Landis+Gyr, Inc.MAXsys 2510 Metering Family
2
MAXSYS TopicsReview of Current Features The latest new Features Value Added solutions The next generation
Landis+Gyr, Inc
3
MAXsys 2510 - 19 Rackmount StyleAll standard features Auto-ranging power supply 40-140V or 85-330V 3 option slots 3 element meter only Mating cables sold separately 19 rack bracket availableLandis+Gyr, Inc
4
MAXsys 2510Tall and short switchboard models available All standard features Auto-ranging power supply 40-140V or 85-330V 3 option slots 3 element meter only Mating cables sold separately
Switchboard Styles
Landis+Gyr, Inc
5
MAXsys 2510All standard features Standard or custom cabling Auto-ranging power supply 40-140V or 85-330V 3 option slots
Socket-base Styles
Form 9/8S, 35S, 36S, 10S, 26S, 5S Mating cables sold separatelyLandis+Gyr, Inc
6
MAXsys 2510 Standard FeaturesPer phase volts, amps, watts and var measurement for power quality monitoring, total harmonic distortion and power outages Transformer Loss Compensation Line Loss Compensation 20 mA Current Loop Port Four programmable pulse outputs Flash EPROM AC or DC Auxiliary Power Four quadrant metering ANSI and IEC approved for class 0.2 meteringLandis+Gyr, Inc
7
MAXsys 2510 Standard Features16 bit microprocessor, bus architecture MultiMulti-tasking operating system Bi-directional measurement Bi16 channel data recording Time of Use 2 line x 16 character programmable display Totalization Functions Modular design for upgrading/adding options Non volatile memory for operating parameters and display registers
Landis+Gyr, Inc
8
MAXsys 2510 Standard FeaturesPassword protected ReadRead-only password - 2 available NoNo-format jumper - for security and sealing RS-232RS-232-1 port for external modem, etc RS-232RS-232-2 port for bi-directional interface biIndividually addressable 256K RAM ReRe-chargeable back-up battery for profile data backand clock Power Outage Monitoring
Landis+Gyr, Inc
9
MAXsys 2510 Optional Features4 Analog outputs (up to 8 available) 4-20 mA or +/-1 mA +/8 auxiliary Inputs for process loads, gas, water, etc.. Up to 12 output relays for alarms, capacitor control and load control functions (4 outputs standard) Protocol Converter board for SCADA interface DNP 3.0 level 3, Modbus, and many others 1200 or 2400 baud modem with master/slave interface 485 port (requies protocol card) Instrument Transformer Compensation
Landis+Gyr, Inc
10
MAXsys 2510 Value Added SolutionsTransformer Loss CalculationsMultiple Levels of Calculations
Calculate the losses Netting Of Sub-loads Before SubCalculations Subtracting station service loads before calculating the losses across power across multiple transformers simultaneously.Logic Control Of Calculations
Controls when and how the loss are calculated base on logic conditions. transformers.Summing of Loads Before Calculations
Summing generator loads which share power transformers.Compensated Analog Values
Provides compensated analog values at all points of compensation. compensation.Landis+Gyr, Inc
11
MAXsys 2510 Value Added SolutionsLine Loss CalculationsLoss calculations Resistance Reactance Charging VarsMultiple Levels Of Compensation
Calculate the line losses across multiple lines at different points of transmission simultaneously.Multiple Sets Of Constants For Each Level
Allows the meter to change the loss calculations as the transmission lines are reconfigured.Logic Control Of Calculations
Logic control from external inputs and or communications allow the loss calculation to change based on real time reconfiguration of the transmission lines.Landis+Gyr, Inc
12
MAXsys 2510 Value Added SolutionsDNP 3.0 Level 2 & 3Complies to DNP3-2000 Certification Procedure DNP3Binary Inputs(27) AND OR Logic Control Binary Outputs (12) Analog&Counter Outputs(96) Event Storage (Binary,Analog,Counter & Freeze) Unsolicited Responses Collision Avoidance Relay Control (S.B.O.,Direct No ACK & With ACK) Communication speeds up to 19200
