Upload
others
View
2
Download
0
Embed Size (px)
Citation preview
i
Manual on Regulatory Audit
Regulatory Audit Division
March 2016
Document 3
iii
v
FOREWORD
Manual of Regulatory Audit has been developed to promote and ensure compliance and conformance with rules and regulations by entire election machinery. It also ensures that audit policies and procedures are applied uniformly across the country.
Successful regulatory audits require auditors to adopt a positive manner and a professional approach while using proven methods for analysis. Equally important are the overall experience and auditing skills developed by each auditor in the process. Only when all audit participants strive for the highest possible standards, can the final product be an accurate assessment of the audit organization.
Representation of the People Act, 1950/1951 and rules framed thereon and Conduct of Elections Rules 1960/1961 provide comprehensive basic law for holding free and fair election. In addition, the Commission has brought out handbooks of instructions for Returning Officer, Presiding Officer, ERO, BLO etc.. These handbooks provide a set of guidelines to be followed for conducting elections in a fair and smooth manner. Also guidelines/instructions have been issued by Election Commission of India [ECI] separately from time to time and depending upon the situations.
The purpose of regulatory audit is to see that election officials and stake holders follow laws, rules and instructions in the right manner. Although rules and instructions bind election machinery to carry out election work in a systematic manner under close supervision of ECI, aberrations can occur though it is not a regular phenomenon. To make sure that even the remote chance of an error is reduced to insignificance, regulatory audit of election machinery is necessary. Any error in the election process can affect the purity & integrity of the election process.
To achieve the above aim, a set of guidelines has been made in the shape of manual to conduct the audit. It is expected that this manual will be helpful in ensuring compliance with laws/rules & instructions of ECI.
vii
Amendments & Corrigenda
Amendments
S. No.
Date Subject
Corrigenda
S. No.
Date Subject
ix
Foreword V
Amendments & Corrigenda VII
Page
1. Chapter 1-Definitions 1-2
2. Chapter 2-Audit Policy 3-4
3. Chapter 3-General Audit Procedures 5-16
4. Checklist for verification of electoral roll (Annexure-I A) 17-19
5. Checklist for verification of Polling Station (Annexure-I B) 20)
6. Checklist for Summary Revision (Annexure-I C) 21
7. Checklist for Continuous Revision (Annexure-I D) 22
8. Checklist for EVM (Annexure-I E) 23-29
9. Check list for VVPAT (Annexure-I F) 30-34
10. Check list for Training (Annexure-I G) 35
Table of Contents
x
11. Draft check list for SVEEP (NVD) (Annexure-I H) 36-37
12. Draft Check list for SVEEP (Summary Revision) (Annexure-I I) 38-41
13. Check list for Media Division (Annexure-I J) 44
14. Confirmation Request Form Annexure-I 45
15. Deficiency Reporting Form Annexure-II 46
16. Audit Finding Form Annexure-III 47
1
AUDIT POLICY AND PROCEDURESCHAPTER 1
DEFINITIONS
ThefollowingterminologyisspecifictotheRegulatoryAuditPrograms(RAP)andManualofRegulatoryAudits(MRA):
Auditmeansanin-depthreviewoftheactivitiesoftheofficesofDEO,ERO,AEROandotherofficerstoverifyconformancetoregulationsandstandards.
Audit activities mean those activities and procedures through whichinformation is obtained to verify the auditee’s conformance to applicableregulations and standards. Such activitiesmay include, but are not limited to:interviewsof officials involved and the stakeholders, observations, inspectionsandthereviewoffilesanddocuments,checklistsetc.
Auditeemeanstheorganizationortheofficesofdifferentelectionofficers,tobeaudited.ThistermwillincludetheBLOs/Enumerators/otherfieldstaffatthelowestleveltotheDistrictElectionOfficer.
Audit Finding means the determination of non-conformance of a service,process,practiceorprocedureoracharacteristicthereoftoaspecifiedregulationorstandard.ThiswillbedocumentedontheAuditFindings.
Audit Managermeans the individual officer of the ECI, designated in thisbehalf, responsible for the planning and conduct of an audit, including theproductionoftheauditreport.
Audit Reportmeansareportthatoutlinestheauditprocessandprovidesasummaryoftheauditfindings.
Compliancemeansthestateofmeetingregulatoryrequirements.
Confirmation RequestForm(CRF)meansaformissuedduringtheinspectionportion of an audit to the auditee by team member of the audit requestinginformationthat isnotreadilyavailable.Theauditeewillberequestedwithinaspecifiedtimeperiod.
Conformancemeansthestateofmeetingtherequirementsofaregulationorstandard.
2
Documented(evidence)recordedinwriting,photocopiedorphotographedandthensigned,datedandretainedsoastoensurethecontinuityoftheevidencesecured.
Follow-Upmeanstheactivityfollowinganauditthatisdedicatedtoprogrammodification based on an Corrective Action Plan. Follow-up ensures that thedocumentholdermeetsregulatoryrequirements.
Inspectionmeans thebasicactivityofanaudit, involvingexaminationofaspecificcharacteristicofanorganization.
Regulatory Audit Program (RAP) means the program that promotesconformancewiththeActs,RulesandECIinstructions,regulationsandstandardsthatcollectivelyprescribeanacceptablelevelofelectoralactivity.TheRAPensuresthataforesaidauditpoliciesandproceduresareapplieduniformly.
Regulatory Audit PlanmeanstheannualplanofscheduledauditsintendedtomeasuretheconformancelevelofActs,Rulesandinstructions.
Non-Compliancemeansnonadherencetoapprovedstandards,deficienciesincharacteristicsofdocumentationorprocedures.
Non-Conformancemeansthefailureofcharacteristics,documentationoraproceduretomeettherequirementsofaregulationorstandard,whichrendersthequalityofaproductorserviceunacceptableoruncertain.
Samplingmeans the inspectionof a representative portion of a particularcharacteristictoproduceastatisticallymeaningfulassessmentofthewhole.
Scopemeansthenumberoffunctionalareaswithinanofficethatwillbeaudited.
Team Leadermeanstheindividualappointedbytheauditmanagertoconductandleadtheaudit.
Team Member means the individual appointed by the team leader toparticipateintheaudit.
Verification means an independent review, inspection, examination,measurement, testing, checking, observation and monitoring to establish anddocument that services and documents conform to regulatory requirements.This includesconfirmationthatanactivity,conditionorcontrolconformstotherequirementsspecifiedinActs,Rules,instructionsetc..
Working Papersmeansalldocumentsrequiredbytheauditororauditteamto plan and implement the audit. Thesemay include audit schedules, auditorassignments,checklistsandvariousreportforms.
3
CHAPTER 2AUDIT POLICY
Purpose:- The Regulatory Audit Programme (RAP) has been developed topromoteconformancewiththeelectionrelatedActs,Rules,ECIinstructionsandregulations,standardsthatcollectivelyprescribeanacceptablelevel.
Approval:- The Commission has already prescribed norms for approval oflanguage of electoral roll, list of polling stations, counting centres, scrutiny ofnominations,codeofconductforcandidates,politicalpartiesetc.andbasedonthenormsinitialapprovalsareaccordedbytheCommission.However,confirmatoryaudits are conducted to ensure that all approvals granted in the field are inconsonancewithActs,RulesandinstructionsoftheCommission.
Auditprogrammeofastate/UTisapproved inadvancebytheCommissionandisnotifiedinadvancetotheconcernedstate/UT.TheAuditManager,anofficeroftheECI,coordinateswiththeCEOofthestate/UTwhereauditteamistovisitandworksouttheauditschedulesetc.
Types of Audit:-
Thetypeofauditisdetermined bythecircumstancesunderwhichtheauditisconvened.Ingeneralacompositeauditoraroutineconformationauditcoversallaspectofelectionprocessinadistrictwhilespecialaudittakescareofspecificareas like electoral roll, EVM,Nomination, SVEEP, Training, concurrentmatters,nonadherencetonormsetc.inanyissue.
Initialapprovalof theCommission isgranted to the listofpolling stations,statutoryofficers,countingcentres,differentprogrammeforrevisionofelectoralroll, conduct of elections etc. The Commission has prescribed standard checklists forspecificapprovalsbasedonstatutory lawsandnecessaryapprovalsareaccordedafterassessingtheinformationprovided.
