Marketplace: The Wastewater Market

Embed Size (px)

Citation preview

  • 8/10/2019 Marketplace: The Wastewater Market

    1/60

    MarketplaceThe Wastewater Market

    Session 2-1

  • 8/10/2019 Marketplace: The Wastewater Market

    2/60

    Market Evaluation Basics

    1. How many clients are in the market?2. Can these clients pay for our services?

    3. Do these clients have a need to solve?

    4. How many competitors are competing for your clients

    business?

    5. How does your business compare to your competitors?

  • 8/10/2019 Marketplace: The Wastewater Market

    3/60

    Our Nations Infrastructure

    Over 19,739 sewer systems 800,000 miles of sewer mains

    Most installed after World War II

  • 8/10/2019 Marketplace: The Wastewater Market

    4/60

    Our Nations Infrastructure

    Aging pipes and inadequate capacity Symptoms:

    Over 700 cities and towns in violation of the Clean Water Act

    Over 900 Billion Gallons of untreated sewage illegally discharged each

    year

  • 8/10/2019 Marketplace: The Wastewater Market

    5/60

    Our Nations Infrastructure

    Washington D.C. 3 Billion gallons per year of raw

    sewage illegally discharge

    Miami, FL. 25 Million gallons per year of raw

    sewage illegally discharge

    Indianapolis, IN 7.8 Billion gallons per year of raw

    sewage illegally discharge

  • 8/10/2019 Marketplace: The Wastewater Market

    6/60

    Our Nations Infrastructure

    2011 EPA Congressional Report 20% of our nations streams unfit:

    Fish and wildlife

    Human recreation

    Only 16% of streams assessed

  • 8/10/2019 Marketplace: The Wastewater Market

    7/60

    Our Nations Infrastructure

    American Society of Civil Engineers Four year report card on Americas Infrastructure

    D(+)

  • 8/10/2019 Marketplace: The Wastewater Market

    8/60

    Our Nations Infrastructure

    The federal government share of wastewater infrastructure spending has shrunk from

    78 percent in 1978 to just 3 percent today.

  • 8/10/2019 Marketplace: The Wastewater Market

    9/60

    Our Market

    Water and Wastewater US market: $ 125 Billion per year Estimated market by 2020: $190 Billion per year

    Wastewater Infrastructure and stormwater systems market: $39

    Billion per year

    AWWA estimates water and wastewater Infrastructurespending: 1 trillion over next 25 years

    Sources:

    ASCE 2013 Infrastructure Report 2012

    EPA-Congressional Budget Report

    ASCEFailure to Act Report

    AWWA Sustainability Report

  • 8/10/2019 Marketplace: The Wastewater Market

    10/60

    RJN In the Market (2014)

    RJN: $ 27M 0.02% of US market

    0.07 % of WW & Stormwater

  • 8/10/2019 Marketplace: The Wastewater Market

    11/60

    RJN In the Market

    Wastewater Inspections

    and Studies Wastewater Design &

    Construction

    GIS & Software Services

    Drinking Water

    Stormwater & Misc.

    Engineering

    96% of work in sewers

  • 8/10/2019 Marketplace: The Wastewater Market

    12/60

    RJN In the Market

    850 Clients1,600 projects

  • 8/10/2019 Marketplace: The Wastewater Market

    13/60

    Sales Coverage

  • 8/10/2019 Marketplace: The Wastewater Market

    14/60

    Sales CoverageDonna

    Donna

    Z

    A

    C

    h

    Clay

    PaulJeff K

    Stephen

  • 8/10/2019 Marketplace: The Wastewater Market

    15/60

    MarketplaceMarket Entrance Strategy

    Session 2-2

  • 8/10/2019 Marketplace: The Wastewater Market

    16/60

    Evaluating Markets

    1. How many clients are in the market?2. Can these clients pay for our services?

    3. Do these clients have a need to solve?

    4. How many competitors are competing for your clients

    business?5. How does your business compare to your competitors?

