9
Material Recovery Plan Material Recovery Plan 30 December 2017 Loan No. 3084 MYA: Power Distribution Improvement Project Prepared by Yangon Electricity Supply Corporation (YESC) through the Ministry of Electricity and Energy (MOEE) of the Union of the Myanmar Republic and the Asian Development Bank. This material recovery plan report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or área.

Material Recovery Plan of Material: Distribution Transformers 1 3 4 2 Item District Recyclable Units (No) Not Recyclable Units (No) Ma Hlwa Gone Substation,Mingalar Taung Nyunt Township

  • Upload
    lykiet

  • View
    217

  • Download
    0

Embed Size (px)

Citation preview

Material Recovery Plan Material Recovery Plan 30 December 2017 Loan No. 3084

MYA: Power Distribution Improvement Project

Prepared by Yangon Electricity Supply Corporation (YESC) through the Ministry of Electricity

and Energy (MOEE) of the Union of the Myanmar Republic and the Asian Development

Bank.

This material recovery plan report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or área.

30/12/2017

The Republic of the Union of Myanmar

Ministry of Electricity and Energy

Yangon Electricity Supply Corporation

Material Recovery Plan

Loan No:3084-MYA (SF)

Power Distribution Improvement Project

Power Distribution Improvement Project Date: 30/12/2017

Material Recovery Plan Page: 1

Quantity

(No).KVA Location Quantiy Location

5 East North Dagon 1000 0 0 0

6 East Mingalar Taung Nyunt 200 0 0 0

7 East South Okkalaa 400 0 0 0

8 East Pa Zun Taung 400 0 0 0

9 South Hlaing Thar Yar 200 0 0 0

Note: Non recyclable materials are to be undergone for aution.

1

West Kamaryut

Inn Sein

1000

West Mayangone

North Mingalardone

North

1000

2000

1

Replaced KVA

Replaced Units

1000

2000

3000

1000

Installed

Capacity

3 10003000

Thiri Street, San Gyi Wa Quarter, Mingalardone Township

1.Lower Mingalardone Road ,Inn Sein Township

2.Corner of Lan Thit Road & Shwe Pyi Aye Street,Inn Sein

Township

1000

1.Corner of Aunt Theik Hti Street & Aung Theik Hti Kyaung

Street , Mayangone Township

2.Corner of Ah Laung Pha Yar Street & 8th

Street,Mayangone Township

2

1000

Township

Area: Yangon Region

PIC Expert: Phoo Ngon Thin

Action to Take

Reutilization Auction Abandon Estimated Date

X

Type of Material: Distribution Transformers

1

3

4

2

Item DistrictRecyclable Units (No) Not Recyclable Units (No)

Ma Hlwa Gone Substation,Mingalar Taung Nyunt Township

1000

X

X

Awaiting for other incoming

transformers to be autioned

together.

