMENT STATUS OF 2X600 MW, JITPL, ANGUL, ODISHA Jun-2014
SL NO PACKAGE DISCIPLINE AGENCY 6-Jun-14 7-Jun-14 9-Jun-14 10-Jun-14 11-Jun-14 12-Jun-14
T A T A T A T A T A T A
1 TG-1 & PH-1 Civil SPCL 100 82 100 75 100 72 100 75 100 75 80 78
2 TG-2 & PH-2 Civil SPCL 120 60 120 55 120 46 120 54 120 56 120 58
3 Control Building Civil SPCL 50 48 50 44 50 18 50 22 50 26 30 26
4 Guard Pond Civil SPCL 0 0 0 0 0 0 0 0 0 0 0 0
5 Fire Station Civil SPCL 0 0 0 0 0 0 0 0 0 0 0 0
6 ESP-1 & 2 Civil SPCL 20 12 20 12 20 8 20 12 20 12 20 12
7 Lube Oil Building 20 5 20 5 20 3 20 3 20 4 20 0
8 Boiler-1 & 2 Civil SPCL 100 57 100 55 100 33 100 42 100 44 100 40
9 TG #1 & Control Building Structural SPCL 0 0 0 0 0 0 0 0 0 0 0 0
10 TG #2 Structural SPCL 80 72 80 75 80 75 80 74 80 68 80 68
11 TG#1 Painting Structural SPCL 10 4 10 4 10 4 10 4 10 4 10 4
12 TG#2 Painting Structural SPCL 30 10 30 10 30 10 30 10 30 10 30 10
13 Fabrication U#1 Fabrication SPCL 0 0 0 0 0 0 0 0 0 0 0 0
14 Fabrication U#2 Fabrication SPCL 10 12 10 10 10 12 10 12 10 8 10 8
15 ID Fan Unit #1 & 2 Civil SPCL 50 42 50 42 50 18 50 22 50 22 50 22
16 Mill Bunker # 1 & 2 Civil SPCL 50 38 50 38 50 27 50 24 50 24 50 24
17 Service Building Civil SPCL 150 35 150 30 150 35 150 35 150 30 150 35
18 Canteen Building Civil SPCL 30 10 30 10 30 12 30 12 30 10 30 12
19 Workshop Building Civil SPCL 30 5 30 5 30 5 30 9 30 9 30 9
20 Overhead Tank Civil SPCL 0 0 0 0 0 0 0 0 0 0 0 0
21 Storage Shed Civil/Ern SPCL 50 24 50 22 50 27 50 27 50 27 50 22
22 Cable Rack & Trench Civil SPCL 15 12 15 12 15 5 15 5 15 5 15 5
23 Civil SPCL 120 117 120 117 120 151 120 135 120 133 120 131
24 Drain & Road Civil SPCL 50 36 50 36 50 40 50 42 50 45 50 40
25 Siemens SwitchYard Civil SPCL 0 0 0 0 0 0 0 0 0 0 0 0
26 Air Compressor Building Civil SPCL 15 0 15 0 15 0 15 0 15 0 10 0
SPCL 1100 681 1100 657 1100 601 1100 619 1100 612 1055 604
Night Shift Civil SPCL 0 0 0 0 0 0
27 BOILER-1 ERECTION BHEL/PCP 200 175 200 178 200 160 200 166 200 162 200 165
Fitters BHEL/PCP 7 8 7 7 7 7 7 7 7 7 7 7
Welders BHEL/PCP 7 8 7 6 7 5 7 5 7 5 7 5
Ducting BHEL/PCP 10 7 10 7 10 5 10 5 10 5 10 5
Mill BHEL/PCP 5 5 5 5 5 3 5 3 5 4 5 3
Fans & APH BHEL/PCP 7 5 7 3 7 5 7 5 7 3 7 3
Night Shift BHEL/PCP 0 0 0 0 0 0
28 ERECTION BHEL/UBEL 300 285 300 290 300 287 300 283 300 282 300 279
Fitters BHEL/UBEL 20 23 20 24 20 24 20 24 20 23 20 23
Welders BHEL/UBEL 10 22 10 24 10 23 10 21 10 22 10 22
Ducting BHEL/UBEL 80 59 80 65 80 64 80 56 80 58 80 56
Mill BHEL/UBEL 25 10 25 10 25 9 25 9 25 8 25 8
Fans & APH BHEL/UBEL 15 8 15 9 15 10 15 10 15 10 15 10
29 POWER CYCLE PIPING-1 ERECTION BHEL/B&R 100 52 100 53 100 48 100 48 100 48 100 45
30 LINING & INSULATION -1 ERECTION BHEL/B&R 250 232 250 234 250 215 250 225 250 228 250 228
B & R 350 284 350 287 350 263 350 273 350 276 350 273
Night Shift B & R
31 LINING & INSULATION -2 ERECTION BHEL/PowerMech 200 82 200 82 200 122 200 152 200 153 200 146
