Upload
lyxuyen
View
225
Download
0
Embed Size (px)
Citation preview
If you are approaching from the center of Tokyo using the expressway, exit at Shibaura exit.Turn right at the fourth traffic lights (Konan Elemen-tary School) after taking the Shibaura exit (not count-ing the traffic lights at the exit). (Note: There is a right turning lane at these traffic lights). Turn left at the second traffic lights (Shin Konan Minamibashi), then right at the second traffic lights (Philips on your left hand side), proceed straight ahead, take a left turn at the bottom, and you will see a row of buildings to your left. It is the fourth building down the street.
From the Airport
Exit Konan Gate, proceed on the Skyway extending to your right.
1 32 The name of the office is clearly marked at the entrance of the build-ing. Please enter and proceed to the reception desk.
・An approx. 5 min. walk from Konan Gate at JR Shinagawa Station・An approx. 10 min walk from Shinagawa Station on the Keihin Kyuko Line.
MITSUBISHI HEAVY INDUSTRIES, LTD. Head Office Shinagawa (Shinagawa Office)16-5, Konan 2-chome, Minato-ku, Tokyo, 108-8215, Japan
By Car
Take the monorail to Hamamatsucho Station from Haneda Airport, transfer to JR line (Either Yamanote Line or Keihin Tohoku Line) and get off at Shinagawa Station. (Approximately 40 min. from Airport)Take the Keihin Kyuko Line from Haneda Airport to Shinagawa Station (Approximately 30 min from Airport).Approximately 30 to 45 minutes by taxi from Haneda Airport.By JR Narita Express from Narita Airport Station to Shinagawa Station. (Approximately 70 min.)
Route map
Shinagawa
Shinjuku
Ikebukuro
Akabane
Ofuna Yokohama
Kawasaki
Ueno
Tokyo
Omiya
Chiba
Narita Airport
Haneda Airport
Keihin Tohoku Line
Tohoku Shinkansen
Narita Express
Keihin Kyuko (Keikyu) Line
Tokaido & Sanyo Shinkansen
Yokosuka - Sobu Rapid Service Train
Tokaido Line
Yamanote Line
Copyright (C) MITSUBISHI HEAVY INDUSTRIES, LTD. All Rights Reserved.
eniL
eto
nama
Yen
iL u
koho
T ni
hieK
,eta
G a
wana
kaT
noit
atS
awa
gani
hS
Front of ShinagawaStation
,eni
L ok
uyK
nihi
eKno
itat
S a
waga
nihS
Central Ticket Gate
North Ticket Gate
EcuteShinagawa
JR Shinagawa Station
Keihin Kyuko Line, Ticket Gate
Shinkansen North Ticket Gate
Shinkansen SouthTicket Gate
NTT Data (A,RE,A Shinagawa)
Konan Gate, Shinagawa Station
JR Shinagawa East Building
ShinagawaEast One Tower ya
wykS
Taiyo Life Insurance
Shinagawa Intercity, Tower A
Shinagawa Grand Central Tower
Shinagawa Intercity Tower B
Canon MJ
Sony Shinagawa Technology Center
nesn
akni
hS o
diak
oT
eni L
aku
soko
Y
Route on foot
eniL
eto
nama
Yen
iL u
koho
T ni
hieK
,eta
G a
wana
kaT
noit
atS
awa
gani
hS
Front of ShinagawaStation
,eni
L ok
uyK
nihi
eKno
itat
S a
waga
nihS
Central Ticket Gate
North Ticket Gate
EcuteShinagawa
JR Shinagawa Station
Keihin Kyuko Line, Ticket Gate
Shinkansen North Ticket Gate
Shinkansen SouthTicket Gate
NTT Data (A,RE,A Shinagawa)
Konan Gate, Shinagawa Station
JR Shinagawa East Building
ShinagawaEast One Tower ya
wykS
Taiyo Life Insurance
Shinagawa Intercity, Tower A
Shinagawa Grand Central Tower
Shinagawa Intercity Tower B
Canon MJ
Sony Shinagawa Technology Center
nesn
akni
hS o
diak
oT
eni L
aku
soko
Y
Route on foot
Head Office Shinagawa (Shinagawa Office)
Head Office Shinagawa is the fourth building on the right hand side, after Shina-gawa East One Building, Taiyo Life Insurance Building and Shinagawa Grand Central Tower.