(a) Routine Conformance Audit:-Audit is conductedona regularbasis for thepurposeofdeterminingconformancetotheActs,RulesandECIinstructions.Audits are conducted for carrying out test check on the election relatedactivitiesbyofficialsbasedontheinstructions,rulesandActsetc.vizelectoralroll,pollingstation,storageandmaintenanceofEVM,accountsofelectionexpensesetc.TheAuditeewillbecontactedapproximately30to60dayspriortotheplannedauditdatetoconfirmtheauditschedule.Thecomplexityof
4
theroutineconformanceauditwilldeterminetheleadtimeforcontactwiththeauditee.
(b) Special Purpose Audit:- The difference between a special purpose auditandtheroutineconformanceauditisthatthereiseithernonoticeorshortnoticetotheauditeebeforetheauditprocesscommences.Obviously,thisisnecessitatedtogatherquickandfirsthandinformationfromtheconstituency.
(c) Concurrent Audit:- It is undertaken to examine working of the offices ofthe CEO, DEO, R.O and their subordinate officers regarding their working,efficiency,observanceoffinancialrulesandproprietyetc.
5
CHAPTER 3 GENERAL AUDIT PROCEDURES
Audit Activities:-The audit process consists of the following four distinctphasesofactivities:(i)Pre-audit(deskaudit)(ii)Physicalaudit(iii)Post-audit(iv)Auditfollow-up.
Pre-Audit:-Planningandpreparationduringthepre-auditphasewillensurethattheobjectivesoftheauditareachievedeffectively,efficientlyandeconomically.Thescopeanddepthoftheproposedaudit,tobeaddressedandjustifiedwithintheauditplan,willdeterminethetimeschedule,personnelandfinancialresourcesrequired.Theschemeofauditmaycoverentirestate/UTcoveringallthedistrict/administrative units or a specific district or a specific Assembly/Parliamentaryconstituencyhavingspecificconsiderationlikebeingaprimarilyanurbanorruralor having certain statistical figures indicatingpossible non conformance. Basedonauditfindingsinsomesampleunitsofelectoralmachinery,otherunitsmaybeaskedtotakeupconformancescheme.
Theteammanagerwillbrieftheteamleadersandifpossible,thememberstoo,abouttheprocedure,formatsscopeetc.beforeproceedingtothestate/UT.
Physical Audit:-Thephysicalauditphasewillbeimplementedinaccordancewith the audit plan. It includes the entry meeting with the auditee, thedeterminationofauditfindingsthroughinterviews,inspectionsandtheevaluationand verification of files and records, including recordings of proceedings ofnomination, scrutiny, conductofpoll atpolling stations, countingof votesetc.;functionalareadebriefingandtheexitmeeting.
Post-Audit:-Post-auditactivities includecompletionoftheaudit reportandparallelreport.
Audit Follow-up:-Auditfollow-upincludesthedevelopmentandapprovaloftheauditee’sCorrectiveActionPlan(CAP)andensuresfullimplementationoftheCAP.TheECIwillappointaninspectingofficerwhowillberesponsiblefortrackingandverifyingtheprogressoftheauditee’sapprovedCAP.
Co-ordination:-Audits will be co-ordinated through the ECI. The auditmanagerwillensurethattheECIisinformedofallrelevantauditmatters,andwillbeaccountabletotheECIforthemanagementofauditresourcesandtheintegrityoftheauditprocess.
6
Scope and Depth
Criteria:-Thescopeanddepthoftheauditisdeterminedbythefollowing:
(a) Thesizeandcomplexityof thestate/UT. Inacompositeauditallaspectofelectionprocesswillbeaudited;
(b) Whetherwhole state/UT is coveredoronly someconstituenciesarebeingcoveredoronlyafewselectedsubjectsaretobeaudited;
(c) Thetimesincethelastaudit;
(d) ThekeyindicesasindicatedinForm1-8ofthestate/UT;and
(e) Auditresourcesavailable.
Frequency:-ThefrequencyoftheauditshallbebasedontheAnnualRegulatoryAuditProgram.
Criteria:-Audittargetingandfrequencywillconsiderthefollowingfactors:
(a) Proximityofelectioninthenearfuture;
(b) Complaintsfromstakeholders;
(c) Poorstatisticalkeyindicators;
Periodic Cycle:-Everystate/UTwillbeauditedonaperiodiccyclerangingfrom24to36months.Thisperiodiccyclecanbeextendedforsmallerstates/UTswithsoundconformancerecord,andnoneoftheriskindicatorsdescribedintheaboveforegoing paragraph. The promptness with which previous non-conformanceswerecorrectedshouldalsobeafactorinthetimingofthenextaudit.
Unit of Control:-Officersassignedtoanauditshallreporttothedesignatedauditmanagerforthedurationoftheaudit.Toensurecontinuity,officersassignedtoanauditshallnotbereleasedfromtheirauditdutiespriortothecompletionoftheauditunlesswrittenauthorizationhasbeenreceivedbytheauditmanager.
Eligibility of audit team:-TheteammanagerofanauditwillbeoftherankofSecretarytoECIandaboveandteammemberofauditteamshouldbechosenfromECIHeadQuarter&fromtheofficesofCEOsofstates/UTs.
Confidentiality:-Owingtothesensitivenatureofaudits,confidentialityisoftheutmostimportance.Teammembersshallexercisediscretionwhendiscussingauditmatters during an audit (whether on or off the site). Discussion of auditcontentshallbelimitedtotheauditteamandECI.
7
Classes of Audits
ThereshallbeonlyoneteamoftheECIthatwilldothejobofaudit inthedistrictforalltheassignedsubjectslikeelectoralroll,pollingstation,EVM,SVEEPetc.
Pre-Audit:-The pre-audit for auditee begins with the selection of ateam, followedby the preparationof an audit plan, the gathering of pre-auditdocumentation and the holding of a pre-audit team meeting. This process isillustratedasfollows:
• TeamSelection
• AuditPlan
• Pre-AuditDocumentation
Team Selection:-Theauditteam,approvedbytheECI,willnormallyconsistof the auditmanager/leader; one or two teammembers for each or group ofdistricts. Forauditsof smaller states/UTs, the teamstructuremaybe the samebuttheirnumberswillbelesserforthereasonthenumberofdistrict/locationsofauditbeingsmaller.
RegulatoryAuditDivision(RAD)willbetheconveningauthority(CA)anditsresponsibilitiesshallbeasunder:-
(a) AppointtheauditmanageratleastonetotwomonthspriortotheauditwiththeapprovaloftheCommission;
(b) Overseetheselectionoftheauditteam;
(c) SeektheapprovalofECIontheobjective,scopeanddepthoftheaudit;
(d) Approvetheauditplan;
(e) Attendtheentrymeetingifpossible;attendtheexitmeeting,whenpracticable;
(f) SeektheapprovaloftheCommissionoftheauditreportandensurethattheauditeereceivesthereportwithintwentyworkingdays;
(g) Ensurethatactionistakeninanappropriate,timelymannerforcriticalsafetyissues identifiedbytheauditmanagerduringthephysicalauditandasperCAPapprovedonthebasisofdraftCAPsubmittedbyauditee.
(h) Ensurethatappropriatefollow-upactioniscompletedafterthephysicalaudit;and
8
(i) Sendalettertotheauditeeconfirmingthatallauditfindingsandcorrectiveactionsarecompleteandthattheaudithasbeenclosed.
Pre-Audit Documentation:-This includes a thorough review of relevantfilesanddocumentationandtheopeningofaauditfileforaparticulardistrict.Information gathered during the pre-audit phase will assist the audit team indeterminingthespecificareas,systemsandactivitiesthatwarrantexamination;supplementingauditchecklists(Annexure-I);oramendingthescopeoftheaudit.Thisauditphaseshould:
(a) ensurethatallreferencemanualsanddocumentstobeusedduringtheauditinaccordancewiththeHandBooksprescribedbytheECIarereadilyavailable,includingthelatestapprovedamendments;
(b) review the auditee’s files and records(includes recordings) to check if theactionsareasperinstructions,timely;
(c) itemizeareaswhichrequirefurtherreview;
(d) selecttheappropriatechecklistitemsfrom,asapplicable,inaccordancewiththescope,depthandcomplexityoftheaudit;
(e) completeallpre-auditsectionsofthechecklists;
(f) ensurethatallauditdocumentationischronologicallyrecordedonthedistrictauditsub-file;and
(g) ensure that each teammember has received appropriate portions of theauditplan.
