8
McDONALD’S 46’ ROOF ELEMENT NOTICE: IF PERSONA DOES NOT COORDINATE INSTALLATION, PERSONA CAN NOT BE HELD RESPONSIBLE FOR ANY VIOLATIONS OF THE SPECIFICATIONS SET FORTH IN THIS DOCUMENT. THIS DOCUMENT IS FOR BIDDING PURPOSES ONLY. EXACT INSTALLATION PROCEDURES MAY VARY BASED ON SITE SPECIFIC CONDITIONS. Rce installation instructions: 1. Uncrate and inspect element pieces. Notify Persona of any damage. 2. RCE legs will have plates welded on both ends. Attach legs to each arch section using supplied bolts. 3. Verify exact position of RCE on wall ledge with GC and site plan. Short arch leg (with shroud) should be center justified with wall “column” below it. If site conditions do not allow for this, call Persona for further direction. 4. Determine distance from back wall to back edge of legs. If necessary, cut off sq tie-back tubes & touch up paint on ends. Ensure there is at least 2” of overlap between the two tie-back sections for bolting together . . Note: smaller tube bracket mounts to wall. 5. Attach tie-back assembly to left-most (shroud) leg and the right-most leg. See above sketch for placements. Secure the sleeve sections of tie-back tubes to the desired length (as determined from step 4) & drill one 9/16” hole through both tie back tubes (on both legs). Install shroud back (only) onto tie-back tube on left-most leg ( ). Bolt tubes together with supplied hardware . . 6. Using straps and spreader bar, lift section 1 onto wall ledge. Ensure legs are level in both directions. Mark & drill 5/16” pilot holes (4 per leg). Fill pilot holes with sealant & secure legs to tower with lag screws (Persona supplied), or alternative stainless steel hardware for mounting surface (installer to supply, if necessary). 8. Using straps and spreader bar, lift section 2 onto wall ledge. Align front & bottom surfaces of each fiberglass arch section to be flush with each other. Note: use extreme care when handling / assembling arch pieces to avoid causing damage to fiberglass. Note: do not bolt fiberglass sections together at this point, as this will crack the material. Seal all mounting bolts / holes in tie-back assemblies AND openings between 1 ½” and 2” tie-back tubes with silver colored, 1-part polyurethane sealant appropriate for mating surfaces Do not tighten bolts. Do not tighten bolts. (see pg 3) see shroud assembly sketch, pg 2 (see pg 3) (see pg 5) Tie-back brackets have an adjustable range from 7 ½” - 12” overall length ½” x 4” stainless steel 7. Mark & drill 5/16” pilot holes in back wall for tie-back plates . Fill pilot holes with sealant & secure plates to wall with appropriate hardware (hardware kit supplied by Persona). if mounting to corrugated wall surface, see additional instructions on (see pg 3) Note: pg 4. 9. Shim bottom plates (only) with silver painted steel or aluminum and adjust positions, if necessary to ensure front & bottom surfaces of each arch section are flush with each other. . 10. Remove joint access cover & secure sections together using provided hardware . ections. Replace the access cover and run a bead of clear silicone around the perimeter. 11. Mark & drill 5/16” pilot holes (4 per leg). Fill pilot holes with sealant & secure legs to tower with lag screws (Persona supplied), or alternative stainless steel hardware for mounting surface (installer to supply, if necessary). 12. Middle two RCE legs each have (2) 9/16” pre-drilled holes (2) 1/2” rivnuts. Vertically center fascia sign mounting bracket on the thru-holes and position so left edge of bracket is flush with left edge of left middle leg (see sketch, pg 1). Mark & drill (6) 9/16” holes in bracket to match the holes and the top rivnut in the RCE legs. Use supplied thru-bolts to attach fascia sign mounting bracket and tie-back plates to these legs 13. 14 Ensure bolts in base plates & tie back plates are tight. Clean out any debris in & around mounting holes. 16. Touch up any paint on sign, bolts or structure as required. Clean area & dispose of installation debris off-premise. Note: proper alignment is a critical design criteria Finger tighten bolts only Do not tighten bolts. all Fill in entire hole cavity for all mounting bolts using silver colored, 1-part polyurethane sealant appropriate for mating surfaces. (see section A-A, pg 2) (see figure 1, on pg 6) to avoid cracking fiberglass arch s ½” x 4” stainless steel ½” x 5 ½” zinc plated . Install the supplied ½” x 1 ½” zinc plated bolts in the rivnuts of both legs (top nut will go through mounting bracket, bottom nut used to fill the rivnut hole not being used). Complete tie-back assemblies for each leg as noted in step 5. Mark & drill 5/16” pilot holes in back wall for tie-back plate . Fill pilot holes with sealant & secure plate to wall with appropriate hardware (hardware kit supplied by persona). if mounting to corrugated wall surface, see additional instructions on shroud front around short leg with supplied hardware (see pg 3) Note: (see pg 5) (see shroud assembly sketch, pg 2) pg 4. Tool sealant smooth to eliminate air pockets & ensure contact to both joint surfaces. Clean off any excess sealant to create finished look . 15. Install . Secure shroud back to shroud front with supplied screws. 45’-7 ½” 4’-9 1/8” 24'-9 9/16" 20'-9 7/8" C L X X X = DISTANCE FROM BOTTOM OF BASE PLATE TO CENTER OF TIE-BACK ASSEMBLY 7 1/4” 1’-4 ½” 1’-4 ½” 1’-4 ½” PRE-DRILLED HOLES IN LEGS X X 10’-8” 2” FASCIA SIGN MOUNTING BRACKET SECTION 1 SECTION 2 McDONALD’S VARIOUS 10-22-13 46’ ROOF ELEMENT & FASCIA SIGN INSTALLATOIN CM File Name: Prepared By: Date: Customer: Location: Note: Color output may not be exact when viewing or printing this drawing. All colors used are PMS or the closest CMYK equivalent. If these colors are incorrect, please provide the correct PMS match and a revision to this drawing will be made. Page 1 OF 8 Rev 7 700 21st Street Southwest PO Box 210 Watertown, SD 57201-0210 1 (800) 843-9888 • www.personasigns.com DISTRIBUTED BY SIGN UP COMPANY RIVNUT