Landis+Gyr, Inc
13
MAXsys 2510 Value Added SolutionsPower QualityOutage Reporting Reports loss of voltage to the meter electronics Reports restoration of voltage to the meter electronics
Loss of Phase Reports loss of voltage to any metered phase Reports restoration of voltage to any metered phase
Captures Voltage Events (Sags & Swells) Captures date and time of event Stores length of the event (1/2 cycle)
Landis+Gyr, Inc
14
MAXsys 2510 Value Added SolutionsPower QualityCaptures Simultaneous Current Captures the simultaneous value of current with the sags or swells of the voltage
Stores Daily Highs and Lows Stores 6 high and low values (programmable) per day Circular memory stores previous 3 days of highs and lows
Total Harmonic Distortion Can display, record and control 60 Hz or 50 Hz values (fundamental) Non-fundamental values Total (net) values
Landis+Gyr, Inc
15
DURATION 1 CYCLE RMS HI TRIP POINTRMS PHASE VOLTAGE
CURRENT MONITORING
LOW TRIP POINT1 SECOND 1 SECOND
Landis+Gyr, Inc
16
Time Stamped Power Quality Events
Landis+Gyr, Inc
17
MAXsys 2510 Value Added SolutionsInstrument Transformer Correction (IT; CTs and VTs)Phase and Ratio error must be known at the burden levels that the transformers in the meter system actually see. Wiring losses must be included as well. The PT ratio and phase corrections are fixed and do not change with levels. The CT ratio and phase corrections are DYNAMIC and change with current levels as needed. The corrections are done at the beginning of the signal processing and they benefit all readings, as well as watt and VAR pulses.Landis+Gyr, Inc
18
MAXsys 2510 Value Added SolutionsInstrument Transformer Correction (IT; CTs and VTs)Many existing installations have instrument transformer which may not meet metering accuracy class 0.3%. The dynamic CT correction allows for system accuracy improvements without changing the existing CTs. Increased accuracy can yield increased revenue. Increased accuracy without buying new transformers. Increased accuracy without the labor of changing out CTs. Improves the overall accuracy of all CT installations including metering system which have metering accuracy CTs.
Landis+Gyr, Inc
19
MAXsys 2510 Value Added SolutionsInstrument Transformer Correction (IT; CTs and VTs)A switch in Maxcom allows the user to turn the correction ON and OFF without losing CT correction data in the meter useful for testing of the meter. Operation of the correction can be verified by running watt-hour wattregistration at 5A PF=1.0 and 0.5 Lag, and at 0.5A PF=1.0 and 0.5 Lag. Expected readings can then be verified.
Landis+Gyr, Inc
20
elay CT and Meter With and Without Correction AppliedSystem %02 000 0 800 0 600 0 400 0 200 0 000 00 800 00 600 00 400 00 200 00 000 99 800 99 600 99 400 99 200 99 000 98 800 98 600 98 400 98 200 L P P L
% Accuracy
Load Points
2
0
00
0
2 0
98 000
400
egistration
i
i
Landis+Gyr, Inc
21
MAXsys 2510 Value Added SolutionsInternet Connectivity ET-Lite Device Server ETExternal device that interfaces with RS-232 port RSSiemens native protocol Industry protocols (DNP 3.0, MODBUS, etc)
Gives the meter an IP addressLink to the internet Connection to an Ethernet LAN
Data encryption over the Internet
Landis+Gyr, Inc
22
MAXsys 2510Makes any serial device IP addressable Standard Ethernet type connection Low power requirements Easily programmed Easy to install
IP Addressability
Landis+Gyr, Inc
23
MAXsys 2510 Value Added SolutionsEnergy Terminal device serverMulti-port communications
Pki encryption capabilityUpload meter information directly to an Internet website Real time data with 4 second updates Type 7 or industry standard protocols
ApplicationsEnergy management systems C&I accounts IPPs
Landis+Gyr, Inc
24
New Product FeaturesDual RTU boardsModbus, DNP 3 level 2, cooper, PG&E, & others Second board must be DNP 3 level 2