(h) previousinspectionorAuditReports;
Pre-Audit Team Meeting:-Thismeetingshould:
(a) confirmindividualteammembers’dutiesandresponsibilities;
(b) ensurethatallteammembershavereceivedappropriateportionsoftheauditplan;
(c) ensurethatallteammembersareawareofrestrictionsregardingauditreportdistribution;
(d) outlinetheoverallauditplan;
(e) clarifyanyoutstandingissuesorproblems;
9
(f) includeabriefingbyaseniorofficeroftheCommission
(g) address the issues of conflict of interest, confidentiality and access toinformation.
Physical Audit
General:-The physical audit consists of the entry meeting, evaluation,verification,dailybriefingsandexitmeeting.
Entry Meeting:-Theentrymeetingshoulddiscusstheplanofthephysicalaudit.Itshouldbeattendedbytheauditee’sseniorofficerssuchastheDistrictCollector/Addl.DistrictCollectorandidentifiedmembersoftheauditteam.Itwilloutlinetheauditprocesstothedistrictandconfirmanyadministrativerequirementssothat thephysicalauditmaybeconductedbotheffectivelyandefficiently,whileminimizingdisruptionstotheelectionmachineryinthedistrict.
(1) The entry meeting should:
(a) takeplaceontheauditee’spremises;
(b) beattendedbytheauditee’sseniorofficers;
(c) specifyauditdetailsandprocedures;and
(d) bebrief,specificandcourteous.
(2) The audit manager shall:
(a) explainthepurposeoftheentrymeeting;
(b) introduceauditteammembers;
(c) statetheobjective,scopeanddepthoftheaudit;
(d) addressthemeansofcommunicationbetweentheauditteamandtheauditee;
(e) explainthatdistrictofficialswillbebriefeddailyonprogressoftheaudit;
(f) describethemannerinwhichanyauditfindingdetectedwillbehandled;
(g) establishalocationandtimefortheexitmeeting;
(h) emphasisethatthepurposeofanauditistoidentifynon-conformancesandthatappropriateactionmayresultfromanyofthesefindings;and
(i) respondtoallquestionsfromtheauditees.
10
(3) The auditee to provide:
(a) adequateworkingspace;
(b) accesstoaphotocopierandfacsimilemachines;
(c) measuringortestequipment;
(d) accessandadmissiontoallfacilities;
(e) accesstocompanyfilesandrecords;
(f) credentialsandfacilitypasses;
(g) selectedpersonnelforinterviews;and
(h) Reliablesupportandliaisonofficers.
Evaluation:-Intheevaluationphase,theDistrictelectionmachinery’slevelofconformancewithregulationsandstandardscontainedinexistinglegislationandactualpracticewillbeassessed.Thefollowingarepossiblemeansofevaluation:
(1) Interviews:-Interviewswithkeyofficialsareimportantduringtheevaluationphase todeterminewhether the control systemdocumented inECImanuals isthatisinuse,andtoassesstheknowledgeofsupervisorypersonneloftheirdutiesand responsibilities. Interviews may also confirm the validity of audit findingsreachedthroughobservationorsampling.Thefollowingguidelineswillbeusefulwhenpreparingforaninterview:
(a) prepare carefully prior to the interview by defining the areas to beexploredandsettingspecificobjectives;
(b) explainwhytheinterviewistakingplace;
(c) useopenquestionsandavoidcomplexquestionsorphrases;
(d) listen carefully to answers and allow interviewee to do most of thetalking;
(e) avoidbeingside-trackedfromyouroriginalobjectives;
(f) ensurethatquestionsareunderstood;
(g) terminatetheinterviewiftheatmospherebecomeshighlynegative;
(h) documentallresponses;and
(I) thanktheintervieweeattheconclusionoftheinterview.
11
(2) Sampling:-Thesamplesizeofapopulationandselectioncriteriahavedirectimpactonthevalidityandconfidenceleveloftheresults.Thefollowingguidelinesshouldbeused:
(a) eachsamplegroupmuststandalone.Ifthereare25EROs,100AEROs,300BLOs,eachofthethreegroupsmustbeconsideredseparately;
(b) thepurposeofauditistoachievea95percentconfidencelevelwiththeresultsof the sample tested.Often, thisgoalmaynotbeappropriate;therefore,theauditteammustcarefullyconsiderboththesamplesizeandthetimedevotedtothetask.Randomsamplingmaybeconsideredanacceptablealternative;-
(c) forsmallerpopulations,alargersamplemustbeexamined.Forexample50%oftheEROsmentionedat(a)abovemaybeexaminedbutonly35to40%ofAEROs/BLOsneedtobeexamined.
Verification:-During this phase, the audit team will gather information todeterminetheauditee’slevelofconformance.Specifically,verificationwill:
(a) determinewhetherofficialsarefunctioningasperinstructionseffectivelyandasintended;
(b) determine whether the auditee’s operation conforms to the ECIrequirementsandstandardscontainedintheauditchecklists;and
(c) analyse particular deficiencies to assess their effects and identify thecauses.
(2) District files or records should not be accessed without appropriateauthorization and , when possible, official representatives should be presentduringreviewofthesefilesandrecords.
(3) Ifthereviewandverificationphasesdonotprovidesufficientconfirmationoftheelectionmachineryinthedistrict,furthersubstantiationwillberequiredtoensurethatanyevidenceobtaineduptothatpointsupportstheauditfindingandconclusions.Inshort,othersupportingdocumentationmustbeacquiredandsecured.
(4) Verificationincludesvarioustypesofinspections.Theremaybeinspectionsof old record, files showingdisposal process, locationof polling station and itssuitability,storageandupkeepofEVMetc.Theseinspectionsmaybecarriedoutasco-ordinatedinspectionsbythesameteamdeputedinthedistrict.
12
Confirmation Request Form (CRF):-
(1) TheCRF(Annexure-II)isaneffectiveaudittoolinthefollowingcases:
(a) whereevidenceindicatesanauditfinding,theauditeewillbegiventheopportunitytoshowotherwiseinDeficiencyReportingForm(Annexure-I).
(b) theauditorwilldeterminethecourseofactiontobeadoptedbasedontheauditee’sresponse;
(c) the auditor will observe the state of the office records managementsystemfromtheauditee’sperspective;
(d) arbitraryauditfindingsbasedonsubjectiveexampleswillbeeliminated;
(e) theauditwillnotbesurprisedattheendoftheaudit,asallcontentiousissueswillhavebeendiscussedopenlyduringthephysicalaudit;
(f) the auditor can concentrate on auditing rather than on researchingauditee’sfilesandrecords;and
(g) theauditeewillreceiveasigneddocumentfromtheauditforinclusioninthesupportingdocumentationpackage.
(2) TheCRFwillbesenttotheteamleaderoradelegateattheoutsettoavoiduntimelysurprises.Itshouldthenberecordedinacontrollog,theformatofwhichwillbedeterminedbytheteamleader.Itmayrangefromasimpletitle,timeanddatelogtoafileofphotocopiedduplicates.AllCRFswillbeissuedsequentiallytoensurethat,uponcompletionofthephysicalaudit,theCRFshaveresponsesandappropriateactionhasbeentaken.
(3) At theendof eachday, theCRF control log shouldbe comparedwith thereturnedCRFtoensurethat it iscurrent.Fora largeaudit, thiscanbedoneatthedailybriefingwiththeauditee.Inthismanner,boththeauditeeandtheauditteamwillbeupdatedastothestatusofthesedocuments.Regardlessofthewayinwhich the control log ismaintained, all CRFs should be cleared prior to thecompletionofthephysicalauditatthatsiteordistrict.
(4) WhentheCRFhasbeenreturnedandappropriateactiontaken,thismaterialshouldbefiledaccordingtotheappropriateauditarea,allowingdocumentationrelatingtohigh-profileitemstobemaintainedforalterreference.Thisfilewillalsoprovidebackgroundandevidence for anyenforcement action tobe takenat alaterdate.AsampleCRFcanbefoundinAppendix1.
13
Audit Finding Form:-
(1) Audit finding forms(Annexure-III) must be completed accurately as theyformthebasisoftheauditreportandasuccessfulaudit.Sinceanumberofteammemberswillbecompletingauditfindingforms,itisimportantthatastandardizedapproachto inputtingdataontheformbetakentoreducethenumberofdataentryerrors.
