26

Meadowbrook Optional Recalculation

  • Upload
    others

  • View
    12

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Meadowbrook Optional Recalculation
Page 2: Meadowbrook Optional Recalculation
Page 3: Meadowbrook Optional Recalculation
Page 4: Meadowbrook Optional Recalculation

RESOLUTION NO 99 ZZA RESOLUTION ADOPTING A NEW TRANSPORTATION SYSTEMSDEVELOPMENT CHARGE METHODOLOGY AND CHARGESPURSUANT TO SECTIONS420040 AND420050 OF THE ASHLANDMUNICIPAL CODE

THE CITY OF ASHLAND RESOLVES AS FOLLOWS

SECTION 1 The Transportation Systems Development report recommended by theAdhocSystems Development Charge Committee marked exhibit A is adopted bythe Ashland City Council and replaces the current resolution establishing the

methodology and charges for transportation systems development charges

SECTION 2 The Transportation Systems Development Charges shall be phased inthree steps Phase one of the charge implementation described in exhibit A shall beeffective August 16 1999 with phase two effective January 2 2000 and phase threeeffective July 1 2000 Charges shall be adjusted for inflation at each phase

SECTION 3 The Transportation Systems Development Charge methodology and

charges will be reviewed three years from the date of adoption to ensure consistencybetween the Transportation System Plan and the Transportation Systems DevelopmentCharges

SECTION 4 Transportation Systems Development Charges collected will bedistributed to transportation projects based on the aggregate growth percentagedescribed in exhibit A

This resolution was read by title only in accordance with Ashland Municipal Code

204 90 duly PASSED and ADOPTED this ft day of

Barbara Christensen City Recorder

Juv 1999

SIGNED and APPROVED this

Paul Nolte City Attorney

day of Jul7 lggg

Catherine M Shaw Mayor

PAGE 1 RE S O LUT IO N FusERMACSDCComreresolutionwpd

Page 5: Meadowbrook Optional Recalculation
Page 6: Meadowbrook Optional Recalculation

Cit ofAshland Transportation Systems Development Char3e duly 1999

INTRODUCTION

Background

In 1996 the City of Ashland adopted its current transportation Systems DevelopmentChard SDC which became effective January 1 1997 The current SDC is based on a

prorate share of future transportation system needs including new street and street

frontage costs needs and new trip generationtravel need estimates for typicaldevelopments The future needs are not defined by specific projects The City ofAshland has developed a Transportation System Plan TSP that outlines transportationsystem needs for the City within the Urban Growth Boundary UGB area The AshlandTSP identifies project specific needs for street bicycle facility pedestrian and transit

improvements Longrange travel projections used in the TSP have been developedbased on future land development projects consistent with the Citys ComprehensivePlan These land development projections were used by W H Pacific Inc to estimatethe trip generation capacity of land consumption by the year 2017 and define the detailed

methodology for arevised SDC

The purpose of this report is to describe the revised methodology for implementing a

project specific transportation SDC to fund aportion of the needed transportation projectswithin the Ashland UGB by year 2017 This same methodology may be adjusted to

include a revised scope of transportation improvements as needed The Ashland

Transportation SDC Methodology is based on similar SDC methods already adopted andin place by other Oregon jurisdictions mainly Salem and Portland Oregon

Consistency With State Law

ORS 223297 through 223314 establishes a uniform flamework for governmental unitsto impose systems development charges to pay for capital improvements includingfacilities or assets used for transportation Such charges may be assessed or collected atthe time of increased usage of acapital improvement or issuance of a developmentpermit building permit or connection to the capital improvement ORS2232994aThe statute allows imposition of systems development charges for costs associated with

capital improvements to be constructed improvement fees and capital improvementsalready constructed or under construction reimbursement fees ORS 223304 Thestatute also provides for credits against fees for the construction of qualified publicimprovements ORS 22330434

As relevant to the City s proposed Transportation SDC ORS 223072authorizes

improvement fees on new development to help cover the costs ofcapacity increasingcapital improvements Under ORS 223309 1 such improvements must be identified ina capital improvement plan public facilities plan transportation master plan or similar

plan which lists the capital improvements which may be funded with improvement feerevenues Consistent with ORS 2233072the capital improvements identified in theTSP and included in this report are limited to those which are capacity increasing Their

city ofAshland Department ofCommunity Development 1

Page 7: Meadowbrook Optional Recalculation

Cit ofAshland Transportation Systems Development Charge July 1999

inclusion in aplan as defined in ORS 2233091assures compliance with that

requirement of the statute

Under ORS 2233042improvement fees must be established by ordinance or resolution

setting ti3rth amethodology that considers the costs of projected capital improvementsneeded to increase the capacity of the system to which the fee is related The statute

requires no specific methodology However there must be a rational basis for the chareie the costs imposed on development must reasonably relate to the impacts created bythe development and the overall costs of the improvements

