PROJECT
CONTRACTING AUTHORITY
Municipality of Lamia
NAME OF PARTNERS
PERIOD
2008 - 2011COST OF THE PROJECT
LOCATION
LAMIA - GREECE
MATURATION STUDIES FOR THE SANITARY LANDFILL
SITE OF 9th WASTE MANAGEMENT SECTION IN
STEREA ELLADA REGION
Empeiria Consulting Engineers S.A.
Detailed description of the project
The projects’ purpose is the preparation of all relevant studies and other documentation which are required for the approval, funding andprocurement of municipal waste processing and disposal facilities, that will serve eleven (11) Municipalities and two (2) Communities inSterea Ellada Region.The permanent served population is 116.498 citizens and the average annual municipal waste production is 68.000 ton/year.
The proposed waste processing and disposal facilities of this specific Waste Management Section, according to the relevant Regional WasteManagement Plan of Sterea Ellada are: One sanitary landfill site with an annual capacity of 68.000t/y (average of years 2011 – 2030) and a total volume of 1.835.000 m3 Initially the municipal solid waste will be deposited in the landfill without any pre-treatment. After the construction of the new MBT Plantclose to the new landfill site, only residues will be deposited, thereby prolonging the landfills’ lifetime. A Mechanical - Biological Treatment Plant (MBT) which is proposed to be constructed close to the new landfill. More specifically, an area of35.000 m2 has been set aside beside the landfill basin for the intended construction of the new MBT Plant.One or two waste transfer stations which are not included in the contract objectives.
The specific projects’ objectives included the following:SITING STUDYIdentification and Evaluation of the most appropriate areas for the location of the sanitary landfill. Four (4) alternative sites have been identifENVIRONMENTAL IMPACT ASSESSMENT STUDYA detailed E.I.A. study was elaborated for the most appropriate site.FEASIBILITY STUDYThe Feasibility Study consists of a Technical Preliminary Design Study (which included Topographical Survey, Geotechnical Study, Geological/A) Landfill Site: • A Landfill basin for the municipal waste disposal with an area of 92.000 m2 and net volume 1.835.000 m3. • A Landfill sealing layer with geocomposite liner (0.50 m compacted clay with K≤ 1x10-9m/sec + 2.00mm geomembrane). • A Biogas collection network and biogas flaring station 1500Nm3/hr. • A Leachate collection and treatment system .• Administrative building, garage and other infrastructure works.• Mobile equipment (Truck, Compactor, Bulldozer). B) Waste Treatment Facilities: A Mechanical - Biological Treatment Plant (MBT) for treatment of mixed waste was designed on a conceptual level inside the landfill site in a
TENDER DOCUMENTS The tender documents were prepared according to Greek legislation, with the system called “Design – Build” which is equivalent with the FIDAPPLICATION FOR FUNDINGPreparation of application for project funding
Type of services provided
CONSULTANCY SERVICES for studies elaboration, including:• Siting Study• Environmental Impact Assessment Study• Feasibility Study which included:- Technical Preliminary Design Study - Cost Benefit Analysis Study• Tender documents• Application for project funding
ΥΠΟΜΝΗΜΑ ΧΩΡΟΥ ΕΠΕΞΕΡΓΑΣΙΑΣ ΣΤΡΑΓΓΙΣΜΑΤΩΝ
∆ΕΞΑΜΕΝΗ SBR2
∆ΕΞΑΜΕΝΗ ΠΡΟΣΩΡΙΝΗΣ ΑΠΟΘΗΚΕΥΣΗΣ
∆ΕΞΑΜΕΝΗ ΠΑΧΥΝΣΗΣ ΙΛΥΟΣ
ΣΥΓΚΡΟΤΗΜΑ ΦΥΣΙΚΟΧΗΜΙΚΗΣ ΕΠΕΞΕΡΓΑΣΙΑΣ
∆ΕΞΑΜΕΝΗ SBR1ΦΡΕΑΤΙΟ ΤΡΟΦΟ∆ΟΣΙΑΣ ΑΝΤΙΣΤΡΟΦΗΣ ΟΣΜΩΣΗΣ
ΜΟΝΑ∆Α ΑΝΤΙΣΤΡΟΦΗΣ ΟΣΜΩΣΗΣ
∆ΕΞΑΜΕΝΗ ΕΠΕΞΕΡΓΑΣΜΕΝΩΝ Υ∆ΑΤΩΝΚΤΙΡΙΟ ΕΝΕΡΓΕΙΑΣ
∆ΕΞΑΜΕΝΗ ΣΥΛΛΟΓΗΣ,ΕΞΙΣΟΡΡΟΠΗΣΗΣ ΚΑΙ ΑΠΟΘΗΚΕΥΣΗΣ ΣΤΡΑΓΓΙΣΜΑΤΩΝ
ΚΤΙΡΙΟ ΕΞΥΠΗΡΕΤΗΣΗΣ Ε.Ε.Σ.ΧΩΡΟΣ ΜΕΛΛΟNΤΙΚΗΣ ΕΠΕΚΤΑΣΗΣ
∆ΕΞΑΜΕΝΗ ΣΥΛΛΟΓΗΣ ΣΥΜΠΥΚΝΩΜΑΤΟΣ ΜΟΝΑ∆ΑΣ Α.Ο.
