    MUNICIPAL CORPORATION OFGREATER MUMBAI

    BRIDGE DEPARTMENT

    VOLUME-I

    UNIFIED SCHEDULE OF RATES FOR

    BRIDGE WORKS

    2013

  • 8/13/2019 MCGM USOR Bridge 2013

    2/81

    FOREWORD

    Ever since it's establishment in 1888 by the erstwhile British rulers in India, in the last

    125 years of the history of its existence Mumbai Municipal Corporation has catered

    to every aspect of the citizen of Mumbai that can be conceived of. Think of Engineer

    Victor Tulloch, who through his unparalleled immense efforts conceived the water

    supply scheme fetching running over from distance of more than 100 km by

    constructing a dam across river Tansa, to feed the population of Mumbai, then only a

    few thousands in number. The items have changed with technological advancement

    and the works like Roller Compacted Concrete Dam at Middle Vaitarna or numerous

    underground tunnels for water supply and sewerage disposal, for example, have

    become hallmark of MCGM's dedication to the citizen of Mumbai. The challenges

    have always been daunting, nevertheless, always met with.

    Every civilization be it 5000 years old Harrappan civilization on the bank of

    Sindhu River, or Mumbai on the west coast of the Indian Ocean, require

    infrastructure like water supply and sewerage system, storm water drainage system,

    road, bridges, etc. and hospitals, markets, recreation centers etc. The exponentially

    growing population of Mumbai and the technological explosion in the field of

    engineering has made every aspect of contracting of works highly challenging.

    M.C.G.M. is one of the largest local self government in the Asian Continent.

    In observance of historic traditions of strong civic activism, with the change in time

    and living conditions to match with the urbanization, M.C.G.M. has mainly focused in

    providing variety of engineering services viz, storm water drain, sewerage, water

    supply projects, roads, bridges, solid waste management, environmental services.

    Beside this, the Corporation is also providing dedicated services in the Health sector

    by establishing numbers of Major and Peripheral hospitals.

    To update and modernize the mechanism being used for working on projects

    from the stage of conceptualization upto execution, the need was realized to revise

    prevailing Schedule of Rates along with specifications which were in operations

    with various departments and being prepared individually as per their need and

    used to revised at different span of time, resulting into various anomalies. Therefore,

    to overcome all these, it was essential to revise the schedule of rates, not only with

    simple mechanized revision, major changes to keep up with the pace of urbanization,

    civilization, construction techniques / mechanization and voluminous developments

    by restructuring items in the schedule as per requirements. This exercise would

  • 8/13/2019 MCGM USOR Bridge 2013

    3/81

    provide comfort with field requirements and designs and will assist in effective

    checks on creation of extra items during execution.

    A conscious decision has been taken to keep pace with the changing time

    and preparation of Unified Schedule of Rates is the first step forward in this direction.

    Since long time, there have been demands made by the stake holders like Municipal

    Engineers and Contractors about non-uniformity, anomalies and discrepancies in

    various schedules of rates for work contracts of various departments of MCGM.

    Every department had its own expertise and way of functioning which got reflected in

    its independent schedule of rates, which, however, had no linkage with the fair

    market schedules of other departments and resulting into extra items and fair rates.

    In place of earlier 9 Schedule of Rates, the Unified Schedule of Rates is an effort &

    seeks to rectify the defects, discrepancies and non uniformities which will provide,

    not to mention about the ease and accuracy of estimation to the Engineers.

    In view of the enormous and voluminous nature of work, keeping time

    frame in perspective and above all, to ensure professionalism, the work of

    preparation of Unified Schedule of Rates was awarded to the eminent consultants

    M/s.Tata Consulting Engineers Ltd. M/s.Tata Consulting Engineers Ltd were directed

    to conduct a thorough factual market research for major materials from

    stockists/manufacturers/dealers and to study schedules of rates of Govt bodies like

    C.P.W.D. and P.W.D. The new Rate Analysis are based on Factual Market research

    done by M/s.Tata Consulting Engineers Ltd.

    The anomalies in rate are minimized after extensive market research and

    collection of quotations from reputed large scaled stockists/dealers, and also after

    comparison with rates of CPWD, PWD etc.

    The SOR is linked with its comprehensive specifications of basic important

    activities so as to have clarity in execution. These specifications follow a chronology

    of general scope of the item, material required, processing of material, construction

    operation, finishing and mode of measurement.

    All the rates are now linked to their detailed specifications and wherever

    required, with drawings. Though there are about 12500 items, every item is now

    given a Unique Code No. which will eliminate the repetition.

    It has been our endeavour to include all the necessary modern materials and

    technologies in SOR, for example, the concept of green building, which will go a long

  • 8/13/2019 MCGM USOR Bridge 2013

    4/81

    way to have control on creation of extra items and fair rates. A salient feature of this

    USR is 'Starring of items' specified, categorically which can be used only at certain

    works or locations.

    Another salient features is 'Dynamic Rate System' which will be based on

    study of data base of quantities and bidding prices of awarded contracts on the basis

    of which necessary corrections can be applied to the Unified Schedule of Rates at

    specified intervals. The MCGM will be now in position to revise the Unified Schedule

    of Rates every year after incumbency period of M/s.Tata Consulting Engineers Ltd of

    one year, to work with and correct the system as and when necessary.

    I hope this 'Unified Schedule of Rates' will be a milestone in civic governance

    by MCGM. This self-contained publication shall be of great help and guidance to theofficers engaged in the project work of MCGM.

    A.M.C. (Project) Municipal Commissioner

  • 8/13/2019 MCGM USOR Bridge 2013

    5/81

    A. GENERAL NOTES

    1. The schedule of rates will be operative from 16-09-2013

    2. The unified schedule of rates includes following department:

    i. Buildings

    ii. Water Supply Projects

    iii. Hydraulic Engineering

    iv. Sewerage Projects

    v. Storm Water Drainage

    vi. Roads

    vii. Bridges

    viii. Traffic and Signals

    ix. Mechanical and Electrical

    x. Garden Works

    3. Volume-I contains USR, basic rate list and approved makes and Volume-II

    contains specification along with drawings wherever necessary and mandatory

    tests.

    4. The specification of the items shall be as per latest Indian Standard Codes

    unless otherwise specified.

    5. The rates of the items in this schedule of rates are worked out assuming average

    lead for Greater Mumbai area for all sorts of materials.

    6. The rates are inclusive of transportation, duties, taxes and charges of all

    Government, Municipal or any other statutory body, applicable from time to time

    but exclusive of Works Contract Tax and Labour Cess levied by Government of

    Maharashtra.

    7. The rates also includes Overheads @ 5% and Contractors Profit @10% which is

    inclusive of labour supervision charges, tools and plants.

    8. Rates of common material and labour is attached in the Annexure-A in Volume-I.

    9. The building Schedule of Rates 2013 includes the existing items of FMA, FMB

    2009, SIC and Fair items, with deletion of obsolete items, merger of similar items

  • 8/13/2019 MCGM USOR Bridge 2013

    6/81

    and value addition of new items in line with modern technology and trends in

    accordance with latest rules, regulation, byelaws etc.

    10. As per the Government policy the use fly ash is done for framing the items of

    work in accordance with the latest provisions of IS Codes. Also green building

    items have been introduced in new schedule to minimize the consumption of

    energy during construction and occupancy of building and also maintaining

    ecological balance.

    11. From safety, health and environment point of view two legged steel tubular

    scaffolding shall be used, without making any holes in the outer face of the

    building or any structure. And no extra payment shall be made for works like

    scaffolding, centering for any height unless otherwise specified.

    12. All materials shall be as per approved list of MCGM or equivalent material having

    quality standards as per relevant IS codes and shall be of first quality unless

    otherwise specified.

    13. Following basic rates are considered in the USR:

    i. Cement : Rs. 6,000/ MT

    ii. Mild Steel : Rs. 47,400/ MT

    iii. HYSD Steel (Fe415) : Rs. 48,400/ MT

    iv. T.M.T. (Fe500) : Rs. 49,400/ MT

    v. Structural Steel : Rs. 53,400/ MT

    14. Rates given in SOR are for estimation purpose.

    15. Rates of items and specification for excavation, concrete, plaster and brickwork

    shall be referred from common schedule unless and otherwise not mentioned in

    concerned departments schedule.

    16. Coding of items:

    The Coding procedure for Basic master material is as follows:

    Code will start with the common prefix of MA which stands for materials

    Followed by Abbreviation code for each schedule of rate for eg H.E. for

    Building works, SP for Sewerage, WSP for water supply and so on and so

    forth.

    The first item category in the list will be numbered as 1

    The last part of the code will be a number starting with a to indicate the item

    number in the master list.

    The alpha numerics will be separated by (dash).

  • 8/13/2019 MCGM USOR Bridge 2013

    7/81

    The code will look like: MA-GN-01

    The Coding procedure for SOR is as follows:

    Code will start from abbreviation for Department name HE or WSP or SP

    The USR will be subdivided into chapters according to the item classification;

    these chapters will be numbered as 1, 2, 3 ..

    The items under the chapter will be numbered from 1

    The sub items will be numbered as a, b, c .

    The code will look like CS-CW-1-a-1

    Abbreviations to be used for Department

    Sr. No. Department Abbreviation

    1 Building works/Common

    Schedule

    CS

    2 Roads RW

    3 Traffic and Signalling RT

    4 Bridges BW

    5 Water Supply Projects WSP

    6 Hydraulic Engg. HE

    7 Sewerage Projects SP

    8 Storm Water Drains SWD

    9 Mechanical and electrical ME

    10 Garden Works GW

  • 8/13/2019 MCGM USOR Bridge 2013

    8/81

    B. SALIENT FEATURES OF SOR FOR BUILDING WORKS

    1) All the rates are for all heights and levels unless noted otherwise.

    2) Chloropyrifos EC 20 has been considered for anti termite treatment.

    3) Artificial sand (crushed sand) has been considered for flooring bedding and for

    concrete work.

    4) All the items are excluding fixtures otherwise not specified in respective item. In such

    case, items of Hardware section shall be used for fixtures.

    5) For plastering and mortar work, river sand has been considered.

    6) For plastering work all the rates are for all heights and levels and architectural

    decorative surface.

    7) All external plaster items are including waterproofing compound except plastering

    item for structures like compound wall, masonary pedestals, pillars, etc.

    8) Items for ashlar masonry, dewatering, self compacting concrete, vacuum dewatered

    concrete flooring and TMT steel bars have been introduced.

    9) Rates of all the items in roofing work are inclusive of staging or scaffolding for any

    height.

    10) Non-asbestos cement sheet provided in place of asbestos cement sheet roofing.

    11) Concreting of pile shall be done with RMC only.

