1
11'0" EXISTING P.C. CONC. SURROUND 6 " 2'9" REQ'D EXIT WIDTH 3'6" x 7'0" TEMP EXIT DOOR 3'6" x 7'0" TEMPORARY EXIT DOOR 4" FRAME 4" FRAME 6'8" REQUIRED EXIT HEIGHT 1'11 7/8" 1'0 3/4" 5 3/8" 2" 5 1/2" 1'1 1/8" 1'1 1/8" 5 1/2" 2" 3'5 1/4" CLOSURE PANEL 3'6" CLOSURE PANEL 5'0" P.C. CONC. SURROUND EXISTING 2 x 8" H.M. FRAME EXISTING PRECAST CONC SURROUND 1 12 REMOVE AND STORE FOR REPLACEMENT REMOVE AND STORE FOR REPLACEMENT AT END OF CONSTRUCTION AT END OF CONSTRUCTION NOTE: CONTRACTOR TO REMOVE EXISTING GLASS & SILL & STORE FOR REUSE. PAINT "EMERGENCY EXIT" ON INT SIDE LETTERING. PROVIDE 8' WIDE ASPHALT WALK IMMEDIATELY ADJACENT TO BUILDING, FLUSH W/ FINISH FLOOR & SLOPED AT MAX 2% GRADE IN ANY 2% MAX SLOPE FINISH FLOOR TEMPORARY ASPHALT EGRESS PATH AS NOTED ABOVE FINISH GRADE ADJACENT TO BUILDING EXISTING 1/4" CLEAR TEMPERED GLASS OF DOOR AT 6' AFF W/ MIN. 4" HIGH RED DIRECTION AS SHOWN ON EXIT PLAN. PAINT ALL EXPOSED STEEL. AFTER CONSTRUCTION IS COMPLETE REMOVE DOOR & FRAME, CLOSURE PANEL, & ASPHALT PAVEMENT & PATCH & REPAIR SURROUND TO ORIGINAL STATE. NEW INSUL H.M. DOOR & FRAME TEMPORARY EXIT DOOR DURING CONSTRUCTION. VERIFY DOOR SWING W/ PLAN. PROVIDE DOOR W/ BEYOND W/ CIP GLAZING RABBET INT RIMMOUNTED EXIT DEVICE, EXT CYLINDER & PULL, WEATHERSTRIPPING, SWEEP, & ALUM ADA THRESHOLD. 1" 4" 3 1/2" MIN SEALANT SECURE FRAME TO SURROUND W/ POWDER DRIVEN ANCHORS EMBED FRAME IN CONT SEALANT BEAD & OVERLAP LEG OF HEAD FLASHING IN CONT BED OF SEALANT MIN 18 GA GALV STL HEAD FLASHING W/ 1/2" DRIP & 1" VERT LEG NOTE: SWAB SEALANT OVER ALL EXPOSED FASTENER HEADS & JOINTS, TYP MIN 18 GA GALV STL CLOSURE PANEL H.M. DOOR & FRAME P.C. CONC SURROUND BEYOND 4" EXISTING SLUMP BLOCK EXTERIOR WALL SEALANT MIN 18 GA GALV STL CLOSURE H.M. DOOR & FRAME SEALANT BEAD & SECURE FRAME TO SURROUND W/ EMBED FRAME IN CONT POWDER DRIVEN ANCHORS H.M. DOOR & FRAME P.C. CONC SURROUND BEYOND LINE OF SLUMP BLOCK WALL BEYOND ALUM ADA THRESHOLD SET IN SEALANT BED & SECURED TO PAVEMENT TEMPORARY ASPHALT PAVEMENT EXISTING CONC FOOTING EXISTING CONC FLOOR SLAB 7'0" 4" 2% SLOPE EXISTING SLUMP BLOCK EXTERIOR WALL EXISTING P.C. CONC SURROUND CONT SEALANT AT TERM BAR & OVER ANCHOR HEADS SECURE CLOSURE PANEL TO