18
Marburg Creek Wastewater Marburg Creek Wastewater Treatment Facility Treatment Facility Reasons for constructing a new facility Reasons for constructing a new facility Increase in treatment capacity Increase in treatment capacity Considerations for evaluating Considerations for evaluating technologies technologies Reuse quality to conserve water Reuse quality to conserve water Efficient, low cost Efficient, low cost Odor control due to high traffic area Odor control due to high traffic area Aesthetics – directly on major state highway Aesthetics – directly on major state highway Technology chosen – Seghers UNITANK Technology chosen – Seghers UNITANK

Marburg Creek Wastewater Treatment Facility Reasons for constructing a new facility Reasons for constructing a new facility Increase in treatment capacity

Embed Size (px)

Citation preview

Page 1: Marburg Creek Wastewater Treatment Facility Reasons for constructing a new facility Reasons for constructing a new facility Increase in treatment capacity

Marburg Creek Wastewater Marburg Creek Wastewater Treatment FacilityTreatment Facility

Reasons for constructing a new facilityReasons for constructing a new facility Increase in treatment capacityIncrease in treatment capacity

Considerations for evaluating technologiesConsiderations for evaluating technologies Reuse quality to conserve waterReuse quality to conserve water Efficient, low costEfficient, low cost Odor control due to high traffic areaOdor control due to high traffic area Aesthetics – directly on major state highwayAesthetics – directly on major state highway

Technology chosen – Seghers UNITANK Technology chosen – Seghers UNITANK

Page 2: Marburg Creek Wastewater Treatment Facility Reasons for constructing a new facility Reasons for constructing a new facility Increase in treatment capacity

Advantages of the Marburg WWTPAdvantages of the Marburg WWTP Compact footprint for a 1.5 MGD facilityCompact footprint for a 1.5 MGD facility Completely enclosed – meeting our aesthetic Completely enclosed – meeting our aesthetic

requirementsrequirements Biological process – no chemicals are used in the Biological process – no chemicals are used in the

treatment processtreatment process Includes a natural odor control Includes a natural odor control Produces reuse quality water for golf course and Produces reuse quality water for golf course and

recreation fieldsrecreation fields Includes dedicated spray fields in case golf course or Includes dedicated spray fields in case golf course or

ball fields do not need to use waterball fields do not need to use water

Marburg Creek Wastewater Marburg Creek Wastewater Treatment FacilityTreatment Facility

Page 3: Marburg Creek Wastewater Treatment Facility Reasons for constructing a new facility Reasons for constructing a new facility Increase in treatment capacity

Marburg Plant capacity and usageMarburg Plant capacity and usage Plant has both a reuse permit & Plant has both a reuse permit &

discharge permitdischarge permit Plant is fully enclosed with natural Plant is fully enclosed with natural

odor controlodor control

Marburg Creek Wastewater Marburg Creek Wastewater Treatment FacilityTreatment Facility

Page 4: Marburg Creek Wastewater Treatment Facility Reasons for constructing a new facility Reasons for constructing a new facility Increase in treatment capacity

MARBURG NPDES

PERMIT LIMITSAVERAGE

RESULTS

BOD5 (mg/L) 20 2.8

TSS (mg/L) 20 1.5

TOTAL PHOSPHOROUS (mg/L) report 3.8

AMMONIA (mg/L) 5 1.6

FECAL COLIFORM (col/100ml) 200 2.6

TURBIDITY (NTU) NA 1.2

MARBURG NPDES

PERMIT LIMITSAVERAGE RESULTS

BOD5 (mg/L) 20 2.8

TSS (mg/L) 20 1.5

TOTAL PHOSPHOROUS (mg/L) report 3.8

AMMONIA (mg/L) 5 1.6

FECAL COLIFORM (col/100ml) 200 2.6

TURBIDITY (NTU) NA 1.2

MARBURG REUSE

PERMIT LIMITSAVERAGE RESULTS

BOD5 (mg/L) 5 2.5

TSS (mg/L) 5 1.3

TOTAL PHOSPHOROUS (mg/L) report 3.8

AMMONIA (mg/L) 5 1.6

FECAL COLIFORM (col/100ml) 23 2.6

TURBIDITY (NTU) 3 1.2

Marburg Creek Wastewater Marburg Creek Wastewater Treatment FacilityTreatment Facility

Page 5: Marburg Creek Wastewater Treatment Facility Reasons for constructing a new facility Reasons for constructing a new facility Increase in treatment capacity

Marburg Creek Wastewater Marburg Creek Wastewater Treatment FacilityTreatment Facility

Page 6: Marburg Creek Wastewater Treatment Facility Reasons for constructing a new facility Reasons for constructing a new facility Increase in treatment capacity

Marburg Creek Wastewater Marburg Creek Wastewater Treatment FacilityTreatment Facility

Page 7: Marburg Creek Wastewater Treatment Facility Reasons for constructing a new facility Reasons for constructing a new facility Increase in treatment capacity

Wastewater ReuseWastewater Reuse

Chimney’s Golf CourseChimney’s Golf Course

Uses recycled water as irrigation to provide the Uses recycled water as irrigation to provide the course with a constant, dependable supply of course with a constant, dependable supply of water during these times of increased watering water during these times of increased watering

restrictions and drought.restrictions and drought.

