    Matu Peoples' OrganisationOur soil, Our heritage

    Working in Uttarakhand, on the rights of people and the environment.

    The Displacement of people is snatching their water,forest, and land.

    Sustainable development is incomplete withoutenvironmental conservation and it becomes impossible

    with human displacement.

    matujan.blogspot.com

  • 8/8/2019 Matu People's Organization

    2/48

    Why Dams?

    According toSout h Asia Network on Dams, Rivers and People (www.sandrp.in) :-

    -I n India, 5100 big dams have led to the displacement of 5.50 crore people.- 4 528 dams have caused the submergence of around 44lakh hectare land.

    -47% of all persons displaced by dams are tribals.-E ven after an investment of more than Rs. two lakh crores, neither has power been

    generated nor irrigation taken place in accordance with the declared claims.

    Every year in India -

    Approx. 30 % of the electricity is lost during transmission.Dams have led to an increase in food grain production by only 10 %Rats eat 10 % of the food grain produced.

  • 8/8/2019 Matu People's Organization

    3/48

    Wh at are big dams?

    According toCentral Water Commission of India

    andThe International Commission on Large Dams

    World Commission on DamsThe following fall in t he categor y of big dams:

    Dams higher than 15 meters in height from the foundation

    Dams with the height of 5 to 15 metres whose water storage capacity ismore than 30 lakh cubic metres.

    Dams which have the irrigation capacity of 10,000 hectare.

  • 8/8/2019 Matu People's Organization

    4/48

    Two kind of Hydro-Electric Projects

    in t he Ganga Valle y

  • 8/8/2019 Matu People's Organization

    5/48

  • 8/8/2019 Matu People's Organization

    6/48

    In this type of a project a reservoir is built by

    damming across the river. The difference isthat in this kind of a dam the water of thereservoir is taken through a straight tunnels

    cut into the mountain. After a distance of many kilometers, this water is dropped froma height on to the turbines and electricity is

    produced.

    Tunnel Hydroelectric ProjectsOR

    Run-of- the river Hydroelectric Projects

  • 8/8/2019 Matu People's Organization

    7/48

  • 8/8/2019 Matu People's Organization

    8/48

    Dams on t heRiverBh agirat h i.

  • 8/8/2019 Matu People's Organization

    9/48

  • 8/8/2019 Matu People's Organization

    10/48

    Environmental PublicHearings h aveproven to be a farce!

  • 8/8/2019 Matu People's Organization

    11/48

    In Run -off - the River projects, apart from land that is submerged, it is alsoused to make residential colonies for the project proponents. Further,project proponents don t give back land used for labour colonies etc.

  • 8/8/2019 Matu People's Organization

    12/48

    Dams have caused the permanent destruction of forests inUttarakhand.

  • 8/8/2019 Matu People's Organization

    13/48

    According to an estimate, tunnels under -construction for hydro electricprojects are hollowing the mountains in Uttarakhand up to an extent of

    nearly 1500 km in length.

  • 8/8/2019 Matu People's Organization

    14/48

    Only 7% cultivable land remains in the mountainous regions. The landnear the river bank is often the most fertile land. Dams either submerge

    this land, or put it to related purposes, such as residential colonies foremployees etc.

  • 8/8/2019 Matu People's Organization

    15/48

    B ecause of diminishing agriculture, organic fertilizerproduction is threatened.

  • 8/8/2019 Matu People's Organization

    16/48

    River banks have become precarious in the whole state of Uttarakhand.River water is released at unpredictable times for electricity production,

    this makes the water current in the river very uncertain.

  • 8/8/2019 Matu People's Organization

    17/48

    In run -off - the river projects, at the point where river water is pushedinto the tunnel, the portion of the river between dam and Power House

    is either dry or has very little water in it.

  • 8/8/2019 Matu People's Organization

    18/48

    A ll prayags (confluences) on the river banks of Devbhoomi (land of Gods)in Uttarakhand are either being submerged or withering away. The

    people of Uttarakhand were once called the residents of thisDevbhoomi, now they are landless oustees.

  • 8/8/2019 Matu People's Organization

    19/48

    River water is not available for religious and cultural ritualslike bathing during festivals, funeral rites, river worship etc.

  • 8/8/2019 Matu People's Organization

    20/48

    The right of the Locals on the river is lost.

  • 8/8/2019 Matu People's Organization

    21/48

    As the river is dry, cattle breeders and people wholive on river banks, don t get water.

  • 8/8/2019 Matu People's Organization

    22/48

    The mountains are becoming weak as tunnels are being dug into wholeriver valleys. This leads to an increase in the number of landslides.

  • 8/8/2019 Matu People's Organization

    23/48

    C racks appear in the houses and land, under which tunnels arebuilt. For this reason, mountains become weak and collapse

    under very slight earthquakes. No compensation is paid for this.Theimage cannotbe displayed.Your computer may nothaveenough memory toopen theimage,or the imagemay havebeen corrupted. Restartyour computer,and then open thefileagain.If thered x stillappears,you may havetodeletethe imageand then insertit again.