SURROUND W/ CONT TERM BAR W/ POWDER DRIVEN ANCHORS MAX 8" OC MIN 18 GA GALV STL CLOSURE PANEL EMBED FACE IN CONT SEALANT BEAD & SECURE TO P.C. CONC SURROUND H.M. DOOR FRAME EXISTING P.C. CONC SURROUND BEYOND EXISTING FIXED GLASS & H.M. SILL REMOVED TO STORAGE DURING CONSTRUCTION NEW INSUL H.M. DOOR & FRAME TEMPORARY EXIT EXISTING CONC FLOOR SLAB ALUM ADA THRESHOLD TEMPORARY ASPHALT PAVEMENT 8' WIDE W/ MAX 2% SLOPE IN ANY DIRECTION BLDG 39 BLDG 46 GYMNASIUM BLDG 35 BLDG 35N BLDG 37 BLDG 36 BLDG 38A BLDG 44 UP UP UP NEW STUDENT ENROLLMENT CENTER EXISTING WALK EXISTING 14' FIRE LANE 4669 SF NAVAJO ROOM A3 667 7 FUTURE STUDENT GOVERNMENT 945 SF STUDENT LIFE B 9.5 100 4426 SF STUDENT LOUNGE A2 295 15 NEW STUDENT LOUNGE 729 SF FOYER B 7.3 100 1621 SF SERVERY B 16.2 100 UP 10 2" 34" 8 1.6" 144" 170 34" 34" 149 29.8" 68" 149 29.8" 34" 3 200 40" 136" 148 29.6" 66" MEN'S RR WOMEN'S RR WOMEN'S RR MEN'S RR DF SS 3206 SF KITCHEN B 16 200 971 SF MECH B 3.2 300 143 SF RACK ROOM B 0.5 300 319 SF STUDENT GOVERNMENT B 3.2 100 831 SF STORAGE B 2.8 300 REMOVE EXISTING GLAZING & CREATE (2) EMERGENCY EXITS DURING CONSTRUCTION BY COVERING OPENINGS W/ SLITTED CLEAR PLASTIC SHEETING, PROVIDE TEMPORARY EXIT SIGNS, REF TO DETAIL ON THIS SHEET 8' WIDE EMERGENCY EXIT DURING CONSTRUCTION W/ CONSTRUCTION FENCING & TEMPORARY ASPHALT PAVEMENT W/ MAX 2% SLOPE IN ANY DIRECTION. PROVIDE OVERHEAD PROTECTION AS REQUIRED EXISTING EXIT DOORS CLOSED OFF DURING CONSTRUCTION COVER EXISTING EXIT SIGNS 437 SF STORAGE S 1.5 300 MECH / ELEC 119 SF OFFICE B 1.2 100 66 13.2" 33" AREA OF CONSTRUCTION FENCED OFF FROM PUBLIC EXISTING MASONRY SCREEN WALL DURING CONSTRUCTION REMOVE THIS PORTION OF NEW EXIT DOORS INSTALLED AS PART OF NEW CONSTRUCTION, INSTALL NEW EXIT SIGN & TEMPORARY SIGNAGE STATING "EMERGENCY EXIT ONLY" CONSTRUCTION FENCING NEW WORK ( SHELL SPACE ) EXISTING NONEXIT DOORS REMOVED DURING CONSTRUCTION W/ TEMPORARY EXIT SIGNS CONSTRUCTION FENCING 148 29.6" 66" 8' WIDE EMERGENCY EXIT DURING CONSTRUCTION WITH CONSTRUCTION FENCING & TEMPORARY ASPHALT PAVEMENT W/ MAX 2% SLOPE IN ANY DIRECTION CONSTRUCTION FENCING UP UP DN DN UP ELEV . EXISTING EXIT DOORS TO REMAIN IN USE DURING CONSTRUCTION UNLESS NOTED OTHERWISE