    12) Rates of piling are inclusive of Chiseling of intermediate local boulders. No separate

    payment shall be made for the same

    13) While estimating the quantity for Grouting of bentonite slurry in bored precast piles

    shall be measured as per bore dia and pile dia. Exact quantity can be measured

    while execution and shall be paid accordingly

    14) Rates considered in concrete items are including pumping of concrete upto placing

    point.

    15) New items like Self compacting concrete, vacuum dewatered concrete flooring and

    TMT steel bars have been introduced.

    16) The dismantling and demolishing chapter covers only removing old items and repair

    work covers both removing old items and refixing the new.

    17) For heritage works the rate includes the statutory charges for heritage committee

    and conservation architect and no extra payment will be made.

    18) APP (Atactic poly-propylene) modified polymeric membrane water proofing will be

    used only for trial basis on approval of City Engineer and/or Chief Engineer (P&D).

    19) In plumbing waterless urinals, fly ash bricks, fly ash concrete for green building

    concept have been introduced.

  • 8/13/2019 MCGM USOR Bridge 2013

    9/81

    Star Rating:

    In view of ambiguity related to choice of quality or grade of materials and subsequent

    items of works to be used at Ward level projects, Centralised projects or Special projects

    of and for smooth functioning during planning stage of a project, the new concept of Star

    Rating has been introduced for building works depending on the life expectancy of

    building, degree of occupancy of building and comfort to the end user. The buildings or

    structures rated are as follows:

    i. Two Star **- Ward offices and Central dept. Offices, schools, Small

    Hospitals, Primary Health Center, Fire Station, Crematorium, Slaughter

    Houses, Markets, Swimming Pools, Zoos, Chowkies, Libraries, Staff

    quarters and residential colonies, Public Toilets and Water tanks.

    ii. Three Star ***- Superspeciality Hospitals , Drama Theatres, MCGM

    Mayors and Officers bungalow, Heritage Structures, Head Office and

    Engineers Hub.

    The items or work not marked as two star or three star are assumed to be

    applicable for all the star buildings or structures mentioned above.

  • 8/13/2019 MCGM USOR Bridge 2013

    10/81

    C. SALIENT FEATURES OF SOR FOR ROAD AND BRIDGE WORKS

    1. The rate analysis includes some provisions such as shuttering / centering on a

    percentage basis. This has been brought on a rational basis using available data.

    2. Since the entire area covered by Greater Mumbai falls within the coastal belt, the

    minimum grade of structural concrete as recommended by IRC / MORTH for severe

    exposure has been adopted.

    Items referred from common schedule or other schedule:

    ROAD

    CS-EW-15 & 16: Excavation in foundation for road works

    CS-CW-1-c: Cement Concrete - Nominal Mix of 1:3:6 -M10

    CS-CW-1-a: P/L M-20 grade concrete for RCC work (using cement @ 330

    kg/cum) - All work upto plinth level

    CS-CW-7 & 19: Providing and laying in position machine batched and machine

    mixed design mix M-40 grade

    CS-CW-30-a: Formwork

    CS-PL-52: Cement Mortar 1:2 (1 Cement: 2 Coarse/ Fine Sand)

    CS-PL-56: Cement Mortar 1:6 (1 Cement: 6 Coarse/ Fine Snad)

    CS-CW-35-a: Reinforcement for R.C.C. work all complete. -Upto plinth level

    Mild steel bars.

    CS-SS-01: Providing, detailing, fabricating and fixing at desired location

    using hot rolled sections and MS Plates of grade Fe 250 as

    per specifications and approved fabrication drawings

    S-PN-4-c: Oil paint/ synthetic enamel paint in two coats with one coat ofprimer for Steelwork

    BRIDGE:

    CS-EW-1-10: Earthwork

    CS-SS-01: Providing and Fabricating structural steel work in rolled

    sections

    CS-CW-1-b: PCC Grade M15 for Open Foundation by Mixer

    CS-CW-1-a: PCC Grade M20 for Open Foundation by Mixer

  • 8/13/2019 MCGM USOR Bridge 2013

    11/81

    CS-CW-2-a-1: RCC Grade M20 for Open Foundation by Batching Plant

    (RMC)

    CS-CW-16: Extra and over for providing richer RMC of M-25 grade cement

    concrete instead of M20

    CS-CW-17: Extra and over for providing richer RMC of M-30 grade cement

    concrete instead of M20

    CS-CW-18: Extra and over for providing richer RMC of M-35 grade cement

    concrete instead of M20

    CS-CW-19: Extra and over for providing richer RMC of M-40 grade cement

    concrete instead of M20

    CS-CW-20: Extra and over for providing richer RMC of M-45 grade cement

    concrete instead of M20

    CS-CW-21: Extra and over for providing richer RMC of M-50 grade cement

    concrete instead of M20

    CS-CW-35-b: Supplying, fitting and placing HYSD bar reinforcement

    Items that are referred to other SORs

    RW-2-01: Supplying blue trap stones of approved quality & providing the

    same in rubble packing 25cm.

    D. LIST OF UNITS USED

    Sr.

    No.

    Units Abbreviation

    Symbol

    Remark

    1 Length (Running Meter) Rmt

    2 Weight (Metric Tonne) MT

    3 Weight Kilogram Kg

    4 Time Shift Shift Refers to a time duration of 8 Hrs

    5 Time (Hour) Hr

    6 Quantity (Numbers) Each/No.Each refers to a single quantity per

    entity

    7 Quantity (Lump sum) LS

    8 Volume Cum

    9 Area (Square Meter) Sqm

    10 Litre Ltr

    11 Cubic Centimeter Cucm

  • 8/13/2019 MCGM USOR Bridge 2013

    12/81

    E. LIST OF ABBREVIATIONS

    AASHTO American Association of State Highway and Transportation Officials

    ASTM American Society for Testing and Materials

    BS British Standard published by the British Standards Institution

    BOQ Bill of Quantities forming part of the contract

    CBR California Bearing Ratio

    IRC Indian Road Congress

    IS Indian Standard published by the Bureau of Indian Standards

    WC Water Cement Ratio

    CRRI Central Road Research Institute

    UCS Unconfined Compressive Strength

    WBM Water Bound Macadam

    SAM Stress Absorbing Membrane

    SAMI Stress Absorbing Membrane Interlayer

    MoRTH Ministry of Road Transport and Highways

    PCC Plain cement concrete

    RCC Reinforced cement concrete

    PSC Prestressed concrete

    HYSD High Yield Strength Deformed Bars

    EJ Expansion joints

    FBEC Fusion Bonded Epoxy Coating

    RE Reinforced Earth

    ESU Elastomeric slab unit

  • 8/13/2019 MCGM USOR Bridge 2013

    13/81

    Schedule for Bridge Works

    2013

    INDEX

    Chapter.No.

    ChapterCode

    Contents Item RangePageNo.

    1 BW-1 SUBSOIL INVESTIGATION BW-1-1 to BW-1-28 1-4

    2 BW-2 FOUNDATION BW-2-1 to BW-2-115 4-24

    3 BW-3 SUB-STRUCTURE BW-3-1 to BW-3-29 24-28

    4 BW-4 SUPER-STRUCTURE BW-4-1 to BW-4-72 28-38

    5 BW-5 MISCELLANEOUS ITEMS BW-5-1 to BW-5-7 38-45

    6 BW-6RIVER TRAINING ANDPROTECTION WORKS

    BW-6-1 to BW-6-11 45-47

    7 BW-7REPAIR ANDREHABILITATION

    BW-7-1 to BW-7-23 47-48

    BASIC RATE LIST Appendix-A 49-57

    LIST OF APPROVEDMAKE

    Appendix-B

  • 8/13/2019 MCGM USOR Bridge 2013

    14/81

    Schedule for Bridge Works

    2013

    ITEM CODE ITEM DESCRIPTION UNIT RATE

    SUBSOIL INVESTIGATION

    A) WORKS TO BE CARRIED OUT IN HAND

    Note: Contractors will have to submit proof of sufficient technical

    competence of agency undertaking items below. The contractors will

    not be entitled to additional reimbursement for employing alternative

    agency, if Engineer-in-charge so desires.

    BW-1-01

    Providing and transporting necessary and adequate plant and

    equipment to site with in a lead of 50 km for taking trial bores for subsoil

    investigations including conducting an initial survey for establishing datum

    RLS and locations at trial bores including installation of the drilling

    equipment of the first bore location etc. complete as specified and

    directed.

    Each unit 25000.00

    BW-1-02

    Shifting and locating the drilling equipment from one location to

    another within a lead of 500 m between successive locations including

    surveying the spot for establishing bore hole location, fixing ground levels

    with reference to datum RLs and observing groundwater level during

    boring operation etc. complete as specified and directed.

    Each

    shift1000.00

    Taking trial bores upto 150 mm dia. for subsoil investigation through

    overburden and soil of all sorts including providing of temporary casing

    and cleaning the bottom of holes before conducting field tests or collecting

    samples at various depths etc. complete as specified and directed.

    BW-1-03-a a) Depth upto 6.0m below ground surface Rmt 1000.00

    BW-1-03-b b) Depth beyond 6.0 m upto 20.0 m below ground surface Rmt 1200.00Taking trial bores for subsoil investigation through rock using rotary

    drilling equipment with NX size diamond core drilling bits to obtain

    approximately 54 mm dia. rock cores including provision of wooden boxes

    for storage of cores, indexing the core samples at site of work and

    conveying the same to the head quarters of concerned office etc. complete

    as specified and directed.

    BW-1-04-a a) Depth upto 10.0 m below ground surface Rmt 950.00

    BW-1-04-b b) Depth beyond 10.0 m upto 20.00 m below ground surface Rmt 1000.00

    BW-1-04-c c) Beyond 20 mtr. Rmt 1100.00

    Taking trial bores for subsoil investigation through rock using rotary

    drilling equipment with NX size diamond core drilling bits and double tubecore barrel to obtain approximately 54 mm dia. rock cores including

    provision of wooden boxes for storage of cores, indexing the core samples

    at site of work and conveying the same to the headquarters of concerned

    office etc. complete as specified and directed.

    BW-1-05-a a) Depth upto 10.0 m below ground surface Rmt 1600.00

    BW-1-05-b b) Depth beyond 10.0 m upto 20.00 m below ground surface Rmt 1900.00

    BW-1-05-c c) Depth beyond 20mtr. Rmt 2000.00

    BW-1-06

    Conducting Standard penetration test as per specifications in soil at

    various levels of bore holes and reporting the results in the approved

    format etc. complete as specified and directed.

    No. 200.00

    Collecting disturbed samples of soil from bore holes as per specifications and delivering the same to the testing laboratory anywhere

    in Greater Mumbai as directed etc. complete as specified and directed.