McDONALD’S 46’ ROOF ELEMENT - Persona Inc Signs... · Fill pilot holes with sealant & secure legs to tower ... or alternative stainless steel hardware for mounting surface (installer

  • Upload
    leanh

  • View
    215

  • Download
    0

Embed Size (px)

Citation preview

Page 1: McDONALD’S 46’ ROOF ELEMENT - Persona Inc Signs... · Fill pilot holes with sealant & secure legs to tower ... or alternative stainless steel hardware for mounting surface (installer

McDONALD’S 46’ ROOF ELEMENT NOTICE:IF PERSONA DOES NOT COORDINATE INSTALLATION, PERSONA CAN NOT BE

HELD RESPONSIBLE FOR ANY VIOLATIONS OF THE SPECIFICATIONS

SET FORTH IN THIS DOCUMENT.THIS DOCUMENT IS FOR BIDDING PURPOSES ONLY. EXACT INSTALLATION PROCEDURES MAY VARY BASED ON SITE SPECIFIC CONDITIONS.

Rce installation instructions:

1. Uncrate and inspect element pieces. Notify Persona of any damage.

2. RCE legs will have plates welded on both ends. Attach legs to each arch section using supplied bolts.

3. Verify exact position of RCE on wall ledge with GC and site plan. Short arch leg (with shroud) should be center justified with wall “column” below it. If site conditions do not allow for this, call Persona for further direction.

4. Determine distance from back wall to back edge of legs. If necessary, cut off sq tie-back tubes & touch up paint on ends. Ensure there is at least 2” of overlap between the two tie-back sections for bolting together . . Note: smaller tube bracket mounts to wall.

5. Attach tie-back assembly to left-most (shroud) leg and the right-most leg. See above sketch for placements. Secure the sleeve sections of tie-back tubes to the desired length (as determined from step 4) & drill one 9/16” hole through both tie back tubes (on both legs). Install shroud back (only) onto tie-back tube on left-most leg ( ). Bolt tubes together with supplied hardware .

. 6. Using straps and spreader bar, lift section 1 onto wall ledge. Ensure legs are level in both directions. Mark & drill 5/16” pilot holes (4 per leg). Fill pilot holes with sealant & secure legs to tower with

lag screws (Persona supplied), or alternative stainless steel hardware for mounting surface (installer to supply, if necessary).

8. Using straps and spreader bar, lift section 2 onto wall ledge. Align front & bottom surfaces of each fiberglass arch section to be flush with each other.

Note: use extreme care when handling / assembling arch pieces to avoid causing damage to fiberglass.

Note: do not bolt fiberglass sections together at this point, as this will crack the material.

Seal all mounting bolts / holes in tie-back assemblies AND openings between 1 ½” and 2” tie-back tubes with silver colored, 1-part polyurethane sealant appropriate for mating surfaces

Do not tighten bolts.

