Upload
dinhtuyen
View
215
Download
0
Embed Size (px)
Citation preview
McDONALD’S PRE-SELL BOARD NOTICE:IF PERSONA DOES NOT COORDINATE INSTALLATION, PERSONA CAN NOT BE
HELD RESPONSIBLE FOR ANY VIOLATIONS OF THE SPECIFICATIONS
SET FORTH IN THIS DOCUMENT.THIS DOCUMENT IS FOR BIDDING PURPOSES ONLY. EXACT INSTALLATION PROCEDURES MAY VARY BASED ON SITE SPECIFIC CONDITIONS.
PRE-SELL BOARD INSTALLATION INSTRUCTIONS:
1. General contractor to stake sign location(s), establish final grade requirements and determine the sign orientation on the property, prior to excavation.2. General contractor to excavate pre-sell board foundation(s), set anchor bolts and conduit per template included with plate & bolt kit. Pour concrete according to engineered drawing specifications .
3. Uncrate and inspect all sign display components. Notify Persona of any damage.4. Place leveling nuts & plate washers on anchor bolts (see anchor bolt detail) and level temporarily for final adjustment later.5. Feed primary electrical wires through the base plate & column and through the Heyco bushing located inside of sign frame. Tie a strain relief knot in the primary wires within the sign frame. Bolt down over leveling nuts (see anchor bolt detail). 6. If authorized to do so, make final electrical connections to primary power, inside sign frame. Test light for proper illumination.7. Re-check sign for level, make final adjustments, and tighten nuts on anchor bolts.8. Touch up any paint on sign, bolts or structure as required.9. Clean area. Remove excess soil & discard installation debris off-premise.
(see note)Also n
ote: pole & base plate are not center justified with sign width. Ensure augured foundation location allo for proper
sign set back requirements.ws
This sign is intended to be installed in accordance with the requirements of article 600 of the National Electrical Code and / or applicable local codes.This includes proper grounding and bonding of the sign.
ELECTRICAL SPECIFICATIONS:1. ILLUMINATION: COOL WHITE FLUORESCENT LAMPS2. POWER SUPPLY: (1) ELECTRONIC BALLAST3. LOAD: 1.10 AMPS4. CIRCUITS: (1) 20 AMP - 120 VOLT
ANCHOR BOLT MOUNTING DETAIL(FIG. 1)
3” X 3/16”SQ. TUBE
HEYCOBUSHING
HINGED FACEFOR ACCESS
3/4” X 39”ANCHOR BOLTS(QTY 4)
ELECTRICAL CONDUIT
GRADE
ANCHOR BOLT DETAIL
2’-0”
2’-5 ½”
5'-2 3/8"
6'-8 3/8"
FACEGRAPHICS
WILLVARY
3 1/8”
8”
3/4” THICK1” SLOTTED HOLES
3/4” BOLTS2” ELECTRICAL HOLE
BASE PLATE DETAIL
8 ½”
8 ½”
5 ½”
5 ½”
McDONALD’S
VARIOUS
3-5-14
McDONALD’S PRE-SELL BOARD INSTALLATION - 100 MPH
MWR/CMFile Name:
Prepared By:Date:Customer:
Location:
Note: Color output may not be exact when viewing or printing this drawing. All colors used are PMS or the closest CMYKequivalent. If these colors are incorrect, please provide the correct PMS match and a revision to this drawing will be made.
Page
1 OF 3Rev
5
700 21st Street SouthwestPO Box 210Watertown, SD 57201-02101 (800) 843-9888 • www.persona-inc.com
DISTRIBUTED BY SIGN UP COMPANY
elevation: 24 / plates: 12
ANCHOR BOLT DETAIL
BASE PLATE
CONCRETEFOOTING
3/4” Ø GALVANIZED ANCHOR BOLT
39” LONG W/ 6” THREAD @ TOP & 3” THREAD
@ BOTTOM; 5 NUTS & 3 PLATE WASHERS
PER BOLT
LEVELING NUT& PLATE WASHER
DOUBLE NUT & PLATE WASHER
DOUBLE NUT
PLATE WASHER
Any modifications to base plates, anchor bolts, or any other structural elements must be approved by a registered structural engineer and documented on
a stamped print
11’-11 5/8”
**NOTE: ALL PLATE WASHERS, NUTS, & LOCK NUTS TO REMAIN ON BOLTS DURING INSTALLATION OF FOUNDATION TO AVOID BEING MISPLACED ON THE JOB SITE
NOTE: REFERENCE ENGINEERED DRAWINGS ON PAGES 2 & 3FOR DETAILS:
1 ½" MAX: REFERENCE ENGINEERED DRAWING
McDONALD’S PRE-SELL BOARD INSTALLATION - 100 MPHFile Name:Page
2 OF 3Rev
5
McDONALD’S PRE-SELL BOARD INSTALLATION - 100 MPHFile Name:Page
3 OF 3Rev
5