Michigan Download the free Mi Drive app for up-to-date traffic information, or visit www.michigan.gov/drive Scan this QR code to go directly to MDOT’s Major Projects website. www.michigan.gov/mdotprojects Map Explanation 94 94 20 127 FREEWAY AREA OF CONSTRUCTION PAVED (TWO OR MORE LANES) AND MULTI-LANE DIVIDED INTERSTATE ROUTE CONSTRUCTION PROJECT INTERSTATE BUSINESS (LOOP OR SPUR) U.S. ROUTE OR B.R. (B.R. - BUSINESS ROUTE) STATE ROUTE OR B.R. (B.R. - BUSINESS ROUTE) COUNTY LINE AND NAME 36 EATON Mi Drive website also available at: www.michigan.gov/drive Scan the appropriate QR code with your device to be taken directly to the free application download or search Mi Drive in Google Play or the Apple App Store. Real-time Travel Information > Traffic Alerts > Construction Info > Traffic Speeds > Camera Views > Interactive Maps > Weather Updates > and more! 2015 Road Repair Projects PAVING THE WAY KEWEENAW HOUGHTON ONTONAGON GOGEBIC BARAGA IRON MARQUETTE DICKINSON MENOMINEE DELTA ALGER SCHOOLCRAFT MACKINAC CHIPPEWA LUCE PRESQUE ISLE CHEBOYGAN EMMET CHARLEVOIX ANTRIM OTSEGO MONTMORENCY ALPENA LEELANAU BENZIE MANISTEE WEXFORD MASON OCEANA MECOSTA NEWAYGO MUSKEGON MONTCALM KENT IONIA CLINTON SHIAWASSEE SAGINAW OTTAWA ALLEGAN VAN BUREN BERRIEN CASS ST. JOSEPH BRANCH HILLSDALE LENAWEE MONROE KALAMAZOO CALHOUN JACKSON WASHTENAW WAYNE BARRY EATON INGHAM LIVINGSTON OAKLAND MACOMB GRATIOT TUSCOLA SANILAC GENESEE LAPEER ST. CLAIR HURON ISABELLA MIDLAND BAY LAKE OSCEOLA CLARE GLADWIN ARENAC MISSAUKEE ROSCOMMON OGEMAW IOSCO GRAND TRAVERSE KALKASKA CRAWFORD OSCODA ALCONA 11 6 8 1 2 3 5 4 7 13 14 17 16 19 20 23 24 28 54 51 49 48 47 45 38 36 39 37 44 34 43 52 53 55 56 61 63 30 66 65 9 10 12 15 18 21 22 64 70 71 67 74 75 76 73 77 72 69 68 25 26 27 29 33 31 32 57 50 46 42 41 35 40 58 60 62 59 Lansing Flint Saginaw Midland Ludington Pentwater Cadillac Grayling Mio Gaylord Alpena Mackinaw City Cheboygan Petoskey Charlevoix Frankfort Manistee Sault Ste. Marie Manistique Marquette Hancock Houghton Ontonagon Ishpeming Munising Newberry Iron Mountain Ironwood Crystal Falls Escanaba Gwinn Menominee St. Ignace Traverse City Alma Mount Pleasant Clare Bay City Port Huron Grand Haven Holland South Haven Kalamazoo Battle Creek Muskegon Big Rapids St. Joseph Jackson Charlotte Ann Arbor Brighton Monroe Hillsdale Adrian Frankenmuth Harbor Beach Grand Rapids Detroit Benton Harbor 94 275 696 496 475 94 96 96 96 69 69 94 94 94 94 75 75 75 75 75 75 69 96 96 23 131 131 131 31 31 127 127 131 31 31 10 10 10 31 12 12 12 31 31 131 31 23 31 23 23 127 127 23 12 24 223 2 2 2 2 2 41 41 41 41 41 45 45 141 2 127 B.R. 136 136 675 196 91 60 86 66 51 43 43 37 37 40 89 66 40 66 66 72 72 119 185 134 48 28 28 28 28 28 64 64 107 38 26 77 77 94 35 35 69 69 95 35 67 94 123 117 183 553 123 221 129 66 33 33 32 68 65 65 72 33 30 61 13 55 21 82 46 37 55 22 22 22 55 18 18 37 115 20 20 57 52 52 99 49 156 60 50 125 15 24 13 81 90 46 19 19 29 53 53 59 142 25 25 46 106 50 50 52 14 99 34 79 99 78 227 43 36 43 66 50 71 60 62 96 124 139 140 216 311 153 113 204 149 203 26 26 6 11 44 45 121 231 89 138 25 13 222 179 100 27 48 75 88 37 32 20 83 63 42 115 116 120 See reverse side of map for Metropolitan Detroit and Grand Rapids road repair projects. 1 US-2: May-Oct Reconstruct 1 mile from Curry St to Roosevelt St in Ironwood. Westbound traffic detoured on Jackson Rd to Greenbush Rd. Eastbound traffic maintained on US-2. 2 US-41/M-26: Dec 2014-Apr 2016 Repair Portage Lake Lift Bridge.1 lane open in each direction on bridge for majority of project. 16 2-hour nighttime closures Jan-Apr, and approximately 200 15- to 20-minute daytime and nighttime closures through Apr 2016. 3 US-41: June-Sept Mill and resurface 2 miles in L’Anse. Lane closures under flag control. 4 US-2: May-Sept Resurface 1 mile in Crystal Falls, reconstruct 2.3 miles south of Crystal Falls. Lane closures under flag control and temporary traffic signal. 5 US-41/M-28: May-Sept Resurface 1.1 miles and pave shoulders from Carp River to Nicolet Blvd in Marquette. 1 lane open in each direction. 6 M-35: May-Sept Resurface 5.9 miles and pave shoulders from 48th Ave in Menominee to Ingallston. Lane closures under flag control and temporary traffic signal. 7 US-2: May-Sept Replace bridge over Ogontz River. Maintain traffic on temporary bridge. 8 US-2: June-Aug Resurface 9.5 miles from Tannery Rd to east of County Rd 434. 1 lane open under flag control. 9 I-75 BS: June-Oct Reconstruct 0.3 miles from Easterday Ave to power canal in Sault Ste. Marie, plus streetscape. Closed with posted detour. 10 I-75: Apr-July Replace 2 culverts immediately south of M-28. Closed with posted detour. 11 I-75: July-Oct Resurface 10 miles from Mackinac/ Chippewa county line to M-80. 1 lane open in each direction. 12 I-75: May-Oct Reconstruct 0.3 miles from Mackinac Trail to north end of I-75 BL in St. Ignace; repair Castle Rock overpass bridge. 1 lane open in each direction until after Labor Day. Intermittent detours after Labor Day. 13 US-23: Mar-Aug Replace bridge over Little Black River. Temporary traffic signal. 14 US-31: Apr-Oct Reconstruct and resurface 4.2 miles from Camp Daggett Rd to US-131 in Petoskey. 1-way detour between Eppler Rd and US-131 before July 4. Traffic shifts. 15 US-31: Sept-Nov Resurface 3.5 miles from Holiday Rd to Brackett Rd in Acme. 1 lane open in each direction. 16 M-72: Mar-Nov Reconstruct and widen 1 mile from east of US-31 to Lautner Rd in Acme, plus construct 2 roundabouts and pedestrian tunnel. Temporary traffic shift; intermittent flag control. 17 US-31: Mar-July Reconstruct 1.6 miles from 3 Mile Rd to Holiday Rd in East Bay Township. 1 lane open in each direction. 18 I-75: Aug-Oct Resurface 7.5 miles from Crawford County line to south of Charles Brink Rd. 1 lane open in each direction. 19 M-33/M-72: July Resurface 1.1 miles west of Fairview School to Home Dr, and M-33/M-72 intersection to east of Maple Dr in Fairview. Flag control. 20 M-33: June-July Chip seal 17.8 miles from I-75 to south of M-55, north of Engle Rd to north of Houghton Creek Rd, and north of Oyster Rd to north of Borden Rd. Flag control. 21 US-31: Sept Resurface 2.9 miles from north of Pere Marquette Hwy to US-10. Lane closures and traffic shifts on ramps. 22 US-131: Apr-Sept Reconstruct 5.7 miles from south of Mecosta County line to north of US-10 in Reed City. Lane closures and traffic shifts on ramps. 23 M-66: Sept-Oct Replace bridge over west branch of Middle Branch River. Detour on M-61 and M-115. 24 US-131: Jan-Oct Repair bridge over Muskegon River. 1 lane open at all times with 5 total closures between mid-May and mid-Aug. 25 M-37: Sept-Oct Mill and resurface 4.4 miles from the White River to 3 Mile Rd, and M-20 from M-37 to Swain St. 1 lane open under flag control. 26 M-82: June-Aug Mill and resurface 10 miles from Main St in Fremont to M-37. 1 lane open under flag control. 27 US-31 BR (Seaway Dr): Apr-Sept Mill and resurface 5.5 miles from US-31 to Shoreline Dr. 1 lane open at all times. 