Material Requirment Planning-om

Embed Size (px)

Citation preview

  • 8/8/2019 Material Requirment Planning-om

    1/18

    MATERIALREQUIRMENT

    PLANNING

    PRESENTED TO PROF. R. MUKUNDAN

  • 8/8/2019 Material Requirment Planning-om

    2/18

    Name Roll No

    Wasim Dalvi 12

    Dimple Karkera 21

    Saima Khan 27

    Abdul Basith Shaikh 43

    Praful Uberoi 59

  • 8/8/2019 Material Requirment Planning-om

    3/18

    DEFINITIONO Material requirement planning is a

    technique for determining the quantity and

    timing for the acquisition of dependentdemand items needed to satisfy master

    production schedule requirements.

  • 8/8/2019 Material Requirment Planning-om

    4/18

    OBJECTIVESO Inventory reduction

    O Reduction in manufacturing and delivery

    lead time

    O Realistic delivery commitments

    O Increased efficiency

  • 8/8/2019 Material Requirment Planning-om

    5/18

    WHAT CAN MRP DO?O ReduceInventory

    Levels

    O Reduce Component

    ortagesO Improve ipping

    erformance

    O Improve Customerervice

    O Improve roductivityO implifiedand

    ccurate c eduling

    O Reduceurc asingCost

    O Improve roduction

    c edulesO Reduce Manufacturing

    Cost

    O Reduce Lead Times

    O Less crapand

    ReworkO Higer roduction

    Quality

  • 8/8/2019 Material Requirment Planning-om

    6/18

    WHAT CAN MRP DO?O Improve

    Communication

    O Improve lantfficiency

    O Reduce reigtCost

    O

    Reduction inxcess Inventory

    O Reduce OvertimeO Improve Supply

    Sc edulesO Improve

    CalculationofMaterialRequirements

    O

    ImproveCompetitiveosition

  • 8/8/2019 Material Requirment Planning-om

    7/18

    HOWITWORKSINPUTS

    MaterialRequirement

    Planning

    Master

    ProductionSchedule

    Bill ofMaterial InventoryStatus File

  • 8/8/2019 Material Requirment Planning-om

    8/18

    Master Production Schedule

    O A series of time phased quantities for each

    item that a company produces

    O Developed from customer orders or from

    forecast of demand

    O Determines specific component requirement

  • 8/8/2019 Material Requirment Planning-om

    9/18

    Inventory Status FileO Gives complete and up to date information

    on the on hand quantities, gross

    requirement, scheduled receipts andplanned order releases

    O Includes PlanningInformation such as lot

    sizes, lead time etc.

  • 8/8/2019 Material Requirment Planning-om

    10/18

    Bill of MaterialO Identifies how each end product is

    manufactured

    O Specifies subcomponents, their sequenceand their end quantity

    O Information is obtained from product designdocuments, work flow analysis & otherstandard manufacturing information.

  • 8/8/2019 Material Requirment Planning-om

    11/18

    HOWITWORKSOUTPUT

    Material Requirement

    lanning

    Order Release

    Requirements(Ordersto be

    laced)Order Rescheduling

    lannedOrders(Future)

  • 8/8/2019 Material Requirment Planning-om

    12/18

    ADVANTAGESO Helps in production planning and

    scheduling.

    O Minimize inventory level and associated

    carrying cost

    O

    Keeps a track on material requirements

    O Determines the most economical lot size for

    orders

  • 8/8/2019 Material Requirment Planning-om

    13/18

    O Computes appropriate level of safety stock

    O Helps in determining various process time &

    total production time of the product

    O Helps in planning future capacity needs

  • 8/8/2019 Material Requirment Planning-om

    14/18

    DISADVANTAGESO MRP relies on accurate input information

    O Requires up to date record

    O Costly to implement

    O Resistance from employees

  • 8/8/2019 Material Requirment Planning-om

    15/18

    HUBBELL LIGHTING CASEO Manufactures Industrial Lighting Products

    O Good-Quality Products

    O Poor at Meeting Due Dates

    O Work is Specialized for Each Customer

    O Job Shop Environment

    O Complex Products

  • 8/8/2019 Material Requirment Planning-om

    16/18

    HUBBELL LIGHTING CASEBeforeMRP

    Implementation

    O Less than % of

    orders completedon

    time

    After MRP

    Implementation

    O 9 % oforders

    completedontime

    O 2% oforders

    completedwith 1 to2 days after duedate

  • 8/8/2019 Material Requirment Planning-om

    17/18

    SUMMARYMRP is a..

    O Computerized Inventory Control

    O Production Planning Systemthat..

    O Schedules Component Items as Needed

    which will..

    O Track Inventory and..O Help you in many other aspects of business

  • 8/8/2019 Material Requirment Planning-om

    18/18