EXISTING EXIT DOORS PROVIDE TEMPORARY EXIT SIGNS & REPLACE HARDWARE WITH RIM PANIC HARDWARE DURING CONSTRUCTION EXISTING EXIT DOORS CLOSED OFF DURING CONSTRUCTION COVER EXISTING EXIT SIGNS 925 B 100 OFFICES 9.3 950 B 100 OFFICES 9.5 STREET & UPPER LEVEL UP UP UP +6' 11" +0' 0" +0' 0" +7' 0" +0' 0" 30' 0" 23' 2" 5' 0" PROVIDE OVERHEAD PEDESTRIAN PROTECTION IN THIS AREA DURING CONSTRUCTION EXISTING MASONRY SCREEN WALL EXISTING MASONRY SCREEN WALL CONSTRUCTION FENCING W/ OVERHEAD PROTECTION AS REQUIRED CONSTRUCTION FENCING M IN. DI ST . B E TWE E N EX ITS 1 32 / 3 = 4 4 ' 132 ' 0" 75' 6 " > 4 4 ' ( M IN. DIS T . B ET W E EN EXI T S ) 75' 6 " PATH OF TRAV EL : 221' 6" MAX PAT H OF T R A VEL : 250' 65 13" 33" EXISTING 14' FIRE LANE CONSTRUCTION GATES CONSTRUCTION GATES BLDG 38 TEMPORARY EXIT DOORS EXISTING 14' FIRE LANE 3759 SF SALES FLOOR M 127 30 BLDG 35N UP UP ELEV . UP 407 SF CONFERENCE A3 27.2 15 270 SF LOUNGE B 2.7 100 328 SF CONFERENCE A3 22 15 1389 SF OFFICES B 13.9 100 1037 SF OFFICES B 10.4 100 BASEMENT LEVEL 7' 0" 7' 0" 7' 0" 2' 10 1/2" 5 A0.05 4 A0.05 6 A0.05 SYMBOL LEGEND ROOM I.D. & NUMBER NET SQUARE FOOTAGE OCCUPANT LOAD RATIO NUMBER OF OCCUPANTS NUMBER OF OCCUPANTS EXIT WIDTH REQUIRED (32" MIN) EXIT WIDTH PROVIDED (INCHES) CONSTRUCTION FENCE TRAVEL DISTANCE TO EXIT BARRIER FREE PATH OF TRAVEL A ASSEMBLY 0.6 250 50 72 X' X' X' X' 300 169 SF CUST CL 2' 10 1/2" A0.05 5 A0.05 4 6 A0.05 DATE: ISSUED FOR: DRAWING NO: Marlene Imirzian & Associates LLC, Architects 8906 North Central Ave. Phoenix, AZ 85020 602 943 5279 v 602 943 5673 f JOB NO: Maricopa County Community College District NOT FOR CONSTRUCTION 1 0 / 1 / 2 0 1 3 1 1 : 4 1 : 1 0 A M A0.05 TEMPORARY CONSTRUCTION EXITING PLAN 1807 01 OCT 2013 NEW STUDENT PORTAL MESA COMMUNITY COLLEGE 1833 WEST SOUTHERN AVE MESA, AZ 85202 Scale: 1" = 20'$0" 1 TEMPORARY CONSTRUCTION EXIT PLAN Scale: 1" = 20'$0" 7 BLDG 35N BASEMENT LEVEL Scale: 1/2" = 1'$0" 2 TEMPORARY EMERGENCY EXIT DURING CONSTRUCTION $ ELEVATION N N Scale: 1 1/2" = 1'$0" 5 TEMPORARY DOOR HEAD Scale: 1 1/2" = 1'$0" 6 TEMPORARY DOOR JAMB Scale: 1 1/2" = 1'$0" 4 TEMPORARY DOOR SILL Scale: 1/2" = 1'$0" 3 TEMPORARY EMERGENCY EXIT DURING CONSTRUCTION $ SECTION

