Martin Luther King, Jr. Blvd. Viaduct, Martin Luther King, Jr. Blvd. Viaduct, Portland Portland Project Background and Today’s Design Status

Martin Luther King, Jr. Blvd. Viaduct, Portland Project Background and Today’s Design Status

Embed Size (px)

Citation preview

Page 1: Martin Luther King, Jr. Blvd. Viaduct, Portland Project Background and Today’s Design Status

Martin Luther King, Jr. Blvd. Martin Luther King, Jr. Blvd. Viaduct, PortlandViaduct, Portland

• Project Background and Today’s Design Status

Page 2: Martin Luther King, Jr. Blvd. Viaduct, Portland Project Background and Today’s Design Status

Location – Looking SoutheastLocation – Looking Southeast

Page 3: Martin Luther King, Jr. Blvd. Viaduct, Portland Project Background and Today’s Design Status

Closer View - Looking Closer View - Looking SoutheastSoutheast

Page 4: Martin Luther King, Jr. Blvd. Viaduct, Portland Project Background and Today’s Design Status

Historic Background - MLKHistoric Background - MLK

• MLK (Union Ave.) built 1938– H-15 Design Live Load

Page 5: Martin Luther King, Jr. Blvd. Viaduct, Portland Project Background and Today’s Design Status

Historic Background – GrandHistoric Background – Grand

• Grand Ave. built 1964– HS-20 Design Live Load

Page 6: Martin Luther King, Jr. Blvd. Viaduct, Portland Project Background and Today’s Design Status

Viaduct – looking SE (late Viaduct – looking SE (late 1930’s)1930’s)

Page 7: Martin Luther King, Jr. Blvd. Viaduct, Portland Project Background and Today’s Design Status

Viaduct – Below (late 1930’s)Viaduct – Below (late 1930’s)

Page 8: Martin Luther King, Jr. Blvd. Viaduct, Portland Project Background and Today’s Design Status

Grand Ave. w/ MLK Looking Grand Ave. w/ MLK Looking SWSW

Page 9: Martin Luther King, Jr. Blvd. Viaduct, Portland Project Background and Today’s Design Status

Grand Ave. Looking N. at CaruthersGrand Ave. Looking N. at Caruthers

Page 10: Martin Luther King, Jr. Blvd. Viaduct, Portland Project Background and Today’s Design Status

Stairway, N. Side of CaruthersStairway, N. Side of Caruthers

Page 11: Martin Luther King, Jr. Blvd. Viaduct, Portland Project Background and Today’s Design Status

Early ProblemsEarly Problems

• Crosses Filled-In Slough– Wood Waste

• Timber Piles Not Driven Deep Enough• Partial Structure Settlement• ACWS Added to Raise Grade• Jacking Attempt after cutting

columns. Instead of raising the structure, it lowered the footings.

Page 12: Martin Luther King, Jr. Blvd. Viaduct, Portland Project Background and Today’s Design Status

Sunken Area – Looking NWSunken Area – Looking NW

Page 13: Martin Luther King, Jr. Blvd. Viaduct, Portland Project Background and Today’s Design Status

Today’s ConditionsToday’s Conditions

• Structure Settlement, Translation & Deterioration

• Sufficiency Ratings– MLK 19, Grand Ave. 60 (out of 100)

• SB Weight Restrictions (50,000 lb)• Ongoing Maintenance

Page 14: Martin Luther King, Jr. Blvd. Viaduct, Portland Project Background and Today’s Design Status

MLK Sunken Span & ConcreteMLK Sunken Span & Concrete

Page 15: Martin Luther King, Jr. Blvd. Viaduct, Portland Project Background and Today’s Design Status

Bent 26 – Before Repair Apr. Bent 26 – Before Repair Apr. ‘02‘02

Page 16: Martin Luther King, Jr. Blvd. Viaduct, Portland Project Background and Today’s Design Status

Beam Support RepairsBeam Support Repairs

Page 17: Martin Luther King, Jr. Blvd. Viaduct, Portland Project Background and Today’s Design Status

Column Repairs 2001-2002Column Repairs 2001-2002

Page 18: Martin Luther King, Jr. Blvd. Viaduct, Portland Project Background and Today’s Design Status

Column Repairs 2001-2002 Column Repairs 2001-2002 cont.cont.