Do not tighten

bolts.

(see pg 3)

see shroud assembly sketch, pg 2(see pg 3)

(see pg 5)

Tie-back brackets have an adjustable range from 7 ½” - 12” overall length

½” x 4” stainless steel

7. Mark & drill 5/16” pilot holes in back wall for tie-back plates . Fill pilot holes with sealant & secure plates to wall with appropriate hardware (hardware kit supplied by Persona).

if mounting to corrugated wall surface, see additional instructions on

(see pg 3)

Note: pg 4.

9. Shim bottom plates (only) with silver painted steel or aluminum and adjust positions, if necessary to ensure front & bottom surfaces of each arch section are flush with each other. .

10. Remove joint access cover & secure sections together using provided hardware . ections. Replace the access cover

and run a bead of clear silicone around the perimeter.

11. Mark & drill 5/16” pilot holes (4 per leg). Fill pilot holes with sealant & secure legs to tower with lag screws (Persona supplied), or alternative stainless steel hardware for mounting surface (installer to supply, if necessary).

12. Middle two RCE legs each have (2) 9/16” pre-drilled holes (2) 1/2” rivnuts. Vertically center fascia sign mounting bracket on the thru-holes and position so left edge of bracket is flush with left edge of left middle leg (see sketch, pg 1). Mark & drill (6) 9/16” holes in bracket to match the holes and the top rivnut in the RCE legs. Use supplied thru-bolts to attach fascia sign mounting bracket and tie-back plates to these legs

13.

14 Ensure bolts in base plates & tie back plates are tight. Clean out any debris in & around mounting holes.

16. Touch up any paint on sign, bolts or structure as required. Clean area & dispose of installation debris off-premise.

Note: proper alignment is a critical design criteria

Finger tighten bolts only

Do not tighten bolts.

allFill in entire hole cavity for all mounting bolts using silver colored, 1-part

polyurethane sealant appropriate for mating surfaces.

(see section A-A, pg 2)

(see figure 1, on pg 6)

to avoid cracking fiberglass arch s

½” x 4” stainless steel

½” x 5 ½” zinc plated . Install the supplied

½” x 1 ½” zinc plated bolts in the rivnuts of both legs (top nut will go through mounting bracket, bottom nut used to fill the rivnut hole not being used). Complete tie-back assemblies for each leg as noted in step 5.

Mark & drill 5/16” pilot holes in back wall for tie-back plate . Fill pilot holes with sealant & secure plate to wall with appropriate hardware (hardware kit supplied by persona). if mounting to corrugated wall surface, see additional instructions on

shroud front around short leg with supplied hardware

(see pg 3)Note:

(see pg 5)

(see shroud assembly sketch, pg 2)

pg 4.

Tool sealant smooth to eliminate air pockets & ensure contact to both joint surfaces. Clean off any excess sealant to create finished look .

15. Install . Secure shroud back to shroud front with supplied screws.

45’-7 ½”

4’-9 1/8”

24'-9 9/16" 20'-9 7/8"

CL

X

X

X = DISTANCE FROM BOTTOM OF BASE PLATE TO CENTER OF TIE-BACK ASSEMBLY

7 1/4”1’-4 ½”1’-4 ½”1’-4 ½”

PRE-DRILLED HOLESIN LEGS

X X

10’-8”

2”

FASCIA SIGN MOUNTING BRACKET

SECTION 1 SECTION 2

McDONALD’S

VARIOUS

10-22-13

46’ ROOF ELEMENT & FASCIA SIGN INSTALLATOIN

CMFile Name:

Prepared By:Date:Customer:

Location:

Note: Color output may not be exact when viewing or printing this drawing. All colors used are PMS or the closest CMYKequivalent. If these colors are incorrect, please provide the correct PMS match and a revision to this drawing will be made.

Page

1 OF 8Rev

7

700 21st Street SouthwestPO Box 210Watertown, SD 57201-02101 (800) 843-9888 • www.personasigns.com

DISTRIBUTED BY SIGN UP COMPANY

RIVNUT

Page 2: McDONALD’S 46’ ROOF ELEMENT - Persona Inc Signs... · Fill pilot holes with sealant & secure legs to tower ... or alternative stainless steel hardware for mounting surface (installer

McDONALD’S 46’ ROOF ELEMENT NOTICE:IF PERSONA DOES NOT COORDINATE INSTALLATION, PERSONA CAN NOT BE

HELD RESPONSIBLE FOR ANY VIOLATIONS OF THE SPECIFICATIONS

SET FORTH IN THIS DOCUMENT.THIS DOCUMENT IS FOR BIDDING PURPOSES ONLY. EXACT INSTALLATION PROCEDURES MAY VARY BASED ON SITE SPECIFIC CONDITIONS.