Dual 16 channel recordersIndependently programmable interval lengths Increased RAM to 512K
True 1-second updates Increased port speeds (19200) Peer to peer networking capabilities Data gatesAdvanced math package for increased flexibility
Landis+Gyr, Inc
25
Instrument Transformer Correction
Cost of replacing non-metering accuracy instrument transformers Estimated increase in revenue from improved meter system accuracy Total Value
$110K + $500K = $610,000
Landis+Gyr, Inc
26
MAXsys RTU BoardCost of external RTU Install costs for RTU Cost of MAXsys RTU Install costs for MAXsys RTU Total Value:
$10K + $3K - $600 - $500 = $11,900Landis+Gyr, Inc
27
Transformer Loss CompensationCost of high-side metering installation Cost of low-side installation Total ValueStation Metering Costs (Excluding meter cost) Cost of transformers Station Service + installation 230KV $110K 69KV $70K 15KV $4K 0.6KV $1K
$110K - $4K = $106,000
Landis+Gyr, Inc
28
Why Peer to Peer Communications?Can free up option card slot Reduce installation costLabor and material
Transfers more information Data (real time) Status (real time) Improves meter summing & netting Instantaneous values Analog outputs Improves real time information Reduces granular data
Landis+Gyr, Inc
29
Math PackageAddition (Sum) Subtraction (Diff) Multiple (Prod) Divide (Quot) Square Root (SQRT) Data Gates 40 Totalizers 32 User defined calculations
Landis+Gyr, Inc
30
Data Gates Application
Del. KwhY1 True Y1
Total Del. Kwh
Auxiliary Input 8 Status 1 Rec. Kwh
Data Gate Data Gate Data Gate
Del. Kwh CAISO Del. Kwh CFE
False
Rec. Kwh CAISO
Landis+Gyr, Inc
31
Market SegmentationGeneration stations Transmission & sub-transmission stations Distribution stations New large end customers
Landis+Gyr, Inc
32
Value Proposition - GenerationRTU board vs. RTUSave cost difference + installation costs
Multi-level transformer loss compensationSave cost of CTs, meter, and installation costs
Analog outputsSave cost of transducers with uncompensated values Compensated analog values save install cost + transducers
Multiple communication pathsSave cost of additional meters + installation cost
Peer to peer networkingSave installation costs + hardware cost
Landis+Gyr, Inc
33
Value Proposition - TransmissionMulti-function revenue accurate IED (existing or new) Improved accuracy Multi-level TLC/LLC Reduced cost with IT correction (existing stations) Increased accuracy can yield increased revenue. Increased accuracy without buying new transformers. Increased accuracy without the labor of changing out CTs. Improves the overall accuracy of all CT installations including metering system which have metering accuracy CTs.
Landis+Gyr, Inc
34
Value Proposition - DistributionSmall point RTU built into MeterSaves cost of RTU Saves costs of installing full scale RTU
Feeder monitoring (loading) Transformer monitoring (loading) Multiple communication pathsSaves installation costs for additional metering
Event reporting
Landis+Gyr, Inc
35
Value Proposition - Large Industrial CustomerLow cost RTU (special rates) Low side meteringReduced installation costs $70k for 69KV vs. $4K for 15KV
Multiple communication pathsSaves installation costs for additional metering
Event reporting and load profiling ControlsLogic and data gates Output relays 8 inputs from other meters or peripheral devices
Landis+Gyr, Inc
36
Future Product FeaturesHigh speed modemAt least 19200 baud Compatible with older modems Updated technology to interface with digital cellular networks
Three-phase power supply Long-life lithium battery Digital inputs to meter from optical CTs and VTsBypass measurement circuitry in meter Higher accuracy system for increased revenue stream
Development of next generation MAXsys meterNeed utility input for design features
Landis+Gyr, Inc
37
The Future of MAXsys MeteringHigh-precision accuracy below 1mA secondary Advanced power quality featuresWaveform capture Individual harmonics