    DESCRIPTION OF ITEMS __ BRIDGE

  • 8/13/2019 MCGM USOR Bridge 2013

    15/81

    Schedule for Bridge Works

    2013

    ITEM CODE ITEM DESCRIPTION UNIT RATE

    BW-1-07-a a) In M.S. Black tube 50 mm dia 150 mm. long including the cost of tube No. 300.00

    BW-1-07-b b) In polythene bags by driving 100 mm size tube. No. 150.00

    BW-1-08

    Collecting undisturbed samples of soil as per specifications at any

    depth in M.S. black tube 100 mm dia. 450 mm long, sealed at both endswith paraffin wax and delivering the same to the testing laboratory

    anywhere in Greater Mumbai etc. complete as specified and directed.

    No. 450.00

    B) WORKS TO BE CARRIED OUT IN WATER CREEK

    Note: 1) The Contractors will have to submit proof of sufficient

    technical competence of agency undertaking items below. The

    Contractor will not be entitled to additional reimbursement for

    employing agency, if Engineer-in-charge so desires.

    2) The Contractor will have to make their own arrangements for

    boats, barges, pontoons, floating platforms etc. for carrying out the

    works covered under 1.009 to 1.016 below for which no extra,

    payment what so ever will be made.

    BW-1-09

    Providing and transporting to site necessary and adequate plant and

    equipment for taking trial bores for subsoil investigations including

    conducting an initial survey for establishing datum RLS and locations of

    trial bores including installation of the drilling equipment of the first bore

    location etc. complete as specified and directed with reference to T.H.D.

    Each

    Unit45000.00

    BW-1-10

    Shifting and locating the drilling equipment from one location to

    another within a lead of 500 m between successive locations including

    surveying the spot for establishing bore hole location, fixing ground levels

    with reference to datum RLS and observing ground water level during

    boring operation etc. complete as specified and directed.

    Each

    Unit3500.00

    Taking trial bores upto 150 mm dia. for subsoil investigation through

    overburden and soil of all sorts including cleaning the bottom of holes

    before taking field tests at various depths etc. complete as specified and

    directed.

    BW-1-11-a a) Depth upto 6.0 m below ground surface Rmt 1600.00

    BW-1-11-b b) Depth beyond 6.0 m upto 20.0 m below ground surface Rmt 2100.00

    Taking trial bores for subsoil investigation through rock using rotary

    drilling equipment with NX size diamond core drilling bits to obtain

    approximately 54 mm dia. rock cores including provision of wooden boxes

    for storage of cores, indexing the core samples at site of work and

    conveying the same to the head quarters of concerned office etc. -

    complete as specified and directed.BW-1-12-a a) Depth upto to 10.0 m below ground surface. Rmt 2500.00

    BW-1-12-b b) Depth beyond 10.0 m upto 20.00 m below ground surface Rmt 2800.00

    BW-1-12-c c) Depth beyond 20 m to 30 m Rmt 3000.00

    Taking trial bores for sub soil investigation through rock using rotary

    drilling equipment with NX size diamond core drillng bits and double tube

    core barrel to obtain approximately 54 mm dia. rock cores including

    provision of wooden boxes for storage of cores, indexing the core samples

    at site of work and conveying the same to the headquarters of concerned

    office etc. complete as specified and directed.

    BW-1-13-a a) Depth upto 10.0 m below ground surface Rmt 1900.00

    BW-1-13-b b) Depth beyond 10.0 m upto 20.00 m below ground surface Rmt 2400.00

  • 8/13/2019 MCGM USOR Bridge 2013

    16/81

    Schedule for Bridge Works

    2013

    ITEM CODE ITEM DESCRIPTION UNIT RATE

    BW-1-14

    Conducting Standard penetration test as per Specifications in soil at

    various levels of bore holes and reporting the results in the approved

    format etc. complete as specified and directed.

    No. 300.00

    Collecting disturbed samples of soil from bore holes as per

    specifications and delivering the same to the testing laboratory anywherein Greater Mumbai as directed etc. complete as specified and directed.

    BW-1-15-a a) In M.S. Black tube 50 mm dia 150 mm. long including the cost of tube No. 300.00

    BW-1-15-b b) In polythene bags by driving 100 mm size tube. No. 150.00

    BW-1-16

    Collecting undisturbed samples of soil as per specifications at any

    depth in M.S. black tube 100 mm dia. 450 mm long, sealed at both ends

    with paraffin wax and delivering the same to the testing laboratory

    anywhere in Greater Mumbai etc. complete as specified and directed.

    No. 450.00

    BW-1-17

    Collecting soil samples and sub-soil water samples in glass or plastic

    bottles I jars from trial bore holes and getting the same chemicallyanalyzed in an approved laboratory for determination of sulphate and

    chloride contents and pH value etc. complete as specified and directed.

    No. 100.00

    BW-1-18

    Carrying out Plate Load Test complete with necessary and adequate

    Kentledge loads, equipments and instruments etc. as per specifications for

    determination of bearing capacity of soil etc. complete as specified and

    directed and submitting reports in duplicate.

    No. 75000.00

    (C) SUB-SURFACE EXPLORATIONS

    BW-1-19

    Preparing and submitting reports and drawings in triplicate for location

    depth and details of underground pipe lines, cables and services as

    existing according to standard technique as specified upto whatever depth

    of excavation and including all equipment, material, and labour of technical

    expertise as directed excluding excavation.

    EachTrench

    15000.00

    Taking trial pit in soil of all sorts excluding rock including shoring and

    strutting as required, collecting disturbed & undisturbed samples at 1 m

    intervals and trial depth, collecting water samples & transporting all soil &

    water sample to lab., visual inspection for description of strata / recording

    water table encountered, dewatering manually and refilling at end etc.

    complete as specified and directed.

    BW-1-20-a a) Upto 2 mt. depth Cum 2000.00

    BW-1-20-b b) 2 m to 4 m depth Cum 3000.00

    BW-1-20-c c) 4 m to 6 m depth Cum 5000.00

    (D) LABORATORY TESTING

    Carrying out testsas per specifications for determination of:

    BW-1-21-a i) Natural moisture Content (NMC) of soil by Oven Drying method No. 150.00

    ii)Atterberg limits

    BW-1-21-b a) Liquid limit No. 150.00

    BW-1-21-c b) Plastic limit No. 150.00

    BW-1-21-d c) Shrinkage limit No. 150.00

    iii) Grain size analysis including grain size distribution curves in

    accordance with IS 2720 (part 4)

    BW-1-21-e a) Sieve Analysis No. 200.00

    BW-1-21-f b)Hydrometer Analysis No. 300.00

    BW-1-21-g iv) In-situ density of soil samples No. 150.00

    BW 1 21 h ) S ifi it N 150 00

  • 8/13/2019 MCGM USOR Bridge 2013

    17/81

    Schedule for Bridge Works

    2013

    ITEM CODE ITEM DESCRIPTION UNIT RATE

    BW-1-21-ivi) Unconfined compressive strength of rock samples, including

    determination of percentage of water absorption and density.No. 500.00

    BW-1-22

    Carrying out Vane Shear Test at various levels of bore holes as per

    specifications laid down in IS:4434 and reporting results thereof as per

    prescribed proforma etc. complete as specified and directed. (Including

    mobilization of necessary and adequate equpment)

    No. 12000.00

    BW-1-23Providing and transporting to site necessary and adequate plant and

    equipment for performing DPTetc. complete as specified and directed.

    Each

    Unit7000.00

    BW-1-24Shifting and locating plant and equipment from one location to another

    location for performing DPTetc. complete as specified and directed.

    Each

    Shift1000.00

    Performing Dynamic cone penetration test in accordance with IS 4968

    and reporting the results in the approved format etc. complete as specified

    and directed.

    BW-1-25-aa) Conducting probing test by using lighter probing rod and light weight

    hammer (18 kg)No. 3000.00

    BW-1-25-b b) Conducting probing test using a-drill and SPT hammer (65 kg) No. 3000.00

    BW-1-26

    Conducting Direct Shear Test in accordance with IS:2720 (part 13) and

    reporting results thereof as per prescribed proforma etc complete as

    specified and directed.

    No. 500.00

    BW-1-27

    Conducting Consolidation test on undisturbed soil sample or soil sample

    compacted to specified density in accordance with IS 2720 ( part-15

    ),reporting results including unit weights, specific gravity, e-log p curve,

    virgin curve, PO, eo, Cc, Cv and mv for all pressure increments etc.

    complete as specified and directed.

    No. 900.00

    BW-1-28

    Conducting Unconfined compression test on undisturebed soil samples

    or soil samples compacted to specified density in accordance with IS :

    2720 (part 10) and reporting results thereof as per prescribed Proforma

    etc. complete as specified and directed.

    No. 350.00

    FOUNDATION

    A) EXCAVATION

    BW-2-1Excavation for foundation in any type of Marshy or creek land upto a

    depth of 3.0 m by Manual meansCum 427.00

    BW-2-1-a Cost for dewatering , where required for Item No. BW -2-1 Cum 96.60

    BW-2-1-b Cost for Shoring & strutting , where required for Item No. BW -2-1 Cum 48.30

    It is assumed that Marshy Soil will be available upto 3 m depth only. For

    deeper excavation below 3 m depth, refer Common Schedule Earth WorkChapter

    BW-2-2Excavation for foundation in any type of Marshy or creek land upto a

    depth of 3.0 m by Mechanical MeansCum 177.00

    BW-2-2-a Cost for dewatering , where required for Item No. BW -2.1.2 Cum 30.78

    BW-2-2-b Cost for Shoring & strutting , where required for Item No. BW -2.1.2 Cum 15.39

    It is assumed that Marshy Soil will be available upto 3 m depth only. For

    deeper excavation below 3 m depth, refer Common Schedule Earth Work

    Chapter

    BW-2-3 Back Filling in Marshy Foundation Pits Cum 256.00

  • 8/13/2019 MCGM USOR Bridge 2013

    18/81

    Schedule for Bridge Works

    2013

    ITEM CODE ITEM DESCRIPTION UNIT RATE

    BW-2-4

    Excavation for foundation in earth, soil of all sorts excluding rock by

    any method as required and / or directed including shoring and strutting as

    necessary, removing down vegetation, bailing out water manually,

    removing the excavated materials upto a safe distance as directed

    including all l ifts and leads, preparing the bed for foundation, backfil ling

    with approved materials, ramming, watering and disposing off the surplus

    excavated material and cleaning the site etc. complete as specified and

    directed (0 to 2m.)

    Refer

    Common

    Schedule

    Earth WorkChapter

    BW-2-5

    Excavation for foundation in earth, soil of all sorts excluding rock by

    any method as required and / or directed including shoring and strutting as

    necessary, removing down vegetation, bailing out water manually,

    removing the excavated materials upto a safe distance as directed

    including all l ifts and leads, preparing the bed for foundation, backfil ling

    with approved materials, ramming, watering and disposing off the surplus

    excavated material and cleaning the site etc. complete as specified and

    directed (above 2m upto 4m.)