ALUMINUM PLATE ONLEFT SECTION; NUTS WELDED IN PLACE

STEEL PLATE ON RIGHT SECTION

JOINT ACCESS COVER

SUPPLIED BOLTS (FINGER-TIGHTEN ONLY)

RUN A BEAD OF CLEAR SILICONE AROUND THE PERIMETER

SECTION A-A

BOTTOM PLATE DETAIL

4” SQ TUBELEGS

13 ½”

6”

TIE-BACKASSEMBLY

SHROUD BACK HAS 3” HOLE TO FIT OVER 2” SQ TIE-BACK TUBE

ATTACH SHROUD BACK / COVERTO BENT TABS ON FRONT SECTION, USING PROVIDED #8-18 X 5/8” SQ DRIVEPAN HEAD SCREWS

SHROUD ASSEMBLY

4” SQ RCE LEG

SHROUD FRONT SITSAGAINST FRONT EDGEOF BASE PLATE

McDONALD’S

VARIOUS

10-22-13

46’ ROOF ELEMENT & FASCIA SIGN INSTALLATOIN

CMFile Name:

Prepared By:Date:Customer:

Location:

Note: Color output may not be exact when viewing or printing this drawing. All colors used are PMS or the closest CMYKequivalent. If these colors are incorrect, please provide the correct PMS match and a revision to this drawing will be made.

Page

2 OF 8Rev

7

700 21st Street SouthwestPO Box 210Watertown, SD 57201-02101 (800) 843-9888 • www.personasigns.com

DISTRIBUTED BY SIGN UP COMPANY

Page 3: McDONALD’S 46’ ROOF ELEMENT - Persona Inc Signs... · Fill pilot holes with sealant & secure legs to tower ... or alternative stainless steel hardware for mounting surface (installer

NOTICE:IF PERSONA DOES NOT COORDINATE INSTALLATION, PERSONA CAN NOT BE

HELD RESPONSIBLE FOR ANY VIOLATIONS OF THE SPECIFICATIONS

SET FORTH IN THIS DOCUMENT.THIS DOCUMENT IS FOR BIDDING PURPOSES ONLY. EXACT INSTALLATION PROCEDURES MAY VARY BASED ON SITE SPECIFIC CONDITIONS.

McDONALD’S 46’ ROOF ELEMENT

* ½” X 2 ½” S.S. LAG SCREW W/EXPANDABLE LEAD SHIELD ANCHOR (SEE WALL INSTALL PROFILES) W

ALL SURFACE

MOUNTING PLATE

½” X 1 ½” ZINC PLATED HEX HEAD BOLT & WASHER

MOUNTING PLATE

4” X 4” SQ TUBEVERTICAL RCESUPPORT TUBE

½” FLAT S.S.WASHER

½” X 4” S.S.HEX HEAD

LAG SCREW*

TIE BACK ASSEMBLY

TIE BACK SECTION FOR ATTACHMENT TO RCEVERTICAL LEG SUPPORT

TIE BACK SECTION FOR ATTACHMENT TO WALL

1 ½” X 1 ½” SQ TUBE

MOUNTING PLATE(SEE PLATE DETAIL)

2” X 2” SQTUBE

MOUNTING PLATE(SEE PLATE DETAIL)

PLATE DETAIL(LEG)

3"

1 ½

"

6"8"

3” X 8” STEEL PLATE

9/16” HOLES

WALL SURFACE

½” FLAT ZINC PLATED WASHER

½” X 3” ZINC PLATED HEX HEAD BOLT& WASHER

½” ZINC PLATED LOCKNUT

MOUNTING PLATE

MOUNTINGPLATE

4” X 4” SQ TUBEVERTICAL RCE

SUPPORT TUBE

DRILL (1) 9/16” HOLE IN TUBES FOR ½” X 3” BOLT

McDONALD’S

VARIOUS

10-22-13

46’ ROOF ELEMENT & FASCIA SIGN INSTALLATOIN

CMFile Name:

Prepared By:Date:Customer:

Location:

Note: Color output may not be exact when viewing or printing this drawing. All colors used are PMS or the closest CMYKequivalent. If these colors are incorrect, please provide the correct PMS match and a revision to this drawing will be made.

