1
LOAD LIMITER BP-LR1 Dinacell Electrónica, s.l. C/ Andrés Obispo, 27 - 28043 Madrid - Tel. 913 001 435 - Fax: 913 001 645 E-mail: [email protected] - http://www.dinacell.com Ref.: Doc-Manual BP- Ø46 53 5 Silent block Tornillo precarga Célula de carga Ø8.5 100 regulable ± 6 mm 80 100 60 40 Dimensions in mm. Silent Block 65 Pre-load Nut adjustable ± 6 mm Load cell Load cell BP-LR1 Cabin Chassis The load cell BP-LR1 is a load limiter whose func- tion consists on dis-activating a relay when the load overcomes the pre-set value. Installation: 1. Install the load cell between the chassis and the cabin. 2. With the empty car and with the used of the nut that has the cell, applied the pre-load by forcing slowly the nut until the led of the pre-load lights on. 3. Place weights in the cabin up to arrive to the value that you wants to limit the load of the eleva- tor. Adjust the potentiometer until the led of the overload turn's off, checking that if the potentiome- ter is slightly rotated in an contrary way the led will light up again , in this way, we make sure that the limit of the overload is adjusted correctly . Notes: 1. In certain moments, the led of the pre-load could be off, due to the mechanical tolerances. 2. The led of the overload should be On so that the elevator works, and when the overload acts it will turned off . 3. In a normal state, the relay is activated and it will be disabled when the overload level is overcome. 4. If the power supply turned down the relay will be disabled and the elevator will be blocked. 5. The power supply is 24 VDC (Red/Rojo for Posi- tive and Black/Negro for Negative) 6. Relays contacts: Blue(Azul) Common White(Blanco) Usually closed Green(Verde) Usually open 24 Vdc NEGRO ROJO VERDE BLANCO AZUL SOBRECARGA PRECARGA Led of pre-load Led of overload Potentiometer

Manual BP LRI (ing)

Embed Size (px)

DESCRIPTION

Manual del equipo BP LRI en formato pdf (idioma:inglés)

Citation preview

Page 1: Manual BP LRI (ing)

LOAD LIMITER BP-LR1

Dinacell EElectrónica, ss.l.C/ Andrés Obispo, 27 - 28043 Madrid - Tel. 913 001 435 - Fax: 913 001 645E-mail: [email protected] - http://www.dinacell.comR

ef.:

Doc

-Man

ual B

P-

Ø46

53

5

Silent block

Tornillo precarga

Célula de carga

Ø8.5

100

regulable ± 6 mm

80

100

6040

Dimensions in mm.

Silent Block

65

Pre-load Nutadjustable ± 6 mm

Load cell

Load cell BP-LR1

Cabin

Chassis

The load cell BP-LR1 is a load limiter whose func-tion consists on dis-activating a relay when the loadovercomes the pre-set value.

Installation:1. Install the load cell between the chassis and thecabin. 2. With the empty car and with the used of the nutthat has the cell, applied the pre-load by forcingslowly the nut until the led of the pre-load lights on. 3. Place weights in the cabin up to arrive to thevalue that you wants to limit the load of the eleva-tor. Adjust the potentiometer until the led of theoverload turn's off, checking that if the potentiome-ter is slightly rotated in an contrary way the ledwill light up again , in this way, we make sure thatthe limit of the overload is adjusted correctly .

Notes: 1. In certain moments, the led of the pre-load couldbe off, due to the mechanical tolerances. 2. The led of the overload should be On so that theelevator works, and when the overload acts it willturned off .3. In a normal state, the relay is activated and it willbe disabled when the overload level is overcome. 4. If the power supply turned down the relay will bedisabled and the elevator will be blocked. 5. The power supply is 24 VDC (Red/Rojo for Posi-tive and Black/Negro for Negative) 6. Relays contacts: Blue(Azul) Common White(Blanco) Usually closed Green(Verde) Usually open

24 Vdc

NEG

RO

RO

JO

VER

DE

BLA

NC

O

AZU

L

SOBRECARGA

PRECARGALed of pre-load

Led of overload

Potentiometer