28 US-31: June-July Construct indirect left-turn lanes and right-turn lanes at Taylor St. 1 lane open at all times. 29 M-104: Sept-Nov Mill and resurface 4.4 miles from Lake Ave to 124th Ave. 1 lane open at all times. 30 I-96: June-Sept Repair bridges over Deer Creek, Sand Creek and 24th Ave. 1 lane open at all times. 31 M-44 (Belding Rd): May-Sept Mill and resurface 9.9 miles from Myers Lake Ave to Kent/Ionia county line. 1 lane open at all times. Westbound traffic detoured at Ramsdell Dr; eastbound traffic maintained. 32 M-21 (Fulton St): Aug-Oct Mill and resurface 2.3 miles from Valley Vista Dr to Kent/Ionia county line. Lane closures during off-peak hours. 33 US-31: Mar-Aug Mill and resurface 1.5 miles from Allegan/Ottawa county line to 8th St and reconstruct CSX Railroad crossing. 1 lane open at all times. 34 M-222: Feb-July Reconstruct bridge over US-131 in Martin. Bridge closed Feb-June. All ramps remain open. Nighttime lane closures on US-131. 35 I-196: Sept-Oct Repave northbound lanes from M-63 to Van Buren Trail bridge. Single-lane closures. 36 M-63 (Niles Rd): June-July Repair bridge over Hickory Creek. Northbound traffic maintained; southbound traffic detoured. 37 I-94: Apr-June Repair bridge over St. Joseph River. Daytime single-lane closures; nighttime double-lane closures. 38 I-94: May-Sept Replace eastbound bridge over Hickory Creek. 2 lanes open in each direction. 39 M-139 (E Main St): Jan-Nov Replace bridge over St. Joseph River. Traffic detoured. 40 M-139: Mar-Aug Reconstruct 3.7 miles from M-140 to Fairland Rd. 1 lane open under flag control. 41 I-94: May-Nov Resurface westbound lanes from CR 687 to M-51, plus reconstruct median shoulder, replace culvert, resurface ramp, extend ramp acceleration lane, reconstruct under 5 bridges, replace guardrail, and reconstruct cable median barrier. 1 lane open. 42 I-94: Sept-Nov Repair 2.9 miles from MM 58 to MM 61. Nighttime single-lane closures. 43 I-94: Mar-Aug Replace bridge over east branch of Paw Paw River. 2 lanes open in each direction. 44 I-94 BL (Stadium Dr): Apr-Sept Reconstruct bridge and interchange at US-131 in Kalamazoo. I-94 BL: ramp and lane closures. US-131: nighttime lane closures. 45 I-94: Mar-Nov Reconstruct interchange with Sprinkle Rd. I-94: nighttime lane closures. Sprinkle Rd: lane closures. All ramps closed. 46 M-60: Mar-Sept Reconstruct 1.1 miles through village of Mendon, from Mendon Pkwy to Congress Rd. Westbound lanes closed and detoured. 47 I-94 BL (Skyline Dr): Apr-Nov Resurface from I-94 to Hill Brady Rd. Flag control. Replace bridge over I-94 at Exit 92. 2 lanes open in each direction on I-94; intermittent ramp closures. 48 M-89: Aug-Oct Repave 1.2 miles from Augusta Dr to Custer Dr west of Battle Creek. Lane closures under flag control. 49 M-89: May-Sept Repave 5.4 miles from Custer Dr to I-94 BL in Battle Creek. 1 lane open in each direction under flag control. 50 M-66: Apr-June Repave 1 mile from I-94 to Glenn Cross Rd. 1 lane open in each direction. 51 I-69: Apr-Aug Bridge work on L Dr N over I-69. I-69: 1 lane open in each direction. L Dr N: 1 alternating lane open with temporary traffic signals. 52 I-94 BL (Michigan Ave): June-Oct Repave 1.6 miles at I-69 in Marshall. 1 lane open in each direction. 53 M-60: June-Aug Repave 0.7 miles at I-69. Flag control. 54 M-100: Mar 2015-Fall 2016 Replace bridge over CN Railroad. 1 lane open in each direction. 1 lane open with temporary signals at 2 local drains just north of downtown Potterville. 55 US-127: Apr-Sept Repair bridge over I-96. US-127: daytime lane closures. I-96: nighttime lane closures, short-term ramp closures with detour posted. 56 I-94: July-Sept Repair bridge over US-127 BR/M-50. I-94: all lanes open. US-127 BR/ M-50: single-lane closures. No work during race weekend at Michigan International Speedway (MIS). 57 US-12: June-Aug Resurface from US-127 to M-50. Daytime single-lane closures. No work during race weekend at Michigan International Speedway (MIS). 58 US-23: Apr-July Repair from School Rd to Center Rd. 1 lane open in each direction. 59 I-75: Apr 2015-Nov 2016 Reconstruct from I-275 to Dixie Hwy. 2 lanes open in each direction. 60 US-23: Apr-Sept Install median guardrail from I-94 to Washtenaw/Monroe county line. Shoulder closures; intermittent single- lane closures. 61 I-94: May-Aug Resurface from Carpenter Rd to US-12. Nighttime single-lane closures. 62 US-12 BR (Michigan Ave): Aug-Oct Resurface from Water St to Wayne County line. 1 lane open in each direction. 63 I-96: Apr 2015-Aug 2016 Replace bridges and construct new lanes near US-23. I-96: intermittent lane closures. Spencer Rd: closed 42 days in spring 2015. 64 I-69: Mar 2015-Aug 2016 Reconstruct 11 miles eastbound from M-19 (Kinney Rd) to Taylor Rd. 1 lane with traffic shifted to westbound side. Temporary ramp closures with posted detour. 65 I-94/I-69: Sept 2013-Oct 2015 Reconstruct 3.7 miles of interchange and reconstruct bridges connecting I-94 and I-69. 1 lane open in each direction. Temporary closures with posted detour. 66 Blue Water Bridge: Apr-June Resurface westbound span. 2-way traffic on eastbound span. 67 I-69: May-Nov Repair 2 bridges on I-69 and 6 bridges over I-69 from Clark Rd to Summers Rd. Single-lane closures and traffic shifts 68 M-24: Mar-Sept Reconstruct 1 mile from Demille Blvd to Nepessing St in Lapeer. Replace culvert over Farmers Creek, install new pedestrian tunnel. 1 lane open in each direction. Detour for 6 weeks between Demille Blvd and Genesee St for culvert work. 69 I-69: Mar-Nov Reconstruct 1 mile from M-54 (Dort Hwy) to Center Rd, including bridge repairs/widening at Center Rd and Averill Rd, and freeway lighting upgrades. Replace bridge over M-54 (Dort Hwy). Single-lane closures, traffic shifts and ramp closures. 70 M-15: Oct 2014-Oct 2015 Replace M-15 bridge over Cass River in Vassar. Single-lane closures. 71 I-75: Apr-July Repair M-54/M-83 bridge over I-75. Single-lane closures. 72 I-75: Mar 2015-Nov 2016 Reconstruct 3.8 miles from Dixie Hwy to Hess Rd. Replace Baker Rd, King Rd, and Hess Rd bridges over I-75. Local bridges over I-75 detoured. Maintain 3 lanes in peak direction and 2 lanes in non-peak direction. 73 I-75: Apr-Dec Replace US-10 bridge over I-75. I-75: intermittent lane closures. US-10: single-lane closures. Ramp traffic detoured. 74 US-10: Apr-Sept Replace Nine Mile Rd bridge over US-10. 1 lane maintained with crossovers. 75 US-10 BR: Apr-Nov Reconstruct 1.5 miles and resurface 0.3 miles from Jerome St to Saginaw St in Midland. 1 lane open in each direction. 76 M-30: Mar-June Construct roundabout at westbound US-10 ramps. Lane closures with traffic shifts on M-30. Short-term detour on M-30; westbound US-10 ramps detoured for majority of project. 77 M-20: Jan-Nov Construct narrow boulevard from east of Summerton Rd to east of Leaton Rd. Single-lane closures and traffic shifts during off-peak hours.

