12
The following is a collection of slides from a few recent talks on computing for ATLAS in Canada, plus a few new ones. I might refer to all of them, I might not depending on time and the scope Les wants covered.

M.C. Vetterli; SFU/TRIUMF

  • Upload
    gwylan

  • View
    35

  • Download
    1

Embed Size (px)

DESCRIPTION

The following is a collection of slides from a few recent talks on computing for ATLAS in Canada, plus a few new ones. I might refer to all of them, I might not depending on time and the scope Les wants covered. The Canadian Model. - PowerPoint PPT Presentation

Citation preview

Page 1: M.C. Vetterli; SFU/TRIUMF

The following is a collection of slides from a few recent talkson computing for ATLAS in Canada, plus a few new ones.

I might refer to all of them, I might not depending on time andthe scope Les wants covered.

Page 2: M.C. Vetterli; SFU/TRIUMF

M.C. Vetterli; SFU/TRIUMF

The Canadian ModelThe Canadian Model

Establish a large computing centre at TRIUMF that willbe on the LCG and will participate in the common tasksassociated with Tier-1 and Tier-2 centres.

Canadian groups will use existing CFI facilities (or what they will become) to do physics analysis. They will access data and the LCG through TRIUMF.

The jobs are smaller at this level and can be more easily integrated into shared facilities. We can also be independent of LCG middleware.

In this model, the TRIUMF centre acts as the hub of theCanadian computing network, and as an LCG node

Page 3: M.C. Vetterli; SFU/TRIUMF

TRIUMFGateway

cpu/storage Experts

- MC data- ESD’- calibration- access to CDN Grid

- algorithms- calibration- MC production

- access to ATLAS Grid- AOD- DPD- technical expertise

The ATLAS-Canada Computing ModelThe ATLAS-Canada Computing Model

CA*Net4

USA, Germany, France, UK, Italy, …

CERN

ATLAS Grid

Canadian Grid

- ESD- access to RAW & ESD

UVic, SFU, UofA, UofT, Carleton, UdeM (CFI funded)

Page 4: M.C. Vetterli; SFU/TRIUMF

M.C. Vetterli; SFU/TRIUMF

What Will We Need at TRIUMF?What Will We Need at TRIUMF?

Total computing power needed: 1.8 MSI2k 250 dual 10GHz 5000 x 1GHz CPUs Total storage required: 340 TB of disk 1.2 PB of tape We assume that the network will be 10 GbitE for both the LAN and WAN These numbers have been supported by an expert advisory committee

Page 5: M.C. Vetterli; SFU/TRIUMF

M.C. Vetterli; SFU/TRIUMF

Acquisition ProfileAcquisition Profile

Year 2005-06 2006-07 2007-08 2008-09 2009-10

Fraction 10% 33% 67% 100% 133%

Disk (TB) 34 113 226 340 453

Tape (TB) 120 400 800 1200 1600

CPU(MSI2k)

0.18 0.6 1.2 1.8 2.4

Page 6: M.C. Vetterli; SFU/TRIUMF

M.C. Vetterli; SFU/TRIUMF

The TRIUMF Centre - IIThe TRIUMF Centre - II

8 NEW people to run the center are included in the budget.

4 for system support; 4 for software/user support.

Also one dedicated technician.

Personnel in the university centers will be mostly for system support.

More software support will be available from ATLAS postdocs.

Page 7: M.C. Vetterli; SFU/TRIUMF

M.C. Vetterli; SFU/TRIUMF

Status of FundingStatus of Funding

The TRIUMF center will be funded through the next TRIUMF 5-year plan; starts Apr.1, 2005.

Decision on this is expected around the end of this year.

University centers are funded through the Canada Foundation for Innovation and the provincial governments. These centers exist and should continue to be funded. Shared facilities.

Ask CFI for funds for a second large center? Driven by new requirements for T1 centers. Just started discussing this.