Page

3 OF 8Rev

7

700 21st Street SouthwestPO Box 210Watertown, SD 57201-02101 (800) 843-9888 • www.personasigns.com

DISTRIBUTED BY SIGN UP COMPANY

3"

1 ½

"

9/16" SLOTTEDHOLES

3" X 10 1/2" X 5/8"STEEL PLATE

8 1/4"10 1/2"

PLATE DETAIL(WALL)

WOOD WALL INSTALL

TBDPERSITE

CUT TIE-BACK TUBES, IFNEEDED, & PAINT EXPOSED STEEL(NOTE: BRACKETS HAVE ADJUSTABLE RANGE FROM 7 ½” -12” OVERALL LENGTH)

½” X 4” S.S. LAG SCREW& WASHER

SEE PG 1

½” RIVNUTS IN OUTSIDE LEGS FOR ½” BOLTS

SEAL OPENING BETWEENTIE-BACK TUBES WITH SILVER COLORED, 1-PART POLYURETHANE SEALANT APPROPRIATE FOR MATING SURFACES

CMU WALL INSTALL

TBDPERSITE

CUT TIE-BACK TUBES, IFNEEDED, & PAINT EXPOSED STEEL(NOTE: BRACKETS HAVE ADJUSTABLE RANGE FROM 7 ½” -12” OVERALL LENGTH)

½” X 2 ½” S.S. LAG SCREW & WASHER WITH EXPANDABLE LEAD SHIELD ANCHOR SEE

PG 1

½” RIVNUTS IN OUTSIDE LEGS FOR ½” BOLTS

SEAL OPENING BETWEENTIE-BACK TUBES WITH SILVER COLORED, 1-PART POLYURETHANE SEALANT APPROPRIATE FOR MATING SURFACES

Page 4: McDONALD’S 46’ ROOF ELEMENT - Persona Inc Signs... · Fill pilot holes with sealant & secure legs to tower ... or alternative stainless steel hardware for mounting surface (installer

NOTICE:IF PERSONA DOES NOT COORDINATE INSTALLATION, PERSONA CAN NOT BE

HELD RESPONSIBLE FOR ANY VIOLATIONS OF THE SPECIFICATIONS

SET FORTH IN THIS DOCUMENT.THIS DOCUMENT IS FOR BIDDING PURPOSES ONLY. EXACT INSTALLATION PROCEDURES MAY VARY BASED ON SITE SPECIFIC CONDITIONS.

McDONALD’S 46’ ROOF ELEMENT

* ½” X 3 ½” S.S. LAG SCREW W/EXPANDABLE LEAD SHIELD ANCHOR (SEE WALL INSTALL PROFILES)

WALL SU

RFAC

E

½” X 1 ½” ZINC PLATED HEX HEAD BOLT & WASHER

MOUNTING PLATE

4” X 4” SQ TUBEVERTICAL RCESUPPORT TUBE

½” FLAT S.S.WASHER

½” X 5” S.S.HEX HEAD

LAG SCREW*

MOUNTING PLATE

PLACE 3” X 1”Ø GALVANIZED PIPES IN GROOVES OF WALL TO PREVENT PLATE FROM CRUSHING CORRUGATION.BARRIER TAPED SIDE OF PIPE TO BE AGAINST WALL SURFACE. SECURE TOWALL WITH MOUNTINGPLATE BOLTS.

TIE BACK ASSEMBLY FOR CORRUGATED WALL

TIE BACK SECTION FOR ATTACHMENT TO RCEVERTICAL LEG SUPPORT

2” X 2” SQTUBE

MOUNTING PLATE(SEE PLATE DETAIL)

PLATE DETAIL(LEG)

3"

1 ½

"

6"8"

3” X 8” STEEL PLATE

9/16” HOLES

WALL SU

RFAC

E

½” FLAT ZINC PLATED WASHER

½” X 3” ZINC PLATED HEX HEAD BOLT& WASHER

½” ZINC PLATED LOCKNUT

MOUNTING PLATE

MOUNTINGPLATE

3” X 1” Ø GALVANIZED PIPE

4” X 4” SQ TUBEVERTICAL RCE

SUPPORT TUBE

DRILL (1) 9/16” HOLE IN TUBES FOR ½” X 3” BOLT

5/8” MOUNTING PRE-DRILLED HOLES

PRE-APPLIED BARRIER TAPE(TO BE PLACED AGAINST WALL SURFACE)

3"

1"

GALVANIZED SPACER PIPE DETAIL

TIE BACK SECTION FOR ATTACHMENT TO WALL

1 ½” X 1 ½” SQ TUBE

MOUNTING PLATE(SEE PLATE DETAIL)

McDONALD’S

VARIOUS

10-22-13

46’ ROOF ELEMENT & FASCIA SIGN INSTALLATOIN

CMFile Name:

Prepared By:Date:Customer:

Location:

Note: Color output may not be exact when viewing or printing this drawing. All colors used are PMS or the closest CMYKequivalent. If these colors are incorrect, please provide the correct PMS match and a revision to this drawing will be made.