(2) All supporting documentation will be included with the completed auditfindingformforreviewbytheauditmanager.Althoughthisdocumentationwillnotbeincludedintheauditreport,itwillberetainedintheauditfile.
(3) All hand-written copies of audit finding forms will be filed according tofunctionalareaandwillformPartofthesupportingdocumentationintheauditreportforeaseofreference.
Completion of Audit Finding Form:-Non-conformancesarerecordedonauditfinding forms. When completing these forms, auditors shall use the followingchecklist:
(a) atthetopoftheauditfindingform:
(1) correctlyidentifythenameofthedistrict;
(2) enterthesubject,nameanddesignationof theofficer, locationof theoffice;
(3) identifytheauditfindingnumberinaccordancewiththechecklistorasdirectedbytheauditmanager.
(b) inthe“Non-ConformanceWith”sectionoftheauditform:
(1) correctly identify the title of the regulatory requirement to bereferenced,withoutusingacronymsorabbreviations;
(2) isolatetherelevantportionoftheregulatoryrequirementbyreferencetothechapter,section,sub-sectionandparagraphasappropriate;
(3) referthenon-conformancetothemostapplicableregulatoryrequirement;
(4) whensegmenting,quoteasufficientportionofthetexttoclearlyidentifytheregulatoryrequirementwhileavoidingtheuseofunnecessarywords.
(c) inthe“Examples”section:
(1) identifytheauditorsanddateofthefinding:
14
(2) specifythethreemostapplicableexamplesofthenon- conformance,wherepracticable;
(3) ensurethattheexamplesillustratenon-conformancewiththeparticularstandards;
(4) useanappropriateleadinstatementtointroducetheexamples;and
(5) support the audit finding with secured evidence (i.e. photocopies,photographstoberetainedinanappropriatelocation).
Daily Briefings:-
(1) Teambriefingswillnormallybeheldattheendofeachdayduringtheauditto:
(a) ensureadherencetotheauditplan;
(b) validateconfirmationrequestsandauditfindings;
(c) resolveissuesorproblemsarisingfromtheday’sactivities;and
(d) updatetheteamleader,ifnecessary.
(2) Briefingsshouldbeheldattheendofeachday,followingteambriefings,toupdatetheauditee’smanagementonauditprogress.Theauditteamleadermayelecttohavespecialistteammember’sbriefauditeeofficialsonspecificitems.
Exit Meeting:-The exit meeting with the auditee’s senior officers shouldprovide an overview of the audit. The meeting should summarise the auditfindings,statingareasofstrengthandweakness.Acontroversialdiscussionwithauditee representatives of the auditee regarding audit report contentmust beavoided.Theprocessfortheexitmeetingisasfollows:
(1) Normally, theDistrict Collector andDEO, audit team leader,memberswillattendtheexitbriefing.Theteamleaderwillattendthemeetingwiththeteam.
(2) Allauditfindingsshouldhavebeendiscussedwithofficialsoftheauditeeaseachfunctionalareawascompleted.Newauditfindingsshouldnotnormallybeidentifiedattheexitmeeting.Themeetingshouldprovideanoverviewoftheauditandnotbecomeadebatebetweentheteamandtheorganization.Theauditeeshouldbeadvisedthattheywillhaveanopportunitytorespondformallytotheauditreport.
(4) Theauditeewillbeadvisedof thoseauditfindings thatmaybe subject toappropriateaction.Theauditeewillalsobeadvisedoftheauditee’sresponsibility
15
to take appropriate action to correct all non-conformance and prevent theirrecurrence.
(5) The audit team leader shall advise the auditee that the audit report willbe forwarded to the officewithin thirtyworking days and that a CAPmust besubmitted toRADdivisionof theCommissionwithin30workingdaysafter theauditeehasreceivedthereport.
Post-Audit
General:-Thisphaseincludespreparationoftheauditreportandtheparallelreport.
Audit Report:-
(1) Everyunitofauditie.anA.C/PC/Districtshouldbecoveredbytheauditteaminnotmorethan5daysandofthat2daysmaybetakentocheckrecordsintheofficesoftheauditeeandremainingtimeinthefieldvisitsforphysicalverification,interviews etc. in the field. The team leader should file the final report to theRADof ECI in the next 5 dayswhile the RAD is expected to seek the approvalontheproposedactionwithinnext5days.Theauditreportshouldnormallybepresentedtotheauditeewithin30workingdays.Anydelaymustbedocumentedsincethevalidityoftheauditwillbecompromisedifthereportisnotpresentedinatimelymanner.Draftauditfinding formsmaybe leftwith theauditeeasacourtesythoughthisisnotmandatory.
(2) TheteamleaderisresponsibleforthepreparationoftheauditreportanditsapprovalbytheECI.
Audit Follow-Up
General:-Upon completion of the audit, the RAD will delegate follow-upresponsibilities to the Zonal Secretary/Pr. Secretary who will then ensure thatallauditfindingshavebeenresolvedinaccordancewithanapprovedCorrectiveActionPlan(CAP).
Corrective Action Plan (CAP):-
(1) Thecovering letterof theaudit reportwill advise theauditee that itmustsubmitaCAPaddressingtheauditfindingswithin30workingdays.Normally,thisdeadlinewillnotbeextendedwithouttheapprovalofECI.
(2) It is important to review theorganization’sCAP todeterminewhether theauditee has developed a reasonable timetable for corrective action. It is also
16
essential to ensure that the timetable has prioritized the corrective actions toaddressthemostcriticalfindingsfirst.
(3) Depending on the nature of the audit findings, the auditee’s CAP shouldinvolveimmediatenecessaryactions.
(4) AnauditwillformallybeclosedwheneveryauditfindinghasbeencorrectedthroughtheCAPandthesamehasbeenacceptedbytheECI.
(5) Trendsandfindingsmustbemadeapplicabletoentirestate/UTasalessonlearntandtheCEOof thestatemustdirectall theDEOstosubmitasuomotuactiontakenandcompliancereport.
Post Audit Surveillance-
Duringauditfollow-up,surveillanceistheonlymeanstoensurethatelectionmachineryinthedistrictcomplywiththeECIinstructions.Post-auditsurveillancecanbeconductedas informalvisitsorasamorestructured follow-upauditoncontinuousmonitoringapproach.
Audit Team will observe sound ethical code while conducting audit in aterritory.
17
Annexure-I-A
Check list for verification of Electoral Roll:
Sr. No. Name of the activity Reference in the Handbook
for ERO
Whether action taken
Yes NO
Remarks
1. RationalisationofPollingStation-publicationoflistofpollingstationandinvitesuggestionsfromMP/MLAsandothers.
ChapterIV,Para27Ch.IPara45
2. Name,telephonenumberofBLOisadequatelypublicizedinthelocality
ECIinstruction
3. VulnerabilityofvoterskeptinviewwhiledrawinglistofP.S
ECIinstruction
4. Areceiptofallformsreceivedhasbeenissuedandreplyregardingacceptance/rejectionhasbeensent.
Ch.V,Para21Ch.V,Para40
5. AllthedeletionsofpreviouslyregisteredvotershavebeendonebysendingtheirnamestoEROsofpreviousplace.
Ch.VIII,Para26
6. BLOshaveverifiedalltheclaims/objectionsandvisitedtheirlocalities.
ECIinstruction
7. Copiesofdraftrollswithsoftcopyhandedovertorecognizedpoliticalparties.
Ch.IV,Para40
8. DraftrollreadoutintheGramSabhas,housingsocietiesanddisplayedatproperplace.
ECIinstruction
9. Listofdeadpersons,shiftedvotersalreadypreparedandactedupon.
ECIinstruction
10. Keyparametersofstatisticaldata,suchasEPratio,genderratioetc.takencareof.
Ch.IV,Para81-90
18
11. De-duplicationsoftwarerunwithintheconstituencyandacrosstheconstituenciesandprobablerepeatedentriesverifiedandproperprocedurefollowedfordeletionetc.
Ch.IV,Para23
12. Copyofrolluploadedonthewebsiteonthedateofdraftpublication/finalpublicationandhelplinesareworking.
Ch.IV,Para32
13. NamesofMPs,MLAsandpersonswithnotifiedofficesverifiedintheroll.
Ch.III,Para32
14. Actiontakentocollectnon-photovoters,photographhasbeentakenandreadyEPICsdistributed.
ECIinstruction
15. Allclaimshavebeendisposedoffbyspecifieddate,ordershavebeenpassedoneachapplicationwithlegiblenamesanddateandrequiredpercentageofsupercheckbyEROandAEROdone.
