12
March 7, 2007 LET Issues (Cai/Kubo/Zisman) Global Design Effort 1 Low-Emittance Tuning Issues and Plans Yunhai Cai, Kiyoshi Kubo and Michael S. Zisman LET Group Conveners

March 7, 2007 LET Issues (Cai/Kubo/Zisman) Global Design Effort 1 Low-Emittance Tuning Issues and Plans Yunhai Cai, Kiyoshi Kubo and Michael S. Zisman

Embed Size (px)

Citation preview

Page 1: March 7, 2007 LET Issues (Cai/Kubo/Zisman) Global Design Effort 1 Low-Emittance Tuning Issues and Plans Yunhai Cai, Kiyoshi Kubo and Michael S. Zisman

March 7, 2007 LET Issues (Cai/Kubo/Zisman) Global Design Effort 1

Low-Emittance Tuning Issues and Plans

Yunhai Cai, Kiyoshi Kuboand

Michael S. ZismanLET Group Conveners

Page 2: March 7, 2007 LET Issues (Cai/Kubo/Zisman) Global Design Effort 1 Low-Emittance Tuning Issues and Plans Yunhai Cai, Kiyoshi Kubo and Michael S. Zisman

March 7, 2007 LET Issues (Cai/Kubo/Zisman) Global Design Effort 2

Introduction• LET is critical to achieving DR vertical

emittance specification– tools and techniques for doing this already are

operational at a number of facilities • challenge is to simulate realistic ring configurations

and make sure we have the hardware and software to carry out the task

• There do not appear to be any major single-particle dynamics obstacles in the way of successful LET– issues of collective effects are another matter,

but are beyond the scope of this plan

Page 3: March 7, 2007 LET Issues (Cai/Kubo/Zisman) Global Design Effort 1 Low-Emittance Tuning Issues and Plans Yunhai Cai, Kiyoshi Kubo and Michael S. Zisman

March 7, 2007 LET Issues (Cai/Kubo/Zisman) Global Design Effort 3

Tasks (1)• Need to evaluate tolerances for lattice

imperfections– strength errors (fixable easily with individual

power supplies)– alignment errors (e.g., 30 m or 100 m)– roll errors– field quality (multipole errors)

• Need to define set of methods for lattice diagnostics– response matrix? – other?

Page 4: March 7, 2007 LET Issues (Cai/Kubo/Zisman) Global Design Effort 1 Low-Emittance Tuning Issues and Plans Yunhai Cai, Kiyoshi Kubo and Michael S. Zisman

March 7, 2007 LET Issues (Cai/Kubo/Zisman) Global Design Effort 4

Tasks (2)• Need to evaluate required numbers and

locations of correctors (lattice dependent)– orbit correctors– skew quadrupoles

• separate magnets or trim windings

• Need to evaluate performance requirements of monitors (assume turn-by-turn)– fixed solidly to adjacent quadrupole (+ nearby

sextupole)• want offset in linear regime of bpm response

– noise level– roll error

Page 5: March 7, 2007 LET Issues (Cai/Kubo/Zisman) Global Design Effort 1 Low-Emittance Tuning Issues and Plans Yunhai Cai, Kiyoshi Kubo and Michael S. Zisman

March 7, 2007 LET Issues (Cai/Kubo/Zisman) Global Design Effort 5

Tasks (3)• Need to evaluate relative merits of

correctors vs. magnet movers– quadrupoles + sextupoles?– quadrupoles only?

• If movers are needed, what range of motion is required? (± 1 mm?)– what setting accuracy? (10 m?)

• What software is needed to measure and correct the ring?– how fast does it need to be?

• need real-time measurements and rapid correction if ring changes quickly

Page 6: March 7, 2007 LET Issues (Cai/Kubo/Zisman) Global Design Effort 1 Low-Emittance Tuning Issues and Plans Yunhai Cai, Kiyoshi Kubo and Michael S. Zisman

March 7, 2007 LET Issues (Cai/Kubo/Zisman) Global Design Effort 6

Comments

• To be safe, should validate 2 pm emittance with both e− and e+ at appropriate intensity– most work to date done with electrons only

• If (weak) solenoids are used for e-cloud suppression, are these enough to limit vertical emittance reduction?