32 POWER CYCLE PIPING-2 ERECTION BHEL/PowerMech 600 485 600 501 600 519 600 518 600 521 600 531
PowerMech 800 567 800 583 800 641 800 670 800 674 800 677
Night Shift PowerMech 30 30 30 30 30 30
33 BTG-Electrical Erection BHEL/Vasavi 200 195 200 197 200 195 200 210 200 205 200 198
34 BTG-C&I Erection U#01 BHEL/Auto Trical 50 44 50 44 50 39 50 38 50 35 50 35
35 BTG-C&I Erection U#02 80 70 80 71 80 70 80 72 80 70 80 74
Misc (Store, Batching plant,QC,survey, steel yard,etc)
BOILER-2
BHEL/Powertronics
Page 2 of 4
MANPOWER DEPLOYMENT STATUS OF 2X600 MW, JITPL, ANGUL, ODISHA Jun-2014
SL NO PACKAGE DISCIPLINE AGENCY 6-Jun-14 7-Jun-14 9-Jun-14 10-Jun-14 11-Jun-14 12-Jun-14
T A T A T A T A T A T A
36 PHB Cladding Erection Lloyd Insulation 50 18 50 18 50 18 50 18 50 18 50 18
37 TURBINE-1 ERECTION BHEL/UBEL 80 75 80 68 80 55 80 54 80 54 80 52
38 TURBINE-2 ERECTION BHEL/EEPL 240 209 240 209 240 208 240 208 240 211 240 211
UBEL 380 360 380 358 380 342 380 337 380 336 380 331
Night Shift UBEL
39 ESP-1 & Ducting ERECTION BHEL/Golden Edge 150 140 150 141 150 134 150 132 150 130 150 130
Night Shift 14 14 14 14 14 12
40 ESP-2 & Ducting ERECTION BHEL/Rukmani 350 316 350 325 350 328 350 327 350 329 350 329
41 Mill Bunker-2Rukmani 0 0 0 0 0 0 0 0 0 0 0 0
Omega 350 318 350 321 350 318 350 330 350 335 350 318
Omega 350 318 350 321 350 318 350 330 350 335 350 318
Night Shift Omega 30 30 30 28 30 30
42 ESP Control Room & ID fan Civil Gammon 45 28 45 30 45 26 45 26 45 30 30 30
43 ChimneyCIVIL Gammon 0 0 0 0 0 0 0 0 0 0 0 0
ERECTION Gammon 50 29 50 24 50 29 50 29 50 28 50 29
44CIVIL Gammon 0 0 0 0 0 0 0 0 0 0 0 0
Fab/Ern Gammon 0 0 0 0 0 0 0 0 0 0 0 0
45 Water treatment plant CIVIL Gammon 15 10 15 8 15 10 15 8 15 8 15 8
46 CIVIL Gammon 20 12 20 10 20 8 20 8 20 8 20 7
47 Air Washer Building CIVIL Gammon 15 25 15 22 15 18 15 23 15 25 25 22
48 Fuel Oil Pump House CIVIL Gammon 10 0 10 0 10 0 10 0 10 0 10 0
49 Raw Water Pump House CIVIL Gammon 25 14 25 12 25 8 25 8 25 12 25 12
50 CW PipingCIVIL Gammon 0 0 0 0 0 0 0 0 0 0 0 0
ERECTION Gammon 0 0 0 0 0 0 0 0 0 0 0 0
51 TOWNSHIP CIVIL Gammon 900 608 900 603 900 549 900 552 900 544 900 549
52 Transformer yard Civil Gammon 100 75 100 72 100 68 100 74 100 78 100 70
53 Transformer yard-Drain Civil Gammon 50 42 50 40 50 30 50 25 50 30 50 30
54 Civil Gammon 30 30 30 33 30 30 30 37 30 27 30 22
55 Misc Gammon 100 92 100 92 100 85 100 80 100 85 100 85
GAMMON 1410 986 1410 967 1410 882 1410 892 1410 897 1405 883
Night Shift Civil GAMMON 97 95 92 92 90 75
56 TRANSMISSION LINECIVIL GAMMON 0 0 0 0 0 0 0 0 0 0 0 0
ERECTION GAMMON 100 100 100 100 100 100 100 50 100 50 50 50
GAMMON-TR LINE 100 100 100 100 100 100 100 50 100 50 50 50
57CIVIL SIEMENS 10 12 10 12 10 10 10 0 10 0 10 0
ERECTION SIEMENS 0 0 0 0 0 0 0 0 0 0 0 0
58 E BOPCIVIL SIEMENS 0 0 0 0 0 0 0 0 0 0 0 0