    Refer

    Common

    Schedule

    Earth Work

    Chapter

    BW-2-6

    Excavation for foundation in earth, soil of all sorts excluding rock by

    any method as required and / or directed including shoring and strutting as

    necessary, removing down vegetation, bailing out water manually,

    removing the excavated materials upto a safe distance as directed

    including all l ifts and leads, preparing the bed for foundation, backfil ling

    with approved materials, ramming, watering and disposing off the surplus

    excavated material and cleaning the site etc. complete as specified and

    directed (above 4m upto 6m.)

    Refer

    Common

    Schedule

    Earth Work

    Chapter

    BW-2-7

    E.O for Excavation for foundation in soft rock by any method as

    required and / or directed including bailing out water manually, removing

    the excavated materials upto a safe distance as directed including all lifts

    and leads, preparing the bed for foundation, backfilling with approved

    materials, watering and disposing off the surplus excavated materials andcleaning the site etc. completed as specified and directed (any depth).

    Refer

    Common

    Schedule

    Earth Work

    Chapter

    BW-2-8

    E.O for Excavation for foundation in hard rock by blasting including

    bailing out water manually, removing the excavated materials upto a safe

    distance as directed, stacking the serviceable materials neatly and

    disposing off the unserviceable materials as directed including all leads

    and lifts, preparing the bed for foundation backfilling with approved

    materials and disposing off the surplus excavated materials and cleaning

    the site etc. complete as specified and directed (any depth).

    Refer

    Common

    Schedule

    Earth Work

    Chapter

    BW-2-9

    Excavation for foundation in hard rock by chiseling / wedging / line

    drilling without blasting including bailing out water manually, removingthe excavated materials upto a safe distance as directed, stacking the

    serviceable materials neatly and disposing off the unserviceable materials

    as directed including all leads and lifts, preparing the bed for foundation,

    backfilling with approved materials and disposing off the surplus excavated

    materials and cleaning the site etc. complete as specified and directed

    (any depth).

    Refer

    Common

    Schedule

    Earth Work

    Chapter

    BW-2-10Filling Annular Space Around Footing in Rock (Lean cement concrete

    1:3:6 nominal mix).Cum 4696.00

    BW-2-11Sand Filling in Foundation Trenches as per Drawing & Technical

    SpecificationCum 1766.00

  • 8/13/2019 MCGM USOR Bridge 2013

    19/81

    Schedule for Bridge Works

    2013

    ITEM CODE ITEM DESCRIPTION UNIT RATE

    BW-2-12

    Dewatering on Horse Power basis by using water pumps including

    diversion of streams, providing earthen bunds, cofferdams etc. as may

    necessary for foundation and other parts of structure including pumping

    out water during and after excavation until work for foundation and sub-

    structure above natural water is completed etc. completed as specified and

    directed.

    HP per

    hr

    Refer CS-

    EW-10

    MASONRY ITEMS

    BW-2-13

    Providing and laying Dry Rubble stone packing having thickness 230 mm

    and above in foundation including hand packing in regular line and level,

    filling interstices with small pieces of stone, thoroughly ramming and

    consolidating including watering as necessary etc. complete as specified

    and directed.

    Cum 1219.00

    BW-2-14

    Providing Coursed rubble masonry 1st sort of trap stone in cement

    mortar 1:5 in superstructure including scaffolding, racking outI striking out

    joints, watering etc. complete as directed and specified.

    Cum 3992.00

    Providing random rubble stone masonry of trap stone in cement mortar 1:3

    in foundation / sub structure as per drawing and specification striking jointsof non exposed faces and pointing the exposed faces with cement mortar

    1:3 including scaffolding and watering including bailing out water manually

    etc. complete.

    BW-2-15-a Square Rubble Coursed rubble masonry( first sort ) Cum 4776.00

    BW-2-15-b Random Rubble Masonry Cum 4611.00

    (B) PLAIN AND R.C.C. FOR OPEN FOUNDATIONS

    Notes: Applicable for all cement concrete items in the BRIDGE

    Schedule.

    1) All concrete shall be machine mixed and consolidated and I or

    compacted by vibrators. The maximum siize of aggregate for plain

    concrete works shall be limited to 40mm and that of reinforcedconcrete shall be limited to 25mm unless otherwise specified in

    particular items or in drawings.

    2) Whenever contractor uses fly ash as part of the cement quantity,

    the following formula shall be applied for deduction in the rate of the

    item.

    Amount in Rupees per Cubic metre of Concrete to be deducted from the

    rate of item in the schedule of Rates/Tender :

    Notes for R.M.C.

    1) Any lead for R.M.C more than 20 km. is on contractors account.

    2) R.M.C is required to be unloaded within one hour from plant tosite, hence more than 20kms. Is not desirable.

    3) If lead is more than 20kms. The contractor has to establish his own

    batching plant near site.

    4) All Batch mixed plant is assumed to be RMC plant

    1.155[N x a/100] (A - B)

    Where N = The Number of bags per Cum. of concrete considered in the

    mix.

    a = Percentage of fly ash used in the concrete mix by the Contractor.

    A : Market Rate of cement per bag (50 Kg) in Rupees In Mumbai or

    Schedule Rate of Cement whichever is higher

    B : Market Rate of fly Ash per 50Kg. in Rupees in Mumbai.

    The factor 1.155 accounts for over head charges and sundries considered

    i th R t b t t f th it

  • 8/13/2019 MCGM USOR Bridge 2013

    20/81

    Schedule for Bridge Works

    2013

    ITEM CODE ITEM DESCRIPTION UNIT RATE

    N' for various grade of concrete considered in the schedule of Rate.

    M-45 = 10.8 bags/Cum. M-25= 8.2 bags I Cum.

    M-40 = 10.8 bags/Cum. M-20 =7.20 bags / Cum.

    M-35 = 10.2 bags/Cum. M-15= 6.40 bags I Cum.

    M-30 = 9.2 bags/Cum. M-10 =5.50 bags / Cum.

    BW-2-16

    Providing and laying in position M-10 plain cement concrete to fill up loose

    pockets of foundations bed for making required levels, annular filling

    aroundabutments, piers, columns for foundation.

    4775.00

    BW-2-17

    Providing and placing in position controlled cement concrete ofM-15grade

    for foundation work with minimum cement 400 kg./cum. and water cement

    ratio not exceeding 0.4 for PCC raft foundation slab with V notches Sloped

    / flat / strlp footings, pile caps tie beams to required lines / levels including

    leveling, compacting by vibrators, curing including shuttering, centering as

    necessary and required etc. complete as specified and as directed.

    Cum 5218.00

    BW-2-18

    Providing and placing in position controlled cement concrete ofM-20grade

    for foundation work with minimum cement 400 kg./cum. and water cementratio not exceeding 0.4 for PCC raft foundation slab with V notches Sloped

    / flat / strlp footings, pile caps tie beams to required lines / levels including

    leveling, compacting by vibrators, curing including shuttering, centering as

    necessary and required etc. complete as specified and as directed.

    Cum 5609.00

    Providing and placing in position controlled cement concrete ofM-20grade

    for foundation work with minimum cement 400 kg./cum. and water cement

    ratio not exceeding 0.4 for RCC raft foundation slab with V notches Sloped

    / flat / strlp footings, pile caps tie beams to required lines / levels including

    leveling, compacting by vibrators, curing including shuttering, centering as

    necessary and required etc. complete as specified and as directed but

    excluding reinforcement.

    BW-2-19-a a) Using concrete mixer Cum 5646.00

    BW-2-19-b b) With Batching Plant, Transit Mixer and Concrete Pump Cum 6019.00

    Providing and placing in position controlled cement concrete ofM-25grade

    for foundation work with minimum cement 400 kg./cum. and water cement

    ratio not exceeding 0.4 for PCC raft foundation slab with V notches Sloped

    / flat / strlp footings, pile caps tie beams to required lines / levels including

    leveling, compacting by vibrators, curing including shuttering, centering as

    necessary and required etc. complete as specified and as directed.

    BW-2-20-a a) Using concrete mixer Cum 5991.00

    BW-2-20-b b) With Batching Plant, Transit Mixer and Concrete Pump Cum 6210.00

    Providing and placing in position controlled cement concrete ofM-25grade

    for foundation work with minimum cement 400 kg./cum. and water cement

    ratio not exceeding 0.4 for RCC raft foundation slab with V notches Sloped

    / flat / strlp footings, pile caps tie beams to required lines / levels including

    leveling, compacting by vibrators, curing including shuttering, centering as

    necessary and required etc. complete as specified and as directed but

    excluding reinforcement.

    BW-2-21-a a) Using concrete mixer Cum 6033.00

    BW-2-21-b b) With Batching Plant, Transit Mixer and Concrete Pump Cum 6210.00

    Providing and placing in position controlled cement concrete ofM-30grade

    for foundation work with minimum cement 400 kg./cum. and water cement

    ratio not exceeding 0.4 for PCC raft foundation slab with V notches Sloped

    / flat / strlp footings, pile caps tie beams to required lines / levels includingleveling, compacting by vibrators, curing including shuttering, centering as

    necessary and required etc. complete as specified and as directed.

  • 8/13/2019 MCGM USOR Bridge 2013

    21/81

    Schedule for Bridge Works

    2013

    ITEM CODE ITEM DESCRIPTION UNIT RATE

    BW-2-22-a a) Using concrete mixer Cum 6020.00

    BW-2-22-b b) With Batching Plant, Transit Mixer and Concrete Pump Cum 6541.00

    Providing and placing in position controlled cement concrete ofM-30grade

    for foundation work with minimum cement 400 kg./cum. and water cement

    ratio not exceeding 0.4 forRCC raft foundation slab with V notchesSloped / flat / strlp footings, pile caps tie beams to required lines /

    levels including leveling, compacting by vibrators, curing including

    shuttering, centering as necessary and required etc. complete as specified

    and as directed but excluding reinforcement.

    BW-2-23-a a) Using concrete mixer Cum 6042.00

    BW-2-23-b b) With Batching Plant, Transit Mixer and Concrete Pump Cum 6606.00

    Providing and placing in position controlled cement concrete ofM-35grade

    for foundation work with minimum cement 400 kg./cum. and water cement

    ratio not exceeding 0.4 forRCC raft foundation slab with V notches

    Sloped / flat / strlp footings, pile caps tie beams to required lines /

    levels including leveling, compacting by vibrators, curing includingshuttering, centering as necessary and required etc. complete as specified

    and as directed but excluding reinforcement.

    BW-2-24-a a) Using concrete mixer Cum 6122.00

    BW-2-24-b b) With Batching Plant, Transit Mixer and Concrete Pump Cum 6779.00

    BW-2-25

    Providing and placing in position controlled cement concrete ofM-40grade

    for foundation work with minimum cement 400 kg./cum. and water cement

    ratio not exceeding 0.4 forRCC raft foundation slab with V notches

    Sloped / flat / strlp footings, pile caps tie beams to required lines /

    levels including leveling, compacting by vibrators, curing including

    shuttering, centering as necessary and required etc. complete as specified

    and as directed but excluding reinforcement.