• Not all lattices are “equal”– need to simulate algorithms on all candidate

designs– need realistic model for wiggler (maps)

Page 7: March 7, 2007 LET Issues (Cai/Kubo/Zisman) Global Design Effort 1 Low-Emittance Tuning Issues and Plans Yunhai Cai, Kiyoshi Kubo and Michael S. Zisman

March 7, 2007 LET Issues (Cai/Kubo/Zisman) Global Design Effort 7

Notes from Talks (1)

• ANL aims to demonstrate y/x ≤ 1/400

– should give y of 2 pm

• ALS achieved y/x = 1/1000

– resulting in y of 5 pm

• Combination of orbit, vertical dispersion, coupling correction is needed– reaching |Dy| ≤ 2 mm suffices at APS

– use harmonic SK knobs for coupling control

• Fast and reliable size measurement at 2 pm not easily done

Page 8: March 7, 2007 LET Issues (Cai/Kubo/Zisman) Global Design Effort 1 Low-Emittance Tuning Issues and Plans Yunhai Cai, Kiyoshi Kubo and Michael S. Zisman

March 7, 2007 LET Issues (Cai/Kubo/Zisman) Global Design Effort 8

Notes from Talks (2)

• CESR-TA can test both e− and e+

• Measure coupling and phase by shaking beam at betatron tune– look at bpm response– get good correction of phases and coupling

• slow measurement (40 s) and prompt (not real time) correction– need to automate procedures (or put Sagan on call 24/7?)

• Proposed bpm upgrade will speed up measurement

• Challenge to measure the small beam size– laser wire; x-ray imager (very fast bunch-by-bunch)

Page 9: March 7, 2007 LET Issues (Cai/Kubo/Zisman) Global Design Effort 1 Low-Emittance Tuning Issues and Plans Yunhai Cai, Kiyoshi Kubo and Michael S. Zisman

March 7, 2007 LET Issues (Cai/Kubo/Zisman) Global Design Effort 9

Notes from Talks (3)

• New ATF bpms will allow progress toward getting 2 pm vertical emittance– permit better response matrix optics correction

and BBA data– use improved laser wire for measurements

• DANE saw vertical beam size growth due to clearing electrode impedance– must test “cures” to make sure they are not worse

than the disease

• Jones showed that not all lattices are equal– need to consider ground motion (esp. for upper

ring)

Page 10: March 7, 2007 LET Issues (Cai/Kubo/Zisman) Global Design Effort 1 Low-Emittance Tuning Issues and Plans Yunhai Cai, Kiyoshi Kubo and Michael S. Zisman

March 7, 2007 LET Issues (Cai/Kubo/Zisman) Global Design Effort 10

The Plan (1)

• Continue measurements at ATF with upgraded bpms (finish during FY08) to demonstrate 2 pm emittance– upgraded bpms needed

• Carry out measurements at APS at 5 GeV to demonstrate 2 pm emittance (by mid-2009)– most resources available; need upgraded

diagnostics

• Carry out measurements at CESR-TA to give 2 pm emittance with positrons (by mid-2009)– need operations support and upgraded diagnostics

Page 11: March 7, 2007 LET Issues (Cai/Kubo/Zisman) Global Design Effort 1 Low-Emittance Tuning Issues and Plans Yunhai Cai, Kiyoshi Kubo and Michael S. Zisman

March 7, 2007 LET Issues (Cai/Kubo/Zisman) Global Design Effort 11

The Plan (2)

• Continue simulations to get tolerances, numbers and strengths of correctors (dipoles, skew quadrupoles)– present effort at ANL, Cockcroft, Cornell, INFN,

KEK, LBNL, SLAC– need to evaluate baseline + alternative lattices– complete by end of 2008 or early 2009

• “releases” engineering effort once lattice is frozen

• Continue work on realistic maps for wigglers and other elements

Page 12: March 7, 2007 LET Issues (Cai/Kubo/Zisman) Global Design Effort 1 Low-Emittance Tuning Issues and Plans Yunhai Cai, Kiyoshi Kubo and Michael S. Zisman

March 7, 2007 LET Issues (Cai/Kubo/Zisman) Global Design Effort 12

Concluding Comments

• Experiments planned or under way at existing facilities should demonstrate what is needed– ATF, APS, CESR-TA, DANE

• Improvements in beam size diagnostics and/or bpms are needed– bunch-by-bunch capability required for beam size

• Improvements in analysis software to get real-time correction will be needed

• Thanks to speakers for excellent, well-focused presentations