  • 8/10/2019 Marketplace: The Wastewater Market

    17/60

    The Competition

    Firm

    Name(s)

    Local/

    Regional

    National

    Firm

    Only Field

    Service

    Only

    Engineering

    Both Engineering

    & Field Services

    CDM X X

    Brown

    and

    Caldwell

    X X

    MWH X X

    B&V X X

    H&S X X

    ADS X XTREK X X

    CES X X

    Burgess

    & Niple

    X X

  • 8/10/2019 Marketplace: The Wastewater Market

    18/60

    The Competition

    Boston, MA

    Design Firms: 112

    National Field Services Firms: 0

    Regional Field Service Firms: 5

    Indianapolis, IN

    Design Firms: 84

    National Field Service Firms: 1

    Regional Field Service Firms: 6

  • 8/10/2019 Marketplace: The Wastewater Market

    19/60

    Develop and deliver exceptional Niche services by encouraginginnovation at all levels

    Enter new geographic markets beyond Regional Offices

    through Niche services

    Sustain our presence by broadening client base anddiversifying capabilities through Core and Other Services

    Organization-Wide Strategies

  • 8/10/2019 Marketplace: The Wastewater Market

    20/60

    Niche Services

    Enhance our Portfolio of Niche Services

    Incorporate Best-in-class Products and Services

    Roll Out RPM

    Integration of RPM / Telog Plan

    RPM Implementation Plan for All Projects

    Improve Mobile Data Acquisition Capability Improve Equipment Hardware

    Improve Software Interface

    Implement an Engineering Quality Control Program

  • 8/10/2019 Marketplace: The Wastewater Market

    21/60

    Sustain Our Presence

    Niche servicesDifferentiation Flow

    Monitoring, Modeling, SSES, Rehab

    Design/RE in separate and combined sewer

    systems

  • 8/10/2019 Marketplace: The Wastewater Market

    22/60

    Sustain Our Presence

    EnhancementsGIS, Capital Planning, Asset

    Management, etc.

    Core servicesSupplemental SustainableServices - Program Management, Master Planning,

    Design Build, New Sewer Design, Stormwater,

    Water Distribution, Lift stations (new/rehab), WWTP,

    Construction Phase Services.

    Other ServicesDiversity Maintenance Management, Other

  • 8/10/2019 Marketplace: The Wastewater Market

    23/60

    Why Lead With Our Niche?

    A niche establishes our credibility and industry expertise

    Offer services that are not easily duplicated due to experience

    and/or capital costs

    Limited Competition

    Develop client from niche to full service offering

  • 8/10/2019 Marketplace: The Wastewater Market

    24/60

    MarketplaceWilmette Story

    Session 2-3

  • 8/10/2019 Marketplace: The Wastewater Market

    25/60

    WilmetteInitial Project

    Initial Project (2012) - $133,385 Competitive Selection with Pricing

    System Modeling and Recommendations

    $20,000 Over Budget

    Field Challenges Extra Report Effort

    Poor Project?

  • 8/10/2019 Marketplace: The Wastewater Market

    26/60

    WilmetteKey Client Data

    Affluent Client

    Significant Basement Backups

    Village Board Wants Action

    Report Draft Report with Recommendations

    Clients Requests Schedule Acceleration

    Develop $25M Bond Program

    Extra EffortProgram Development

  • 8/10/2019 Marketplace: The Wastewater Market

    27/60

    WilmetteProgram Initiation (2012-2013)

    20123 Small Projects ($32,000 total)

    2013Start Program $330,779Phase 1

    Quick Hit Items

    Flow Monitoring

    Study for Core Project

    $266,870Phase 2

    Initial SSES

    Preliminary DesignCore Project

  • 8/10/2019 Marketplace: The Wastewater Market

    28/60

    Wilmette Challenges

    3 Follow Up Projects ($264,100 total)

    Significant Construction Cost Increases

    Challenges = Opportunity Need Park District Approval

    Park District Requests Tight Window

    Village Questions Feasibility

    Design-Build Opportunity?

