STATE UNIVERSITY CONSTRUCTION FUND

Measurement Record of Operations and Accomplishments

2020/2021

Page 2: Measurement Record of Operations and Accomplishments 2020 …

Contract Title Vendor Name Contract Type Est. Value Expend LTD

Rehab Toilet Rooms for ADA - Podium DEMBLING & DEMBLING ARCHITECTS PC Design - Fee Schedule 1,288,615.00 808,565.20Renovate Building 30 for Engineering/Science ENVISION ARCHITECTS DPC Design - Fee Schedule 1,837,961.00 622,186.55Renovate Building 35 for Liberal Arts & Social Sciences JMZ ARCHITECTS AND PLANNERS PC Design - Fee Schedule 1,144,714.94 761,800.96Renovate Building 35 for Liberal Arts & Social Sciences GUTH DECONZO CONSULTING ENGINEERS PC Design - Commissioning 61,017.00 9,661.70

Renovate Gym & Infill Pool - PE Building LACEY THALER REILLY WILSON ARCHITECTURE & PRESERVATION LLP

Design - Fee Schedule 995,000.00 45,753.15

Update Facilities Master Plan CHIANG OBRIEN ARCHITECTS DPC Design - Program Study 719,822.00 0.006 Total Projects 6,047,129.94 2,247,967.56

Rehabilitate Science IV Ph 2 ASHLEY MCGRAW ARCHITECTS DPC Design - Fee Schedule 1,547,197.27 862,196.09Rehabilitate Science IV Ph 2 HORIZON ENGINEERING ASSOCIATES LLP Design - Commissioning 60,597.83 395.53

Renovate Bartle Library, Third floor South and Penthouse M E ENGINEERING PC Design - Fee Schedule 3,449,600.00 499,895.17Replace Roofs - Various Bldgs. BELL & SPINA ARCHITECTS - PLANNERS PC Design - Fee Schedule 563,000.00 0.00

4 Total Projects 5,620,395.10 1,362,486.79

Rehabilitate Elevators in Various Buildings - Alumni, Capen, Furnas, NSC, BEB

ARCHITECTURAL RESOURCES PC Design - Fee Schedule 2,249,000.00 152,134.32

1 Total Project 2,249,000.00 152,134.32

Renovate Crosby Hall ANDREW BERMAN ARCHITECT PLLC Design - Fee Schedule 2,647,000.00 740,645.09Renovate Foster Hall MITCHELL GIURGOLA ARCHITECTS LLP Design - Fee Schedule 3,368,000.00 430,046.81

2 Total Projects 6,015,000.00 1,170,691.90

Study - Exterior Envelope Conditions - Health Sciences Center BELL & SPINA ARCHITECTS - PLANNERS PC Design - Program Study 377,771.08 145,594.89

Repair/Replace Pedestrian Bridge at HSC M J ENGINEERING AND LAND SURVEYING P C Design - Fee Schedule 116,000.00 65,011.05

2 Total Projects 493,771.08 210,605.94

Rehab Chemistry GOODY CLANCY ARCHITECTURE LLC Design - Fee Schedule 7,255,054.85 2,317,830.10Repair Facade - Melville Library and Staller Center SUPERSTRUCTURES ENGINEERING &

ARCHITECTURE PLLCDesign - Fee Schedule 421,000.00 181,170.67

Rehabilitate Javits Lecture Center DLR GROUP ARCHITECTURE AND ENGINEERING PC

Design - Fee Schedule 4,176,530.00 678,780.81

3 Total Projects 11,852,584.85 3,177,781.5818 Total Projects 32,277,880.97 8,321,668.09

Contract Title Vendor Name Contract Type Est. Value Expend LTD

Renovate McMahon for Advanced Ceramic Manufacturing and Education

KIDENEY ARCHITECTS PC Design - Fee Schedule 1,124,000.00 514,743.74

Rehabilitate Service Building for Ceramics Foundry KIDENEY ARCHITECTS PC Design - Fee Schedule 938,000.00 11,724.322 Total Projects 2,062,000.00 526,468.06

Project Name

Rehabilitate Science IV Ph 2

University Centers

Repair Facade - Melville Library and Staller Center

Total Binghamton University

Binghamton University

Report AState University Construction Fund Projects In Planning

As of September 30, 2020* Projects in Planning have a design contract that has been awarded to a consultant for the development of contract drawings for the proper construction and completion of the project. As of the date of this report, these projects do not yet have a construction contract associated with them.

All projects listed were let by the State University Construction Fund.