Page 8: Marburg Creek Wastewater Treatment Facility Reasons for constructing a new facility Reasons for constructing a new facility Increase in treatment capacity

Wastewater ReuseWastewater Reuse

Chimney’s Golf CourseChimney’s Golf Course

Construction of Hole #2Construction of Hole #2

Page 9: Marburg Creek Wastewater Treatment Facility Reasons for constructing a new facility Reasons for constructing a new facility Increase in treatment capacity

Wastewater ReuseWastewater Reuse

Dedicated Spray FieldsDedicated Spray Fields

Page 10: Marburg Creek Wastewater Treatment Facility Reasons for constructing a new facility Reasons for constructing a new facility Increase in treatment capacity

Wastewater ReuseWastewater Reuse

Chimney’s Golf CourseChimney’s Golf Course

Aerial View of Plant, Golf Course and Spray Aerial View of Plant, Golf Course and Spray FieldsFields

Page 11: Marburg Creek Wastewater Treatment Facility Reasons for constructing a new facility Reasons for constructing a new facility Increase in treatment capacity

Wastewater Treatment & Wastewater Treatment & CollectionCollection

Barrow County Recreation FieldsBarrow County Recreation Fields

Page 12: Marburg Creek Wastewater Treatment Facility Reasons for constructing a new facility Reasons for constructing a new facility Increase in treatment capacity

Wastewater ReuseWastewater Reuse

Barrow County Recreation FieldsBarrow County Recreation Fields

Page 13: Marburg Creek Wastewater Treatment Facility Reasons for constructing a new facility Reasons for constructing a new facility Increase in treatment capacity

Wastewater ReuseWastewater Reuse

Barrow County Recreation FieldsBarrow County Recreation Fields

Tim WhitingTim Whiting

Apalachee High SchoolApalachee High School

Trace Mc DanielTrace Mc Daniel

Winder Barrow High SchoolWinder Barrow High School

Brett MarbutBrett Marbut

Winder Barrow High SchoolWinder Barrow High School

Shawnee PattersonShawnee Patterson

Apalachee High SchoolApalachee High School

Cedell LongCedell Long

Winder Barrow High SchoolWinder Barrow High School

Page 14: Marburg Creek Wastewater Treatment Facility Reasons for constructing a new facility Reasons for constructing a new facility Increase in treatment capacity

Wastewater ReuseWastewater ReuseWinder-Barrow High School Softball Winder-Barrow High School Softball

&& Baseball Fields Baseball Fields

Max PentecostMax Pentecost

Winder Barrow High SchoolWinder Barrow High SchoolTrace Clamp, Jonathan Fuller & Trace Clamp, Jonathan Fuller &

Brendan VealBrendan Veal

Page 15: Marburg Creek Wastewater Treatment Facility Reasons for constructing a new facility Reasons for constructing a new facility Increase in treatment capacity

Wastewater TreatmentWastewater Treatment

Wastewater Treatment Cedar Creek Water Reclamation Facility July 2008 4 MGD of wastewater treatment capacity. State of the art treatment plant that

produces clean water with very minimum odor for

the residents who live in close proximity of the plant.

Page 16: Marburg Creek Wastewater Treatment Facility Reasons for constructing a new facility Reasons for constructing a new facility Increase in treatment capacity

Wastewater TreatmentWastewater Treatment

Cedar Creek Water Reclamation Facility

Page 17: Marburg Creek Wastewater Treatment Facility Reasons for constructing a new facility Reasons for constructing a new facility Increase in treatment capacity

MARBURG NPDES

PERMIT LIMITSAVERAGE

RESULTS

BOD5 (mg/L) 20 2.8

TSS (mg/L) 20 1.5

TOTAL PHOSPHOROUS (mg/L) report 3.8

AMMONIA (mg/L) 5 1.6

FECAL COLIFORM (col/100ml) 200 2.6

TURBIDITY (NTU) NA 1.2

Wastewater TreatmentWastewater Treatment

CEDAR CREEK NPDES

PERMIT LIMITS AVERAGE RESULTS

BOD5 (mg/L) 5 2.4

TSS (mg/L) 5 1.7

TOTAL PHOSPHOROUS (mg/L) 1 0.5

AMMONIA (mg/L) (N-A)7.4 & (M-O)3.5 1.6

FECAL COLIFORM (col/100ml) 200 9

TURBIDITY (NTU) N/A 1.1

Page 18: Marburg Creek Wastewater Treatment Facility Reasons for constructing a new facility Reasons for constructing a new facility Increase in treatment capacity

Wastewater Treatment & Wastewater Treatment & CollectionCollection

Capacity, Maintenance, Operation & Capacity, Maintenance, Operation & Management (CMOM)Management (CMOM)

Tours of Treatment PlantTours of Treatment Plant