Page 8: M.C. Vetterli; SFU/TRIUMF

M.C. Vetterli; SFU/TRIUMF

The TRIUMF Prototype The TRIUMF Prototype CentreCentre

Hardware: - 5 dual 2.8 GHz Xeon nodes - 6 white boxes (2 CE, LCfGng, UI, LCG-GIIS, spare) - 1 SE (770 Gbytes usable disk space)

Functionality: - LCG core node (CE #1) - Gateway to Grid-Canada & WestGrid (CE #2) - Canadian regional centre: + coordinates & pre-certifies Canadian LCG

centres + primary contact with LCG

Middleware: - Grid inter-operability: + integrate non-LCG sites;

there is a lot of interest in this (UK, US)Rod Walker (SFU research associate) as been invaluable!

Page 9: M.C. Vetterli; SFU/TRIUMF

M.C. Vetterli; SFU/TRIUMF

The Other Canadian The Other Canadian SitesSites

Victoria: - Grid-Canada Production Grid (PG-1) - Grid inter-operability (Dan Vanderster et al)

SFU/WestGrid: - Non-LCG test site (incorporate into LCG through TRIUMF)

Alberta: - Grid-Canada Production Grid (PG-1)- LCG node- Coordination of DC2 for Canada (Bryan Caron)

Toronto: - LCG node- ATLAS software mirror

Montreal: - LCG node

Carleton: - LCG node

Page 10: M.C. Vetterli; SFU/TRIUMF

M.C. Vetterli; SFU/TRIUMF

Canadian DC2 Computing Canadian DC2 Computing ResourcesResources

Note: 1 kSI2k 2.8 GHz Xeon

Canadian Computing Resources for LCG and ATLAS DC2

Site Name TRIUMF Toronto Alberta Victoria WestGrid Montreal Carleton TOTALService Manager Rod WalkerGreg Wu Bryan CaronRandy SobieMike VetterliWen Chao ChenBill JackCenter Type Tier_2 Tier_2 Tier_2 Tier_3 Tier_3 Tier_2 Tier_2Year/Quarter 2004-Q2 2004-Q2 2004-Q2 2004-Q2 2004-Q2 2004-Q2 2004-Q2CPU Power (kSI2k) 10.3 177 60 50 55/110 8.15 13.5 374/419Disk Space (Tbytes) 0.8 8 9 1 1 0.4 3 23.2Tape Capacity (Tbytes) 10-20 0 10 10 10-20 0 0 40-60share_alice 25% 0% 25% 0% 0% 0% 25%share_atlas 25% 80% 25% 100% 100% 100% 25%share_cms 25% 20% 25% 0% 0% 0% 25%share_lhcb 25% 0% 25% 0% 0% 0% 25%

400 x 2.8 GHz CPUs 23 TBytes of disk 50 TBytes of tape

Page 11: M.C. Vetterli; SFU/TRIUMF

M.C. Vetterli; SFU/TRIUMF

Federated Grids for ATLAS DC2Federated Grids for ATLAS DC2

Grid-Canada PG-1

WestGrid

LCG/WestGrid

SFU/TRIUMF

LCG/Grid-Can

LCG

In addition to LCG resources in Canada

Page 12: M.C. Vetterli; SFU/TRIUMF

M.C. Vetterli; SFU/TRIUMF

Linking HEPGrid to LCGLinking HEPGrid to LCG

.....GCRes.1

GCRes.n

Grid-Cannegotiator/scheduler

WGUBC/TRIUMF

TRIUMF

TRIUMFcpu &storage

negotiator/scheduler

RB/scheduler

LCG BDII/RB/ scheduler

Class ad

1) Each GC resource publishes a class ad to the GC collector

2) The GC CE aggregates this info and publishes it to TRIUMF as a single resource

Class ad

3) The same is done for WG

3) The CondorG job manager at TRIUMF builds a submission script for the TRIUMF Grid4) The TRIUMF negotiator matches the job to GC or WG

1) The LCG RB decides where to send the job (GC/WG or the TRIUMF farm)Job class ad2) Job goes to the TRIUMF farm or

TRIUMF decides to sendthe job to WG

5) The job is submitted to the proper resource

TRIUMF decides to sendthe job to GC

6) The process is repeated on GC if necessary

MDS

4) TRIUMF aggregates GC & WG and publishes this to LCG as one resource5) TRIUMF also publishes its own resources separately