UNCLASSIFIED UNCLASSIFIED DOD Maintenance Symposium 27 Oct 2009 Mr. Richard Stauffer, HQMC (LP) Marine Corps Ground Equipment Reset

Marine Corps Ground Equipment Reset - SAE · PDF fileUNCLASSIFIED UNCLASSIFIED DOD Maintenance Symposium. 27 Oct 2009. Mr. Richard Stauffer, HQMC (LP) Marine Corps Ground Equipment

  • Upload
    ledung

  • View
    221

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Marine Corps Ground Equipment Reset - SAE · PDF fileUNCLASSIFIED UNCLASSIFIED DOD Maintenance Symposium. 27 Oct 2009. Mr. Richard Stauffer, HQMC (LP) Marine Corps Ground Equipment

UNCLASSIFIED

UNCLASSIFIED

DOD Maintenance Symposium27 Oct 2009

Mr. Richard Stauffer, HQMC (LP)

Marine CorpsGround Equipment Reset

Page 2: Marine Corps Ground Equipment Reset - SAE · PDF fileUNCLASSIFIED UNCLASSIFIED DOD Maintenance Symposium. 27 Oct 2009. Mr. Richard Stauffer, HQMC (LP) Marine Corps Ground Equipment

UNCLASSIFIED

UNCLASSIFIED Ground Equipment Reset Agenda

Commandant’s Priorities

Factors Affecting Reset

Reset Plan

Reset Integration

Reset Process

Reset Cost Model

Reset Challenges

Page 3: Marine Corps Ground Equipment Reset - SAE · PDF fileUNCLASSIFIED UNCLASSIFIED DOD Maintenance Symposium. 27 Oct 2009. Mr. Richard Stauffer, HQMC (LP) Marine Corps Ground Equipment

UNCLASSIFIED

UNCLASSIFIED

Commandant of the Marine Corps (CMC) priorities:

OEF sourcing

Maintaining persistent presence in the MARCENT AOR

Reset supports CMC priorities by ensuring that…

Required equipment is in the right place at the right time

Required equipment is visible to the appropriate agencies

Ground Equipment Reset Commandant’s Priorities

Page 4: Marine Corps Ground Equipment Reset - SAE · PDF fileUNCLASSIFIED UNCLASSIFIED DOD Maintenance Symposium. 27 Oct 2009. Mr. Richard Stauffer, HQMC (LP) Marine Corps Ground Equipment

UNCLASSIFIED

UNCLASSIFIED Ground Equipment Reset Reset Challenges

To conduct in-stride reset of equipment while…

Simultaneously redeploying to & engaging in Afghanistan

Drawing down forces from Iraq

Equipment availability; retrograde & redeployment timelines

Modernizing legacy equipment to meet future challengesPrepositioning ISO Irregular Warfare…MPF/GeoPrepo

Increasing the baseline of the force (202K)

QDR and new Administration’s priorities

Uncertainty in OCO funding beyond 2011

Page 5: Marine Corps Ground Equipment Reset - SAE · PDF fileUNCLASSIFIED UNCLASSIFIED DOD Maintenance Symposium. 27 Oct 2009. Mr. Richard Stauffer, HQMC (LP) Marine Corps Ground Equipment

UNCLASSIFIED

UNCLASSIFIED Ground Equipment Reset Reset Plan

The Reset Plan…

Establishes policy & guidance

Promulgates roles & responsibilities

Synchronizes reset efforts

Provides strategic communication tool

Ground Equipment Reset Plan

6 June 2009

Page 6: Marine Corps Ground Equipment Reset - SAE · PDF fileUNCLASSIFIED UNCLASSIFIED DOD Maintenance Symposium. 27 Oct 2009. Mr. Richard Stauffer, HQMC (LP) Marine Corps Ground Equipment

UNCLASSIFIED

UNCLASSIFIED Ground Equipment Reset Reset Integration

Reset ReconstituteRetrograde

Equipment Strategies (Depot, Field, Procurement)

Maintenance capacity & resources

Registered demand signals

Deployed Force Changes

Execution timelines

Equipment throughput

Requirements Development

Reconstitution Priorities

MCLC (FWD)MARCENT MCLC, MCSC PP&O

CD&I, MARFORS

Reset Integration: DC I&L leads the planning process designed to ensure reset programming & execution are continually aligned and responsive to reconstitution requirements.