ERECTION SIEMENS 100 0 100 7 100 15 100 20 100 23 100 23
59 PLANT ILLUMINATION ERECTION JITPL Agency 50 15 50 15 50 15 50 15 50 15 50 22
SIEMENS 160 12 160 19 160 25 160 20 160 38 160 45
Night Shift SIEMENS
BHEL/Golden Edge
Fabrication/ ErectionFabrication/ Erection
CW Pump House & SG Bldg
CW Side Stream Filtration Unit & Chlorination Building
River Water PH,channel & forebay & Cofferdam
Misc (Store, batching plant,QC,survey etc)
Bays at Angul pooling station with metering yard
Page 3 of 4
MANPOWER DEPLOYMENT STATUS OF 2X600 MW, JITPL, ANGUL, ODISHA Jun-2014
SL NO PACKAGE DISCIPLINE AGENCY 6-Jun-14 7-Jun-14 9-Jun-14 10-Jun-14 11-Jun-14 12-Jun-14
T A T A T A T A T A T A
60 LP PIPING ERECTION 80 62 80 62 80 70 80 69 80 70 80 70
61 ERECTION NEW FIRE ENGG. 100 41 100 38 100 46 100 40 100 40 80 41
62 DG Building CIVIL KSSIIPL 0 0 0 0 0 0 0 0 0 0 0 0
63 Mill Bunker-1 CIVIL KSSIIPL 30 9 30 7 30 8 30 9 30 9 15 9
Erection KSSIIPL 150 76 150 76 150 73 150 73 150 72 60 72
64 Duct Support & ID fan CIVIL KSSIIPL 0 0 0 0 0 0 0 0 0 0 0 0
65 ESP control room-2 CIVIL KSSIIPL 100 91 100 89 100 98 100 92 100 92 100 92
66 PA, FD fan foundation CIVIL KSSIIPL 0 0 0 0 0 0 0 0 0 0 0 0
67 Structural Erection-TG-2 ERECTION KSSIIPL 0 0 0 0 0 0 0 0 0 0 0 0
68 Structural Fabrication Fabrication KSSIIPL 40 11 40 11 40 10 40 10 40 10 0 10
69 Misc KSSIIPL 55 11 55 11 55 10 55 10 55 10 25 10
KSSIIPL 375 198 375 194 375 199 375 194 375 193 200 193
Night Shift KSSIIPL
70 COOLING TOWER-1CIVIL PCTL 0 0 0 0 0 5 0 4 0 7 0 6
ERECTION PCTL 0 0 0 6 0 0 0 0 0 0 0 0
71 COOLING TOWER-2CIVIL PCTL 100 54 100 52 100 48 100 53 100 52 100 51
ERECTION PCTL 50 40 50 28 50 29 50 29 50 28 50 29
PCTL 150 94 150 86 150 82 150 86 150 87 150 86
Night Shift PCTL
72CIVIL TECPRO 50 23 50 40 50 35 50 38 50 40 50 52
ERECTION TECPRO 200 185 200 175 200 182 200 185 200 181 200 181
73CIVIL TECPRO 20 7 20 0 20 0 20 0 20 10 20 5
ERECTION TECPRO 10 10 10 10 10 10 10 8 10 7 10 8
TECPRO 280 225 280 225 280 227 280 231 280 238 280 246
Night Shift Tecpro
74 C W PUMPs ERECTION KBL 20 16 20 15 20 16 20 15 20 16 20 16
75 River Water Piping RAUNAQ 0 0 0 0 0 0 0 0 0 0 0 0
76 Raw Water Pump house ERECTION RAUNAQ 0 0 0 0 0 0 0 0 0 0 0 0
77 River Water Pump House ERECTION RAUNAQ 10 2 10 5 10 0 10 3 10 11 10 5
78 CW makeup line ERECTION RAUNAQ 0 0 0 0 0 0 0 0 0 0 0 0
RAUNAQ 10 2 10 5 10 0 10 3 10 11 10 5
79 CIVIL SAMARPITA 0 0 0 0 0 0 0 0 0 0 0 0
80 ERECTION IEL 50 42 50 32 50 32 50 32 50 33 50 32
81 FLY ASH SYSTEMCIVIL MACAWBER 100 38 100 40 100 38 100 38 100 38 100 32
ERECTION MACAWBER 200 95 200 105 200 110 200 112 200 112 200 112
82
CIVIL BSBK 65 21 65 21 65 17 65 17 65 15 65 13
ERECTION BSBK 100 75 100 75 100 78 100 76 100 77 100 77
Refractory ERECTION BSBK 0 0 0 0 0 0 0 0 0 0 0 0
MBPL/BSBK 465 229 465 241 465 243 465 243 465 242 465 234
Night Shift MBPL/BSBK
83 ERECTION ATLAS COPCO 0 0 0 0 0 0 0 0 0 0 0 0