    Cum 7017.00

    (C) PILE FOUNDATIONS

    Providing and installing in position controlled concrete of grade M-

    30(Batching Plant,Transit Mixer and Concrete Pump ) with minimum

    cement content as 400 kg/cum. and W.C. ratio not exceeding 0.40 for

    RCC work in cast-in-situ bored piles each of load capacity as per design

    and of specified diameter using maximum 20 mm size of aggregate

    including boring through aIl strata except rock, including placing of

    concrete by tremie arrangement through mild steel casing to the required

    depth through all strata except rock, compaction as necessary with drawl

    of mild steel casing including chipping / dressing of piles to requiredlevels, cleaning the reinforcement etc. complete as specified and directed

    (Excluding reinforcement).

    BW-2-26-a 1) 400 mm dia Rmt 1272.00

    BW-2-26-b 2) 450 mm dia Rmt 1610.00

    BW-2-26-c 3) 500 mm dia Rmt 1987.00

    BW-2-26-d 5) 600 mm dia Rmt 2862.00

    BW-2-26-e 8) 750 mm dia Rmt 4490.00

    BW-2-26-f 11) 1000 mm dia Rmt 7982.00

    BW-2-26-g 13) 1200 mm dia Rmt 11494.00

  • 8/13/2019 MCGM USOR Bridge 2013

    22/81

    Schedule for Bridge Works

    2013

    ITEM CODE ITEM DESCRIPTION UNIT RATE

    Providing and installing in position controlled concrete of grade M-35

    (Batching Plant, Transit Mixer and Concrete Pump ) with minimum

    cement content as 400 kg/cum. and W.C. ratio not exceeding 0.40 for

    RCC work in cast-in-situ bored piles each of load capacity as per design

    and of specified diameter using maximum 20 mm size of aggregate

    including boring through aIl strata except rock, including placing of

    concrete by tremie arrangement through mild steel casing to the required

    depth through all strata except rock, compaction as necessary with drawl

    of mild steel casing including chipping / dressing of piles to required

    levels, cleaning the reinforcement, removal of excavated earth with all lifts

    and lead upto 1000 m. etc. complete as specified and directed (Excluding

    reinforcement).

    BW-2-27-a 1) 400 mm dia Rmt 1245.00

    BW-2-27-b 2) 450 mm dia Rmt 1575.00

    BW-2-27-c 3) 500 mm dia Rmt 1945.00

    BW-2-27-d 4) 550 mm dia Rmt 2353.00

    BW-2-27-e 5) 600 mm dia Rmt 2801.00

    BW-2-27-f 6) 650 mm dia Rmt 3287.00

    BW-2-27-g 7) 700 mm dia Rmt 3812.00

    BW-2-27-h 8) 750 mm dia Rmt 4376.00

    BW-2-27-i 9) 800 mm dia Rmt 4979.00

    BW-2-27-j 10) 900 mm dia Rmt 6302.00

    BW-2-27-k 11) 1000 mm dia Rmt 7780.00

    BW-2-27-l 12)1100mmdia Rmt 9414.00

    BW-2-27-m 13) 1200 mm dia Rmt 11203.00

    Extra over rates quoted in items BW-2-26 and BW-2-27 for chiseling

    through soft / weathered rock / hard rock / large boulders / old foundations

    / masonry / concrete etc. using a chisel weighing not less than 750 kg.

    BW-2-28-a 1) 400mmdia Rmt 786.00

    BW-2-28-b 2) 450 mm dia Rmt 995.00

    BW-2-28-c 3) 500 mm dia Rmt 1228.00

    BW-2-28-d 4) 550 mm dia Rmt 1486.00

    BW-2-28-e 5) 600 mm dia Rmt 1769.00

    BW-2-28-f 6) 650 mm dia Rmt 2076.00

    BW-2-28-g 7) 700 mm dia Rmt 2407.00

    BW-2-28-h 8) 750 mm dia Rmt 2764.00

    BW-2-28-i 9) 800 mm dia Rmt 3144.00

    BW-2-28-j 10) 850 mm dia Rmt 3550.00

    BW-2-28-k 11) 900 mm dia Rmt 3980.00

    BW-2-28-l 12) 1000 mm dia Rmt 4913.00BW-2-28-m 13) 1100 mm dia Rmt 5945.00

    BW-2-28-n 14) 1200 mm dia Rmt 7075.00

    BW-2-3-4Empty boring through over burden including road crust upto the bottom of

    pile cap for all diameters of piles.Rmt 1806.00

    Chipping and dressing of the RCC piles to remove surplus concrete

    above cut off level without damaging the projecting reinforcement including

    clearing reinforcement and removing the dismantled materials etc.

    complete as specified and directed.

    BW-2-29-a 1) 400 mm dia Rmt 110.00

    BW-2-29-b 2) 450 mm dia Rmt 140.00

    BW-2-29-c 3) 500 mm dia Rmt 173.00

    BW-2-29-d 4) 550 mm dia Rmt 209.00BW-2-29-e 5) 600 mm dia Rmt 248.00

    BW 2 29 f 6) 650 mm dia Rmt 292 00

  • 8/13/2019 MCGM USOR Bridge 2013

    23/81

    Schedule for Bridge Works

    2013

    ITEM CODE ITEM DESCRIPTION UNIT RATE

    BW-2-29-g 7) 700 mm dia Rmt 338.00

    BW-2-29-h 8) 750 mm dia Rmt 388.00

    BW-2-29-i 9) 800 mm dia Rmt 442.00

    BW-2-29-j 10) 900 mm dia Rmt 499.00

    BW-2-29-k11) 1000 mm dia Rmt 559.00

    BW-2-29-l 12) 1100 mm dia Rmt 690.00

    BW-2-29-m 13) 1200 mm dia Rmt 835.00

    Providing and installing in position controlled concrete of grade M-35

    (Batching Plant, Transit Mixer and Concrete Pump ) with minimum cement

    content as 400 kg/cum. and W.C. ratio not exceeding 0.40 for RCC work in

    driven cast-in-situ vertical piles each of load capacity as per design and

    of specified diameter using maximum 20 mm size of aggregate including

    boring through aIl strata except rock, including placing of concrete by

    tremie arrangement through mild steel casing to the required depth

    through all strata except rock, compaction as necessary with drawl of mild

    steel casing including chipping / dressing of piles to required levels,

    cleaning the reinforcement etc. complete as specified and directed(Excluding reinforcement).

    BW-2-30-a a) 750 mm dia Rmt 4174.00

    BW-2-30-b b) 1000 mm dia Rmt 6865.00

    BW-2-30-c c) 1200 mm dia Rmt 9989.00

    BW-2-31

    Providing and placing in position M-35 RCC precast piles of 500 mm dia

    in preformed bores made with hydraulic rig drilling / boring through all type

    of strata including hard rock using portland cement with minimum cement

    content as 400 kg. Per cum. and water cement ratio not exceeding 0.40

    each with a load capacity as per design, transporting the precast pile from

    casting yard to site of work, hoisting and holding the pile truly vertical with

    the help of crane of required capacity, placing the pile in position includinggrouting the annular space with cement grout (1 :2) (1 cement, 2 fine sand)

    between the pile and the preformed bore including cutting off the surplus

    length of pile and dressing neatly including providing M.S. black tube 30

    mm dia through the centre of pile for grouting etc. complete including cost

    of all boring work through all type of strata as specified and directed but

    excluding the cost of reinforcement.

    Rmt 2508.00

    BW-2-32

    Providing and placing in position M-35 RCC precast piles of 600 mm dia

    in preformed bores made with hydraulic rig drilling / boring through all type

    of strata including hard rock using portland cement with minimum cement

    content as 400 kg. Per cum. and water cement ratio not exceeding 0.40

    each with a load capacity as per design, transporting the precast pile fromcasting yard to site of work, hoisting and holding the pile truly vertical with

    the help of crane of required capacity, placing the pile in position including

    grouting the annular space with cement grout (1 :2) (1 cement, 2 fine sand)

    between the pile and the preformed bore including cutting off the surplus

    length of pile and dressing neatly including providing M.S. black tube 30

    mm dia through the centre of pile for grouting etc. complete including cost

    of all boring work through all type of strata as specified and directed but

    excluding the cost of reinforcement.

    Rmt 2788.00

  • 8/13/2019 MCGM USOR Bridge 2013

    24/81

    Schedule for Bridge Works

    2013

    ITEM CODE ITEM DESCRIPTION UNIT RATE

    BW-2-33

    Providing and placing in position M-35 RCC precast piles of 450 mm dia

    in preformed bores made with hydraulic rig drilling / boring through all type

    of strata including hard rock using portland cement with minimum cement

    content as 400 kg. Per cum. and water cement ratio not exceeding 0.40each with a load capacity as per design, transporting the precast pile from

    casting yard to site of work, hoisting and holding the pile truly vertical with

    the help of crane of required capacity, placing the pile in position including

    grouting the annular space with cement grout (1 :2) (1 cement, 2 fine sand)

    between the pile and the preformed bore including cutting off the surplus

    length of pile and dressing neatly including providing M.S. black tube 30

    mm dia through the centre of pile for grouting etc. complete including cost

    of all boring work through all type of strata as specified and directed but

    excluding the cost of reinforcement.

    Rmt 2255.00

    BW-2-34

    Providing and placing in position M-35 RCC precast piles of 750 mm diain preformed bores made with hydraulic rig drilling / boring through all type

    of strata including hard rock using portland cement with minimum cement

    content as 400 kg. Per cum. and water cement ratio not exceeding 0.40

    each with a load capacity as per design, transporting the precast pile from

    casting yard to site of work, hoisting and holding the pile truly vertical with

    the help of crane of required capacity, placing the pile in position including

    grouting the annular space with cement grout (1 :2) (1 cement, 2 fine sand)

    between the pile and the preformed bore including cutting off the surplus

    length of pile and dressing neatly including providing M.S. black tube 30

    mm dia through the centre of pile for grouting etc. complete including cost

    of all boring work through all type of strata as specified and directed but

    excluding the cost of reinforcement.

    4294.00

    BW-2-35

    Providing and placing in position M-35 RCC precast piles of 1000 mm

    dia in preformed bores made with hydraulic rig drilling / boring through all

    type of strata including hard rock using portland cement with minimum

    cement content as 400 kg. Per cum. and water cement ratio not exceeding

    0.40 each with a load capacity as per design, transporting the precast pile

    from casting yard to site of work, hoisting and holding the pile truly vertical

    with the help of crane of required capacity, placing the pile in position

    including grouting the annular space with cement grout (1 :2) (1 cement, 2

    fine sand) between the pile and the preformed bore including cutting off

    the surplus length of pile and dressing neatly including providing M.S.

    black tube 30 mm dia through the centre of pile for grouting etc. complete

    including cost of all boring work through all type of strata as specified and

    directed but excluding the cost of reinforcement.