Marlene Imirzian & Associates LLC, Architects · asphalt pavement & patch & repair surround to original state. new insul h.m. door & frame temporary exit door during construction

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Marlene Imirzian & Associates LLC, Architects · asphalt pavement & patch & repair surround to original state. new insul h.m. door & frame temporary exit door during construction

11'�0

" EX

ISTI

NG

P.C

. CO

NC

. SU

RR

OU

ND

6"

2'�9" REQ'D EXIT WIDTH

3'�6" x 7'�0" TEMP EXIT DOOR

3'�6

" x

7'�0

" TE

MP

OR

AR

Y EX

IT D

OO

R4"

FR

AM

E

4" FRAME

6'�8

" R

EQU

IRED

EXI

T H

EIG

HT

1'�1

1 7/

8"1'

�0 3

/4"

5 3/

8"

2" 5 1/2" 1'�1 1/8" 1'�1 1/8" 5 1/2" 2"

3'�5 1/4" CLOSURE PANEL

3'�6

" C

LOS

UR

E P

AN

EL

5'�0" P.C. CONC. SURROUND

EXISTING 2 x 8" H.M. FRAME �

EXISTING PRECAST CONC SURROUND

1

12

REMOVE AND STORE FOR REPLACEMENT

REMOVE AND STORE FOR REPLACEMENT

AT END OF CONSTRUCTION

AT END OF CONSTRUCTION

NOTE:

CONTRACTOR TO REMOVE EXISTINGGLASS & SILL & STORE FOR REUSE.PAINT "EMERGENCY EXIT" ON INT SIDE

LETTERING. PROVIDE 8' WIDE ASPHALTWALK IMMEDIATELY ADJACENT TO

BUILDING, FLUSH W/ FINISH FLOOR &SLOPED AT MAX 2% GRADE IN ANY

2%

MAX SLOPEFINISH FLOOR

TEMPORARY ASPHALT EGRESS PATH

AS NOTED ABOVE

FINISH GRADE ADJACENT TO BUILDING

EXISTING 1/4" CLEAR TEMPERED GLASS �

OF DOOR AT 6' AFF W/ MIN. 4" HIGH RED

DIRECTION AS SHOWN ON EXIT PLAN.PAINT ALL EXPOSED STEEL. AFTER

CONSTRUCTION IS COMPLETE REMOVEDOOR & FRAME, CLOSURE PANEL, &

ASPHALT PAVEMENT & PATCH & REPAIRSURROUND TO ORIGINAL STATE.

NEW INSUL H.M. DOOR & FRAME �

TEMPORARY EXIT DOOR DURINGCONSTRUCTION. VERIFY DOOR

SWING W/ PLAN. PROVIDE DOOR W/

BEYOND W/ CIP GLAZING RABBET

INT RIM�MOUNTED EXIT DEVICE,

EXT CYLINDER & PULL, WEATHERSTRIPPING,

SWEEP, & ALUM ADA THRESHOLD.

1"4"

3 1/2"

MIN

SEALANT

SECURE FRAME TO SURROUND W/POWDER DRIVEN ANCHORS

EMBED FRAME IN CONT SEALANT BEAD &

OVERLAP LEG OF HEAD FLASHING INCONT BED OF SEALANT

MIN 18 GA GALV STL HEAD FLASHING W/

1/2" DRIP & 1" VERT LEG

NOTE:

SWAB SEALANT OVER ALLEXPOSED FASTENER

HEADS & JOINTS, TYP

MIN 18 GA GALV STL CLOSURE PANEL

H.M. DOOR & FRAME

P.C. CONC SURROUND BEYOND

4"

EXISTING SLUMP BLOCKEXTERIOR WALL

SEALANT

MIN 18 GA GALV STL CLOSURE

H.M. DOOR & FRAME

SEALANT BEAD & SECUREFRAME TO SURROUND W/

EMBED FRAME IN CONT

POWDER DRIVEN ANCHORS

H.M. DOOR & FRAME

P.C. CONC SURROUND BEYOND

LINE OF SLUMP BLOCK WALL BEYOND

ALUM ADA THRESHOLD

SET IN SEALANT BED &SECURED TO PAVEMENT

TEMPORARY ASPHALT PAVEMENT

EXISTING CONC FOOTING

EXISTING CONC

FLOOR SLAB

7'�0

"4"