MDOT 2015 Roadwork Projects

Embed Size (px)

DESCRIPTION

Roadwork goes on. Here's a map of MDOT's 2015 planned road repair projects.

Citation preview

  • Michigan

    Download the free Mi Drive app for up-to-date traffic information, or

    visit www.michigan.gov/drive

    Scan this QR code to go directly to MDOTs Major Projects website.

    www.michigan.gov/mdotprojects

    Map Explanation

    94

    94

    20

    127

    FREEWAY

    AREA OFCONSTRUCTION

    PAVED (TWO OR MORE LANES)AND MULTI-LANE DIVIDED

    INTERSTATE ROUTE

    CONSTRUCTIONPROJECT

    INTERSTATE BUSINESS(LOOP OR SPUR)

    U.S. ROUTE OR B.R.(B.R. - BUSINESS ROUTE)

    STATE ROUTE OR B.R.(B.R. - BUSINESS ROUTE)

    COUNTY LINE AND NAME

    36

    EATON

    Mi Drive website also available at: www.michigan.gov/drive

    Scan the appropriate QR code with your device to be taken directly to the free application download orsearch Mi Drive in Google Play

    or the Apple App Store.

    Real-time Travel Information

    > Traffic Alerts> Construction Info> Traffic Speeds> Camera Views> Interactive Maps> Weather Updates > and more!