+379.15m
+382.35m
+384.00m
+369.70m
+361.35m
+337.55m
+306.60m+301.00m
+302.00m+309.55m
+332.40m
+355.45m
+368.50m
+353.75m
+345.90m
+322.00m+322.35m
+301.55m+301.60m
+294.50m+295.20m
+297.30m
+288.00
ΧΩΡΟΣ Ε.Ε.Σ.
+300.00
Åð á ñ÷éá êÞ Ï äüòÐ ñï ò Ôñßëïöï
÷ù ì á ôüäñï ì ï ò
÷ùì
áôüäñï ì ïò
åéêï í ï ó ôÜóé
Åð á ñ÷éá êÞ Ï äüò
÷ù ì á ôüäñï ì ï ò
÷ùì
áôü äñï ì ï ò
Ðñ ï ò Êáóôñß
1
2
7
1011
3
45 13
9 6
12
8
2α
ΕΠΙΠ Ε∆Ο ΚΤ ΙΡΙΑΚΩΝ ΕΓΚ/ΣΕΩΝ
14
1+050
1+100
1+150
1+200
1+250
1+300
1+350
1+400
1+450
1+500
1+550
1+600
1+650
1+700
1+750
1+800
1+850
1+900
1+950
1+000
0 +050
0+100
0+150
0+050
0+100
ΠΕΡΙΜΕΤΡΙΚΟΣ
ΑΝΑΒΑΘΜΟΣ
ΑΝΑΒΑΘΜΟΣ
A' ΦΑΣΗ
B' ΦΑΣΗ
+379.15m
+382.35m
+384.00m
+369.70m
+361.35m
+337.55m
+306.60m+301.00m
+302.00m+309.55m
+332.40m
+355.45m
+368.50m
+353.75m
+345.90m
+322.00m+322.35m
+301.55m+301.60m
+294.50m+295.20m
+297.30m
ΦΣΕΒ 1
ΦΣΕΒ
2
KF18
KF3
KF13
KF2
KF1
KF4
KF5
KF8
KF12
KF11
KF10
KF9
KF14
KF15
KF16
KF17KF19
KF20
KF21
KF22
KF24
KF23
KF25
KF26
KF27
KF28
KF29
KF30
KF31
KF33
KF32
KF34
KF35
KF36
KF37
KF38
KF39
KF40KF41
KF42
KF43
KF44
KF45
KF46
KF47
KF48
KF49
KF7
KF6
ΣΤΑΘΜΟΣ ΠΑΡΑΓΩΓΗΣΕΝΕΡΓ ΕΙΑΣ 1 (Μ.Ε.Κ.)
ΣΤΑΘΜΟΣ ΠΑΡΑΓΩΓΗΣΕΝΕΡΓΕΙΑΣ 2 (Μ.Ε.Κ.)
ΜΟΝΑ∆Α ΡΑΦΙΝΑΡΙΣΜΑΤΟΣ
ΜΟΝΑ∆Α ΩΡΙΜΑΝΣΗΣ
ÐÑÏ Ó ÁÍ ÁÊÕÊËÏ ÖÏ ÑÉÁ
ÓÔÑÁÃÃÉÓÌ ÁÔÙÍ