Ch.IV,Para26Ch.V,Para56-60
16. Namesofaddition/deletionandcorrectionpreparedandintegratedifrequiredanddraftlistprepared.
Ch.IV,Para25.1-25.2
17. Onlineapplicationreceivedhasbeendisposedoff,checkedandanyrepetitioninthehardcopychecked.
ECIinstruction
18. Properstorageofrecordsofrollmaintained.
ECIinstruction
19. BLOshavegonethroughthecopyofelectoralrolltocheckthatnamesoffamilymembersareenlistedinoneplace.Therearenorepeatedentriesetc.
ECIinstruction
19
20. Totalnumberoftheentriesintheelectoralrollsshouldtallywiththedetailsintheheaderpage.
ECIinstruction
21. BLOshavecarriedoutfieldvisitsandEROshavealsosupervisedtheirwork.
ECIinstruction
22. Actiontakenforupdatinglastpartofrollforservicepersonnel.
ChapterX.para20-28
23. ActiontakentoincludeForm6AfromNRIs,ifany.
ChapterXI,para2-6
20
Sr. No. Name of the activity Reference in the Handbook for RO
Whether action taken
Yes NO
Remarks
1. Therearenopollingstationslocatedinreligiousplaces,firstfloorofanybuilding,buildingbelongingtopoliticalparties,hospitaletc.
ECIinstruction
2. Thereisnopollingstationforwhichavoterhastotravelmorethantwokilometers.
Ch.I,Para41
3. Basicminimumfacilitysuchaswater,shelterforprotectionfromsun,toilet,ramp,electricityetc.areavailableatthepollingstation.
4. Draftproposedofpollingstationwaspublishedinlocalityinvitingsuggestion/objectionandallpartymeetingwasheldtodiscussandactonthesuggestions.
5. Whiledrawinglistofpollingstation,duecarehasbeentakenforvulnerablesectionsofsociety,issuesinvolvingpolarityinlocality,geographicalbarriarsetc.
Annexure-I-B
Check list for verification of Polling Station:
21
Sr. No. Name of the activity Reference in the Handbook
for ERO
Whether action taken
Yes NO
Remarks
1. WasdraftpublishedonprescribeddateandcopiesgiventoPoliticalParties,MLA/MPs?
2. Numberofclaims/objectionsreadandwhetheractiontakenonallclaimsbeforepublication.
3. Supplementsofcontinuousupdationincludedindraftroll.
4. Whetherdataentryofallformsdoneandacknowledgementissued
5. Allclaimantsinformedofactiontaken
6. BLO’svisitedtheirareaofjurisdictionandsubmittedinformationaboutdead,shifted,newvoters.
7. Collectedphotosorphotographedresidualvoters.
8. ProgrammeforEPICfinalizedfornewvoters.
9. Runde-duplicationsoftwareandverificationofduplicatesdoneandfurtheractiontaken.
Annexure IC
Checklist for Summary Revision:
22
Annexure ID
Checklist for Continuous Revision:
Sr. No. Name of the activity Reference in the Handbook for ERO
Whether action taken
Yes NO
Remarks
1. SupplementssenttoERO’son7th of the monthbytheBLOs.
2. Photographofresidualvoterscollected.
3. EPICdistributed
4. Actiontakenonformsreceived.
5. Action taken oncomplaintreceived.
23
Annexure IE
Check list for verification of Electronic Voting Machines:
Sl. No. Check point Observation
Storage and Safety arrangement of EVMs
1. WhetheracommitteeconsistingofofficernominatedbyDistrictElectionOfficer(notbelowtherankofSub-DivisionalMagistrate),ElectionSupervisorandWarehouse-in-chargeofEVMshavebeenconstitutedforthedistrict?
2. WhetherMasterStockRegisterforEVMshasbeenmaintainedwarehouse-wiseforthedistrict?
3. a) No.ofBallotUnitsavailableinthewarehouse(s)asperMasterStockRegisterb) No.ofControlUnitsavailableinthewarehouse(s)asperMasterStockRegister
4. WhetherEVMsavailableinthewarehouseareinvolvedinanyElectionPetitionorCourtcase?
5. Ifyes,detailsofcase?
6. WhetherdetailsofallEVMsavailableinthedistricthavebeenenteredintheMSRofrespectivewarehouseaswellasintheLedgerofEVMs?
7. EVMsarestoredinTreasuryorwarehouseatDistrictHeadquartersorwarehouseatTehsilheadquarters.
8. WhetherEVMshavebeenstoredinaseparatewarehousewherenothingotherthanEVMiskept?
9. EVMstoragewarehousehasone(1)entrypoint.Ifthereareanyotherdoorsorwindowsinthewarehouse,theyhavebeensealedusingbrick-masonry/concreteornot.
10. WhetherentryofEVMstoragewarehousehasbeensecuredbyadoublelocksystemornot?
11. Whetherwarehouseisfreefromanydampness,pests,rodentsetc.?
24
12. Whetherproperfire-fightingarrangementhasbeenmadeavailable?
13. Whetheradequatesecurityarrangementhasbeenmadeatwarehousebydeputingpolice/securityguard?
14. WhetherDEOhasnominatedone(1)officernotbelowtherankofTehsildartobein-chargeofeveryEVMwarehouseforthepurposeofopening/closingofwarehouse?
15. Whetherlogbookforopening/closingofwarehousehasbeenmaintained?
16. WhethercopiesofthewrittenordersoftheDEOforopeningofwarehouseisavailable?
17. WhethercopiesofinvitationtoNationalandStaterecognizedpoliticalpartiesregardingdateandtimeofopeningandclosureofEVMwarehouseareavailable?
18. WhethersignaturesofauthorizedrepresentativesofNationalandStaterecognizedpoliticalpartiespresentatthetimeofopeningandclosureofthewarehousehavebeentakeninalogbookmaintainedforthispurpose?
19. WhethercopiesofwrittenordersoftheDEOregardingmovementofEVMsinandoutoftheEVMwarehouseisavailable?
20. WhetheramovementregisterforEVMsismaintained?
21. Whetherthewarehousein-chargehastakenawrittenacknowledgementfromtheofficerreceivingtheEVM?
22. WhenEVMswerereturnedtothewarehousewhetheranentrytothateffectwasmadeinthemovementregister?
23. 100%physicalverificationofEVMshasbeencarriedoutbytheCommitteementionedat1aboveduringlastyear.
First Level Checking of EVMs
24. WhetherDEOpreparedaschedulefortheFLCofEVMinconsultationwiththeEVMmanufacturers(ECIL&BEL)andtheCEO?
25
25. WhetherschedulewasmadeinsuchamannerthatsufficienttimeisavailableforFLCofEVMsbyengineersofmanufacturers?
26. WhetherthescheduleforFLCwascommunicatedtoeverynationalandstatelevelrecognizedpoliticalpartyinwritingbytheDEOatleastoneweekbeforethebeginningoftheFLCinthedistrict?
27. WhetherrepresentativesofallnationalandstatelevelrecognizedpoliticalpartiesauthorizedbytheDistrictPresidentofthepartyare/werepresentatthetimeofFLC?Specificdetailsofparties.
28. WhetherDEOhasnominatedoneofficernotbelowtherankofAdditionalDistrictMagistratetosupervisetheentireprocessofFLC?
29. WhethernominatedofficerpresentsintheFLChallfortheentiredurationofFLC?
30. WhethertheprocessofFLCis/wascontinuouslyvideographed?
31. WhetherCCTVcamerasare/wereputintheFLChall?
32. AregisterhasbeenkeptbytheDEOinwhichsignaturesofallpoliticalpartiesare/weretakeneverydayastokenoftheirpresence.
33. DateofstartingFirstLevelCheckingofEVMs.
34. FirstLevelCheckingofEVMsisstillgoingonorcompleted.
35. IfFLCiscompleted,dateofcompletion.
36. No.ofBallotUnitsandControlUnitsaresubjectedtoFLC.
37. FLChasbeenconductedinno.ofBallotUnitsandControlUnitstilldate.
38. No.ofBallotUnitsandControlUnitsfounddefectiveintheprocessofFLC.
39. FLCiscarriedoutinalargehallwhichaccommodatesEVMstobechecked.
26
40. Whethereveryentrytothehallisguardedbypoliceforce?
41. Whethereveryhallhasadoorframe,metaldetector?
42. Whethereverypersonwhoentersthehallisfriskedateveryentry?
43. WhetherentrytothishallisonproductionofIdentityCardoftheauthorizedofficials/passesissuedbytheDistrictElectionOfficer?
44. Whethernobodyisallowedtocarryanyelectronicdeviceinsidethehallincludingcellphones,cameraandspypensetc.?
45. WhetherFLCiscarriedoutonlybyauthorizedengineersofBELandECIL?
46. WhetherBEL/ECILengineerscarryouttestprescribedbythemanufacturerstoconfirmthatallcomponentsoftheEVMareoriginalandcertifythatallthecomponentsoftheEVMsareoriginal?