    2015Road Repair Projects

    PAVING THE WAY

    KEWEENAW

    HOUGHTON

    ONTONAGON

    GOGEBIC

    BARAGA

    IRON

    MARQUETTE

    DICKINSON

    MENOMINEE

    DELTA

    ALGER

    SCHOOLCRAFT MACKINAC

    CHIPPEWA

    LUCE

    PRESQUE ISLECHEBOYGAN

    EMMET

    CHARLEVOIX

    ANTRIM

    OTSEGO

    MONTMORENCYALPENA

    LEELANAU

    BENZIE

    MANISTEE

    WEXFORD

    MASON

    OCEANA

    MECOSTA

    NEWAYGO

    MUSKEGON

    MONTCALM

    KENT

    IONIA

    CLINTON

    SHIAWASSEE

    SAGINAW

    OTTAWA

    ALLEGAN

    VAN BUREN

    BERRIEN

    CASS

    ST. JOSEPHBRANCH

    HILLSDALE

    LENAWEE

    MONROE

    KALAMAZOO

    CALHOUN

    JACKSON

    WASHTENAWWAYNE

    BARRY EATON

    INGHAM

    LIVINGSTON OAKLAND

    MACOMB

    GRATIOT

    TUSCOLA

    SANILAC

    GENESEE

    LAPEER

    ST. CLAIR

    HURON

    ISABELLA

    MIDLAND

    BAY

    LAKE OSCEOLA

    CLARE

    GLADWIN

    ARENAC

    MISSAUKEE

    ROSCOMMON

    OGEMAW IOSCO

    GRANDTRAVERSE

    KALKASKA

    CRAWFORD

    OSCODA

    ALCONA

    11

    6

    8

    1

    2

    3

    5

    4

    7

    13

    14

    17 16

    19

    20

    23

    24

    28

    54

    514948

    4745

    38

    36

    39

    37

    44

    34

    43

    52

    53

    55

    5661

    63

    30

    66

    65

    9

    10

    12

    15

    18

    21

    22

    64

    70

    71

    67

    74

    75

    76

    7377

    72

    69

    68

    25

    26

    27

    29

    33

    31

    32

    57

    50

    46

    4241

    35

    4058

    60

    62

    59

    Lansing

    Flint

    Saginaw

    Midland

    Ludington

    Pentwater

    Cadillac

    Grayling Mio

    GaylordAlpena

    Mackinaw City

    Cheboygan

    Petoskey

    Charlevoix

    Frankfort

    Manistee

    Sault Ste. Marie

    Manistique

    Marquette

    Hancock

    Houghton

    Ontonagon

    IshpemingMunising

    Newberry

    Iron Mountain

    Ironwood

    CrystalFalls

    Escanaba

    Gwinn

    Menominee

    St. Ignace

    Traverse City

    Alma

    MountPleasant

    Clare

    Bay City

    PortHuron

    Grand Haven

    Holland

    South Haven

    Kalamazoo Battle Creek

    Muskegon

    Big Rapids

    St. Joseph

    Jackson

    Charlotte

    Ann Arbor

    Brighton

    Monroe

    HillsdaleAdrian

    Frankenmuth

    HarborBeach

    Grand Rapids

    Detroit

    Benton Harbor94 275

    696

    496

    475

    94

    96

    96

    96

    69

    69

    9494

    94

    94

    75

    75

    75

    75

    75

    75

    69

    96

    96

    23

    131

    131

    131

    31

    31

    127

    127

    131

    31

    31

    10

    10

    10

    31

    12

    12

    12

    31

    31

    131

    31

    23

    31

    23

    23

    127

    127

    23

    12

    24223

    22

    2

    2

    2

    41

    41

    41

    41

    41

    45

    45

    141

    2

    127B.R.

    136

    136675

    196

    91

    60

    86

    6651

    43

    43 37

    3740

    89

    66

    40

    66

    66

    72

    72

    119

    185

    134

    48

    2828

    28

    2828

    64

    64

    107

    38

    26

    77

    77

    94

    35

    35

    69

    69

    9535

    67

    94

    123

    117

    183

    553

    123

    221

    129

    66

    33

    33

    32

    68

    65

    65

    72

    33

    30

    61

    13

    55

    21

    82

    46

    37

    55

    22

    2222

    55

    18

    18

    37

    115

    2020

    57

    52

    5299

    49156

    60

    50

    125

    15

    24

    13

    81

    90

    46

    19

    19

    29

    53

    53

    59

    142

    25

    25

    46

    106

    50

    50

    52

    14

    99

    34

    7999

    78

    227

    43

    36

    43

    66

    50

    71

    60 62

    96

    124

    139

    140

    216

    311

    153

    113

    204

    149

    203 26

    26

    6

    11

    44

    45

    121

    231

    89

    138

    25

    13

    222

    179

    100

    27

    48

    75

    88

    37

    32

    20

    83

    63

    42

    115

    116

    120

    See reverse side of map for Metropolitan Detroit and

    Grand Rapids road repair projects.

    1 US-2: May-OctReconstruct 1 mile from Curry St to Roosevelt St in Ironwood. Westbound traffic detoured on Jackson Rd to Greenbush Rd. Eastbound traffic maintained on US-2.

    2 US-41/M-26: Dec 2014-Apr 2016Repair Portage Lake Lift Bridge.1 lane open in each direction on bridge for majority of project. 16 2-hour nighttime closures Jan-Apr, and approximately 200 15- to 20-minute daytime and nighttime closures through Apr 2016.

    3 US-41: June-SeptMill and resurface 2 miles in LAnse. Lane closures under flag control.

    4 US-2: May-SeptResurface 1 mile in Crystal Falls, reconstruct 2.3 miles south of Crystal Falls. Lane closures under flag control and temporary traffic signal.

    5 US-41/M-28: May-SeptResurface 1.1 miles and pave shoulders from Carp River to Nicolet Blvd in Marquette. 1 lane open in each direction.

    6 M-35: May-SeptResurface 5.9 miles and pave shoulders from 48th Ave in Menominee to Ingallston. Lane closures under flag control and temporary traffic signal.

    7 US-2: May-SeptReplace bridge over Ogontz River. Maintain traffic on temporary bridge.

    8 US-2: June-AugResurface 9.5 miles from Tannery Rd to east of County Rd 434. 1 lane open under flag control.

    9 I-75 BS: June-OctReconstruct 0.3 miles from Easterday Ave to power canal in Sault Ste. Marie, plus streetscape. Closed with posted detour.

