SEMINOLE BOWLEGS WETUMKA WEWOKA Horntown MAUD WELEETKA BEARDEN 9A 9A 3E 40 9 9 59 59 99 56 56 99A 75 75 270 377 The rebuild will involve removing approximately 49 miles of existing 138-kilovolt (kV) transmission facilities and replacing them with sturdier facilities of the same voltage. In most instances, the existing H-frame poles will be replaced with sturdier, single-pole steel structures and new wire that can carry more current. With the existing infrastructure aging, local field personnel identified the need to upgrade these facilities to bring them up to current standards and ensure continued reliable power. The line extends from a PSO substation south of Weleetka to an OG&E substation located west of Maud. The Company has existing easements for the rebild lines; some, however, will need updated or supplemented. WHAT WHY WHERE MAUD TO WELEETKA 138KV TRANSMISSION LINE REBUILD AEP Oklahoma Transmission Company, an affiliate of Public Service Company of Oklahoma (PSO), is planning to rebuild approximately 49 miles of electric transmission line to bring the system up to current standards and ensure continued reliable power. The line originates at an existing PSO substation south of Weleetka, then heads west towards Earlsboro before turning south to reach an OG&E substation located west of Maud. The rebuild project will involve removing existing transmission facilities and replacing them with steel structures and new wire. These improvements are necessary to ensure the continued reliability of the electrical system. MAUD TO WELEETKA 138 KV TRANSMISSION LINE REBUILD SUBSTATIONS MAUD SECTION - 14 MILES - COMPLETED 12/15/15 EARLSBORO SECTION - 8 MILES - COMPLETED 4/29/16 EARLSBORO SECTION - 5 MILES - COMPLETED 12/9/15 WELEETKA SECTION - 10 MILES - EXPECTED COMPLETION 12/31/17 EARLSBORO SECTION - 13 MILES - EXPECTED COMPLETION 12/31/17 N

MAUD TO WELEETKA - aeptransmission.com€¦ · MAUD WELEETKA BEARDEN 9A 9A 3E 40 9 9 59 59 99 56 56 99A 75 270 75 377 The rebuild will involve removing approximately 49 miles of existing

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: MAUD TO WELEETKA - aeptransmission.com€¦ · MAUD WELEETKA BEARDEN 9A 9A 3E 40 9 9 59 59 99 56 56 99A 75 270 75 377 The rebuild will involve removing approximately 49 miles of existing

SEMINOLE

BOWLEGS

WETUMKA

WEWOKA

Horntown

MAUD

WELEETKABEARDEN

9A

9A

3E

40

9

9

59

59

99

56

56

99A

75

75270

377

The rebuild will involve removing approximately 49 miles of existing 138-kilovolt (kV) transmission facilities and replacing them with sturdier facilities of the same voltage. In most instances, the existing H-frame poles will be replaced with sturdier, single-pole steel structures and new wire that can carry more current.

With the existing infrastructure aging, local field personnel identified the need to upgrade these facilities to bring them up to current standards and ensure continued reliable power.

The line extends from a PSOsubstation south of Weleetka to an OG&E substation located west of Maud. The Company has existing easements for the rebild lines; some, however, will need updated or supplemented.

WHAT WHY WHERE

MAUD TO WELEETKA138KV TRANSMISSION LINE REBUILD

AEP Oklahoma Transmission Company, an affiliate of Public Service

Company of Oklahoma (PSO), is planning to rebuild approximately 49

miles of electric transmission line to bring the system up to current

standards and ensure continued reliable power. The line originates at an

existing PSO substation south of Weleetka, then heads west towards

Earlsboro before turning south to reach an OG&E substation located west

of Maud. The rebuild project will involve removing existing transmission

facilities and replacing them with steel structures and new wire. These

improvements are necessary to ensure the continued reliability of the

electrical system.

MAUD TO WELEETKA 138 KV TRANSMISSION LINE REBUILD

SUBSTATIONS

MAUD SECTION - 14 MILES - COMPLETED 12/15/15

EARLSBORO SECTION - 8 MILES - COMPLETED 4/29/16

EARLSBORO SECTION - 5 MILES - COMPLETED 12/9/15

WELEETKA SECTION - 10 MILES - EXPECTED COMPLETION 12/31/17

EARLSBORO SECTION - 13 MILES - EXPECTED COMPLETION 12/31/17

N

Page 2: MAUD TO WELEETKA - aeptransmission.com€¦ · MAUD WELEETKA BEARDEN 9A 9A 3E 40 9 9 59 59 99 56 56 99A 75 270 75 377 The rebuild will involve removing approximately 49 miles of existing

PSO VALUES YOUR INPUT ABOUT THIS PROJECT. PLEASE SEND COMMENTS AND QUESTIONS TO:

9/7/20179/7/2017

EXISTING STRUCTURES TYPICAL STRUCTURES

JULIET CAPEHEARTAEP Project Outreach [email protected]

Typical Pole Height: 95 feet • Typical Right-of-way Width: 100 feet