47. Whetherdetailedstep-by-stepinstructionsofcheckingofthemachinewereissuedbyBEL/ECILfortheirrespectivemachines?
48. Whethertheseinstructionsincludealistofequipment,whichtheengineerscarrywiththeminFLChall?
49. Whetherin5% percentofEVMsatleast1000votespolledduringthemockpoll?
50. Whetheraprintoutoftheresultsofmockpollaswellasasequentialprintoutofeveryvotepolledduringthemockpollare/weretakenoutforatleast5%ofEVMsandshowntotherepresentativesofpoliticalparties?
51. Whethersignaturesofrepresentativesofpoliticalpartiesare/weretakeninaregisterasatokenofhavingseentheprintoutandconfirmthatthereis/wasnodiscrepanciesbetweenthevotespolledduringthemockpollandresultsintheprintout?
27
52. AfterfixingthePinkPaperSealonControlUnit,whethertheEngineeroftheManufacturerputshissignatureonthePinkPaperSeal?
53. WhethertherepresentativesofthePoliticalPartiesalsoputtheirsignatureonthesaidsealwithpartynameinabbreviationbelowthesignature?
54. Whethersignaturesofrepresentativesofpoliticalpartiesare/wereobtainedontheregistermaintainedtonotedowntheserialnumberofthepinkpapersealusedontheControlUnitbyclearlymentioningtheuniqueIDnumberofControlUnitandthePinkPaperSealnumber?
55. WhetherphotocopyofthisregisterhasbeengivenfreeofcosttoallNationalandStatelevelrecognizedpoliticalpartiesassoonasFLCisover.
56. AfterFLCisover,whethertheDEOfixascheduleforfirstrandomizationofEVMs?
57. WhetherfirstrandomizationofEVMsofBallotUnits(BUs)andControlUnits(CUs)isdonetorandomlyassignEVMstoAssemblyConstituencies(ACs),trainingandAwarenessProgrammes?
58. AfterfirstrandomizationwhethertheR.Ooftheconstituency,takeschargeoftheCUsandBUsrandomlyallottedtohisconstituency?
59. WhethertheCUsandBUsmeantforuseattheelectionareseparatelytakentoR.O’sstrongroomunderproperescortandisguarded24X7?
60. Atthetimeofsealingthestrongroom,whethertherepresentativesofpoliticalpartiesremainpresentandtheyalsoaffixtheirsealonthelock?
61. ThetrainingEVMsaredistributedtotherelevantofficersforthetrainingpurpose?
Preparation of EVMs (Candidate setting)
62. WhetheracopyofthislistoffirstrandomizationofEVMsisgiventoallthecandidatesafterthelastdateofwithdrawalofcandidatures?
28
63. WhethertheReturningofficerfixesthedateofpreparationofEVMsforpoll(Candidateset)andintimatetoallcandidatestoremainpresentorsendtheirrepresentativesduringtheprocess?
64. WhetheronthedayofpreparationofEVMssecondrandomizationofEVMs(BUs&CUs)isdonebeforedoingtheprocessofpreparationofEVMsforpolls?
65. WhethercandidatesortheirrepresentativesarepresentatthetimeofPreparationofEVMsforelection?
66. WhethercandidatesortheirrepresentativesarepresentatthetimeofPreparationofEVMs?Specificdetailsofcandidates.
67. WhethertheprocessofpreparationofEVMsiscontinuouslyvideographed?
68. AregisterhasbeenkeptbytheROinwhichsignaturesofcandidates/theirrepresentativesaretakeneverydayastokenoftheirpresence.
69. DateofstartingPreparationofEVMs.
70. DateofcompletionofpreparationofEVMs.
71. No.ofBallotUnitsandControlUnitsfounddefectiveduringpreparationofEVMs.
72. WhetherpreparationofEVMsiscarriedoutinalargehallwhichaccommodatesEVMstobeprepared.
73. Whethereveryentrytothehallisguardedbypoliceforce?
74. Whethereveryhallhasadoorframe,metaldetector?
75. Whethereverypersonwhoentersthehallisfriskedateveryentry?
76. WhetherentrytothishallisonproductionofIdentityCardoftheauthorizedofficials/passesissuedbytheDistrictElectionOfficer/ReturningOfficer?
77. Whethernobodyisallowedtocarryanyelectronicdeviceinsidethehallincludingcellphones,cameraandspypensetc.?
29
78. WhetherpreparationofEVMsiscarriedoutinthepresenceofauthorizedengineersofBELandECIL?
79. WhetherBEL/ECILengineerscarryouttestprescribedbythemanufacturerstoconfirmthatallcomponentsoftheBallotUnitsareoriginalandcertifythatallthecomponentsoftheBallotUnitsareoriginal?
80. Whetherin5% percentofEVMsatleast1000votespolledduringthemockpoll?
81. Whetheraprintoutoftheresultsofmockpollaswellasasequentialprintoutofeveryvotepolledduringthemockpollare/weretakenoutforatleast5%ofEVMsandshowntotherepresentativesofpoliticalparties?
82. Whethersignaturesofrepresentativesofpoliticalpartiesare/weretakeninaregisterasatokenofhavingseentheprintoutandconfirmthatthereis/wasnodiscrepanciesbetweenthevotespolledduringthemockpollandresultsintheprintout?
83. AfterfixingthePinkPaperSealonBallotUnit,whethertheEngineeroftheManufacturerputshissignatureonthePinkPaperSeal?
84. Whethercandidates/theirrepresentativesalsoputtheirsignatureonthesaidsealwithpartynameinabbreviationbelowthesignature?
85. Whethersignaturesofcandidates/theirrepresentativesareobtainedontheregistermaintainedtonotedowntheserialnumberofthepinkpapersealusedontheBallotUnitbyclearlymentioningtheuniqueIDnumberofBallotUnitandthePinkPaperSealnumber?
86. Whetherphotocopyofthisregisterhasbeengivenfreeofcosttoallcandidates/theirrepresentativesassoonasPreparationofEVMsisover?
30
Annexure IF
Check list for verification of Voter Verifiable Paper Audit Trail
Sl. No. Check point Observation
Storage and Safety arrangement of VVPATs
1. WhetheranyMasterStockRegisterforVVPATshasbeenmaintainedwarehouse-wiseforthedistrict?
2. No.ofVVPATsavailableinthewarehouse(s).3. WhetherdetailsofallVVPATsavailableinthedistricthave
beenenteredintheMSRofrespectivewarehouseaswellasintheLedgerofVVPATs?
4. Whetherwarehouseisfreefromanydampness,pests,rodentsetc.?
5. Whetherproperfire-fightingarrangementhasbeenmadeavailable?
6. Whetheradequatesecurityarrangementhasbeenmadeatwarehousebydeputingpolice/securityguard?
7. WhetherDEOhasnominatedone(1)officernotbelowtherankofTehsildartobein-chargeofeverywarehouse,whereVVPATshavebeenkept,forthepurposeofopening/closingofwarehouse?
8. Whetherlogbookforopening/closingofwarehousehasbeenmaintained?
9. WhethercopiesofthewrittenordersoftheDEOforopeningofwarehouseisavailable?
10. WhethercopiesofinvitationtoNationalandStaterecognizedpoliticalpartiesregardingdateandtimeofopeningandclosureofwarehouse,whereVVPAThavebeenkept,areavailable?
11. WhethersignaturesofauthorizedrepresentativesofNationalandStaterecognizedpoliticalpartiespresentatthetimeofopeningandclosureofthewarehousehavebeentakeninalogbookmaintainedforthispurpose?