    10 I-75: Apr-JulyReplace 2 culverts immediately south of M-28. Closed with posted detour.

    11 I-75: July-OctResurface 10 miles from Mackinac/Chippewa county line to M-80. 1 lane open in each direction.

    12 I-75: May-OctReconstruct 0.3 miles from Mackinac Trail to north end of I-75 BL in St. Ignace; repair Castle Rock overpass bridge. 1 lane open in each direction until after Labor Day. Intermittent detours after Labor Day.

    13 US-23: Mar-AugReplace bridge over Little Black River. Temporary traffic signal.

    14 US-31: Apr-OctReconstruct and resurface 4.2 miles from Camp Daggett Rd to US-131 in Petoskey. 1-way detour between Eppler Rd and US-131 before July 4. Traffic shifts.

    15 US-31: Sept-NovResurface 3.5 miles from Holiday Rd to Brackett Rd in Acme. 1 lane open in each direction.

    16 M-72: Mar-NovReconstruct and widen 1 mile from east of US-31 to Lautner Rd in Acme, plus construct 2 roundabouts and pedestrian tunnel. Temporary traffic shift; intermittent flag control.

    17 US-31: Mar-JulyReconstruct 1.6 miles from 3 Mile Rd to Holiday Rd in East Bay Township. 1 lane open in each direction.

    18 I-75: Aug-OctResurface 7.5 miles from Crawford County line to south of Charles Brink Rd. 1 lane open in each direction.

    19 M-33/M-72: JulyResurface 1.1 miles west of Fairview School to Home Dr, and M-33/M-72 intersection to east of Maple Dr in Fairview. Flag control.

    20 M-33: June-JulyChip seal 17.8 miles from I-75 to south of M-55, north of Engle Rd to north of Houghton Creek Rd, and north of Oyster Rd to north of Borden Rd. Flag control.

    21 US-31: SeptResurface 2.9 miles from north of Pere Marquette Hwy to US-10. Lane closures and traffic shifts on ramps.

    22 US-131: Apr-SeptReconstruct 5.7 miles from south of Mecosta County line to north of US-10 in Reed City. Lane closures and traffic shifts on ramps.

    23 M-66: Sept-OctReplace bridge over west branch of Middle Branch River. Detour on M-61 and M-115.

    24 US-131: Jan-OctRepair bridge over Muskegon River. 1 lane open at all times with 5 total closures between mid-May and mid-Aug.

    25 M-37: Sept-OctMill and resurface 4.4 miles from the White River to 3 Mile Rd, and M-20 from M-37 to Swain St. 1 lane open under flag control.

    26 M-82: June-AugMill and resurface 10 miles from Main St in Fremont to M-37. 1 lane open under flag control.

    27 US-31 BR (Seaway Dr): Apr-SeptMill and resurface 5.5 miles from US-31 to Shoreline Dr. 1 lane open at all times.

    28 US-31: June-JulyConstruct indirect left-turn lanes and right-turn lanes at Taylor St. 1 lane open at all times.

    29 M-104: Sept-NovMill and resurface 4.4 miles from Lake Ave to 124th Ave. 1 lane open at all times.

    30 I-96: June-SeptRepair bridges over Deer Creek, Sand Creek and 24th Ave. 1 lane open at all times.

    31 M-44 (Belding Rd): May-SeptMill and resurface 9.9 miles from Myers Lake Ave to Kent/Ionia county line. 1 lane open at all times. Westbound traffic detoured at Ramsdell Dr; eastbound traffic maintained.

    32 M-21 (Fulton St): Aug-OctMill and resurface 2.3 miles from Valley Vista Dr to Kent/Ionia county line. Lane closures during off-peak hours.

    33 US-31: Mar-AugMill and resurface 1.5 miles from Allegan/Ottawa county line to 8th St and reconstruct CSX Railroad crossing. 1 lane open at all times.

    34 M-222: Feb-JulyReconstruct bridge over US-131 in Martin. Bridge closed Feb-June. All ramps remain open. Nighttime lane closures on US-131.

    35 I-196: Sept-OctRepave northbound lanes from M-63 to Van Buren Trail bridge. Single-lane closures.

    36 M-63 (Niles Rd): June-JulyRepair bridge over Hickory Creek. Northbound traffic maintained; southbound traffic detoured.

    37 I-94: Apr-JuneRepair bridge over St. Joseph River. Daytime single-lane closures; nighttime double-lane closures.

    38 I-94: May-SeptReplace eastbound bridge over Hickory Creek. 2 lanes open in each direction.

    39 M-139 (E Main St): Jan-NovReplace bridge over St. Joseph River. Traffic detoured.

    40 M-139: Mar-AugReconstruct 3.7 miles from M-140 to Fairland Rd. 1 lane open under flag control.

    41 I-94: May-NovResurface westbound lanes from CR 687 to M-51, plus reconstruct median shoulder, replace culvert, resurface ramp, extend ramp acceleration lane, reconstruct under 5 bridges, replace guardrail, and reconstruct cable median barrier. 1 lane open.

    42 I-94: Sept-NovRepair 2.9 miles from MM 58 to MM 61. Nighttime single-lane closures.

    43 I-94: Mar-AugReplace bridge over east branch of Paw Paw River. 2 lanes open in each direction.

    44 I-94 BL (Stadium Dr): Apr-SeptReconstruct bridge and interchange at US-131 in Kalamazoo. I-94 BL: ramp and lane closures. US-131: nighttime lane closures.

    45 I-94: Mar-NovReconstruct interchange with Sprinkle Rd. I-94: nighttime lane closures. Sprinkle Rd: lane closures. All ramps closed.

    46 M-60: Mar-SeptReconstruct 1.1 miles through village of Mendon, from Mendon Pkwy to Congress Rd. Westbound lanes closed and detoured.

    47 I-94 BL (Skyline Dr): Apr-Nov Resurface from I-94 to Hill Brady Rd. Flag control. Replace bridge over I-94 at Exit 92. 2 lanes open in each direction on I-94; intermittent ramp closures.