    6954.00

    BW-2-36

    Providing and installing in position permanent M.S. liners for piles of

    specified diameter and fabricated from 6.0 to 8.0mm thick plates as per

    detailed drawings and designs including cutting, bending to required

    shape, welding, painting with Red Oxide paint etc. complete as specified

    and directed.

    MT 78465.00

    BW-2-37Levelling course for Pile cap - Providing and laying of PCC M15

    levelling course 100mm thick below the pile cap.Cum 4150.00

    Providing and cutting bending, hooking, laying in position and tying Mild

    steel / HYSD bars for reinforcement as per detailed drawings for

    R.C.C.work.BW-2-38-a a) HYSD bars MT 62100.00

    BW-2-38-b b) Mild Steel bars MT 61199 00

  • 8/13/2019 MCGM USOR Bridge 2013

    25/81

    Schedule for Bridge Works

    2013

    ITEM CODE ITEM DESCRIPTION UNIT RATE

    (D) WEll FOUNDATIONS

    Providing and constructing temporary island 16 m diameter for

    construction of well foundation for 8m dia. Well.

    BW-2-39-a Assuming depth of water 1.0 m and height of island to be 1.25m. Each 38565.00

    BW-2-39-b Assuming depth of water 4.0 m and height of island 4.5 m. Each 228563.00

    BW-2-40Providing and constructing one span service road to reach island location

    from one pier location to another pier locationRmt 1928.00

    BW-2-41

    Providing, fabricating and setting out in requisite position Mild steel

    weighing 40 kg per metre cutting edge for RCC wells including cutting,

    bending to required shape as per detailed drawings and designs including

    bolting, revetting or welding sections, dowels for anchoring the cutting

    edge to well curb etc. complete as specifeid and directed.

    MT 83902.00

    Well curb

    Providing and placing in position controlled cement concrete in M-25 grade

    in well curbs with minimum cement content as 400 kg/cum. water cement

    ratio not exceeding 0.40 and maximum size of coarse aggregate notexceeding 20 mm including necessary formwork to give form finish

    surface, compacting by vibrators, curing etc. complete as specified and

    BW-2-42-a a) Using concrete mixer Cum 6979.00

    BW-2-42-b b) With Batching Plant, Transit Mixer and Concrete Pump Cum 7237.00

    Providing and placing in position controlled cement concrete in M-30

    grade in well curbs with minimum cement content as 400 kg/cum. water

    cement ratio not exceeding 0.40 and maximum size of coarse aggregate

    not exceeding 20 mm including necessary formwork to give form finish

    surface, compacting by vibrators, curing etc. complete as specified and

    directed. (Excluding reinforcement).

    BW-2-43-a a) Using concrete mixer Cum 7006.00

    BW-2-43-b b) With Batching Plant, Transit Mixer and Concrete Pump Cum 8995.00

    Providing and placing in position controlled cement concrete in M-35

    grade in well curbs with minimum cement content as 400 kg/cum. water

    cement ratio not exceeding 0.40 and maximum size of coarse aggregate

    not exceeding 20 mm including necessary formwork to give form finish

    surface, compacting by vibrators, curing etc. complete as specified and

    directed. (Excluding reinforcement).

    BW-2-44-a a) Using concrete mixer Cum 7133.00

    BW-2-44-b b) With Batching Plant, Transit Mixer and Concrete Pump Cum 7822.00

    Well steining

    BW-2-45

    Providing and placing in position controlled cement concrete of M-15 grade

    in PCC well steining as per detailed design and drawings with minimum

    cement content of 400 kg/cum, water cement ratio not exceeding 0.40 and

    maximum size of aggregate not exceeding 20 mm including form work to

    give form finish surface, compacting by vibrators, necessary bracings and

    curing etc. complete as specified and directed.

    Cum 5519.00

  • 8/13/2019 MCGM USOR Bridge 2013

    26/81

    Schedule for Bridge Works

    2013

    ITEM CODE ITEM DESCRIPTION UNIT RATE

    BW-2-46

    Providing and placing in position controlled cement concrete of M-20 grade

    in PCC well steining as per detailed design and drawings with minimum

    cement content of 400 kg/cum, water cement ratio not exceeding 0.40 and

    maximum size of aggregate not exceeding 20 mm including form work to

    give form finish surface, compacting by vibrators, necessary bracings andcuring etc. complete as specified and directed.

    Cum 5933.00

    Providing and placing in position controlled cement concrete ofM-20grade

    in RCC well steining as per detailed design and drawings with minimum

    cement content of 400 kg/cum, water cement ratio not exceeding 0.40 and

    maximum size of aggregate not exceeding 20 mm including form work to

    give form finish surface, compacting by vibrators, necessary bracings and

    curing etc. complete as specified and directed. (Excluding

    reinforcement)

    BW-2-47-a a) Using concrete mixer Cum 5972.00

    BW-2-47-b b) With Batching Plant, Transit Mixer and Concrete Pump Cum 6367.00

    Providing and placing in position controlled cement concrete of M-25

    grade in PCC well steining as per detailed design and drawings with

    minimum cement content of 400 kg/cum, water cement ratio not exceeding

    0.40 and-maximum size of aggregate not exceeding 20 mm including form

    work to give form finish surface, compacting by vibrators, necessary

    bracings and curing etc. complete as specified and directed.

    BW-2-48-a a) Using concrete mixer Cum 6353.00

    BW-2-48-b b) With Batching Plant, Transit Mixer and Concrete Pump Cum 6568.00

    Providing and placing in position controlled cement concrete ofM-25grade

    in RCC well steining as per detailed design and drawings with minimum

    cement content of 400 kg/cum, water cement ratio not exceeding 0.40 and

    maximum size of aggregate not exceeding 20 mm including form work to

    give form finish surface, compacting by vibrators, necessary bracings and

    curing etc. complete as specified and directed. (Excluding

    reinforcement)

    BW-2-49-a a) Using concrete mixer Cum 6397.00

    BW-2-49-b b) With Batching Plant, Transit Mixer and Concrete Pump Cum 6634.00

    Providing and placing in position controlled cement concrete of M-30 grade

    in PCC well steining as per detailed design and drawings with minimum

    cement content of 400 kg/cum, water cement ratio not exceeding 0.40 and

    maximum size of aggregate not exceeding 20 mm including form work to

    give form finish surface, compacting by vibrators, necessary bracings andcuring etc. complete as specified and directed.

    BW-2-50-a a) Using concrete mixer Cum 6398.00

    BW-2-50-b b) With Batching Plant, Transit Mixer and Concrete Pump Cum 6918.00

    Providing and placing in position controlled cement concrete ofM-30grade

    in RCC well steining as per detailed design and drawings with minimum

    cement content of 400 kg/cum, water cement ratio not exceeding 0.40 and

    maximum size of aggregate not exceeding 20 mm including form work to

    give form finish surface, compacting by vibrators, necessary bracings and

    curing etc. complete as specified and directed. (Excluding

    reinforcement)

    BW-2-51-a a) Using concrete mixer Cum 6422.00

    BW 2 51 b b) With Batching Plant Transit Mixer and Concrete Pump Cum 6987 00

  • 8/13/2019 MCGM USOR Bridge 2013

    27/81

    Schedule for Bridge Works

    2013

    ITEM CODE ITEM DESCRIPTION UNIT RATE

    Providing and placing in position controlled cement concrete ofM-35grade

    in RCC well steining as per detailed design and drawings with minimum

    cement content of 400 kg/cum, water cement ratio not exceeding 0.40 and

    maximum size of aggregate not exceeding 20 mm including form work to

    give form finish surface, compacting by vibrators, necessary bracings and

    curing etc. complete as specified and directed (Excluding

    reinforcement).

    BW-2-52-a a) Using concrete mixer Cum 6539.00

    BW-2-52-b b) With Batching Plant, Transit Mixer and Concrete Pump Cum 7170.00

    Providing and placing in position controlled cement concrete ofM-40grade

    in RCC well steining as per detailed design and drawings with minimum

    cement content of 400 kg/cum, water cement ratio not exceeding 0.40 and

    maximum size of aggregate not exceeding 20 mm including form work to

    give form finish surface, compacting by vibrators, necessary bracings and

    curing etc. complete as specified and directed (Excluding

    reinforcement).

    BW-2-53 - With Batching Plant, Transit Mixer and Concrete Pump Cum 7494.00

    Sinking of 6 m external diameter well ( other than pneumatic method

    of sinking ) through all types of strata namely sandy soil, clayey soil

    and rock as shown against each case, complete as per drawing and

    technical specifications. Depth of sinking is reckoned from bed level.

    Sandy soil

    BW-2-54-a Depth below bed level upto 3.0 M Rmt 3296.00

    BW-2-54-b Beyond 3m upto 10m depth Rmt 4594.00

    Beyond 10m upto 20m

    BW-2-54-c Add 5% for every additional meter depth of sinking over the rate of sinkingfor the previous meter

    Rmt 6067.00

    Beyond 20m upto 30 m

    BW-2-54-dAdd 7.5% for every additional meter depth of sinking over the rate of

    sinking for the previous meterRmt 11378.00

    BW-2-54-eAdd 20% of cost for Kentledge including supports, loading arrangement

    and Labour .13654.00

    Beyond 30m upto 40 m Rmt

    BW-2-54-fAdd 10% for every additional meter depth of sinking over the rate of

    sinking for the previous meter27033.00

    BW-2-54-gAdd 20% of cost for Kentledge including supports, loading arrangement

    and Labour .

    Rmt 32439.00

    Clayey soil ( 6m dia. Well )

    BW-2-55-a Depth below bed level upto 3.0 M Rmt 4623.00

    BW-2-55-b Beyond 3m upto 10m depth Rmt 10132.00

    Beyond 10 m upto 20 m

    BW-2-55-cAdd 5% for every additional meter depth of sinking over the rate of sinking

    for the previous meterRmt 13383.00

    BW-2-55-d Add for dewatering @ 5% of cost, if required. Rmt 14052.00

    Beyond 20m upto 30 m

    BW-2-55-eAdd 7.5% for every additional meter depth of sinking over the rate of

    sinking for the previous meter Rmt 25104.00

    BW-2-55-f Add 5% of cost for dewatering of the cost, if required Rmt 32949.00

  • 8/13/2019 MCGM USOR Bridge 2013

    28/81

    Schedule for Bridge Works

    2013

    ITEM CODE ITEM DESCRIPTION UNIT RATE

    BW-2-55-gAdd 25% of cost for Kentledge including supports, loading arrangement

    and Labour ).Rmt 31380.00

    Beyond 30m upto 40 m

    BW-2-55-hAdd 10% for every additional meter depth of sinking over the rate of

    sinking for the previous meter

    Rmt 59644.00

    BW-2-55-i Add 5% of cost for dewatering, if required Rmt 75151.00

    BW-2-55-jAdd 20% of cost for Kentledge including supports, loading arrangement

    and Labour).Rmt 71573.00

    Soft rock (6m dia well )

    BW-2-56 Depth of soft rock strata upto 3m Rmt 16577.00

    Hard rock (6m dia well )

    BW-2-57 Depth of soft rock strata upto 3m Rmt 16482.00

    Sinking of 7 m external diameter well ( other than pneumatic method

    of sinking ) through all types of strata namely sandy soil, clayey soil

    and rock as shown against each case, complete as per drawing and

    technical specifications. Depth of sinking is reckoned from bed level.