2%

SLOPE

EXISTING SLUMP BLOCK EXTERIOR WALL

EXISTING P.C. CONC SURROUND

CONT SEALANT AT TERM BAR & OVER ANCHOR HEADS

SECURE CLOSURE PANEL TO SURROUND W/

CONT TERM BAR W/ POWDER DRIVEN ANCHORS MAX 8" OC

MIN 18 GA GALV STL CLOSURE PANELEMBED FACE IN CONT SEALANT BEAD &

SECURE TO P.C. CONC SURROUND

H.M. DOOR FRAME

EXISTING P.C. CONC SURROUND BEYOND

EXISTING FIXED GLASS & H.M. SILL

REMOVED TO STORAGE DURING CONSTRUCTION

NEW INSUL H.M. DOOR & FRAME

TEMPORARY EXIT

EXISTING CONC FLOOR SLAB

ALUM ADA THRESHOLD

TEMPORARY ASPHALT PAVEMENT 8' WIDE W/

MAX 2% SLOPE IN ANY DIRECTION

BLDG 39

BLDG 46

GYMNASIUM

BLDG 35

BLDG 35N

BLDG 37

BLDG 36

BLDG 38A

BLDG

44

UP

UP

UP

NEW STUDENT

ENROLLMENT

CENTER

EXIS

TIN

G W

ALK

EXIS

TIN

G 1

4' F

IRE

LAN

E

4669 SF

NAVAJO ROOM

A�3

667

7

FUTURE STUDENT GOVERNMENT

945 SF

STUDENT LIFE

B

9.5

100

4426 SF

STUDENT LOUNGE

A�2

295

15

NEW

STUDENT

LOUNGE

729 SF

FOYER

B

7.3

100

1621 SF

SERVERY

B

16.2

100

UP

10

2"

34"

8

1.6"

144"

170

34"

34"

149

29.8"

68"

149

29.8"

34"

3

200

40"

136"

148

29.6"

66"

MEN'S RR

WOMEN'S RR

WOMEN'S RR MEN'S RR

DF

SS

3206 SF

KITCHEN

B

16

200

971 SF

MECH

B

3.2

300

143 SF

RACK ROOM

B

0.5

300 319 SF

STUDENT

GOVERNMENT

B

3.2

100

831 SF

STORAGE

B

2.8

300

REMOVE EXISTING GLAZING & CREATE (2) EMERGENCY EXITS

DURING CONSTRUCTION BY COVERING OPENINGS W/

SLITTED CLEAR PLASTIC SHEETING, PROVIDE TEMPORARY

EXIT SIGNS, REF TO DETAIL ON THIS SHEET

8' WIDE EMERGENCY EXIT DURING CONSTRUCTION W/ CONSTRUCTION

FENCING & TEMPORARY ASPHALT PAVEMENT W/ MAX 2% SLOPE IN ANY

DIRECTION. PROVIDE OVERHEAD PROTECTION AS REQUIRED

EXISTING EXIT DOORS CLOSED

OFF DURING CONSTRUCTION

COVER EXISTING EXIT SIGNS

437 SF

STORAGE

S

1.5

300

MECH / ELEC

119 SF

OFFICE

B

1.2

100

66

13.2"

33"

AREA OF CONSTRUCTION

FENCED OFF FROM PUBLIC

EXISTING MASONRY SCREEN

WALL DURING CONSTRUCTION

REMOVE THIS PORTION OF

NEW EXIT DOORS INSTALLED AS PART OF NEW

CONSTRUCTION, INSTALL NEW EXIT SIGN & TEMPORARY

SIGNAGE STATING "EMERGENCY EXIT ONLY"

CONSTRUCTION FENCINGNEW WORK

(SHELL SPACE)

EXISTING NON�EXIT DOORS REMOVED DURING

CONSTRUCTION W/ TEMPORARY EXIT SIGNS

CONSTRUCTION

FENCING

148

29.6"

66"

8' WIDE EMERGENCY EXIT DURING CONSTRUCTION WITH

CONSTRUCTION FENCING & TEMPORARY ASPHALT

PAVEMENT W/ MAX 2% SLOPE IN ANY DIRECTION

CONSTRUCTION

FENCING

UP

UP

DN

DN

UP

ELEV

.