x

Done

Done

Done

DoneX

Total 9400 7500 17 7000

10 DalaSouth 200 0 1

Store,

Department of

transformer

maintenance

500 0

Power Distribution Improvement Project Date: 24 30/12/2017

Material Recovery Plan Page: 2

Area: Yangon Region

Type of Material: Line Materials

Quantity

(No).Material Location Quantiy (kg) Material Location

6 East North Okkalapa - 276 SWG 7/12 x Q4 2017/Q1 2018

7 East North Okkalapa 4Cx70mm2+1Cx16mm2 AL/XLPE/Insulated LV ABC Cable 237 HDBC No.6 x Q4 2017/Q1 2018

8 East North Okkalapa 4Cx70mm2+1Cx16mm2 AL/XLPE/Insulated LV ABC Cable 106 HDBC No.8 x Q4 2017/Q1 2018

9 West Kamaryut 11kV 1Cx120mm2 Aerial Spacer Cable 156 ACSR 70mm2 x Q4 2017/Q1 2018

10 West Kamaryut 11kV 1Cx120mm2 Aerial Spacer Cable 229 ACSR 95mm2 x Q4 2017/Q1 2018

11 West Kamaryut 4Cx70mm2+1Cx16mm2 AL/XLPE/Insulated LV ABC Cable 153 HDBC No.4 x Q4 2017/Q1 2018

12 West Kamaryut 4Cx70mm2+1Cx16mm2 AL/XLPE/Insulated LV ABC Cable 114 HDBC No.8 x Q4 2017/Q1 2018

20 North Mayangone 4Cx70mm2+1Cx16mm2 AL/XLPE/Insulated LV ABC Cable 36 HDBC No.6 x Q4 2017/Q1 2018

21 North Mayangone 4Cx70mm2+1Cx16mm2 AL/XLPE/Insulated LV ABC Cable 35 HDBC No.8 x Q4 2017/Q1 2018

22 North Ah Pyauk 4Cx70mm2+1Cx16mm2 AL/XLPE/Insulated LV ABC Cable 1100 ACSR 35mm2 x Q4 2017/Q1 2018

23 North Ah Pyauk 4Cx70mm2+1Cx16mm2 AL/XLPE/Insulated LV ABC Cable 325 ACSR 25mm2 x Q4 2017/Q1 2018

24 North Ah Pyauk 11kV 1Cx120mm2 Aerial Spacer Cable 129 ACSR 70mm2 x Q4 2017/Q1 2018

Note: Non recyclable materials are to be undergone for aution.

Q4 2017/Q1 2018

North Dar Pain 4Cx70mm2+1Cx16mm2 AL/XLPE/Insulated LV ABC Cable 278 HDBC No.6

North Dar Pain 4Cx70mm2+1Cx16mm2 AL/XLPE/Insulated LV ABC Cable 134 HDBC No.8

x Q4 2017/Q1 2018

x Q4 2017/Q1 2018

North Dar Pain 4Cx70mm2+1Cx16mm2 AL/XLPE/Insulated LV ABC Cable HDBC No.4 Q4 2017/Q1 2018

HDBC No.4

x435

Q4 2017/Q1 2018

x Q4 2017/Q1 2018

643.3

South

Hlaing thar yar

2

17

East Hlaing thar yar 4Cx70mm2+1Cx16mm2 AL/XLPE/Insulated LV ABC Cable 120.5

80.9

Hlaing thar yar 11kV 1Cx120mm2 Aerial Spacer Cable 240

East Hlaing thar yar 4Cx25mm2 AL/XLPE/Insulated ABC Cable 1155.2

16

11kV 1Cx120mm2 Aerial Spacer Cable 1467 ACSR 95mm2 x

x

0 0 8250.9

18

East Yan kin 4Cx70mm2+1Cx16mm2 AL/XLPE/Insulated LV ABC Cable

1 East Thinkankyun 11kV 1Cx120mm2 Aerial Spacer Cable

360

PIC Expert: Phoo Ngon Thin

Item District Township Unit (Nos.) to be replaced

Replaced Units

Recyclable Units (No) Not Recyclable Units (No)

428

Q4 2017/Q1 2018

ACSR 70mm2

ACSR 70mm2

4

3

HDBC No.8

ACSR 120mm2

4Cx70mm2+1Cx16mm2 AL/XLPE/Insulated LV ABC CableHlaing thar yarEast HDBC No.6

x Q4 2017/Q1 2018HDBC No.8 3ph,4W

South Hlaing thar yar 11kV 1Cx120mm2 Aerial Spacer Cable Q4 2017/Q1 2018

South

5

13

14

15

Main Store, Ahlone

Township

Action to Take

Reutilization Auction Abandon Estimated Date

x Done (May 2017)

x

x Q4 2017/Q1 2018

x

Total

Q4 2017/Q1 201819 North Mayangone 4Cx70mm2+1Cx16mm2 AL/XLPE/Insulated LV ABC Cable 13 HDBC No.4 x

Annex 1 :

Recyclable Units

Replaced Unit from Mayangone Township

Replaced Unit fromMayangone Township

Non-Recyclable Units

Replaced Unit from Kamayut Township

Replaced Unit from Dala Township

Annex 2

Storage condition (ACSR,HDBC) at Ahlone Township, Storage Area

ACSR 95mm2 at Dala Township, Storage Area 400V HDBC at TwantayTownship, Storage

Annex 3:

List of reputable recycling service providers

No Company Name

1 Asia General Electric Co, Ltd

2 Capital Power Co, Ltd

3 Hitachi Soe Elecric & Machinery Co., Ltd

4 Chint Co., Ltd

5 UPT Co., Ltd

6 Yangon Transformer Electric Co., Ltd

1 Yangon Crown Wire Co., Ltd

Transformers

Cables & Conductors

Annex 4: Current Practice of transformer oil storage at maintenance yard, YESC