NEEDED IMPROVEMENTS

Types of Deficiencies

The Ashland TSP indicates that there are anumber ofprojects that will be needed by2017 to provide sufficient transportation system capacity to accommodate future traveldemand These improvements include new streets upgrades to existing streets to urbanstandardsie added bicycle lanes curbsgutters sidewalks etc new bicycle lanesandor sidewalks new traffic signals and improved transit to serve expanded publictransportation needs

New streets and bridges street upgrades and new traffic signals provide improvementsresulting in a transportation system that can accommodate higher travel demand

additional capacity New buses and shelters provide added capacity to route coverageserving more transit riders and together with bicycle and pedestrian improvementsprovide the needed capacity that otherwise require major street widening in areas

deficient of adequate rightofwayor compatible land use egNorth Main Streetbetween Helman and Wimer

Estimated Improvement Costs

Improvement costs are those capital costs that will be required to construct the projectsidentified in the Ashland TSP These projects and the estimated costs estimated in 1998

dollars for each project are listed in Appendix A of this document Improvement fees are

the systems development charges defined and summarized below imposed on new

development to help fund the projects identified in the Ashland TSP Improvement feesimposed on new development are used to provide a portion of the funding required for

project improvement costs

The Ashland Transportation SDC includes improvement fees but does not includereimbursement fees Improvement fees are system development charges that are appliedto improvement costs associated with capital improvements to be constructedReimbursement fees are systems development charges applied to improvement costs for

capital improvements already constructed or under construction

City ofAshland Department ofCommunity Development 2

Page 8: Meadowbrook Optional Recalculation

City ofAshland Transportation SVstems Development Chare Jub 1999

To comply with Oregon law only a portion ofthe roadway and transit improvement costs

are eligible for funding through an SDC program Improvement costs to maintain or

improvement the structure ofexisting roadways and intersections or costs associatedwith transit operations do not provide significant capacity increases Thus this portionof the improvement cost is not eligible for funding through the SDC As previouslystated improvement fees are authorized under Oregon law to help cover the costs of

capacity increasing capital improvements identified in acapital improvement planpublic facilities plan transportation master plan or similar plan New streets bridgestraffic signals sidewalk and buses are fully eligible for SDC funding The cost

associated with street upgrades paid for by the SDC can be based on the proportionateshare of the added street arnenities to the total street improvement costs egbike lanescurbgutter and sidewalks

Additionally it is proposed that a portion of local street improvements done through theLID process be funded through the Transportation SDC It is estimated that an overall

capacity of 18will be realized citywide by the improvement of local streets This isbased up the buildable lands analysis undertaken by the city which has shown that whenlocal streets are improved the opportunity for additional lot splits will be availableincreasing the use of local streets for new trips related to growth

As such the Ashland Transportation SDC program will generate funds from

improvement fees that may be used to partially fund improvement projects that provideadditional roadway and transit capacity As discussed below the improvement fees are

based on the estimated number of daily trips generated by new development resulting inan improvement fee that is fair and equitable Thus the program is in compliance with