    Key Hire NeededConstruction Manager

  • 8/10/2019 Marketplace: The Wastewater Market

    29/60

    WilmetteClosing the Deal

    Multiple MeetingsStaff and Board

    40% Design$226,134 Approved 7/8/2014 6 Week Push3 Sheets to 43 Sheets

    Phase I Bidding

    Phase II Pricing

    JV and DB Agreements

    $15,024,432 DB Contract Approved 9/9/2014

  • 8/10/2019 Marketplace: The Wastewater Market

    30/60

    Marketplace

    Little Rock StoryMaturing aClient

    Session 2-4

  • 8/10/2019 Marketplace: The Wastewater Market

    31/60

    Little Rock StoryMaturing a Client

    First Project for LRW Flow Monitoring as a Dub to MWH

    Used Project to Begin Developing a Relationship with Key Staff

    Continued Building Relationship with Staff AfterCompletion of First Project

    Used RJNs Reputation and Relationships to Obtain a

    Sole Source 5-Year SSES Program

    Completed 3 SSES Projects in First Years of Program

  • 8/10/2019 Marketplace: The Wastewater Market

    32/60

    Little Rock StoryMaturing a Client

    At Beginning LRW Perceived RJN Only as a Field Service Provider

    At End of 1stProject Continued Marketing Client by BD and PM

    Client Asked RJN to Provide MH Rehab Design for First Study

    Contracted with RJN to Provide Construction InspectionServices

    Contracted to Train LRWs Staff to Perform ConstructionInspection

  • 8/10/2019 Marketplace: The Wastewater Market

    33/60

    Little Rock StoryMaturing a Client

    For 2ndSSES Project LRW Requested that Hydraulic Modeling be Added to Scope

    Also, Requested MH Rehab Design

    Even Though LRW Now Perceived RJN as More Than aField Service Firm We were still Perceived as a Firm that Only Provided FM, SSES,

    Modeling and Some Limited Design

  • 8/10/2019 Marketplace: The Wastewater Market

    34/60

    Little Rock StoryMaturing a Client

    In 2009, LRW Decided to Update their SECAPDeveloped by MWH in 2002 SECAP was developed as a result of LRW being under a CO

    due to suit by Sierra Club due to Sanitary Sewer Overflows

    (SSOs) CO requires that all SSOs be eliminated by end of 2016

    Purpose of SECAP

    Update was to provide a review of where LRW was in meetingCO requirements and develop other alternatives in necessary

    LRW originally thought that RJN was not qualified to provide theupdate and was looking at larger National Firms to do

  • 8/10/2019 Marketplace: The Wastewater Market

    35/60

    Little Rock StoryMaturing a Client

    Based on RJNs past performance and our staff

    relationships with LRW, we invited them to our Dallasoffice Dallas staff developed a presentation on our capabilities in flow

    monitoring, hydraulic modeling and planning Based on this presentation, LRW decided to award the SECAP

    update to RJN sol source

  • 8/10/2019 Marketplace: The Wastewater Market

    36/60

    Little Rock StoryMaturing a Client

    SECAP update completed in 2010 and resulted inrecommendations for $180M of additional improvements,including: Flow Equalization Storage

    Collection System Capacity Improvements Pump Station Upgrades

    Changes to WWTP Operations

  • 8/10/2019 Marketplace: The Wastewater Market

    37/60

    Little Rock StoryMaturing a Client

    RJN was selected for the First Design / RE Project fromthe SECAP recommendations based on: Deeper appreciation of RJN capabilities developed during the

    workshops

    SECAP update development Continued marketing efforts

  • 8/10/2019 Marketplace: The Wastewater Market

    38/60

    Little Rock StoryMaturing a Client

    Cantrell Road Project Design of a 32 MGD pump station

    Design of a 30 inch diameter force main

  • 8/10/2019 Marketplace: The Wastewater Market

    39/60

    Little Rock StoryConclusion

    BD and PM must develop a strong relationship withclient staff

    RJN must be seen as an extension of client staff

    BD and PM must continuously convey to client full rangeof services that RJN can provide