Page 19: Martin Luther King, Jr. Blvd. Viaduct, Portland Project Background and Today’s Design Status

Stakeholder & Architectural Stakeholder & Architectural Goals 1Goals 1

• Environmental Assessment & 4(f) Evaluation Process 2001-2002

• Design Review Advisory Committee (DRAC)

• Improved Vehicular Access• Improved Ped. & Bike Access• Traffic Calming• Landscaping, Planters on Structure

Page 20: Martin Luther King, Jr. Blvd. Viaduct, Portland Project Background and Today’s Design Status

Stakeholder & Architectural Stakeholder & Architectural Goals 2Goals 2

• Access to Springwater Trail• Gateway to SE Portland• Appearance Reminiscent of Existing

Structure– Shorter, Haunched Spans 24 m (80 ft)– Deck Overhangs– Historic Lighting Fixtures

• Historic Interpretive Signs (in pylons)• Improved Ped. & Bike Access

Page 21: Martin Luther King, Jr. Blvd. Viaduct, Portland Project Background and Today’s Design Status

Stakeholder & Architectural Stakeholder & Architectural Goals 3Goals 3

• Architectural Rails – Open for Outward Visibility– “Not like the Ross Island Bridge”– Must meet LRFD Strength & Performance– Similar to FHWA Crash-Tested Rail– FHWA Concurrence

• Keep Adjacent Businesses Open• Cross Existing UPRR• Future Light Rail Transit Beneath

Page 22: Martin Luther King, Jr. Blvd. Viaduct, Portland Project Background and Today’s Design Status

Near Ivon St. Looking North Near Ivon St. Looking North (1930’s)(1930’s)

Page 23: Martin Luther King, Jr. Blvd. Viaduct, Portland Project Background and Today’s Design Status

Gateway Rendering 2001Gateway Rendering 2001

Page 24: Martin Luther King, Jr. Blvd. Viaduct, Portland Project Background and Today’s Design Status

Rail Mockup w/ Light PoleRail Mockup w/ Light Pole

Page 25: Martin Luther King, Jr. Blvd. Viaduct, Portland Project Background and Today’s Design Status

Bridge Replacement Concept Bridge Replacement Concept Studies (1999-2001)Studies (1999-2001)

• Replace MLK Structure on Existing Alignment

• Highway Standards– 45 mph, 3.6 m Lanes, Std. Metal Rails

• Prestressed Concrete Girders– Approx. 36 m (120 ft.) Spans

Page 26: Martin Luther King, Jr. Blvd. Viaduct, Portland Project Background and Today’s Design Status

New Alignment AlternativesNew Alignment Alternatives

• Boulevard (35 mph) Standards– Grade Separated Alternative (Chosen)– Signalized Alternative (Not Chosen)– 3.3 m Lanes, 1.2 m & 1.8 m Shoulders– Tight Curves: Shorter Bridge, Less Skew– Substandard Horizontal Alignment

• Accepted By City of Portland via IGA• Ownership Transfers to Portland Upon

Completion

Page 27: Martin Luther King, Jr. Blvd. Viaduct, Portland Project Background and Today’s Design Status

At-Grade Signalized At-Grade Signalized AlternativeAlternative

Page 28: Martin Luther King, Jr. Blvd. Viaduct, Portland Project Background and Today’s Design Status

MLK/Grand Selected MLK/Grand Selected AlternativeAlternative

Page 29: Martin Luther King, Jr. Blvd. Viaduct, Portland Project Background and Today’s Design Status

Engineering SolutionsEngineering Solutions

• Replace MLK Struct., Rehab Grand• TS&L (Sept. 2003): Replace Grand?

– Approx. $3 million extra– Best time to replace during this project– Wouldn’t have to remove rails, etc. later– But, existing structure didn’t meet

criteria to replace (SR > 50)– Not in original scope– Not in the budget

Page 30: Martin Luther King, Jr. Blvd. Viaduct, Portland Project Background and Today’s Design Status

Stage Construction ChallengesStage Construction Challenges

• Narrow Lanes & Shld. on New Struct.• Restricted Right-of-Way• Traffic Volumes (60,000+ ADT)• Maintain 4 Lanes During Construction• Temporary Detour Structure (partial)

Page 31: Martin Luther King, Jr. Blvd. Viaduct, Portland Project Background and Today’s Design Status

Stage Construction SectionsStage Construction Sections

Page 32: Martin Luther King, Jr. Blvd. Viaduct, Portland Project Background and Today’s Design Status

SuperstructureSuperstructure

• Precast P/S Slab/Box Girders – Fits Desired Span Lengths (75’-80’)– Haunched for Architectural Appearance– Quicker to Build, No Falsework Req’d.– Good Structure Economy– Spread Boxes w/ Cast Deck– Has Been Done Before

• North 3 Spans CIP P/T Box Girder– Flared, Curved, Skewed

Page 33: Martin Luther King, Jr. Blvd. Viaduct, Portland Project Background and Today’s Design Status