Resource Programming

Page 7: Marine Corps Ground Equipment Reset - SAE · PDF fileUNCLASSIFIED UNCLASSIFIED DOD Maintenance Symposium. 27 Oct 2009. Mr. Richard Stauffer, HQMC (LP) Marine Corps Ground Equipment

UNCLASSIFIED

UNCLASSIFIED Equipment Retrograde & Movement Process

KUWAIT/JORDAN

MCLCBarstow, CA

BICJacksonville, FL

MCSCQuantico, VA

OPFORS

DRMO

Depot

MNF-W

DRMO

Al Taqaddum

A/E TAMCN

B/C/D TAMCNAlpha: CommElecBravo: Engineer

Delta: Motor transportEcho: Ordnance Equipment

IRAQ

DP 2

DP 1DP 3

•SMC•CMC Priorities•GFM (Reset, UDP)

MCLCAlbany, GA

CODE A/B

CODE H

CODE H Afghanistan

Decision Point Decision Issues Disposition

DP1 OEF or CONUS MCLC

DP2 Equipment Disposition MCLC/MCSC

DP3 Equipment Distribution MCLC

Page 8: Marine Corps Ground Equipment Reset - SAE · PDF fileUNCLASSIFIED UNCLASSIFIED DOD Maintenance Symposium. 27 Oct 2009. Mr. Richard Stauffer, HQMC (LP) Marine Corps Ground Equipment

UNCLASSIFIED

UNCLASSIFIED

MCSC Reset Strategies

Process…Another View

DC, PP&O and MARCENT:

Planned reset inventory

Reset Cost Model

Retrograde and Reset Process Simulation Tool

MCLC-Managed Maintenance•Depot

•Field

CMC Sourcing Priorities

Retrograde

Reset

Reconstitution

Quantifying maintenance requirements

Issuing to requirement

Presenter
Presentation Notes
KEY MESSAGE: Operational decisions made during enterprise reset planning have the greatest influence over current reset maintenance plans and production. Planned Reset Inventory: DC, PP&O and MARCENT determine both the inventory available for reset and the retrograde sequence for ground equipment. In CMC’s reset plan, DC, PP&O is tasked to “develop Marine Corps reconstitution priorities” and “manage the OIF/OEF force list and associated ground equipment levels.” Similarly, MARCENT is directed to “ensure required capabilities remain in theater for mission accomplishment.” Taken together, these actions shape the inventory of the OIF ground equipment that is available for reset – this is the planned reset inventory. MARCENT’s task to “validate force requirements and equipment density lists to support Marine Corps operations in the USCENTCOM AOR” indicates that the off ramp schedule has been incorporated into retrograde planning from a ground equipment perspective. Quantifying Maintenance Requirements: Modeling tools show the total resource and capacity requirement to retrograde/redeploy and reset OIF ground equipment at the end of a two-year period; they do not reflect how resources and capacity support the process over a two-year period. The Reset Cost Model: The RCM applies equipment reset strategies against the inventory of OIF ground equipment to estimate reset costs by TAMCN. It does not incorporate operational redeployment or offramping factors. The Retrograde and Reset Process Simulation Tool: This tool identifies nodal and arc capabilities and characteristics, and develops a network process simulation that demonstrates current retrograde and reset capacity and future requirements. It does not incorporate operational redeployment or offramping factors. Reset Strategies: The reset strategies are developed by Life Cycle Managers (PMs) based on many factors – authorized equipment quantities, on hand inventory postures, life cycle of equipment, current and future fielding plans, equipment shortfalls, equipment obsolescence, and long term Marine Corps requirements, etc. The strategies categorize reset actions for each equipment type such as Depot, Field Level Repair, Procurement, or no reset. These strategies are estimates and will most likely change as equipment is inspected in the reset process. An example of an item not requiring reset or replacement would be an OIF unique piece of equipment purchased by the Marine Corps that will not become a system item. Reset strategies are updated biannually. From the MCLC perspective, reset happens to individual items of OIF ground equipment. When equipment moves from the retrograde phase to the reset phase, MCLC manages the maintenance according the MCSC’s reset strategies. Depot-level maintenance will be performed based on established sources of repair and the accompanying statements of work. MCLC will manage and perform field-level maintenance to mitigate this burden on the operating forces. When a designated item of equipment has been repaired to a ready-for-issue condition it is considered reset...reset happens one piece at a time. For MCLC, reconstitution occurs when a reset item fills a requirement. CMC sourcing priorities direct how available reset equipment will be distributed among units and organizations.
Page 9: Marine Corps Ground Equipment Reset - SAE · PDF fileUNCLASSIFIED UNCLASSIFIED DOD Maintenance Symposium. 27 Oct 2009. Mr. Richard Stauffer, HQMC (LP) Marine Corps Ground Equipment

UNCLASSIFIED

UNCLASSIFIED Ground Equipment Reset Reset Cost Model

Operational analysis model used to calculate reset costs Estimates USMC reset “liability” in OIF/OEF

Maps reset strategy to equipment in theater; 4 categories:1. Procure: Equipment with this strategy will be procured through the acquisition process.2. Depot: Equipment with this strategy will be repaired using depot level maintenance. The cost for this type maintenance is 65% of the equipment’s procurement cost.3. Field: Equipment with this strategy will be repaired using organizational or intermediate level maintenance. The cost for this type of maintenance is 20% of the equipment’s procurement cost.4. No Reset: Equipment with this strategy will not require reset and will be returned to the operating forces.

4.a. No Reset Obsolete: Equipment with this strategy will not require reset and will be disposed of.