  • 8/8/2019 Matu People's Organization

    24/48

    On the Richter scale Uttarakhand comes under 4 & 5earthquake zone. The Ganga Valley is already affected by

    earthquakes. Thousands of people have been killed. The risk of

    earthquakes increases with the building of so many dams.

  • 8/8/2019 Matu People's Organization

    25/48

    As a result of all the projects undertaken on the Ganga valley,rivers B hagirathiganga, Vishnupadiganga A laknanda and all

    their tributaries, no river will be left free.

  • 8/8/2019 Matu People's Organization

    26/48

    Use of explosives during tunnelings in run -off - the river projects, causenatural water sources dry up or change their location. B ut dam

    proponents provide no solutions for this.

  • 8/8/2019 Matu People's Organization

    27/48

    The required monitoring of any hydroelectric project is notbeing done by either the central or state government.

  • 8/8/2019 Matu People's Organization

    28/48

    Problems have multiplied as pre -studies of projects have notbeen completed or done in the right way.

  • 8/8/2019 Matu People's Organization

    29/48

    B uilding several dams, one after another on the same rivercreates many negative impacts. There is no cumulative impactassessment study of the effect of multiple dams on one river.

  • 8/8/2019 Matu People's Organization

    30/48

    Dust and debris rise because of dam project work. Fodder for animals isaffected and rendered useless by exposure to explosions. The negative

    effects affects forests and areas far and wide.

  • 8/8/2019 Matu People's Organization

    31/48

  • 8/8/2019 Matu People's Organization

    32/48

    Wild animals are adversely affected by dam projects inUttarakhand. As a result of the Tehri Dam reservoir, the terror

    of monkeys, wild pigs, bears and tigers has increased in

    human populated areas.

  • 8/8/2019 Matu People's Organization

    33/48

    Hydroelectric project reservoirs bring negative effects such asfog, diseases, landslides, and subsidence land around the

    reservoir.

  • 8/8/2019 Matu People's Organization

    34/48

    It is common for the dam reservoir to become filled with silt. Sinceseveral dams are being built one after the other, even when silt is

    allowed to flow downstream of one dam, it ends up collecting on thesecond dam.

  • 8/8/2019 Matu People's Organization

    35/48

    River is not safe for the local people.

  • 8/8/2019 Matu People's Organization

    36/48

    In the whole state of Uttarakhand, risks from electrictransmission lines are increasing.

  • 8/8/2019 Matu People's Organization

    37/48

    Uttarakhand is in the middle of the Himalayas and so its environmentremains comparatively cooler. Dams lead to increased concretization andconsequently higher temperatures, this negatively effects local crops and

    fruits trees.

  • 8/8/2019 Matu People's Organization

    38/48

    Thousands of people engaged in dam construction work, livein one place because of which dirt and disease are rampant.

  • 8/8/2019 Matu People's Organization

    39/48

    Dams affect peoples culture, for which there can be nocompensation. The worst effect is on the freedom of women.

  • 8/8/2019 Matu People's Organization

    40/48

    Women are specifically affected by Hydro Electric Projects,with a reduced access to water, and displaced homes etc.

  • 8/8/2019 Matu People's Organization

    41/48

    Dam reservoirs produce green house gases which contributes to global warmingalso. Kotli -B hel, Pancheshwar like projects will have 10 to 30 K.M. Or even long

    reservoirs.

  • 8/8/2019 Matu People's Organization

    42/48

    Where private companies are making dams, even the Right toInformation Act does not apply, and collecting information is

    even tougher.

  • 8/8/2019 Matu People's Organization

    43/48

  • 8/8/2019 Matu People's Organization

    44/48

    No lesson is being learnt from earlierNo lesson is being learnt from earlierdams.dams.

    Why should we invite long lastingWhy should we invite long lastingproblems?problems?

  • 8/8/2019 Matu People's Organization

    45/48

    Rivers s hould have t h eRivers s hould have t h erig h t to flow.rig h t to flow.

  • 8/8/2019 Matu People's Organization

    46/48

    Just T h ink!Just T h ink!

  • 8/8/2019 Matu People's Organization

    47/48

    National & State govts. s h ould release a w h iteNational & State govts. s h ould release a w h ite

    paper explaining t h e realt y of H ydropaper explaining t h e realt y of H ydro--PowerPowerProjects. Onl y th en s h ould t h e y talk about newProjects. Onl y th en s h ould t h e y talk about new

    Hydro Electric Projects.Hydro Electric Projects.

  • 8/8/2019 Matu People's Organization

    48/48

    Join us, and lets walk toget h er for t h e rig h ts of Join us, and lets walk toget h er for t h e rig h ts of People and Rivers.People and Rivers.