Ethernet port under glass Flexibility of interfacesFiber optic, RS485, RS232, 10base-T, etc. Optically isolated interface to the meter
Wireless digital modem Plug and play upgradeability of new features
Landis+Gyr, Inc
38
Infrared LED
Reduced height Transmit/Receive Status Graphical Display Visible LED No Backlighting
Pushbutton Access
Landis+Gyr, Inc
39
Power Quality Enhancements
L+G diagnostics Waveform capture Triggered by a setpoint, programmable schedule based on time or logic, or external signal Number of capture cycles user selectable 16 to 256 samples per cycle (selectable) Seven channels for recording
Flicker according to industry standards Individual harmonic analysis to 63rd harmonic Triggered by the same method as waveforms
Landis+Gyr, Inc
40
Power Quality EnhancementsVoltage Sags and Swells Quarter cycle resolution to X number of cycles Rolling floating point nominal voltage every X number of minutes (user defined) Simultaneous current Three levels of voltage thresholds Three separate sag and swell recorders running simultaneously
Transient events Waveform recording to capture transients on current and voltage waveforms Time resolution to within one (1) millisecond
Landis+Gyr, Inc
s
EVEvent Monitoring Soft are: System DiagramMultiple er
41
Internetenerating lant Event M nit ring Soft re TELCO
Industrial Customer
ys 1
Substation
C running EVM
Cellular Telephone / ager
ys 41
Local Reporting
Landis+Gyr, Inc
42
EVM Online Reporting
Event Log Power Quality Diagnostics
Landis+Gyr, Inc
43
Event Log
Events logged by Month,Day,Hour and Minute Up to 100 events in wrap-around memory
Landis+Gyr, Inc
44
Examples of Event Logy ac power down y ac power up y Clock set y Status input change y Unit access y Password change y Cold start y Static input register y Relay Control Set-points y Low Battery y Etc.
Landis+Gyr, Inc
45
EVM Power Quality
Per phase reportingVoltage outside tolerance range (high or low) MAX or MIN volts (1,2,or 3 cycle rolling 1/2 cycle) Coincidental current Length of event in 1/2 cyclesLandis+Gyr, Inc
46
EVMTime-Stamped Power Quality Events
Siemens Power Transmission & Distribution, Inc.
Siemens, 2000 Landis+Gyr, Inc
47
2410/2510 Diagnostic applicationsS4 type diagnostics Phase angle data Per phase data Dial in on diagnostics Display diagnostics Log diagnostics to history
Landis+Gyr, Inc
48
Diagnostic Reporting Polarity and Cross Check (1)Any phase angle more than +/- 15 degrees
Phase Voltage Deviation Check (2)Checks each phase against nominal
Inactive Phase Current Check (3)Checks each current against specified value in diagnostic control table. If any current is below its threshold, fails; if all below, passes
Landis+Gyr, Inc
49
Diagnostic Reporting Phase Angle Displacement Check (4)Verifies that power factor is within specified limit on each enabled phase
Current Magnitude Imbalance Check (6)Checks relative amplitude of the enabled phase currents; compares each current to the average of all currents
Energy Direction Check (7)Fails if any phase energy flow is negative (received power)
Landis+Gyr, Inc
50
Diagnostic ReportingAuto SenseWye or Delta Phase A volts Phase rotation
e.g. : 4 Wire Wye 120 V
ABC
Landis+Gyr, Inc
Diagnostic ReportEvsocket.logFILE: EVSOCKET. LOG
51
TIME: Sun Jul 16 00:55:19 2000
Call Date & Time: 07/16/2000 00:53:24
An Installation Diagnostic Event has Occurred for UID:1234567
(C0l) Ajax Industrial 1234567890 (C02) Diagnostics
(U01) Ajax Industrial 1234567890
Auto-sense:
277 Volts 4 Wire WYE (ABC) 1 1 1 1 1 1 1
Diagnostic: Enabled:
1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6Y Y Y Y N Y Y N N N N N N N N N
Pass for Diagnostic 4 (00019 fails total) Fail for Diagnostic 6 (00032 fails total)
Landis+Gyr, Inc
52
EVM logging an Event
Landis+Gyr, Inc
53
EVM completing and reporting on notification via email.
Landis+Gyr, Inc
54
EVM call Logs
Landis+Gyr, Inc
Landis+Gyr, Inc.Growing A Great Relationship