Total Univ. Buffalo - South

University at Albany

Univ. Buffalo - North

Univ. Buffalo - SouthRenovate Crosby Hall

Update Facilities Master Plan

Renovate Gym & Infill Pool - PE Building

Total Stony Brook University

Rehabilitate Elevators in Various Buildings - Alumni, Capen, Furnas, NSC, BEB

Total Univ. Buffalo - North

Stony Brook UniversityRehab Chemistry

Rehabilitate Javits Lecture Center

Replace Pedestrian Bridge at HSC

Total Stony Brook - HSC

Renovate Bartle Library, Third floor South and PenthouseReplace Roofs - Various Bldgs.

Stony Brook - HSCStudy - Exterior Envelope Conditions - Health Sciences Center

Alfred CeramicsRenovate McMahon for Ceramic Research, Education and Technology Enterprise

Renovate Foster Hall

Rehab Toilet Rooms for ADA - PodiumRenovate Building 30 for Engineering/ScienceRenovate Building 35 for Liberal Arts & Social Sciences

Total University at Albany

Total University Centers

Other DoctoralProject Name

Rehabilitate Heating Plant for Ceramics FoundryTotal Alfred Ceramics

Page 2 of 30

Page 3: Measurement Record of Operations and Accomplishments 2020 …

Report AState University Construction Fund Projects In Planning

As of September 30, 2020* Projects in Planning have a design contract that has been awarded to a consultant for the development of contract drawings for the proper construction and completion of the project. As of the date of this report, these projects do not yet have a construction contract associated with them.

All projects listed were let by the State University Construction Fund.

Contract Title Vendor Name Contract Type Est. Value Expend LTD

Renovate Plant Science Building ELLENZWEIG ARCHITECTS OF NY PC Design - Fee Schedule 1,840,000.00 985,013.991 Total Project 1,840,000.00 985,013.99

Upgrade Electrical System UHB LIZARDOS ENGINEERING ASSOCIATES PC Design - Fee Schedule 4,401,370.96 2,439,451.54CM Upgrade Electrical System UHB JACOBS PROJECT MANAGEMENT CO Design - Construction

Management121,637.11 121,637.11

Upgrade Electrical System UHB LIRO PROGRAM & CONSTRUCTION MANAGEMENT PE PC

Design - Construction Management

2,708,685.00 488,197.48

Upgrade Electrical System UHB GENESYS ENGINEERING PC Design - Commissioning 111,414.00 0.00

Renovate Pharmacy UHB Basement PETER GISOLFI ASSOCIATES ARCHITECTURE LANDSCAPE ARCHITECTURE LLP

Design - Fee Schedule 381,200.00 270,365.48

Renovate Pharmacy UHB Basement MDSZERBATY ASSOCIATES ARCHITECTURE LLC

Design - Fee Schedule 482,920.31 236,587.65

Renovate Pharmacy UHB Basement JACOBS PROJECT MANAGEMENT CO Design - Construction Management

746,382.00 0.00

Renovate Pharmacy UHB Basement GENESYS ENGINEERING PC Design - Commissioning 260.00 260.00

Claims Analysis & Litigation Services HKA GLOBAL INC Design - Other Professional Services

758,170.00 145,294.58

Renovate Cafeteria Servery and Dining Area FRANCIS CAUFFMAN INC Design - Fee Schedule 2,257,000.00 139,491.00Renovate Interventional Areas/ Bi Plane LOTHROP ASSOCIATES LLP Design - Fee Schedule 478,936.00 104,514.82Replace Exterior Doors- BSB and HSEB ISMAEL LEYVA ARCHITECT PC Design - Fee Schedule 169,569.00 62,740.37Replace Exterior Doors- BSB and HSEB ELLANA INC Design - Construction

Management780,000.00 2,484.00

Renovate Toilets and Locker Rooms- BSB MDSZERBATY ASSOCIATES ARCHITECTURE LLC

Design - Fee Schedule 755,983.00 232,397.21

Construct Infrastructure Riser BSB LOTHROP ASSOCIATES LLP Design - Fee Schedule 308,757.11 71,473.74Demo 34th Street Parking Garage LOTHROP ASSOCIATES LLP Design - Fee Schedule 746,567.00 449,918.55Demo 34th Street Parking Garage LIRO PROGRAM & CONSTRUCTION

MANAGEMENT PE PCDesign - Construction Management

309,814.00 99,677.48

Replace BSB Chiller OBRIEN & GERE ENGINEERS INC Design - Fee Schedule 840,000.00 240,355.42Replace BSB Chiller JACOBS PROJECT MANAGEMENT CO Design - Construction

Management584,077.00 0.00

Library Study JMZ ARCHITECTS AND PLANNERS PC Design - Program Study 182,241.00 157,651.87Replace Diesel Fuel Tanks #8 & #9 OBRIEN & GERE ENGINEERS INC Design - Fee Schedule 474,000.00 0.00Upgrade / Replace Fire Suppression System IAQ SYSTEMS INC Design - Fee Schedule 267,000.00 0.00 Study R-22 Units for Replace/Upgrade UHB RMF ENGINEERING INC PC Design - Program Study 110,330.00 0.00Replace HSEB Roof ISMAEL LEYVA ARCHITECT PC Design - Fee Schedule 315,077.00 156,107.50