12. WhethercopiesofwrittenordersoftheDEOregardingmovementofVVPATsinandoutofthewarehouseisavailable?
31
13. WhetheramovementregisterforVVPATsismaintained?
14. Whetherthewarehousein-chargehastakenawrittenacknowledgementfromtheofficerreceivingtheVVPAT?
15. WhenVVPATswerereturnedtothewarehousewhetheranentrytothateffectwasmadeinthemovementregister?
16. 100%physicalverificationofVVPATshasbeencarriedoutduringlastyear.
First Level Checking of VVPATs
17. WhetherDEOpreparedaschedulefortheFLCofVVPATinconsultationwiththeVVPATmanufacturers(ECIL&BEL)andtheCEO?
18. WhetherschedulewasmadeinsuchamannerthatsufficienttimeisavailableforFLCofVVPATsbyengineersofmanufacturers?
19. WhetherthescheduleforFLCwascommunicatedtoeverynationalandstatelevelrecognizedpoliticalpartyinwritingbytheDEOatleastoneweekbeforethebeginningoftheFLCinthedistrict?
20. WhetherrepresentativesofallnationalandstatelevelrecognizedpoliticalpartiesauthorizedbytheDistrictPresidentofthepartyare/werepresentatthetimeofFLC?Specificdetailsofparties.
21. WhetherDEOhasnominatedoneofficernotbelowtherankofAdditionalDistrictMagistratetosupervisetheentireprocessofFLC?
22. WhethernominatedofficerpresentsintheFLChallfortheentiredurationofFLC?
23. WhethertheprocessofFLCis/wascontinuouslyvideographed?
24. WhetherCCTVcamerasare/wereputintheFLChall?
25. AregisterhasbeenkeptbytheDEOinwhichsignaturesofallpoliticalpartiesare/weretakeneverydayastokenoftheirpresence.
26. DateofstartingFirstLevelCheckingofEVMs.
32
27. IfFLCiscompleted,dateofcompletion.28. No.ofVVPATsaresubjectedtoFLC.29. FLChasbeenconductedinno.ofVVPATstilldate.30. No.ofVVPATsfounddefectiveintheprocessofFLC.31. FLCiscarriedoutinalargehall,whichaccommodates
VVPATstobechecked.32. Whethereveryentrytothehallisguardedbypoliceforce?33. Whethereveryhallhasadoorframe,metaldetector?34. Whethereverypersonwhoentersthehallisfriskedatevery
entry?35. WhetherentrytothishallisonproductionofIdentityCardof
theauthorizedofficials/passesissuedbytheDistrictElectionOfficer?
36. Whethernobodyisallowedtocarryanyelectronicdeviceinsidethehallincludingcellphones,cameraandspypensetc.?
37. WhetherFLCiscarriedoutonlybyauthorizedengineersofBELandECIL?
38. WhetheraprintedpaperslipsofthemockpollaswellastheelectronicdataoftheControlUnitofEVMtalliedandshowntotherepresentativesofpoliticalparties?
39. Whethersignaturesofrepresentativesofpoliticalpartiesare/weretakeninaregisterasatokenofhavingseenthecountingandconfirmthatthereis/wasnodiscrepanciesbetweentheprintedpaperslipsandelectronicdataoftherespectiveControlUnit,duringthemockpoll?
40. AfterFLCisover,whethertheDEOfixascheduleforfirstrandomizationofVVPATs?
41. WhetherfirstrandomizationofVVPATsisdonetorandomlyassignVVPATstoAssemblyConstituencies(ACs),trainingandAwarenessProgrammes?
42. AfterfirstrandomizationwhethertheR.Ooftheconstituency,takeschargeoftheVVPATsrandomlyallottedtohisconstituency?
33
43. WhethertheVVPATsmeantforuseattheelectionareseparatelytakentoR.O’sstrongroomunderproperescortandisguarded24X7?
44. Atthetimeofsealingthestrongroom,whethertherepresentativesofpoliticalpartiesremainpresentandtheyalsoaffixtheirsealonthelock?
45. ThetrainingVVPATsaredistributedtotherelevantofficersforthetrainingpurpose?
Preparation of VVPATs
46. WhetheracopyofthelistoffirstrandomizationofVVPATsisgiventoallthecandidatesafterthelastdateofwithdrawalofcandidatures?
47. WhethertheReturningofficerfixesthedateofpreparationofVVPATsforpoll(SymbolLoading)andintimatetoallcandidatestoremainpresentorsendtheirrepresentativesduringtheprocess?
48. WhetheronthedayofpreparationofVVPATssecondrandomizationofVVPATsisdonebeforedoingtheprocessofpreparationofVVPATsforpolls?
49. WhethercandidatesortheirrepresentativesarepresentatthetimeofPreparationofVVPATs?Specificdetailsofcandidates.
50. WhethertheprocessofpreparationofVVPATsiscontinuouslyvideographed?
51. AregisterhasbeenkeptbytheROinwhichsignaturesofcandidates/theirrepresentativesaretakeneverydayastokenoftheirpresence.
52. DateofstartingPreparationofVVPATs.
53. WhetherfreshPaperRollandnewPowerPackare/wereinstalledintheVVPATprinterunitbyfollowingtheproceduregivenintheusermanualforVVPATsystems?
54. Whethertestprintoutoftheserialnumberofthecandidatesandsymbolsallottedtothemis/wastakenandcheckedwiththeBallotPaperplacedonBallotUnit?
34
55. Whetheronevotetoeachcandidateis/wasgiventoensurethatVVPATiscorrectlyprintingthepaperslipsinrespectofallcandidates?
56. DateofcompletionofpreparationofVVPATs.
57. No.ofVVPATsfounddefectiveduringpreparationofVVPATs.
58. WhetherpreparationofVVPATsiscarriedoutinalargehallwhichaccommodatesVVPATstobeprepared.
59. Whethereveryentrytothehallisguardedbypoliceforce?
60. Whethereveryhallhasadoorframe,metaldetector?
61. Whethereverypersonwhoentersthehallisfriskedateveryentry?
62. WhetherentrytothishallisonproductionofIdentityCardoftheauthorizedofficials/passesissuedbytheDistrictElectionOfficer/ReturningOfficer?
63. Whethernobodyisallowedtocarryanyelectronicdeviceinsidethehallincludingcellphones,cameraandspypensetc.?
64. WhetherpreparationofVVPATsiscarriedoutinthepresenceofauthorizedengineersofBELandECIL?
65. WhetheraprintedpaperslipsofthemockpollaswellastheelectronicdataoftheControlUnitofEVMtalliedandshowntotherepresentativesofpoliticalparties?
66. Whethersignaturesofrepresentativesofpoliticalpartiesare/weretakeninaregisterasatokenofhavingseenthecountingandconfirmthatthereis/wasnodiscrepanciesbetweentheprintedpaperslipsandelectronicdataoftherespectiveControlUnit,duringthemockpoll?
67. Whetherphotocopyofthisregisterhasbeengivenfreeofcosttoallcandidates/theirrepresentativesassoonasPreparationofEVMsisover?
35
Annexure IG
Check list for Training Activities:
S. No. Audit points Reference
1. TrainingsforALMTshavebeenorganizedforSummaryRevision
Yes/No InstructionsissuedbytheTrainingDivisionfromtimetotime
2. IfYes,No.ofALMTstrained
3. BLOshavebeentrainedforSummaryRevision
Yes/No
4. Ifyes,totalnumberofBLOstrained
5. StudyMaterial/latestinstructionshavebeenprovidedtoALMTs/BLOsduringtraining
Yes/No
6. InstructionshavebeenissuedbytheTrainingDivisionofECIforSummaryRevision/ConductofElection
Yes/No
7. Ifyes,DEOhasfollowedinstructionsissuedbyTrainingDivisionoftheECI(PleasementionECI’scircular)
Yes/No
8.
8A
FundfortrainingsreceivedfromtheECI/StateUtilisationreportsentforfundsreceivedfortraininginpreviousyears.