    48 M-89: Aug-OctRepave 1.2 miles from Augusta Dr to Custer Dr west of Battle Creek. Lane closures under flag control.

    49 M-89: May-SeptRepave 5.4 miles from Custer Dr to I-94 BL in Battle Creek. 1 lane open in each direction under flag control.

    50 M-66: Apr-JuneRepave 1 mile from I-94 to Glenn Cross Rd. 1 lane open in each direction.

    51 I-69: Apr-AugBridge work on L Dr N over I-69. I-69: 1 lane open in each direction. L Dr N: 1 alternating lane open with temporary traffic signals.

    52 I-94 BL (Michigan Ave): June-OctRepave 1.6 miles at I-69 in Marshall. 1 lane open in each direction.

    53 M-60: June-AugRepave 0.7 miles at I-69. Flag control.

    54 M-100: Mar 2015-Fall 2016Replace bridge over CN Railroad. 1 lane open in each direction. 1 lane open with temporary signals at 2 local drains just north of downtown Potterville.

    55 US-127: Apr-SeptRepair bridge over I-96. US-127: daytime lane closures. I-96: nighttime lane closures, short-term ramp closures with detour posted.

    56 I-94: July-SeptRepair bridge over US-127 BR/M-50. I-94: all lanes open. US-127 BR/ M-50: single-lane closures. No work during race weekend at Michigan International Speedway (MIS).

    57 US-12: June-AugResurface from US-127 to M-50. Daytime single-lane closures. No work during race weekend at Michigan International Speedway (MIS).

    58 US-23: Apr-JulyRepair from School Rd to Center Rd. 1 lane open in each direction.

    59 I-75: Apr 2015-Nov 2016Reconstruct from I-275 to Dixie Hwy. 2 lanes open in each direction.

    60 US-23: Apr-SeptInstall median guardrail from I-94 to Washtenaw/Monroe county line. Shoulder closures; intermittent single-lane closures.

    61 I-94: May-AugResurface from Carpenter Rd to US-12. Nighttime single-lane closures.

    62 US-12 BR (Michigan Ave): Aug-OctResurface from Water St to Wayne County line. 1 lane open in each direction.

    63 I-96: Apr 2015-Aug 2016Replace bridges and construct new lanes near US-23. I-96: intermittent lane closures. Spencer Rd: closed 42 days in spring 2015.

    64 I-69: Mar 2015-Aug 2016Reconstruct 11 miles eastbound from M-19 (Kinney Rd) to Taylor Rd. 1 lane with traffic shifted to westbound side. Temporary ramp closures with posted detour.

    65 I-94/I-69: Sept 2013-Oct 2015Reconstruct 3.7 miles of interchange and reconstruct bridges connecting I-94 and I-69. 1 lane open in each direction. Temporary closures with posted detour.

    66 Blue Water Bridge: Apr-JuneResurface westbound span. 2-way traffic on eastbound span.

    67 I-69: May-NovRepair 2 bridges on I-69 and 6 bridges over I-69 from Clark Rd to Summers Rd. Single-lane closures and traffic shifts

    68 M-24: Mar-SeptReconstruct 1 mile from Demille Blvd to Nepessing St in Lapeer. Replace culvert over Farmers Creek, install new pedestrian tunnel. 1 lane open in each direction. Detour for 6 weeks between Demille Blvd and Genesee St for culvert work.

    69 I-69: Mar-NovReconstruct 1 mile from M-54 (Dort Hwy) to Center Rd, including bridge repairs/widening at Center Rd and Averill Rd, and freeway lighting upgrades. Replace bridge over M-54 (Dort Hwy). Single-lane closures, traffic shifts and ramp closures.

    70 M-15: Oct 2014-Oct 2015Replace M-15 bridge over Cass River in Vassar. Single-lane closures.

    71 I-75: Apr-JulyRepair M-54/M-83 bridge over I-75. Single-lane closures.

    72 I-75: Mar 2015-Nov 2016Reconstruct 3.8 miles from Dixie Hwy to Hess Rd. Replace Baker Rd, King Rd, and Hess Rd bridges over I-75. Local bridges over I-75 detoured. Maintain 3 lanes in peak direction and 2 lanes in non-peak direction.

    73 I-75: Apr-DecReplace US-10 bridge over I-75. I-75: intermittent lane closures. US-10: single-lane closures. Ramp traffic detoured.

    74 US-10: Apr-SeptReplace Nine Mile Rd bridge over US-10. 1 lane maintained with crossovers.

    75 US-10 BR: Apr-NovReconstruct 1.5 miles and resurface 0.3 miles from Jerome St to Saginaw St in Midland. 1 lane open in each direction.

    76 M-30: Mar-June Construct roundabout at westbound US-10 ramps. Lane closures with traffic shifts on M-30. Short-term detour on M-30; westbound US-10 ramps detoured for majority of project.

    77 M-20: Jan-NovConstruct narrow boulevard from east of Summerton Rd to east of Leaton Rd. Single-lane closures and traffic shifts during off-peak hours.

  • Metropolitan Detroit

    Grand Rapids Area

    2015

    Road Repair Projects

    PAVING

    THE WAY

    MICHIGAN DEPARTMENT OF TRANSPORTATION

    Scan this QR code to go directly to

    MDOTs Major Projects website.

    www.michigan.gov/mdotprojects

    2015Road Repair Projects

    PAVING THE WAY

    Download the free Mi Drive app for up-to-date traffic information, or

    visit www.michigan.gov/drive

    Map Explanation

    94

    94

    20

    127

    FREEWAY

    AREA OFCONSTRUCTION

    PAVED (TWO OR MORE LANES)AND MULTI-LANE DIVIDED

    INTERSTATE ROUTE

    CONSTRUCTIONPROJECT

    INTERSTATE BUSINESS(LOOP OR SPUR)

    U.S. ROUTE OR B.R.(B.R. - BUSINESS ROUTE)

    STATE ROUTE OR B.R.(B.R. - BUSINESS ROUTE)

    COUNTY LINE AND NAME

    36

    EATON

    WAYNE

    OAKLAND

    MACOMB

    Warren

    Novi

    Troy

    St. ClairShores

    Taylor

    AuburnHills

    Pontiac

    FarmingtonHills

    Detroit

    1

    5

    11

    12

    14

    13

    76

    8

    34

    2

    10

    15

    9

    1

    59

    59

    5329

    19

    3

    97

    53

    85

    150

    153

    102

    5

    10

    14

    39

    5

    8

    59

    24

    24

    24

    12

    24B.R.