Oregon law

City ofAshland Department ofCommunity Development 3

Page 9: Meadowbrook Optional Recalculation

lutudlaGXluntataDflutaUmdO PurlttsYfD

tlZ IQN13Jad lsoO 000Z1Inr

vsr QN13Jad 1sod 000Z fuenuer

C65 1CN13Jad sod 666L L lsnOny

LCV9g

0g09Z

000gbS

LSgZ

O00OgL

g

g

gL

6 L L gg L g OqLUOD

000 LV0g AloedeO

000E0Z qpedeO

8gOg qoedeO

ooooo0 L GpeJBdrl

O00OZ 0

O00Ogg 9g

000gZL qoedeO

00000o L qqoedeg

ZgZZg6gj

008L

986006 gZ

0ZgZ gg

g90LL gL

00VggV gZ

00000 0

0080 gL

ggg6g gL

0gZg gL

006Z gL

ggLgL

0gg0L 00L

egL gL

0006 gL

0066 gL

009V g

000L g

00gg g

V00 gg

000ggL gg

09gZ 09

000L 00

00ggL gL

000E65

0g895

9OVggL

0068L

068

0008995

000Z

g

LZ6685

0666

99960L

00095

ZL66e

0YZSL

996V0L

000teL

O0000g

Z89

00065

9906

00065 apejOd

0gg L0 L apeJ6dR

00gV 3edeg

00gZgZ ePeJBdA

00Z095 oedeO

000000b apeJ6dR

000Z apejBd

0089Z6 epeJBdR

00YegL apeJBdR

0008g epeJedR

0V98 oedeO

0990L oedeO

09gL apejBd

0000g epeJBdR

000995 GpejBd

O09IeL oedeg

0000995 apeJBdR

O00tBL oedeO

09L oedeO

00000gg oedeO

OOV oedeO

00Y095 oedeO

00065 epBd

S1311dlSla1NqlNAOIdlNIlVOO1

SglIIIlCVJ313A318 0L L 6Z

SHqVM3QIS 0L b 8

slsoo leldeo leoolllgNVil 0L L ZZ

V SgNISSOOIdldR OZLL 9

qoeojddVAHsBupdS uaaJ9 uepulpeaO 0L L

MaaJO uewlol ol noXMsS eolells OLL Z

ueVI3o1SPuelqsVPJOueLulol 0LL Z

ue oi PuelqsV 1S elO 0LL 0

um3 ouosuex3GnuGAV lemJoN 0LL 6L

H sBuPdS ueeJ9 ol noAMsS puosMoJ3 ObL B

pHGGJO uewIol le ue3 0LL ZL

Tsea slYtaR D ol aAV lemJoN um3 0LL 9

noXMsgol HeO aele JO uemlo OLL g

eO oele ol sMopeaH uaeJ9 Jg uemlo 0L L F

epeAaN o1 eqluedeN ueluno N 0LL C

XasJaH ol uoqsuelx3 iS ql 0LL Z L

leeJ1S uqeiuno ol uuV AGsJGH 0L L L

peupuelqsV 0LL 0

xoj o 66 AMH ueN 0L L 6

TSGM lewJoN olslwR O Ue 0 L9 9

pueJqsV ol noAsS 1S AEI3 0 L9 Z

sGqgeojddV PALE noAHsWg Jg Uemlol 0 Lg 9

IeoJis equedeN o1AsJoH umiuno N 0L9 S

EpEAGN eBppe GGJO Jeg8 0L9 V

Meuno N ol HeeJO Jeee epeAeN 0L9 g

dR olnoAHsS pJg uelol gL Z

noXMsS le eeJ1S qoee8 gL L

SINIINIAOtddlNI NOIIVlldOdSNVldl118191F1oas

6661 dlnr aadmttD luatadolaaaCl szaals4S LlollgldodsbiDdZpumlqYjo UD

Page 10: Meadowbrook Optional Recalculation

Cit dAshland Transportation Svstems Development Charge July 1999

TRANSPORTATION SDC UNIT COST

Introduction

The Ashland Transportation SDC has been developed to provide fairness and equityamong the various types of development that are likely to occur by 2017 To reach this

goal the Ashland Transportation SDC methodology recognizes that the number oftripsgenerated varies by type of land use It has been shown that some types of land use

retail for example attract trips from traffic that is already passing the retail site amotorist that is going home from work that stops en route to buy groceries In this

instance a trip is generated by the retail use but not all generated trips are new to the

adjacent roadway traffic stream hence the retail use adds lower number ofnew vehiclemiles of travel to the roadway system compared to other uses This type of trip is knownas a linked trip A Linked Trip Factor has been used to account for this difference innew trip generation versus total trip generation When the basic trip generation ratesietrips per dwelling unit is adjusted by the linked trip factor and applied t the new

development the resulting number of new generated trips are called Equivalent LengthNew Daily Trips ELNDT The ELNDT are used as the basis for the Ashland

Transportation SDC

Methodology

To develop the City of Ashland Transportation SDC a summary of the planned land uses

within the UGB was made From these planned land uses the number ofdaily vehicle

trips generated on the public street system was made These trips were added to thenumber of existing traffic volumes throughout the study area to estimate the total numberof vehicle trips on the study area street system Since the SDC is based on trips generatedby new development the number ofnew trips divided into the estimated improvementcosts results in the dollar cost per new trip generated The future planned land use andnew trip generation estimates within the Ashland UGB are summarized in theattachments