    Always be looking for the next opportunity with the client

  • 8/10/2019 Marketplace: The Wastewater Market

    40/60

    MarketplaceBaltimore County Story

    Session 2-5

  • 8/10/2019 Marketplace: The Wastewater Market

    41/60

    Baltimore County Progression

    2006Piggy Back on City Contract, and Local Firm

    20062008 Establish Reputation 2009Differentiator in Selection

    20102012 Selection as Prime

    Project 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018

    Rain Gauge$500K $500K $500K $500K $500K

    JMT JV$5M

    ACS Stemmers $820K

    Force Mains $4.8M

    South Area FM $5.5M

    SRRR Plans $2.2M

    On-Call FM $1.1M

  • 8/10/2019 Marketplace: The Wastewater Market

    42/60

    Rain Gauge ProgramContract 42903 (2006)

    Piggy-back on BaltimoreCity Project Started in August 2006

    45 Total County Network

    Sites 11 Shared Rain Gauges

    Two-Year Contract Extended 4 times (10 years

    total)

    Tried to extend for 10 yearterm

    $2.5M contract budget todate

    Established reputation Quality work

    On-time deliverables Responsive to County

    needs

  • 8/10/2019 Marketplace: The Wastewater Market

    43/60

    Baltimore County Progression

    2006Piggy Back on City Contract, and Local Firm

    20062008 Establish Reputation 2009Differentiator in Selection

    20102012 Selection as Prime

    Project 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018

    Rain Gauge$500K $500K $500K $500K $500K

    JMT JV$5M

    ACS Stemmers $820K

    Force Mains $4.8M

    South Area FM $5.5M

    SRRR Plans $2.2M

    On-Call FM $1.1M

  • 8/10/2019 Marketplace: The Wastewater Market

    44/60

    Joint Venture with JMTContract # 2005-10

    On-Call Contact Started in October 2006

    RJN does SSES studies

    RJN did HydraulicModeling

    JMT does Design

    $5M Contract Budget toDate

    RJN + $3-3.5M

    Two Sewersheds Flow Monitoring

    Field Work

    SRRR Plan Development

    Design

  • 8/10/2019 Marketplace: The Wastewater Market

    45/60

    Joint Venture with JMTContract # 2005-10

    Differentiated from Other Consultant Clearly outperformed JMT

    Go-to Contact for County, even though JMT was managing JVPartner

    Asked to represent County in City-County modelingboundary condition dispute

    Instrumental in establishing County Guidelines forPreparing SRRR Plans

  • 8/10/2019 Marketplace: The Wastewater Market

    46/60

    Baltimore County Progression

    2006Piggy Back on City Contract, and Local Firm

    20062008 Establish Reputation 2009Differentiator in Selection

    20102012 Selection as Prime

    Project 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018

    Rain Gauge$500K $500K $500K $500K $500K

    JMT JV$5M

    ACS Stemmers $820K

    Force Mains $4.8M

    South Area FM $5.5M

    SRRR Plans $2.2M

    On-Call FM $1.1M

  • 8/10/2019 Marketplace: The Wastewater Market

    47/60

    Subcontract to ACSCounty Contract # 2008-06

    On-Call Contact Started in November 2009

    One Sewershed

    RJN subcontracted to ACS

    Scope Provided flow meters

    Limited manhole inspections

    Hydraulic Modeling and Capacity Analysis

    I/I Analysis

    $622K initial contract $200K amendment to prepare SRRR plan

  • 8/10/2019 Marketplace: The Wastewater Market

    48/60

    Subcontract to ACSCounty Contract # 2008-06

    Strategic Partnership (Balt Co / VA Beach)

    ACS almost terminated by County RJN was asked if we could take over

    County mandated that RJN become more involved in writingreport

    Subcontract amendment

    ACS assigned new Project Manager

    County starts to ask When is RJN going to Prime one of

    these?