Haunched Beam – Half Haunched Beam – Half ElevationElevation

Page 34: Martin Luther King, Jr. Blvd. Viaduct, Portland Project Background and Today’s Design Status

Haunched Beam – SectionsHaunched Beam – Sections

Page 35: Martin Luther King, Jr. Blvd. Viaduct, Portland Project Background and Today’s Design Status

Span Layout IssuesSpan Layout Issues

• Repetitive Spans Promote Economy• Try To Avoid Existing Bents• Many Utilities, Buried and Overhead• Resulting Spans Weren’t Equal

Page 36: Martin Luther King, Jr. Blvd. Viaduct, Portland Project Background and Today’s Design Status

Layout – w/ Grand Ave. Rehab.Layout – w/ Grand Ave. Rehab.

Page 37: Martin Luther King, Jr. Blvd. Viaduct, Portland Project Background and Today’s Design Status

Foundation ConditionsFoundation Conditions

• Silt Overburden Layer• Seismic Settlement & Amplification• Use Steel H-Piles

– Driven into Troutdale Gravel Layer– Approx. 15-20 m deep North & South– Approx. 25-30 m deep at wood waste

• MSE Wire Retaining Walls– CIP Architectural Facing, After Settlement

Page 38: Martin Luther King, Jr. Blvd. Viaduct, Portland Project Background and Today’s Design Status

Logistical Challenges During Logistical Challenges During DesignDesign

• Decentralization of ODOT in 2004• Designers/Drafters in:

– Region 1, Portland– Region 2, East Salem– ODOT HQ, Salem

• Minimal Traffic Control Design Begun• DEA, Inc. Recruited for Traffic Control

Design, Drafting, Lead Structure Design

Page 39: Martin Luther King, Jr. Blvd. Viaduct, Portland Project Background and Today’s Design Status

Evolving Bid ScheduleEvolving Bid Schedule

• November 2005: Change of Course– Cost of Grand rehab approached

replacement cost– Decision to Replace Grand Ave.– Split Contracts

• March 9, 2006 bid for earthwork, drainage, utilities ($5 million)

• Nov. 2006 bid for structure and retaining walls

Page 40: Martin Luther King, Jr. Blvd. Viaduct, Portland Project Background and Today’s Design Status

Layout – Grand Ave. Rehab.Layout – Grand Ave. Rehab.

Page 41: Martin Luther King, Jr. Blvd. Viaduct, Portland Project Background and Today’s Design Status

Layout – Grand Ave. ReplaceLayout – Grand Ave. Replace

Page 42: Martin Luther King, Jr. Blvd. Viaduct, Portland Project Background and Today’s Design Status

General LayoutGeneral Layout

Page 43: Martin Luther King, Jr. Blvd. Viaduct, Portland Project Background and Today’s Design Status

Innovative Contracting Innovative Contracting MethodsMethods• Complex Project with Significant Risk

Elements

– Want an experienced contractor with innovative abilities

– Think it through ahead of time

Page 44: Martin Luther King, Jr. Blvd. Viaduct, Portland Project Background and Today’s Design Status

Innovative Contracting, cont. 1Innovative Contracting, cont. 1

• Best Value Bid Process (A+C+D) on Structure Work– “A” Component: Price (40%)– “C” Component: Qualifications (40%)– “D” Component: Tech. Approach (20%)– Not Used: “B” Component (Time)

Page 45: Martin Luther King, Jr. Blvd. Viaduct, Portland Project Background and Today’s Design Status

Innovative Contracting, cont. 2Innovative Contracting, cont. 2

• ODOT Experience with Best Value Contracting:– I-5 Interstate Bridge Lift Span Trunnion

Replacement (1997) – St. Johns Bridge Rehabilitation (2003-05) – Both Were A+C– Procedure now in place at Office of

Procurement to streamline Best Value Contracting

Page 46: Martin Luther King, Jr. Blvd. Viaduct, Portland Project Background and Today’s Design Status

Philosophical Considerations Philosophical Considerations

• Budget Limitations– $32 million available from Bridge

Program

• Scope creep– Project now approx. $50 million range

• Unfunded Stakeholder Demands• Awareness of Project Scope

– Grand Ave. not part of original scope

Page 47: Martin Luther King, Jr. Blvd. Viaduct, Portland Project Background and Today’s Design Status

Philosophical Considerations cont.Philosophical Considerations cont.

• Context Sensitive Solutions– Was the original scope realistic

considering the setting?– Old industrial area vs. redevelopment

visions– Transportation impacts on communities – Cause urban blight vs. enhancement

Page 48: Martin Luther King, Jr. Blvd. Viaduct, Portland Project Background and Today’s Design Status

Questions?Questions?