84 FUEL OIL SYSTEM ERECTION 0 2 0 2 0 2 0 2 0 2 0 2
85 ERECTION 0 0 0 0 0 0 0 0 0 0 0 0
86 ERECTION 40 34 40 34 40 34 40 34 40 34 40 34
87 EOT CRANE 105/15 T-2ND ERECTION WMI 0 0 0 0 0 0 0 0 0 0 0 0
88 EOT CRANE -30 T ERECTION SAFEX 0 0 0 0 0 0 0 0 0 0 0 0
89CIVIL Gammon 30 4 30 4 30 4 30 4 30 5 30 4
ERECTION Airox Nigen 10 2 10 2 10 2 10 2 10 2 10 2
Zeromm/Other Agency
FIRE PROTECTION SYSTEM
Infrastructure & Misc (Store, batching plant,QC,survey ,steel yard etc)
CHP
MINE CONVEYOR SYSTEM
CIVIL/ERECTION
Haul Road-River Water System
WATER TREATMENT PLANT
BOTTOM ASH HANDLING SYSTEM
COMPRESSED AIR SYSTEM
THERMOSYSTEMS
POTABLE WATER SYSTEM
THERMOSYSTEMS
AIR CONDITIONING SYSTEM
STERLING & WILSON
HYDROGEN GENERATION PLANT
Page 4 of 4
MANPOWER DEPLOYMENT STATUS OF 2X600 MW, JITPL, ANGUL, ODISHA Jun-2014
SL NO PACKAGE DISCIPLINE AGENCY 6-Jun-14 7-Jun-14 9-Jun-14 10-Jun-14 11-Jun-14 12-Jun-14
T A T A T A T A T A T A
90CIVIL Gammon 0 0 0 0 0 0 0 0 0 0 0 0
ERECTION Ion Exchange 0 0 0 0 0 0 0 0 0 0 0 0
91 ERECTION CHEMTROL 0 0 0 0 0 0 0 0 0 0 0 0
92 COLTCS ERECTION GEA-BGR 5 2 5 2 5 1 5 1 5 1 5 1
93 WORKSHOP EQUIP.-I ERECTION HMT 0 0 0 0 0 0 0 0 0 0 0 0
94 ERECTION BATLIBOI 0 0 0 0 0 0 0 0 0 0 0 0
95 WORKSHOP EQUIP.-III ERECTION PATHAK 0 0 0 0 0 0 0 0 0 0 0 0
96 Raw Water Reservoir Civil Sinhotia 50 12 30 12 30 9 30 10 30 12 30 12
97 Roads
Civil Nanda 30 28 30 29 30 27 30 26 30 28 30 26
Civil RK Associates 25 24 25 26 25 24 25 25 25 24 25 23
Civil Pradhan 25 0 25 0 25 0 25 0 25 0 25 0
Civil Monalisha 25 25 25 25 25 24 25 24 25 25 25 23
98 Civil Monalisha 60 72 60 55 60 58 60 56 60 62 60 65
99 Peripheral Drainage-IICivil R K Associates 50 45 50 45 50 46 50 45 50 47 50 45
Civil Essem Constn 50 0 50 0 50 0 50 0 50 0 50 0
100 Internal Drains
Civil R K Associates 95 67 65 49 65 52 65 52 65 55 65 54
Civil Gammon 20 17 20 17 20 17 20 18 20 17 20 15
Civil Sinhotia 50 45 50 43 50 44 50 43 50 44 50 40
Civil Essem Constn 50 0 50 0 50 0 50 0 50 0 50 0
101 Ash Dyke` Civil Sinhotia 50 15 50 15 50 9 50 8 50 8 50 12
145 112 115 94 115 98 115 97 115 102 115 99
60 72 60 55 60 58 60 56 60 62 60 65
100 0 100 0 100 0 100 0 100 0 100 0
Sinhotia 150 72 130 70 130 62 130 61 130 64 130 64
Night Shift(Sinhotia) Sinhotia 0 0 0 0 0 0
102 EOT CRANE ERECTION Electromech 5 0 5 0 5 0 5 0 5 0 5 0
TOTAL 8170 5772 8120 5727 8120 5586 8120 5618 8120 5667 7825 5625
Night Shift (Total) 171 169 166 164 164 147
Note:
SEWAGE TREATMENT PLANT
Ambient Air Quality Monitoring System
WORKSHOP EQUIP.-II (BATLIBOI)
Peripheral Drainage-I + Internal drain
R K Associates( Drain)
Monalisha(Drains)
Essem Constn(Drains)
(1)Manpower target revised from 8120 to 7825 wef 12.06.2014 based on balance quantum of works in various packages.(2)Agency wise manpower includes night shift manpower also. Total manpower in nightshift as on 11.06.2014 - 147 heads.(3) Manpower of O & M services is excluded.