    96

    96

    94

    275

    696

    375

    696

    275

    94

    75

    75

    75

    75

    75

    75

    85

    12

    375

    3

    75

    75

    94

    5

    101

    1816

    DowntownDetroit

    17

    KENT

    OTTAWA EastGrand Rapids

    Walker

    Grandville

    KentwoodWyoming

    5

    1

    2

    4 8

    6

    7

    9

    3

    21

    11

    45

    121

    44

    11

    66

    37

    37

    131

    131

    96

    196

    196

    131B.R.

    96

    Grand Rapids

    196

    MICHIGAN DEPARTMENT OF TRANSPORTATION

    Were Here To Serve YouMurray D. Van Wagoner Transportation Building

    425 W. Ottawa St., Lansing, MI 48909517-373-2090

    REGION OFFICES TRANSPORTATION SERVICE CENTERS

    SUPERIOR1818 Third Ave., NorthEscanaba, MI 49829888-414-6368

    Crystal Falls ......866-584-8100Ishpeming ........888-920-6368Newberry ..........866-740-6368

    NORTH1088 M-32 East Gaylord, MI 49735888-304-6368

    Alpena ..............877-404-6368Cadillac ............800-943-6368Gaylord .............989-731-5090Traverse City ....888-457-6368

    GRAND1420 Front Ave., N.W.Grand Rapids, MI 49504866-815-6368

    Grand Rapids ...616-464-1800Muskegon ........231-777-3451

    BAY5859 Sherman RoadSaginaw, MI 48604989-754-7443

    Bay City ............989-671-1555Davison ............810-653-7470Mt. Pleasant .....989-773-7756

    SOUTHWEST1501 E. Kilgore Rd.Kalamazoo, MI 49001269-337-3900

    Coloma .............877-321-6368Kalamazoo .......877-320-6368Marshall ............877-324-6368

    UNIVERSITY4701 W. Michigan Ave.Jackson, MI 49201517-750-0401

    Brighton ............810-227-4681Jackson ............517-780-7540Lansing .............517-335-3754

    METRO18101 W. Nine Mile Rd.Southfield, MI 48075248-483-5100

    Detroit ............... 313-965-6350Macomb/St. Clair ..586-421-3920Oakland ............ 248-451-0001Taylor ................ 313-375-2400

    1 M-11 (Ironwood Dr/Remembrance Ave): Mar-Aug

    Mill and resurface 2.2 miles from Hayes St to Wilson Ave, and construct a roundabout at M-11 and Remembrance Rd. 1 lane open in each direction. Wilson Ave: closed and detoured north of Remembrance Ave. Remembrance Ave: closed and detoured east of Wilson Ave.

    2 M-11 (Wilson Ave): June-AugMill and resurface 4.1 miles from M-45 (Lake Michigan Dr) to I-196. Lane closures during off-peak hours.

    3 I-196: June-SeptRepair bridges over M-11, service road (north of Ivanrest Ave), and Conrail Railroad (north of Byron Center Ave). Lane closures nights and weekends.

    4 M-11 (Wilson Ave/28th St): June-SeptReconstruct 0.2 miles from Indian Mounds Dr to Church Rd. 1 lane open in each direction.

    5 I-96: June-JulyMill and resurface 8.2 miles from the Grand River to Cascade Rd. Nightly lane closures.

    6 M-21 (Fulton St): June-NovReplace bridge deck and construct nonmotorized facility over GTW Railroad. 1 lane open in each direction.

    7 I-96: Aug 2015-Oct 2016Replace bridge and reconfigure interchange at Cascade Rd. 1 lane open in each direction with a center turn lane. 2 short-term weekend closures for demolition and beam setting.

    8 M-11 (28th St): May-JulyMill and resurface 0.9 miles from Kalamazoo Ave to Breton Ave and construct 3 miles of sidewalk from Breton Ave to Patterson Ave. Lane closures at night and during off-peak hours.

    9 I-196: MayRepair eastbound bridge over 22nd Ave. 1 lane open at all times.

    14 I-75: Apr-Nov Repair 1.7 miles from Springwells Rd to Clark St. At least 1 lane open nights and weekends. Intermittent ramp closures.

    15 M-8 (Davison Fwy): Apr-Nov Oakland Ave bridge work over M-8. M-8: 2 lanes open; closed for 2 weekends between M-10 and I-75, with detour to I-94. Oakland Ave: southbound lanes closed with detour posted; northbound lanes closed on weekends with detour posted.

    16 M-1 (Woodward Ave): July 2014-May 2016

    Reconstruct 2.5 miles between Adams St and Bethune St for M-1 Rail. 3 lanes open.

    17 M-1 (Woodward Ave): Jan-Dec Replace bridges over I-94 and I-75. 3 lanes open on I-94, I-75 and M-1. Intermittent weekend closures for beam removal and beam setting.

    18 M-3 (Gratiot Ave): Apr-OctBridge work over I-375; beam installation weekends and off-peak hours. Intermittent weekend closures each direction on I-375 and M-3. I-375: nightly lane closures for painting.

    www.michigan.gov/drive

    Mic

    higa

    n D

    epar

    tmen

    t of T

    rans

    porta

    tion

    425

    W. O

    ttaw

    a St

    reet

    P.

    O. B

    ox 3

    0050

    La

    nsin

    g, M

    I 489

    09

    Designed by MDOT Graphic Design & Mapping Unit

    Graphics:\maps\Paving The Way\C-Map Paving The Way 2015.indd - rld

    Find MDOT online at

    www.michigan.gov/drive,

    and on social media sites at

    www.facebook.com/MichiganDOT,

    www.twitter.com/MichiganDOT, and

    www.youtube.com/MichiganDOT.

    Work Zone Safety - It is for EveryoneA vast majority of all people hurt or killed in work zones are drivers and their passengers. The power to keep everyone safe, including construction workers, is in the hands of motorists. Follow these tips and make sure everyone makes it home tonight:

    Slow down. Drive to road surface and weather conditions.