    Sandy soil

    BW-2-58-a Depth below bed level upto 3.0 M Rmt 4831.00

    BW-2-58-b Beyond 3m upto 10m depth Rmt 6367.00

    Beyond 10m upto 20m

    BW-2-58-cAdd 5% for every additional meter depth of sinking over the rate of sinking

    for the previous meterRmt 8409.00

    Beyond 20m upto 30 m

    BW-2-58-dAdd 7.5% for every additional meter depth of sinking over the rate of

    sinking for the previous meterRmt 15772.00

    BW-2-58-eAdd 20% of cost for Kentledge including supports, loading arrangement

    and Labour) .Rmt 18927.00

    Beyond 30m upto 40 m

    BW-2-58-fAdd 10% for every additional meter depth of sinking over the rate of

    sinking for the previous meterRmt 37470.00

    BW-2-58-gAdd 20% of cost for Kentledge including supports, loading arrangement,

    and Labour etc.Rmt 44964.00

    Clayey soil ( 7m dia. Well )

    BW-2-59-a Depth below bed level upto 3.0 M Rmt 6367.00

    BW-2-59-b Beyond 3m upto 10m depth Rmt 9071.00

    Beyond 10 m upto 20 m

    BW-2-59-cAdd 5% for every additional meter depth of sinking over the rate of sinking

    for the previous meterRmt 11980.00

    BW-2-59-d Add for dewatering @ 5% of cost, if required. Rmt 12579.00

    Beyond 20m upto 30 m

    BW-2-59-eAdd 7.5% for every additional meter depth of sinking over the rate of

    sinking for the previous meterRmt 22472.00

    BW-2-59-f Add 5% of cost for dewatering on the cost, if required Rmt 29494.00

    BW-2-59-g Add 25% of cost for Kentledge including supports, loading arrangementand Labour ). Rmt 28089.00

    Beyond 30m upto 40 m

  • 8/13/2019 MCGM USOR Bridge 2013

    29/81

    Schedule for Bridge Works

    2013

    ITEM CODE ITEM DESCRIPTION UNIT RATE

    BW-2-59-hAdd 10% for every additional meter depth of sinking over the rate of

    sinking for the previous meterRmt 53389.00

    BW-2-59-i Add 5% of cost for dewatering, if required Rmt 67270.00

    BW-2-59-jAdd 20% of cost for Kentledge including supports, loading arrangement

    and Labour).

    64067.00

    Soft rock ( 7m dia well )

    BW-2-60 Depth of soft rock strata upto 3m Rmt 13392.00

    Hard rock ( 7m dia well )

    BW-2-61 Depth upto 3 m Rmt 19719.00

    Sinking of 8 m external diameter well ( other than pneumatic method

    of sinking ) through all types of strata namely sandy soil, clayey soil

    and rock as shown against each case, complete as per drawing and

    technical specifications. Depth of sinking is reckoned from bed level.

    Sandy soilBW-2-62-a Depth below bed level upto 3.0 M Rmt 5893.00

    BW-2-62-b Beyond 3m upto 10m depth Rmt 7216.00

    Beyond 10m upto 20m

    BW-2-62-cAdd 5% for every additional meter depth of sinking over the rate of sinking

    for the previous meterRmt 9532.00

    Beyond 20m upto 30 m

    BW-2-62-dAdd 7.5% for every additional meter depth of sinking over the rate of

    sinking for the previous meterRmt 17881.00

    BW-2-62-eAdd 20% of cost for Kentledge including supports, loading arrangement

    and Labour .Rmt 21457.00

    Beyond 30m upto 40 m

    BW-2-62-f Add 10% for every additional meter depth of sinking over the rate ofsinking for the previous meter

    Rmt 6285.00

    BW-2-62-gAdd 20% of cost for Kentledge including supports, loading arrangement,

    and Labour etc.Rmt 7543.00

    Clayey soil ( 8m dia. Well )

    BW-2-63-a Depth upto 3.0 M Rmt 7801.00

    BW-2-63-b Beyond 3m upto 10m depth Rmt 10550.00

    Beyond 10 m upto 20 m

    BW-2-63-cAdd 5% for every additional meter depth of sinking over the rate of sinking

    for the previous meterRmt 13933.00

    BW-2-63-d Add for dewatering @ 5% of cost, if required. Rmt 14630.00

    Beyond 20m upto 30 m

    BW-2-63-e Add 7.5% for every additional meter depth of sinking over the rate ofsinking for the previous meter

    Rmt 26133.00

    BW-2-63-f Add 5% of cost for dewatering on the cost, if required Rmt 34299.00

    BW-2-63-gAdd 25% of cost for Kentledge including supports, loading arrangement

    and Labour ).Rmt 32666.00

    Beyond 30m upto 40 m

    BW-2-63-hAdd 10% for every additional meter depth of sinking over the rate of

    sinking for the previous meterRmt 62088.00

    BW-2-63-i Add 5% of cost for dewatering, if required Rmt 78231.00

    BW-2-63-jAdd 20% of cost for Kentledge including supports, loading arrangement

    and Labour).Rmt 74505.00

    Soft rock ( 8m dia well )

    BW-2-64 Depth in soft rock strata upto 3m Rmt 14964.00Hard rock ( 8m dia well )

    BW-2-65 Depth in hard rock strata upto 3 m Rmt 20399.00

  • 8/13/2019 MCGM USOR Bridge 2013

    30/81

    Schedule for Bridge Works

    2013

    ITEM CODE ITEM DESCRIPTION UNIT RATE

    Sinking of 9 m external diameter well ( other than pneumatic method

    of sinking ) through all types of strata namely sandy soil, clayey soil

    and rock as shown against each case, complete as per drawing and

    technical specifications. Depth of sinking is reckoned from bed level.

    Sandy soil

    BW-2-66-a Depth below bed level upto 3.0 M Rmt 6000.00

    BW-2-66-b Beyond 3m upto 10m depth Rmt 7905.00

    Beyond 10m upto 20m

    BW-2-66-cAdd 5% for every additional meter depth of sinking over the rate of sinking

    for the previous meterRmt 10440.00

    Beyond 20m upto 30 m

    BW-2-66-dAdd 7.5% for every additional meter depth of sinking over the rate of

    sinking for the previous meterRmt 19582.00

    BW-2-66-eAdd 20% of cost for Kentledge including supports, loading arrangement

    and Labour .Rmt 23498.00

    Beyond 30m upto 40 mBW-2-66-f

    Add 10% for every additional meter depth of sinking over the rate of

    sinking for the previous meterRmt 46522.00

    BW-2-66-gAdd 20% of cost for Kentledge including supports, loading arrangement,

    and Labour etc.Rmt 55827.00

    Clayey soil ( 9m dia. Well )

    BW-2-67-a Depth below bed level upto 3.0 M Rmt 8281.00

    BW-2-67-b Beyond 3m upto 10m depth Rmt 11348.00

    Beyond 10 m upto 20 m

    BW-2-67-cAdd 5% for every additional meter depth of sinking over the rate of sinking

    for the previous meterRmt 14987.00

    BW-2-67-d Add for dewatering @ 5% of cost, if required. Rmt 15736.00

    Beyond 20m upto 30 mBW-2-67-e

    Add 7.5% for every additional meter depth of sinking over the rate of

    sinking for the previous meterRmt 28109.00

    BW-2-67-f Add 5% of cost for dewatering on the cost, if required Rmt 36894.00

    BW-2-67-gAdd 25% of cost for Kentledge including supports, loading arrangement

    and Labour ).Rmt 35137.00

    Beyond 30m upto 40 m

    BW-2-67-hAdd 10% for every additional meter depth of sinking over the rate of

    sinking for the previous meterRmt 66781.00

    BW-2-67-i Add 5% of cost for dewatering, if required Rmt 84145.00

    BW-2-67-jAdd 20% of cost for Kentledge including supports, loading arrangement

    and Labour).Rmt 80138.00

    Soft rock ( 9m dia well )BW-2-68 Depth upto 3m Rmt 18419.00

    Hard rock ( 9m dia well )

    BW-2-69 Depth of hard rock strata upto 3 m Rmt 23418.00

    Sinking of 10 m external diameter well ( other than pneumatic method

    of sinking ) through all types of strata namely sandy soil, clayey soil

    and rock as shown against each case, complete as per drawing and

    technical specifications. Depth of sinking is reckoned from bed level.

    Sandy soil

    BW-2-70-a Depth below bed level upto 3.0 M Rmt 7055.00

    BW-2-70-b Beyond 3m upto 10m depth Rmt 8397.00

    Beyond 10m upto 20m

    BW-2-70-cAdd 5% for every additional meter depth of sinking over the rate of sinking

    for the previous meterRmt 11090.00

  • 8/13/2019 MCGM USOR Bridge 2013

    31/81

    Schedule for Bridge Works

    2013

    ITEM CODE ITEM DESCRIPTION UNIT RATE

    BW-2-70-dAdd 7.5% for every additional meter depth of sinking over the rate of

    sinking for the previous meterRmt 20802.00

    BW-2-70-eAdd 20% of cost for Kentledge including supports, loading arrangement

    and Labour .Rmt 24963.00

    Beyond 30m upto 40 m

    BW-2-70-fAdd 10% for every additional meter depth of sinking over the rate of

    sinking for the previous meterRmt 49423.00

    BW-2-70-gAdd 20% of cost for Kentledge including supports, loading arrangement,

    and Labour etc.Rmt 59308.00

    Clayey soil (10m dia. Well )

    BW-2-71-a Depth below bed level upto 3.0 M Rmt 9358.00

    BW-2-71-b Beyond 3m upto 10m depth Rmt 11483.00

    Beyond 10 m upto 20 m

    BW-2-71-cAdd 5% for every additional meter depth of sinking over the rate of sinking

    for the previous meterRmt 15166.00

    BW-2-71-d Add for dewatering @ 5% of cost, if required. Rmt 15924.00

    Beyond 20m upto 30 m

    BW-2-71-eAdd 7.5% for every additional meter depth of sinking over the rate of

    sinking for the previous meterRmt 28447.00

    BW-2-71-f Add 5% of cost for dewatering on the cost, if required Rmt 37337.00

    BW-2-71-gAdd 25% of cost for Kentledge including supports, loading arrangement

    and Labour ).Rmt 35559.00

    Beyond 30m upto 40 m

    BW-2-71-hAdd 10% for every additional meter depth of sinking over the rate of

    sinking for the previous meterRmt 67586.00

    BW-2-71-i Add 5% of cost for dewatering, if required Rmt 85159.00

    BW-2-71-jAdd 20% of cost for Kentledge including supports, loading arrangement

    and Labour).81104.00

    Soft rock (10m dia well )

    BW-2-72 Depth of soft rock strata upto 3m Rmt 18728.00

    Hard rock (10m dia well )

    BW-2-73 Depth of hard rock strata upto 3 m Rmt 25774.00

    Sinking of 11 m external diameter well ( other than pneumatic method

    of sinking ) through all types of strata namely sandy soil, clayey soil

    and rock as shown against each case, complete as per drawing and

    technical specifications. Depth of sinking is reckoned from bed level.