24 Total Projects 18,291,390.49 5,418,605.80

Update Facilities Master Plan JMZ ARCHITECTS AND PLANNERS PC Design - Program Study 298,600.00 221,848.09Program Study - Illick Hall JMZ ARCHITECTS AND PLANNERS PC Design - Program Study 112,600.00 98,143.03Rehabilitate 4th Floor HVAC-Bray Hall CHIANG OBRIEN ARCHITECTS DPC Design - Fee Schedule 325,000.00 0.00

3 Total Projects 736,200.00 319,991.12

Renovate Pharmacy UHB Basement

Other DoctoralProject NameCornell - Ag&Life Sci.Renovate Plant Science Building

SUNY DownstateTotal Cornell - Ag&Life Sci.

Renovate Toilets and Locker Rooms- BSB

Demo 34th Street Parking Garage

Replace BSB Chiller

Claims Analysis & Litigation Services

Renovate Cafeteria Servery and Dining AreaRenovate Interventional Areas/ Bi Plane

Construct Infrastructure Riser BSB

Upgrade Electrical System UHB

Library Study

Total SUNY Downstate

Replace Exterior Doors- BSB and HSEB

SUNY ESFUpdate Facilities Master PlanProgram Study - Illick HallRehabilitate 4th Floor HVAC-Bray Hall

Total SUNY ESF

Replace Diesel Fuel Tanks #8 & #9Upgrade / Replace Fire Suppression System Study R-22 Units for Replace/Upgrade UHBReplace HSEB Roof

Page 3 of 30

Page 4: Measurement Record of Operations and Accomplishments 2020 …

Report AState University Construction Fund Projects In Planning

As of September 30, 2020* Projects in Planning have a design contract that has been awarded to a consultant for the development of contract drawings for the proper construction and completion of the project. As of the date of this report, these projects do not yet have a construction contract associated with them.

All projects listed were let by the State University Construction Fund.

Contract Title Vendor Name Contract Type Est. Value Expend LTD

Renovate 7th floor for Clinical Operations MDSZERBATY ASSOCIATES ARCHITECTURE LLC

Design - Fee Schedule 843,000.00 400,104.18

Rehab Elevator Systems RMF ENGINEERING INC PC Design - Fee Schedule 420,000.00 173,511.832 Total Projects 1,263,000.00 573,616.01

Facility Master Planning - Academic Buildings JMZ ARCHITECTS AND PLANNERS PC Design - Program Study 117,206.00 116,191.86Reconstruct Plaza - Donovan Hall and Replace Wildcat Pedestrian Bridge

C & S ENGINEERS INC Design - Fee Schedule 592,150.00 219,264.02

Facility Master Planning - Albany Campus JMZ ARCHITECTS AND PLANNERS PC Design - Program Study 149,917.00 86,554.313 Total Projects 859,273.00 422,010.19

Renovate Silverman Hall ASHLEY MCGRAW ARCHITECTS DPC Design - Fee Schedule 1,632,000.00 362,988.81NAB Boilers exhaust stack RMF ENGINEERING INC PC Design - Fee Schedule 167,000.00 70,994.60Fire Suppression - UH (02) & UUH at CG (30) M E ENGINEERING PC Design - Fee Schedule 1,693,000.00 131,702.92Replace OR Air Handler AHU-1 UH at Community Campus (30) HESNOR ENGINEERING ASSOCIATES PLLC Design - Fee Schedule 600,000.00 0.00

Renovate Heart & Vascular Center - UH 6th fl. HBT ARCHITECTS LLP Design - Fee Schedule 1,208,000.00 568,997.46Renovate Heart & Vascular Center - UH 6th fl. HORIZON ENGINEERING ASSOCIATES LLP Design - Commissioning 24,650.00 1,917.30

Upgrade Chiller - UH 3W6W HESNOR ENGINEERING ASSOCIATES PLLC Design - Fee Schedule 195,000.00 0.00Space Study - Install 4 ORs 5th fl. Surgical Unit - UH HBT ARCHITECTS LLP Design - Program Study 31,000.00 20,450.70Replace Canopy at ED Entrance - University Hospital HBT ARCHITECTS LLP Design - Fee Schedule 375,000.00 0.00DLAR Renovations Phase III Weiskotten Hall DAVID MASTANDUNO ARCHITECT Design - Fee Schedule 2,613,911.89 1,992,488.17Commissioning – DLAR Phase III Renovation Weiskotten Hall GENESYS ENGINEERING PC Design - Commissioning 70,111.00 10,328.84