Page

4 OF 8Rev

7

700 21st Street SouthwestPO Box 210Watertown, SD 57201-02101 (800) 843-9888 • www.personasigns.com

DISTRIBUTED BY SIGN UP COMPANY

3"

1 ½

"

9/16" SLOTTEDHOLES

3" X 10 1/2" X 5/8"STEEL PLATE

8 1/4"10 1/2"

PLATE DETAIL(WALL)

WOOD WALL INSTALL

TBDPERSITE

CUT TIE-BACK TUBES, IFNEEDED, & PAINT EXPOSED STEEL(NOTE: BRACKETS HAVE ADJUSTABLE RANGE FROM 7 ½” -12” OVERALL LENGTH)

½” X 5” S.S. LAG SCREW& WASHER

3” X 1”Ø GALVANIZED PIPES WITH BARRIER TAPEAGAINST WALL SURFACE

SEAL OPENING BETWEENTIE-BACK TUBES WITH SILVER COLORED, 1-PART POLYURETHANE SEALANT APPROPRIATE FOR MATING SURFACES

SEE PG 1

½” RIVNUTS IN OUTSIDE LEGS FOR ½” BOLTS

CMU WALL INSTALL

TBDPERSITE

CUT TIE-BACK TUBES, IFNEEDED, & PAINT EXPOSED STEEL(NOTE: BRACKETS HAVE ADJUSTABLE RANGE FROM 7 ½” -12” OVERALL LENGTH)

½” X 3 ½” S.S. LAG SCREW & WASHER WITH EXPANDABLE LEAD SHIELD ANCHOR

SEE PG 1

½” RIVNUTS IN OUTSIDE LEGS FOR ½” BOLTS

SEAL OPENING BETWEENTIE-BACK TUBES WITH SILVER COLORED, 1-PART POLYURETHANE SEALANT APPROPRIATE FOR MATING SURFACES

3” X 1”Ø GALVANIZED PIPES WITH BARRIER TAPEAGAINST WALL SURFACE

Page 5: McDONALD’S 46’ ROOF ELEMENT - Persona Inc Signs... · Fill pilot holes with sealant & secure legs to tower ... or alternative stainless steel hardware for mounting surface (installer

McDONALD’S FASCIA SIGN - RCE MOUNT NOTICE:IF PERSONA DOES NOT COORDINATE INSTALLATION, PERSONA CAN NOT BE

HELD RESPONSIBLE FOR ANY VIOLATIONS OF THE SPECIFICATIONS

SET FORTH IN THIS DOCUMENT.THIS DOCUMENT IS FOR BIDDING PURPOSES ONLY. EXACT INSTALLATION PROCEDURES MAY VARY BASED ON SITE SPECIFIC CONDITIONS.

ELECTRICAL SPECIFICATIONS:1. ILLUMINATION: WHITE LEDS2. POWER SUPPLY: (1) LED POWER SUPPLY3. LOAD: 0.85 AMPS 4. CIRCUITS: (1) 20 AMP - 120 VOLT

GENERAL NOTES:1. THE INSTALLER SHALL VERIFY ALL SITE CONDITIONS AND DIMENSIONS.2. THE INSTALLER SHALL PROVIDE MOUNTING HARDWARE AS REQUIRED.3. THE CUSTOMER’S BUILDING ENGINEER IS TO DETERMINE IF THE BUILDING STRUCTURE WILL SUPPORT THE SIGN. THE CUSTOMER SHALL SUPPLY ANY ADDITIONAL STRUCTURE THAT IS REQUIRED ON OR BEHIND WALL.

THIS SIGN IS INTENDED TO BE INSTALLED IN ACCORDANCE WITH THE REQUIREMENTS OF ARTICLE 600 OF THE NATIONAL ELECTRICAL CODE AND / OR APPLICABLE LOCAL CODES.THIS INCLUDES PROPER GROUNDING AND BONDING OF THE SIGN.