Used to justify resource requirements

Page 10: Marine Corps Ground Equipment Reset - SAE · PDF fileUNCLASSIFIED UNCLASSIFIED DOD Maintenance Symposium. 27 Oct 2009. Mr. Richard Stauffer, HQMC (LP) Marine Corps Ground Equipment

UNCLASSIFIED

UNCLASSIFIED

MCLC OEF Ops & R2 Process - MCLC Fwd TACON to MarCent EA

2012

Projected “Waves” of OIF/OEF Equipment

2009

Jan

VELOCITY

MCLC Expands & Contracts Capability and Staff in AOR to Meet Workload Spikes & Evolving Support

Requirements Jan

MCLC OIF R2 Process until EOM - MCLC Fwd TACON to MarCent EA

Duration

Workload Intensity

Presenter
Presentation Notes
This slide depicts the workload spikes that MCLC is prepared to support in the AOR for retrograde. The retrograde process is started prior to MCLC FWD receipt of equipment, as units execute a 5-step process for disposition of all other supplies and material, in conjunction with the transfer of designated Classes of Supply to MCLC FWD.
Page 11: Marine Corps Ground Equipment Reset - SAE · PDF fileUNCLASSIFIED UNCLASSIFIED DOD Maintenance Symposium. 27 Oct 2009. Mr. Richard Stauffer, HQMC (LP) Marine Corps Ground Equipment

UNCLASSIFIED

UNCLASSIFIED

Reset Liability: Snapshot in Time

Presenter
Presentation Notes
Ground Equipment Reset Liability Determination (estimate for future planning). a. FY09 4th Qtr OIF Ground Equipment Reset liability, when general supply items (i.e. tents, boots, etc.) are excluded, estimates the handling of over 73K individual pieces of equipment with estimated cost of approx. $1.6B. 50 of the 633 equipment types (i.e. – Tanks, LAVs, howitzers, etc.) make up over 80% of our total estimated reset cost. A high percentage of these items are planned for Depot work and not replacement. The estimated reset liability is based on PM reset strategies: 20% of the total quantity of equipment is projected to require depot work; 28%,replacement / procurement; 32%, field level maintenance; and 20%, no reset. b. FY09 4th Qtr OEF Ground Equipment Reset liability, when general supply items (i.e. tents, boots, etc.) are excluded, estimates the handling of over 59K individual pieces of equipment and estimated cost of approx. $876M. 79 equipment types make up over 80% of our total estimated reset cost. A high percentage of these items are planned for Depot work and not replacement. The estimated reset liability is based on PM reset strategies: 27% of the total quantity of equipment is projected to require depot work; 27%, require replacement / procurement; 29%, field level maintenance; and 17%, no reset. c. Reset strategies are developed by Life Cycle Managers (PMs) based on several factors – authorized equipment quantities, on-hand inventory postures, life cycle of equipment, current and future fielding plans, equipment shortfalls, equipment obsolescence, and long term Marine Corps requirements, etc. The strategies categorize reset actions for each equipment type such as Depot, Field Level Repair, Procurement, or no reset. These strategies are estimates – reset actions will ultimately be determined as equipment is inspected in the reset process. The MCSC PM Reset strategies are updated biannually. d. Estimated costs and workloads change – this information is captured quarterly. The Marine Corps remains flexible in order to conduct physical inspections of equipment being redeployed, react to new operational requirements, or revise reset strategies based on service equipment requirements.
Page 12: Marine Corps Ground Equipment Reset - SAE · PDF fileUNCLASSIFIED UNCLASSIFIED DOD Maintenance Symposium. 27 Oct 2009. Mr. Richard Stauffer, HQMC (LP) Marine Corps Ground Equipment

UNCLASSIFIED

UNCLASSIFIED Marine Corps Ground Equipment Impacts and Risk

Reset funding received/requested through FY‐11 supports Marine Corps equipment reset requirement (Ground Equipment liability ‐ $2.5B)

• Assumes that all equipment is retrograded/redeployed and is available for RESET actions to be executed prior to FY‐12

RISK: Equipment is not available during year of execution, funding received can not be obligated, and reset requirement (liability) is carried over to future year

Operational requirement remains in theater beyond FY‐11• Assumes:

‐ Forces/capability sets deployed require sustainment‐ Forces/capability sets, specifically the equipment that uniquely meets theater requirements redeployed/retrograded will be reset

RISK: Deployed materiel readiness impacted

LONG TERM IMPLICATION:• Post‐deployment maintenance is deferred or not performed • Global Force Management Readiness for theater specific capability is reduced

Page 13: Marine Corps Ground Equipment Reset - SAE · PDF fileUNCLASSIFIED UNCLASSIFIED DOD Maintenance Symposium. 27 Oct 2009. Mr. Richard Stauffer, HQMC (LP) Marine Corps Ground Equipment

UNCLASSIFIED

UNCLASSIFIED

Questions?

USMC Reset Strategy