Future land use estimates and the daily trips generated by new land development withinthe Ashland UGB are estimated based on future trip estimates from Ashlandscreme2travel model and validated by ITE Trip Generation Manual estimates summarized in

Appendix B Inherent in these trip estimates is the provision for linkedtripcharacteristics by land use type The Equivalent Length New Daily Trips generatedwithin the Ashland UGB by the year 2017 is indicated in the table on the following page

Trip Generation Adjustments

As mentioned previously inherent in the travel demand forecasting model is the type of

trip by land use and effect of linked trips The methodology used to determine the

transportation system development charge fee in Ashland is consistent with the ELNDT

concept This methodology uses the best available trip generation and linked tripinformation Trip generation rates for each of the land use categories were adjusted using

CiofAshland Department ofCommunity Development 5

Page 11: Meadowbrook Optional Recalculation

City dAshland Transportation Systems Development Chare July 1999

the trip generation rates reported in Trip Generation Fifth Edition published by theInstitute of Transportation Engineers 1991 The attachment at the end of this report liststhese trip generation rates and the adjustment factors used to determine the ELNDT

generation rate for each general land use category listed in the ITE Trip GenerationManual

Unit Cost Methodology

The Transportation SDC is calculated by dividing the total cost ofthe SDCrelated

transportation improvements by the number ofcitywide ELNDT resulting in an SDCcost per ELNDT The Transportation SDC unit cost per trip is summarized as follows

Ashland

Transportation Systems Development ChargeSDCRelated Transportation Improvement Total

Costs ELNDT

8341148 39040

CostELNDT

214

Transportation SDC Calculation

The Transportation SDC is applicable to all new land development within the AshlandUGB and is calculated at 214 per ELNDT The Trip Generation Fifth Edition is to beused for all SDC calculations Tabulations oftrip generation rates and linked trip factorsfor various land uses are found in the attachments

The following table identifies the Ashland Transportation SDC fee as applied to variousland use developments such asinglefamily multifamily homes fast food restaurant

3000 sq and industrial centers30000 sq ft

Transportation System Development Charge Calculations

Single Family DwellingMulti Family DwellingFast Food Restaurant 3000 sq ftLight Industrial 30000 sq ft

324 2040196 13828826 231316123 50037

Credits

Credits against the calculated SDC will be given for the cost ofqualified publicimprovements in whole or in part identified on the SDC Eligible TransportationImprovements table Costs not included in the calculation of the SDC shall not be

eligible for SDC credit Except that the City may agree that certain costs may in factrepresent system costs that will be considered for addition to SDCeligible costs duringthe next SDC update If those noneligible costs are subsequently changed to become

City ofAshland Department ofCommunity Development 6

Page 12: Meadowbrook Optional Recalculation

CIvofAshland Transportation SVstems Development Charge Julv 1999

SDC eligible credit will be given in a form of areimbursement of aportion of the SDC

improvement fees

TDM Credits

Credits may be given for developments that implement transportation demand

management TDM plans designed to reduce generated vehicle trips The proponent ofthe development must declare an intention to apply for TDM vehicle trip reduction and

Transportation SDC credit as a part of the building permit application The TDM planmust be prepared by a transportation planning professional recognized by the CommunityDevelopment Director as being proficient in TDM programs

Oregon law requires that provisions be included in the SDC for alternative methodologiesto calculate the trip generation ELNDT for use in calculation of improvement feesThese provisions are needed in case standard trip generation rates or linked trip factorsincluded in the SDC do not adequately reflect the true trip generation characteristics of a

particular land use development These provision s also provide an approach for projectproponents that believe their development does not generate trips in the same way as

described in the SDC

Credits for TDM vehicle trip reductions will be limited to amaximum of 15of the SDCcharge calculated without TDM credits TDM plans must include an annual reportingplan that will document the amount of vehicle trip reduction that is actually achievedFailure to achieve the projected level of trip reduction shall result in the required paymentofthe full SDC

Redevelopment

Redevelopment of existing land use of which the traffic generated by the existing use is

implied to be already accounted for under existing traffic conditions and will not beconsidered as part of the transportation SDC calculation requiring abuilding permit thatresults in a net change in trip generation due to either a change in general land use

category residential vs commercial number ofdwelling units or building area willalso be required to pay a transportation SDC in lieu of the existing use Specifically the

transportation SDC will be calculated based on the net difference between the tripgeneration including equivalent and new trip rate adjustments ofthe new use less the

trip generation of the existing use If the new use generates fewer trips than the existinguse no transportation SDC shall be paid but no reimbursements will be given to the

proposed development

Implementation

Given the substantial proposed increase in the transportation SDC it is recommendedthat the new charge be implemented using a phased approach as follows