EXISTING EXIT DOORS TO REMAIN IN

USE DURING CONSTRUCTION

UNLESS NOTED OTHERWISE

EXISTING EXIT DOORS

PROVIDE TEMPORARY EXIT SIGNS

& REPLACE HARDWARE WITH RIM PANIC

HARDWARE DURING CONSTRUCTION

EXISTING EXIT DOORS CLOSED

OFF DURING CONSTRUCTION

COVER EXISTING EXIT SIGNS

925

B 100

OFFICES

9.3

950

B 100

OFFICES

9.5

STREET & UPPER LEVEL

UP

UP

UP

+6' � 11"

+0' � 0"

+0' � 0"

+7' � 0"

+0' � 0"

30' �

0"23' � 2"

5' �

0"

PROVIDE OVERHEAD PEDESTRIAN PROTECTION

IN THIS AREA DURING CONSTRUCTION

EXISTING MASONRY SCREEN WALL

EXISTING MASONRY SCREEN WALL

CONSTRUCTION FENCING W/

OVERHEAD PROTECTION AS REQUIRED

CONSTRUCTION FENCING

MIN

. DIST. B

ETWEEN

EXITS 132/3 = 44'

132' � 0"75'�6" >

44' (MIN

. DIST. BETW

EEN EXITS)

75' � 6"

PATH OF TRAVEL: 221' � 6"

MAX PATH OF TRAVEL: 250'

65

13"

33"

EXISTING 14' FIRE LANE

CONSTRUCTION

GATES

CONSTRUCTION

GATES

BLDG 38

TEMPORARY EXIT DOORS

EXISTING 14' FIRE LANE

3759 SF

SALES FLOOR

M

127

30

BLDG 35N

UP

UP

ELEV

.UP

407 SF

CONFERENCE

A�3

27.2

15

270 SF

LOUNGE

B

2.7

100

328 SF

CONFERENCE

A�3

22

15

1389 SF

OFFICES

B

13.9

100

1037 SF

OFFICES

B

10.4

100

BASEMENT LEVEL

�7' � 0"

�7' � 0"

�7' � 0"

2' � 10 1/2"

5

A0.05

4

A0.05

6

A0.05

SYMBOL LEGEND

ROOM I.D. & NUMBER

NET SQUARE FOOTAGE

OCCUPANT LOAD RATIO

NUMBER OF OCCUPANTS

NUMBER OF OCCUPANTS

EXIT WIDTH REQUIRED (32" MIN)

EXIT WIDTH PROVIDED (INCHES)

CONSTRUCTION FENCE

TRAVEL DISTANCE TO EXIT

BARRIER FREE PATH OF TRAVEL

A ASSEMBLY

0.6

250

50

72

X'X'X'X'

300

169 SF

CUST CL

2' � 10 1/2"

A0.05

5

A0.05

4

6

A0.05

DATE: ISSUED FOR:

DRAWING NO:

Marl

ene I

mir

zian &

Ass

oci

ate

s LLC

, A

rchit

ects

8906 North Central Ave.

Phoenix, AZ

85020

602 943 5279 v

602 943 5673 f

JOB NO:

MaricopaCounty

Community

CollegeDistrict

NOT FOR

CONSTRUCTION

10/1

/2013 1

1:4

1:1

0 A

M

A0.05

TEMPORARY CONSTRUCTION

EXITING PLAN

1807

01 OCT 2013

NEW STUDENT PORTAL

MESA COMMUNITY COLLEGE

1833 WEST SOUTHERN AVE

MESA, AZ 85202

Scale: 1" = 20'$0" 1TEMPORARY CONSTRUCTION EXIT PLAN

Scale: 1" = 20'$0" 7BLDG 35N BASEMENT LEVELScale: 1/2" = 1'$0" 2

TEMPORARY EMERGENCY EXIT DURING

CONSTRUCTION $ ELEVATION

N

N

Scale: 1 1/2" = 1'$0" 5TEMPORARY DOOR HEAD

Scale: 1 1/2" = 1'$0" 6TEMPORARY DOOR JAMBScale: 1 1/2" = 1'$0" 4TEMPORARY DOOR SILL

Scale: 1/2" = 1'$0" 3TEMPORARY EMERGENCY EXIT DURING

CONSTRUCTION $ SECTION