Yes/No
Yes/No
9. HasfundbeendemandedfromtheStateaswellasfromtheECI
Yes/No
10. TrainingObservershavebeenappointedformonitoringoftrainings
Yes/No
36
Annexure IH
Check list for SVEEP (NVD) Activities:
Sl. No. Name of the activity
Reference in the
Handbook for ERO
Whether action taken
Yes NO
Remarks
1 NumberofPSlocationswhereNVDwillbe/wasorganised
NA
2 Totalelectors tobe/wasdistributedEPIC onNVD(includesthosegivenEPICbetweenfinalpublicationofERandNVD)
Male NA
Female
Others
3 Ofthese,howmanyin18-19yragegroup(newlyeligible)
Male NA
Female
Others
4 Numberofbadgestobe/wasdistributedtonewelectors
NA
5 NumberofEducationalInstitutionsorganisingNVDfunction
NA
6 No.OfSpecialcampsplanned/organisedforsurrenderofduplicates,correctionofentries,newregistrations
NA
7 ChiefGuestproposed/attendedtheStateNVDfunction
NA
37
8 NameofPartnerAgenciesbeing/wereropedinforNVD
NA
9 AnyonlineeventlikeQuiz,Discussion,etc.Planned/held
NA
10 Concurrentactivitiesproposed/takenupaspartofNVDatstatelevel.
NA
11 Concurrentactivitiesproposed/takenupaspartofNVDatdistrictlevel
NA
12 NewspapersinwhichNVDadvertisementisplanned/wasgivenon25thJanuary,2015.
NA
Signature:
38
Annexure II
Draft checklist for SVEEP (Summary Revision) activities:
Sl.No Nameoftheactivity ReferenceintheHandbook
forERO
Whetheractiontaken
Yes NO
Remarks
1 Numberofexcludedgroups/communitiesidentified
NA
2 Numberofphysicaleventsorganisedfortheseidentifiedgroups
NA
3 Numberofmediainsertionsfortheseidentifiedgroups
NA
4 Physicaleventsorganisedformeetinggendergapa.Meetings(withfunctionarieslikeAWW/ASHA,CSOsetc)b.SpecialCampsc.StreetPlays/Folkartcompetitionsetcd.Rallies/Runse.SpecialeventwithIconf.Otherevents
NA
5 Numberofgenderspecificmediainsertionsa.Posters,pamphlets,bannersb.Radiosports/pgmc.Televisionspots/pgmd.Newspaperadvertisementse.OutdoorHoardings/Buspanelsetcf.SMS/Callertuneetcg.Internetinsertions
NA
39
6 Youthspecificphysicaleventsorganiseda.Numberofeventslikecompetitions,festivals,streetplaysetcb.NumberofEducationalInstitutionsthatparticipatedineventsc.Specialregistrationcampsineducationalinstitutionsd.SpecialCampsforyouthoutsidetheeducationalsysteme.SpecialeventwithIconf.Rallies/Runsg.Anyotherinitiative
NA
7 YouthSpecificmediainsertionsa.Posters,pamphlets,bannersb.Radiospots/pgmc.Televisionspots/pgmd.Newspaperadvertisementse.OutdoorHoardings/Buspanelsetcf.SMS/Callertuneetc.g.Internetinsertions
NA
8 Physicaleventsorganisedforfightingurbanapathya.BLO/RWAmeetingsb.SpecialCampsc.Rallies/Runsd.AppealLetters(fromDEOs/CEO)e.PressNotesf.SpecialeventwithIcong.Otherevents
NA
40
9 Urbanspecificmediainsertionsa.Posters,pamphlets,bannersb.Radiospots/pgmc.Televisionspots/pgmd.Newspaperadvertisementse.OutdoorHoardings/Buspanelsetc.f.SMS/Callertuneetc.g.Internetinsertions
NA
10 NumberofpartnerAgenciesa.GovernmentDepartments/GovtMediab.CSOsc.PrivateMediad.PSUs/Corporatee.OtherorganisationslikeNYKS,NSS,CooperativesSocieties,RWAsetc
NA
11 NumberofCampusAmbassadorsappointeda.Maleb.Female
NA
12 NumberofmeetingsofCampusAmbassadorswithCEOs/CEO’soffice
NA
13 NumberofmeetingsofCampusAmbassadorswithinthedistrictwithDEO/DEOsoffice
NA
14 InitiativestakentoenrolServiceVoters(pl.Specify)
NA
15 Others(anyotherinitiativethatyoumayliketohighlight)
NA
41
16 SpecificnoofcreativitiesusedfromECI’swebsiteSVEEPPortalhttp://eci.nic.in/eci_main1/sveep.aspxRegistrationPosters,AudiomessagesbyIconsPhotosIconsPhotosVoterEducationChannelhttp://www.youtube.com/eciRegisterNowtoVoteMSDhoniSainaNehwalTeekaLagao(ViratKohli)WorliArt-Gujarat
NA
42
INDICATORS
(to be submitted on 31st December 2014)
I NewenrolmentfromexcludedgroupsduringSRperiod
II Genderratioonrollinfinalrollw.r.t.1.1.2014Genderratioonroll(attimeofreporting)
III EPRatioinurbancentres(inFinalrollw.r.t.1.1.2014)EPratioinurbancentres(attimeofreporting)
IV Newenrolmentof18-19yrold(inlastSummaryrevision)Newenrolmentof18-19yrold(asondate)
V NewenrolmentofServiceElectors
VI Totalnumberofform6receivedduringtheSummaryRevisionperiod
Signature:
Date:
43
Calendar of SVEEP Activities for Summary Revision (w.r.t. 1.1.2016)
Intervention/Activities August September October Remarks
44
Annexure IJ
Check list for Media Division :
Sl. No. Name of activity Reference Whether Action Taken
Yes NO
Remarks
1. ConstitutionofDistrictMediaCertificationandMonitoringCommittee(MCMC)
*Compendium-Letterdated27th August,2012.Page-49
2. PaidNewsreportandMonitoringofpoliticaladvertisementsinmedia
*Compendium-Letterdated27th August,2012.Page-49
3. IssuingAuthorityLetters,forwardedbytheCommission,tomediapersons
Rules32(c)and53(1)(b)ofConductofElectionRules,1961
4. MediaMonitoringandInteractionwithmedia
ECIinstructionsgivenfromtimetotime
*CompendiumofInstructionsonPaidNewsandRelatedMatters(February-2014)
45
Annexure-I
Confirmation Request Form
NAMEOFDISTRICT DATE:DD/MM/YYYY
NAMEOFOFFICER DESIGNATION
AREAOFINSPECTION(Asperchecklist) CRFNO.(tobedevelopedbytheteamleader)
SUBJECTMATTER:
NAMEOFOFFICER:
SIGNATURE:
DATE:DD/MM/YYYY
TIME
RESPONSEFROMAUDITEE:
NAMEANDSIGNATUREOFOFFICER DATE:DD/MM/YYYY
TIME
FORECIUSEONLY:
RESPONSEACCEPTED: () YES () NO
AUDITFINDING: () YES () NO
COMMENTS:
ECIOFFICERName:Designation:
SIGNATURE
DATE:DD/MM/YYYY
46
Annexure-II
Deficiency Reporting Form (Form-2001)
ELECTION COMMISSION OF INDIA
DEFICIENCY REPORTING FORM (FORM-2001)
1.NAMEOFTHEDISTRICT 2.REFERENCENO. 3.ISSUEDATE
4.AREAOFAUDIT 5.NAMEOFTHERESPONSIBLEOFFICER
6.DATEOFAUDIT
7.NON-CONFORMITY/DEFICIENCYDETAILS:
8.LEVELOFFINDING 9.REFERENCENO. 10.ENCLOSURES
11.NAMESOFTHEAUDITOR&TEAMLEADER
12. SIGNATURE OFTHETEAMLEADER
13.DATE 14.TARGET
RESPONSEOFTHEAUDITEE
16.CORRECTIVEACTIONDETAILS&NUMBEROFATTACHMENTPAGES
17. NAME OF THERESPONSIBLEOFFICER
18. SIGNATURE OFTHERESPONSIBLEOFFICER
19.DATE
20.COMMENTSOFTHEAUDITORWITHREFERENCETOTHEACTIONTAKEN
47
Annexure-III
ELECTION COMMISSION OF INDIA
AUDIT FINDING FORM
NAMEOFTHEDISTRICT:-
Area of Audit-Electoral Roll/Polling Station/EVM DATEOFAUDIT
NON-CONFORMITY/DEFICIENCYDETAILS:
SR.NO. SUBJECT CONFIRMATIONREQUESTFORMNo./PHYSICALINSPECTIONDONEONBYSh.…….&OTHERS
PHOTOCOPYOFPROOF
1.
2.
3.
4.
NOTES
Index RAD ManualRAD Manual