    Sandy soil

    BW-2-74-a Depth from bed level upto 3.0 M Rmt 15860.00

    BW-2-74-b Beyond 3m upto 10m depth Rmt 13687.00

    Beyond 10m upto 20mBW-2-74-c

    Add 5% for every additional meter depth of sinking over the rate of sinking

    for the previous meterRmt 18078.00

    Beyond 20m upto 30 m

    BW-2-74-dAdd 7.5% for every additional meter depth of sinking over the rate of

    sinking for the previous meterRmt 33910.00

    BW-2-74-eAdd 20% of cost for Kentledge including supports, loading arrangement

    and Labour .Rmt 40692.00

    Beyond 30m upto 40 m

    BW-2-74-fAdd 10% for every additional meter depth of sinking over the rate of

    sinking for the previous meterRmt 80568.00

    BW-2-74-gAdd 20% of cost for Kentledge including supports, loading arrangement,

    and Labour etc.

    Rmt 96681.00

    Clayey soil (11 m dia. Well )

    BW-2-75-a Depth from bed level upto 3.0 M Rmt 15624.00

  • 8/13/2019 MCGM USOR Bridge 2013

    32/81

    Schedule for Bridge Works

    2013

    ITEM CODE ITEM DESCRIPTION UNIT RATE

    Beyond 10 m upto 20 m

    BW-2-75-cAdd 5% for every additional meter depth of sinking over the rate of sinking

    for the previous meterRmt 31622.00

    BW-2-75-d Add for dewatering @ 5% of cost, if required. Rmt 33203.00

    Beyond 20m upto 30 m

    BW-2-75-eAdd 7.5% for every additional meter depth of sinking over the rate of

    sinking for the previous meterRmt 59314.00

    BW-2-75-f Add 5% of cost for dewatering on the cost, if required Rmt 77850.00

    BW-2-75-gAdd 25% of cost for Kentledge including supports, loading arrangement

    and Labour ).Rmt 74143.00

    Beyond 30m upto 40 m

    BW-2-75-hAdd 10% for every additional meter depth of sinking over the rate of

    sinking for the previous meterRmt 140920.00

    BW-2-75-i Add 5% of cost for dewatering, if required Rmt 177559.00

    BW-2-75-jAdd 20% of cost for Kentledge including supports, loading arrangement

    and Labour).Rmt 169104.00

    Soft rock (11m dia well )

    BW-2-76 Depth of soft rock strata upto 3m Rmt 41766.00

    Hard rock (11m dia well )

    BW-2-77 Depth of hard rock upto 3 m Rmt 56986.00

    Sinking of 12 m external diameter well ( other than pneumatic method

    of sinking ) through all types of strata namely sandy soil, clayey soil

    and rock as shown against each case, complete as per drawing and

    technical specifications. Depth of sinking is reckoned from bed level.

    Sandy soil

    BW-2-78-a I) Depth below bed level upto 3.0 M Rmt 33389.00

    BW-2-78-b Beyond 3m upto 10m depth Rmt 38426.00

    Beyond 10m upto 20m

    BW-2-78-cAdd 5% for every additional meter depth of sinking over the rate of sinking

    for the previous meterRmt 50748.00

    Beyond 20m upto 30 m

    BW-2-78-dAdd 7.5% for every additional meter depth of sinking over the rate of

    sinking for the previous meterRmt 95189.00

    BW-2-78-eAdd 20% of cost for Kentledge including supports, loading arrangement

    and Labour .Rmt 114226.00

    Beyond 30m upto 40 m

    BW-2-78-fAdd 10% for every additional meter depth of sinking over the rate of

    sinking for the previous meterRmt 226154.00

    BW-2-78-gAdd 20% of cost for Kentledge including supports, loading arrangement,

    and Labour etc.

    Rmt 271384.00

    Clayey soil (12 m dia. Well )

    BW-2-79-a Depth below bed level upto 3.0 M Rmt 37933.00

    BW-2-79-b Beyond 3m upto 10m depth Rmt 58219.00

    Beyond 10 m upto 20 m

    BW-2-79-cAdd 5% for every additional meter depth of sinking over the rate of sinking

    for the previous meterRmt 76889.00

    BW-2-79-d Add for dewatering @ 5% of cost, if required. Rmt 80733.00

    Beyond 20m upto 30 m

    BW-2-79-eAdd 7.5% for every additional meter depth of sinking over the rate of

    sinking for the previous meterRmt 144223.00

    BW-2-79-f Add 5% of cost for dewatering on the cost, if required Rmt 189292.00

    BW-2-79-g Add 25% of cost for Kentledge including supports, loading arrangementand Labour ).

    Rmt 180278.00

    Beyond 30m upto 40 m

  • 8/13/2019 MCGM USOR Bridge 2013

    33/81

    Schedule for Bridge Works

    2013

    ITEM CODE ITEM DESCRIPTION UNIT RATE

    BW-2-79-hAdd 10% for every additional meter depth of sinking over the rate of

    sinking for the previous meterRmt 342652.00

    BW-2-79-i Add 5% of cost for dewatering, if required Rmt 431742.00

    BW-2-79-jAdd 20% of cost for Kentledge including supports, loading arrangement

    and Labour).Rmt 411183.00

    Soft rock (12m dia well )

    BW-2-80 Depth of soft rock strata upto 3m Rmt 96500.00

    Hard rock (12m dia well )

    BW-2-81 Depth of hard rock strata upto 3 m Rmt 125737.00

    Sinking of Twin D Type well ( other than pneumatic method of sinking

    ) through all types of strata namely sandy soil, clayey soil and rock

    as shown against each case, complete as per drawing and technical

    specifications. Depth of sinking is reckoned from bed level.

    Sandy soil

    BW-2-82-a Depth from bed level upto 3.0 M Rmt 7501.00BW-2-82-b Beyond 3m upto 10m depth Rmt 8155.00

    Beyond 10m upto 20m

    BW-2-82-cAdd 5% for every additional meter depth of sinking over the rate of sinking

    for the previous meterRmt 10770.00

    Beyond 20m upto 30 m

    BW-2-82-dAdd 7.5% for every additional meter depth of sinking over the rate of

    sinking for the previous meterRmt 20200.00

    BW-2-82-eAdd 20% of cost for Kentledge including supports, loading arrangement

    and Labour .Rmt 24241.00

    Beyond 30m upto 40 m

    BW-2-82-fAdd 10% for every additional meter depth of sinking over the rate of

    sinking for the previous meter

    Rmt 47994.00

    BW-2-82-gAdd 20% of cost for Kentledge including supports, loading arrangement,

    and Labour etc.Rmt 57593.00

    Clayey soil (Twin D Type Well )

    BW-2-83-a Depth below bed level upto 3.0 M Rmt 8998.00

    BW-2-83-b Beyond 3m upto 10m depth Rmt 12702.00

    Beyond 10 m upto 20 m

    BW-2-83-cAdd 5% for every additional meter depth of sinking over the rate of sinking

    for the previous meterRmt 16775.00

    BW-2-83-d Add for dewatering @ 5% of cost, if required. Rmt 17614.00

    Beyond 20m upto 30 m

    BW-2-83-eAdd 7.5% for every additional meter depth of sinking over the rate of

    sinking for the previous meter

    Rmt 31466.00

    BW-2-83-f Add 5% of cost for dewatering on the cost, if required Rmt 41299.00

    BW-2-83-gAdd 25% of cost for Kentledge including supports, loading arrangement

    and Labour ).Rmt 39332.00

    Beyond 30m upto 40 m

    BW-2-83-hAdd 10% for every additional meter depth of sinking over the rate of

    sinking for the previous meterRmt 74759.00

    BW-2-83-i Add 5% of cost for dewatering, if required Rmt 94196.00

    BW-2-83-jAdd 20% of cost for Kentledge including supports, loading arrangement

    and Labour).Rmt 89710.00

    Soft rock (Twin D Type well )

    BW-2-84 Depth of soft rock strata upto 3m Rmt 20774.00

    Hard rock (Twin D Type well )BW-2-85 Depth of hard rock strata upto 3 m Rmt 27039.00

  • 8/13/2019 MCGM USOR Bridge 2013

    34/81

    Schedule for Bridge Works

    2013

    ITEM CODE ITEM DESCRIPTION UNIT RATE

    BW-2-86

    Pneumatic sinking of wells with equipment of approved design, drawing

    and specifications worked by competent and trained personnel and

    comprising of compression and decompression chambers, reducers, two

    air locks separately for men and plant & materials, arrangement for supply

    of fresh air to working chambers, check valves, exhaust valves, shafts

    made from steel plates of riveted construction not less than 6 mm thick to

    withstand an air pressure of 0.50 MPa, controlled blasting of hard rock

    where required, staircases and 1 m wide landing plate forms with railing,

    arrangement for compression and decompression, electric lighting of 50 V

    maximum, proper rooms for rest and medical examinations and

    compliance with safety precautions as per IS:4138, all as per

    clause1207.6 of Specifications.

    Cum 95739.00

    BW-2-87 Sand filling in wells complete as per drawing and technical specifications Cum 1766.00

    BW-2-88 Providing steel liner 10 mm thick for curbs and 6mm thick for steining ofwells including fabricating and setting out as per detailed drawing

    MT 76648.00

    Providing and placing in position controlled cement concrete in bottom

    plug of well foundations in wells or through tremie arrangement including

    compacting by vibrators and curing where necessary etc. complete as

    specified and directed. (10% extra cement to be added when concreting is

    done under water).

    PCC Grade M20

    BW-2-89-a Using Concrete Mixer Cum 6310.00

    BW-2-89-b Using Batching Plant, Transit Mixer and Crane/concrete pump Cum 6501.00

    PCC Grade M25

    BW-2-90-a Using Concr