  • 8/10/2019 Marketplace: The Wastewater Market

    49/60

    Baltimore County Progression

    2006Piggy Back on City Contract, and Local Firm

    20062008 Establish Reputation 2009Differentiator in Selection

    20102012 Selection as Prime

    Project 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018

    Rain Gauge$500K $500K $500K $500K $500K

    JMT JV$5M

    ACS Stemmers $820K

    Force Mains $4.8M

    South Area FM $5.5M

    SRRR Plans $2.2M

    On-Call FM $1.1M

  • 8/10/2019 Marketplace: The Wastewater Market

    50/60

    Force Main AssessmentContract # 2010-01

    On-Call Contact Started in January 2011

    17 Task Orders

    $4.75M Contract Budget to Date

    Two contracts/assessments teams RJN clearly outperformed the other team

    Captured 80% of remaining work in last task order

  • 8/10/2019 Marketplace: The Wastewater Market

    51/60

    Force Main AssessmentContract # 2010-01

    Two Teams RJN

    PHRA/Pure JV

    Clearly outperformed the other team On-Time, Under Budget

    Captured 85% of Remaining Work after Priority ForceMains completed

  • 8/10/2019 Marketplace: The Wastewater Market

    52/60

    Baltimore County Progression

    2006Piggy Back on City Contract, and Local Firm

    20062008 Establish Reputation 2009Differentiator in Selection

    20102012 Selection as Prime

    Project 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018

    Rain Gauge$500K $500K $500K $500K $500K

    JMT JV$5M

    ACS Stemmers $820K

    Force Mains $4.8M

    South Area FM $5.5M

    SRRR Plans $2.2M

    On-Call FM $1.1M

  • 8/10/2019 Marketplace: The Wastewater Market

    53/60

    South Area Flow MonitoringContract # 2010-02

    Flow Monitoring 8 Sewersheds Started in August 2011

    One-Year Monitoring Period

    December 2011-November 2012

    130 Locations I/I Analysis

    $5.5M Budget

  • 8/10/2019 Marketplace: The Wastewater Market

    54/60

    South Area Flow MonitoringContract # 2010-02

    Two Teams (North Area / South Area)

    Contract in Place 6 Months Earlier

    More Difficult Area (low-lying, pump stations)

  • 8/10/2019 Marketplace: The Wastewater Market

    55/60

    Baltimore County Progression

    2006Piggy Back on City Contract, and Local Firm

    20062008 Establish Reputation 2009Differentiator in Selection

    20102012 Selection as Prime

    Project 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018

    Rain Gauge$500K $500K $500K $500K $500K

    JMT JV$5M

    ACS Stemmers $820K

    Force Mains $4.8M

    South Area FM $5.5M

    SRRR Plans $2.2M

    On-Call FM $1.1M

  • 8/10/2019 Marketplace: The Wastewater Market

    56/60

    SRRR Plan DevelopmentContract # 2012-01

    On-Call Contract

    SRRR Plans for 4 Sewersheds Started in March 2013

    4 years with four 1-year renewals

    $6M Contract Budget

    9 Task Orders to Date

    $2.2M Under Contract

  • 8/10/2019 Marketplace: The Wastewater Market

    57/60

    SRRR Plan DevelopmentContract # 2012-01

    4 SRRR Consultants

    4 Design Consultants

    1 Modeling Consultant

    Highest Ranked SRRRand Modeling

    First Under ContractSRRR Plans Ahead of all others in

    Completion

  • 8/10/2019 Marketplace: The Wastewater Market

    58/60

    Baltimore County Progression

    2006Piggy Back on City Contract, and Local Firm

    20062008 Establish Reputation 2009Differentiator in Selection

    20102012 Selection as Prime

    Project 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018

    Rain Gauge$500K $500K $500K $500K $500K

    JMT JV$5M

    ACS Stemmers $820K

    Force Mains $4.8M

    South Area FM $5.5M

    SRRR Plans $2.2M

    On-Call FM $1.1M

  • 8/10/2019 Marketplace: The Wastewater Market

    59/60

    On-Call Flow MonitoringContract # P-112 (2013)

    On-Call Contract Two Year Initial Term (start 4/22/2014)

    Three One-Year Renewals (thru 4/21/2019)

    Flow Monitoring by Task Order

    $5.7M Contract Budget Awaiting Approval of First Task Order

    20 meters, 18 months

    $1.1M

    Two Consultants (RJN / ADS)

    Need to Out-Perform

  • 8/10/2019 Marketplace: The Wastewater Market

    60/60

    Key Reasons for Success

    Superior Quality Work

    Sound Advice / Consultation

    Established Working Relationship

    On-Time / Early Deliverables

    On or Under Budget

    Responsiveness