City ofAshland Department ofCommunity Development 7

Page 13: Meadowbrook Optional Recalculation

City ofAshland Transportation Systems Development Chare July 1999

1st Phase

2nd Phase

3rd Phase

August161999January 12000July12000

ELNDT 93ELNDT 154ELNDT 214

This phasing would result in an implementation schedule and costs for typicaldevelopment shown in the following table

Transportation Systems Development Charge Calculations

ImplementationTypical Development i Current Phase 1 Phase 2

SDC 8161999 22000SinlIamilyIwclling 324 888 1471Multi Family Dwelling 196 584 966Fast Food Restaurant 8826 10068 166723000 sq ftLight Industrial 30000 6123 21780 36066sq ft

Phase 3 fui712000

2040138223131

50037

City ofAshland Department ofCommunity Development 8

Page 14: Meadowbrook Optional Recalculation

LOE5 g15 695

EOII5 6L5 Og5

69gL15 OggE5 gLLL

glH5 161015 g569 6gLZ 9I59t9lS 99115 91L

817615 0 81785

C0C 09915 0015

E6IOgE19L L99ISIS91779917ES0LLI69015C6ZLOIEILgOILLLgCTLEE1212C60V156LVE80C7EUgECCUESF9Ig9E

CC9lS76E801125OTLEOkSC06SLOCT696L6C61TOI0615E9656956gc00E9LCClE ELOE6TZc95665ICI0CCI91265LOSSIUTS gl0ETLLO0SU9Igl6015OgESLU991569ZE9CEU898159EIEIg6012L89ECgCCIg8011596995196569561175Cl9650695OUrS60ELg117COcgL669590L66561L7E159LgIC996501L900ILO00960019600196001c00go900C900IC9001C0CCOLI0CLOLI0CLO61O9L0610EOCCO800901710LL0LO09L0090190600EL0OI00806170St06r0L06170Lg06c01900170OCOfd0gUOCL06170CL06t70CL06170CLO6l0CLO6170CL0690019600ICOO0MTO0SUOOl801Ol 801OI80Ol801Ol80O00101190OICOOl

IC00I91700I6001060010600I0600I060OIO0I0IL600ILO001L60VtDJs000tttqoLLVjDjs0001OLL09LVADJs0001ZtLg7ULZVADJsO00IU099IlLVdOJs0001C6S0OCtVHgJsO001TfVdDJsOOOqcqIIOLVHDjsOOOM8COIOiLVHDjs00016tUOS9VxlOJs0001E99UEI6VzIOjsO00l1ooilI6VIDJs00017tt068VdOjsO00lLUIfOLgdmndaulosePC176VdOJs000l60LtLIc8aaKoldtuH7gLg09gdmndulsgD179UNttgVdDJsO00HIoLIgVdOts0001ZT9ELSCgVdOJs0001 ofC0UVxlDJs00ffl98SVd9Js000IZOUtOUgVdgjs000lIgot0UgVd9js0000Ctc0ZgVdDjs00fflL90L0UgVJDJs000IC9It0Ug VdDJs000I6goL9OEg0E8VztDjs000809VHOjs000lOUIVdOjs0001Cl

OLVHDjs0001LO017bigVxlOJs000l990mtPdna300Lg01USquDltullohx91t09UluFlBullodPdna3018c0rTtuflullovGogS0TiuDulloOLItOUTapo3asllaledjIJlpuwqsaloNiwpqa3A4tallJaaVaslPuFIsoloeHluomlsnfpVsoleBuopezeue9dillill

Page 15: Meadowbrook Optional Recalculation

50L go LO

9E f915 665

C9E 6g15

I6 99 I0

9915 OE 9L

99 E0 9

L515Ilooz1166nsIIluflladlso3010100I0ILt001ElI01Eli01Eli01El01VzlDJs0001CLI098IalusaoqVVtOJsO00lIq7ISasnoqajluVdDs000Igg17OSIasnoqajcVzIOJs0001gOtuJnl3gSnuglVjCjs0001LOq0ElagdrJlsnPulV3Djs00010cI0ElIImlsnpulABaHIguanaVzIrDjs000L6tl01IIgulsnpuIlqqluDusJolaelluamlsnfPVLIKq3apo3asIaleldlJL311pusqsoloNiePIooAXilleaoAViJlaslpuqtLISJOOeJuetusnpvJONqlsaeluolejeue9dJL