17'-5 3/4"

2'-3 5/16"

SEAM LOCATION

12’-0”

.080” ALUMINUM MOUNTING BRACKET(DRILL HOLES TO MATCH HOLES IN RCE LEGS)

.080” ALUMINUM END CAP

.080” ALUMINUM END CAP

10 11/16”OD

1”

11 1/8”ID

1”

11 1/8”ID

Installation instructions:

1. Uncrate and inspect sign. Temporarily make electrical connections between sign sections Test light sign. Notify Persona of any damage.

2. Determine and mark center of wall elevation below display. Lift “MCDO” section and position so that seam edge is flush with center line of the wall below it. If site conditions do not allow for this call Persona for further direction. Mounting bracket on RCE leg will slide inside mounting channel on sign back Secure mounting & sign brackets together using screws (6 required for this section).

3. Remove face from “NALD’S” section & lift into position so two sign sections are flush together pass-thru from “MCDO” section into “NALD’S” section thru pre-cut hole Secure mounting & sign

brackets together using crews (6 required for this section). Ensure sign is level & plumb.

4. Connect wires from “MCDO” section to wires from power supply inside “NALD’S” . Connect wires and conduit to provided primary junction box location. Replace face. Installer to make final electrical connections to primary power, if authorized to do so. Test light sign.

5. Attach 2” wide end cap pieces to each end of mounting brackets on sign using supplied #8-18 x 1” zinc plated pan-head, self-tapping screws. Bent tabs on end cap will slide over outside of mounting channel on sign back

6. Clean area & dispose of installation debris off-premise.

(see figure 4, pg 8)

(see figure 2, pg 7)

(see figure 3, pg 7)(see figure 4, pg 8)

(see figure 4, pg 8)

(see figure 5, pg 8)

.

. provided #12-24 x 7/8” hex-head galvanized self-tapping

. Insert threaded ; tighten nuts.

provided #12-24 x 7/8” hex-head galvanized self-tapping s

.

McDONALD’S

VARIOUS

10-22-13

46’ ROOF ELEMENT & FASCIA SIGN INSTALLATOIN

CMFile Name:

Prepared By:Date:Customer:

Location:

Note: Color output may not be exact when viewing or printing this drawing. All colors used are PMS or the closest CMYKequivalent. If these colors are incorrect, please provide the correct PMS match and a revision to this drawing will be made.

Page

6 OF 8Rev

7

700 21st Street SouthwestPO Box 210Watertown, SD 57201-02101 (800) 843-9888 • www.personasigns.com

DISTRIBUTED BY SIGN UP COMPANY

FIGURE 1

½” LOCKNUT

½” FLAT WASHER

MOUNTING PLATE

4” X 4” SQ TUBERCE LEG

½” X 5 ½” ZINC PLATEDTHRU BOLTS & WASHERS

DRILL (6) 9/16” HOLES IN BACKET FOR

½” X 5 ½” THRU BOLTS& ½” X 1 ½” BOLTS

½” X 1 ½” BOLTS & WASHERS TO

FILL RIVNUT HOLE

ZINC PLATED

½” X 1 ½” BOLT & WASHER

ZINC PLATED

Page 6: McDONALD’S 46’ ROOF ELEMENT - Persona Inc Signs... · Fill pilot holes with sealant & secure legs to tower ... or alternative stainless steel hardware for mounting surface (installer

McDONALD’S

VARIOUS

10-22-13

46’ ROOF ELEMENT & FASCIA SIGN INSTALLATOIN

CMFile Name:

Prepared By:Date:Customer:

Location:

Note: Color output may not be exact when viewing or printing this drawing. All colors used are PMS or the closest CMYKequivalent. If these colors are incorrect, please provide the correct PMS match and a revision to this drawing will be made.

Page

5 OF 8Rev

7

700 21st Street SouthwestPO Box 210Watertown, SD 57201-02101 (800) 843-9888 • www.personasigns.com

DISTRIBUTED BY SIGN UP COMPANY

NOTICE:IF PERSONA DOES NOT COORDINATE INSTALLATION, PERSONA CAN NOT BE

HELD RESPONSIBLE FOR ANY VIOLATIONS OF THE SPECIFICATIONS

SET FORTH IN THIS DOCUMENT.THIS DOCUMENT IS FOR BIDDING PURPOSES ONLY. EXACT INSTALLATION PROCEDURES MAY VARY BASED ON SITE SPECIFIC CONDITIONS.