    Be patient and stay calm. Dont use your cell phone. Eliminate all

    distractions while driving. Dont tailgate. Pay attention to workers, barrels, cones,

    and signs. Keep a safe distance between your vehicle and

    construction workers and their equipment. Obey workers directing traffic. Merge early. Dont wait until the last second. With more and more construction taking

    place at night, pay close attention after dark. Pedestrians and bicyclists are reminded

    they must follow all traffic and work zone signs and devices as well.

    Laws You Can Live WithSpeedingDo not speed in work zones. You risk a speeding ticket, points on your license, and tough penalties. Speeding also puts yourself, your passengers, and construction workers at risk of serious injury or death. Fines are doubled in work zones.Dont Text and DriveTexting while driving is banned in Michigan. You risk getting a $100 citation if you text behind the wheel, not to mention getting yourself and others injured in a crash. Texting is defined by the Michigan State Police as: reading, manually typing or sending a text message while driving.Kelseys Law cell phone ban for novice driversState law prohibits any drivers with a Level 1 or Level 2 Graduated Drivers License from using a cell phone while operating a motor vehicle. Violating this law is a civil infraction. The law does not apply to a novice driver using a cell phone to:

    Report a traffic crash, medical emergency or serious road hazard.

    Report a situation in which the person believes his or her personal safety is in jeopardy.

    Report or avert a possible criminal act against the driver or another person.

    The law also does not prohibit novice drivers from using a voice-operated system integrated into their vehicles.For more information, go to www.michigan.gov/teendriver.Commercial driver cell phone banFederal law prohibits commercial truck and bus drivers from using hand-held cell phones while operating a commercial motor vehicle (hands-free devices are still permitted). Drivers breaking this law face fines up to $2,750 each time, possibly losing their commercial drivers license (CDL) for multiple offenses. Employers can be fined up to $11,000 for each offense.If you can Steer it, Clear it - Its our law!Remember that you are required to safely remove your vehicle from the main traveled portion of the roadway IF you are in a crash and your vehicle still operates AND there are no apparent serious injuries (or deaths).Click it or Ticket!You can be fined $65 for not wearing your seat belt. Worse than that, not being belted could result in serious injury or death.

    For More InformationMDOTs Paving the Way map is produced annually prior to each construction season and is current at the time of printing. For questions, comments, or to request additional copies of Paving the Way, call:

    MDOT Office of Communications (7:30 a.m. to 5 p.m., Monday Friday) 517-335-3084If you will be traveling through nearby states, contact the following for information:Illinois Department of Transportation www.dot.state.il.us 217-782-7820Indiana Department of Transportation www.in.gov/indot 317-232-5533Ohio Department of Transportation www.dot.state.oh.us 614-466-7170Wisconsin Department of Transportation www.dot.wisconsin.gov 608-266-3581

    Major Road Project UpdatesFor current information on these projects:

    www.michigan.gov/drive

    Know Before You GoPlease keep this map as a handy reference tool to stay informed - it shows you major road projects in 2015 that will last several months or longer and may involve significant delays.

    MDOT: Providing the highest quality integrated

    transportation services for economic benefit

    and improved quality of life.

    Toward Zero Deaths is a statewide safety campaign to positively influence driver behavior and improve safety. More than 35,000 fatalities occur on U.S. highways each year, with driver behavior factoring into nearly 90 percent of all fatal crashes. One key to changing driver behavior is education. MDOT is posting traffic fatality statistics on Dynamic Message Signs (DMS) on I, M and US highways as a simple and inexpensive way to educate the public on the scope of one of the most challenging issues facing Michigan and the nation.

    1 I-75: Apr-OctRepair and resurface 4.1 miles from Clintonville Rd to M-15. 1 lane open nights and weekends.

    2 I-75: Mar-NovReplace University Dr bridge over I-75. University Dr and ramps closed and detoured.

    3 M-150 (Rochester Rd): May-NovMill and resurface 3.5 miles from M-59 to Avon Rd, and Paint Creek to Tienken Rd. Replace curb and gutter from Paint Creek to Tienken Rd. 1 lane open in each direction for night and weekend work.

    4 M-59: Apr-JuneRepair 2.2 miles from Elizabeth Rd to I-94. 1 lane open weekends.

    5 US-24 (Telegraph Rd): Apr-AugRepair 3.8 miles northbound lanes from Long Lake Rd to US-24 BR (Square Lake Rd), southbound lanes from Orchard Lake Rd to Long Lake Rd, and in each direction near Maple Rd. 1 lane open in each direction nights and weekends on US-24 (Telegraph Rd) and US-24 BR (Square Lake Rd).

    6 I-75: Mar-AugRepair 11.2 miles from 12 Mile Rd to Square Lake Rd. 1 lane open at night.

    7 M-53 (Van Dyke Ave): Feb-DecReconstruct 3.2 miles from 15 Mile Rd to 18 Mile Rd. Resurface bridge over Plum Creek. 2 lanes open weekdays; 1 lane open nights and weekends.

    8 M-53 (Van Dyke Ave): Feb-DecMill and resurface 1.5 miles from Red Run Drain to 15 Mile Rd. 2 lanes open weekdays; 1 lane open nights and weekends.

    9 M-14: Apr-JuneMill and resurface 4 miles from Sheldon Rd to Newburgh Rd. 1 lane open weekends.

    10 I-275: Mar-JuneRepair southbound lanes over M-14. 2 lanes open.

    11 M-153 (Ford Rd): Apr-Aug Mill and resurface 2.1 miles from Sheldon Rd to Lotz Rd. 1 lane open at night. Safety improvements 1 mile between I-275 and Haggerty Rd. 2 lanes open; intermittent weekend closures on I-275 ramp to M-153.

    12 I-94: May-SeptRepair 6.9 miles from Rawsonville Rd to I-275. 2 lanes open weekdays, 1 lane open nights and weekends. Intermittent ramp closures at Rawsonville Rd, Belleville Rd, and Haggerty Rd.

    13 M-10 (Lodge Fwy): Apr-OctRepair 6.7 miles from I-94 to Meyers Rd. At least 1 lane open nights and weekends. Intermittent weekend closures between M-8 and I-94.