Page 16: Meadowbrook Optional Recalculation

ASHLAND

Land Use Category1

SingeFamilyResidential

MultiFamilyResidential

Health Care Senior

HousingRetailCommercial

Specialty Retail

Hardware

Quality Restaurant

Fast Food Restaurant

DriveIn Bank

Shopping Center 4

FUTURE LAND USE VALIDATIONLAND USE CATEGORIZATION LAND DENSITY 3

FORECAST ITE Sub ADJUSTED DUsEmployeeGROWTH 2 GROWTH s

DUs Employees Code Allocation DUs Employees Acre 1000 SF

3 GFA

2558 210 100 2558 40

644 220 100 644 150

180 220 100 180 150

1014814 14 142 182816 7 71 096831 17 172 746834 17 172 1090912 20 203 382820 25 254 100

Local 1000 SF

Adjustment GFAAcre

DEVELOPABLELAND AREA

1000

SF GFA Acres

NA 640

NA 43

NA 12

100 883 78 9100 1064 74 7100 750 23 3

100 750 16 2

100 750 53 7100 1100 254 23

Industnal

Light 370 110 34 370 216 100 818 171 21Heavy 245 120 33 245 182 100 451 135 30

Industrial Park 399 130 33 399 200 100 1106 200 18

Service7 145 912 50 73 382 100 800 19 2

848 50 73 094 100 800 77 10

School 200

Office

Elementary 520 50 100 NAHigh School 530 50 100 NA

Office Park 750 50 0 359General 5 710 50 0 329

TotaZ 3202 2373 3202 2373

NA NA NANA NA NA

100 1816100 224

0 00 00 826

Notes

1 Consistent with Ashland TSPCity of Ashland

Comprehensive Plan

2 Residential dwelling units all other uses

employees3 ITE Trip Generation FifthEdition

4 Assumes I employee per 1000

SF GFA

5 Assumes office building of25000 SF GFA trip generation rates

vary by building size6 Average of95employees and 4000

SF GFA

7 Assumes Bank ITE 912 and Tire

Store ITE 848

Page 17: Meadowbrook Optional Recalculation

ASHLAND

Land Use Category

FUTURE TRIP GENERATION VALIDATIONDEVELOPABLE LAND AREA 45

1000

DUs SF GFA Employees

SingleFamilyResidential 2558

MultiFamily Residential 644

Health Care Senior 180

Housing

RetailCommercial

Specialty Retail 38

Hardware 19

Quality Restaurant 46

Fast Food Restaurant 46

DriveIn Bank 55

Shopping Center 3 68

Industrial

Manufacturing 384

School

Elementary 100

High School 100

ITE TRIP GENERATION2WAY

New PM Daily PM Peak DailUse Peak

Factor Hour Rate Hour Trips Tri

Rate

100 101 955 2584

100 063 647 406

100 1 00 300 180

100 493 4067 187

100 474 5129 90

100 972 7651 447

100 4626 63212 2128

100 5123 26521 2818

100 657 16759 447

100 086 385 150

100 310 1339 310

100 287 1679 287

EQUIVALENT LENGTH NEW

DAILY TRIPS

ily Adjustment Factors

ps Length Linked 2 ELNDT1

Y Y

429 1 00 100 24429167 097 100 404254 100 100 540

545 049 075 568

975 049 075 358

519 019 075 502

078 009 051 133587 017 055 1364396 031 028 98c

478 112 100 1656

339 108 100 1446679 108 100 1813

TOTAL 39040Notes

1Trip length variation compared to singlefamily residential2Passbylinked trip rate

reduction

3Assumes 50000 SF GFA shoppingcenter

4Based on buildable lands data within the city limits12696and outside the city limits inside the UGB 1030905Data for buildable lands outside the city limits inside the UGB assumes no development or rezoning since 1090 and assumes any annexation was concommitent with UGBexpansion

Page 18: Meadowbrook Optional Recalculation
Page 19: Meadowbrook Optional Recalculation
Page 20: Meadowbrook Optional Recalculation
Page 21: Meadowbrook Optional Recalculation
Page 22: Meadowbrook Optional Recalculation
Page 23: Meadowbrook Optional Recalculation
Page 24: Meadowbrook Optional Recalculation
Page 25: Meadowbrook Optional Recalculation
Page 26: Meadowbrook Optional Recalculation