McDONALD’S 46’ ROOF ELEMENT

WALL SU

RFAC

E

Seal opening between tie back tubes & and mounting bolt / hole

Seal mounting bolt & holes into tie-back leg

Seal mounting bolt & holes in base plate

Seal mounting bolt & holes into wall surface

Clean out any debris in & around mounting holes. Fill in ENTIRE hole cavity for all mounting bolts,

using . Tool sealant smooth to eliminate

air pockets & ensure contact to both joint surfaces. Clean off any excess sealant to create finished look

1-part polyurethane sealant appropriate for mating surfaces

ROOF ELEMENT SEALING INSTRUCTIONS

Page 7: McDONALD’S 46’ ROOF ELEMENT - Persona Inc Signs... · Fill pilot holes with sealant & secure legs to tower ... or alternative stainless steel hardware for mounting surface (installer

McDONALD’S FASCIA SIGN - RCE MOUNT NOTICE:IF PERSONA DOES NOT COORDINATE INSTALLATION, PERSONA CAN NOT BE

HELD RESPONSIBLE FOR ANY VIOLATIONS OF THE SPECIFICATIONS

SET FORTH IN THIS DOCUMENT.THIS DOCUMENT IS FOR BIDDING PURPOSES ONLY. EXACT INSTALLATION PROCEDURES MAY VARY BASED ON SITE SPECIFIC CONDITIONS.

FIGURE 2

.080” ALUMINUM MOUNTING BRACKET (ON WALL)

10 11/16” OD

MOUNTING CHANNELON BACK OF FASCIA SIGN

11” OD

FASCIA SIGN BACK

#12-24 X 7/8” HEX-HEAD GALVANIZED SELF-

TAPPING SCREW

PRIMARY POWER ELECTRICAL OUT

LOCATION

2”2”

FASTENER LOCATIONS FOR CONNECTINGRCE BRACKET TO MOUNTING CHANNELON BACK OF SIGN.(QTY: 6 TOP / 6 BOTTOM)

FIGURE 3

12'-0"

McDONALD’S

VARIOUS

10-22-13

46’ ROOF ELEMENT & FASCIA SIGN INSTALLATOIN

CMFile Name:

Prepared By:Date:Customer:

Location:

Note: Color output may not be exact when viewing or printing this drawing. All colors used are PMS or the closest CMYKequivalent. If these colors are incorrect, please provide the correct PMS match and a revision to this drawing will be made.

Page

7 OF 8Rev

7

700 21st Street SouthwestPO Box 210Watertown, SD 57201-02101 (800) 843-9888 • www.personasigns.com

DISTRIBUTED BY SIGN UP COMPANY

Page 8: McDONALD’S 46’ ROOF ELEMENT - Persona Inc Signs... · Fill pilot holes with sealant & secure legs to tower ... or alternative stainless steel hardware for mounting surface (installer

McDONALD’S FASCIA SIGN - RCE MOUNT NOTICE:IF PERSONA DOES NOT COORDINATE INSTALLATION, PERSONA CAN NOT BE

HELD RESPONSIBLE FOR ANY VIOLATIONS OF THE SPECIFICATIONS

SET FORTH IN THIS DOCUMENT.THIS DOCUMENT IS FOR BIDDING PURPOSES ONLY. EXACT INSTALLATION PROCEDURES MAY VARY BASED ON SITE SPECIFIC CONDITIONS.

PASS-THRU FROM ‘McDO’ SECTION WILL FIT THRUPRE-CUT HOLE IN ‘NALD’S’ SECTION

CONNECT WIRES FROM ‘McDO’ SECTION TO POWER SUPPLY WIRES IN ‘NALD’S’ SECTION

FIGURE 4

FIGURE 5

.080” ALUMINUM END CAP11 1/8” ID

ONE ON EACH END

#8-18 X 1” ZINC PLATEDPAN-HEAD, SELF-TAPPING

SCREW

MOUNTING CHANNELON BACK OF FASCIA SIGN11” OD

MOUNTING BRACKETON RCE LEGS10 11/16” OD

1”

2”

McDONALD’S

VARIOUS

10-22-13

46’ ROOF ELEMENT & FASCIA SIGN INSTALLATOIN

CMFile Name:

Prepared By:Date:Customer:

Location:

Note: Color output may not be exact when viewing or printing this drawing. All colors used are PMS or the closest CMYKequivalent. If these colors are incorrect, please provide the correct PMS match and a revision to this drawing will be made.

Page

8 OF 8Rev

7

700 21st Street SouthwestPO Box 210Watertown, SD 57201-02101 (800) 843-9888 • www.personasigns.com

DISTRIBUTED BY SIGN UP COMPANY