CM DLAR Renovations Phase III Weiskotten Hall TURNER CONSTRUCTION COMPANY Design - Construction Management

45,554.27 45,554.27

12 Total Projects 8,655,227.16 3,205,423.0747 Total Projects 33,707,090.65 11,451,128.24

Contract Title Vendor Name Contract Type Est. Value Expend LTD

Infrastructure Improvements, North Campus Phase 2 C & S ENGINEERS INC Design - Fee Schedule 3,012,000.00 750,869.39Reconstruct Allen Loop Plaza and New Campus Drive C & S ENGINEERS INC Design - Fee Schedule 1,009,000.00 173,079.83Reconstruct Allen Loop Plaza and New Campus Drive M J ENGINEERING AND LAND SURVEYING P C Design - Program Study 29,489.00 29,489.00

Renovate Holmes Hall JMZ ARCHITECTS AND PLANNERS PC Design - Program Study 77,470.00 68,386.13Renovate Tuttle Complex JMZ ARCHITECTS AND PLANNERS PC Design - Program Study 173,478.00 146,936.06Renovate Seymour Student Union HBT ARCHITECTS LLP Design - Program Study 105,500.00 70,677.24

6 Total Projects 4,406,937.00 1,239,437.65

Total College of Optometry

College of OptometryRenovate 7th floor for Clinical Operations

Rehab Elevator Systems

Comprehensive Colleges

Total SUNY Brockport

Space Study - Install 4 ORs 5th fl. Surgical Unit - UHReplace Canopy at ED Entrance - University Hospital

NAB Boilers exhaust stackFire Suppression - UH (02) & UUH at CG (30)Replace OR Air Handler AHU-1 UH at Community Campus (30)

Upgrade Chiller - UH 3W6W

Total Upstate Medical Univ.Total Other Doctoral

Project Name

Renovate Gallery, Seymour Student Union

SUNY Brockport

Reconstruct Allen Loop Plaza and New Campus Drive

Renovate Holmes HallRenovate Tuttle Complex

Infrastructure Improvements, North Campus Phase 2

Total SUNY Polytech

DLAR Renovations Phase III Weiskotten Hall

Facility Master Planning - Academic BuildingsReconstruct Plaza - Donovan Hall and Replace Wildcat Pedestrian BridgeFacility Master Planning - Albany Campus

Upstate Medical Univ.Renovate Silverman Hall

SUNY Polytech

Renovate Heart & Vascular Center - UH 6th fl.

Other DoctoralProject Name

Page 4 of 30

Page 5: Measurement Record of Operations and Accomplishments 2020 …

Report AState University Construction Fund Projects In Planning

As of September 30, 2020* Projects in Planning have a design contract that has been awarded to a consultant for the development of contract drawings for the proper construction and completion of the project. As of the date of this report, these projects do not yet have a construction contract associated with them.

All projects listed were let by the State University Construction Fund.

Contract Title Vendor Name Contract Type Est. Value Expend LTD

Renovate Classroom Building ARCHITECTURAL RESOURCES PC Design - Fee Schedule 3,361,800.00 1,179,754.03Campus Space & Classroom Utilization Study HBT ARCHITECTS LLP Design - Program Study 195,520.00 153,681.83Renovation Moore Hall for Student Life KIDENEY ARCHITECTS PC Design - Program Study 63,212.00 41,316.97

3 Total Projects 3,620,532.00 1,374,752.83

Upgrade Site Lighting - Campus wide C & S ENGINEERS INC Design - Fee Schedule 1,011,000.00 409,405.15Abate & Renovate 2nd Floor - Miller Building CHIANG OBRIEN ARCHITECTS DPC Design - Fee Schedule 671,100.00 111,139.48

2 Total Projects 1,682,100.00 520,544.63

Rehabilitate Plaza Maytum/Reed/McEwen BELL & SPINA ARCHITECTS - PLANNERS PC Design - Fee Schedule 732,000.00 259,869.45

Program & Phasing Study for New Academic Space KIDENEY ARCHITECTS PC Design - Program Study 195,246.00 29,589.652 Total Projects 927,246.00 289,459.10

Renovate Milne Library JMZ ARCHITECTS AND PLANNERS PC Design - Fee Schedule 3,641,000.00 49,910.27Renovate Milne Library JMZ ARCHITECTS AND PLANNERS PC Design - Program Study 135,595.59 135,595.59Renovate Milne Library PATHFINDER ENGINEERS & ARCHITECTS LLP Design - Fee Schedule 552,000.00 282,393.25

Reconstruct Plaza, Roads & Utilities - College Circle & College Drive

C & S ENGINEERS INC Design - Fee Schedule 1,078,000.00 132,301.18

4 Total Projects 5,406,595.59 600,200.29

Masonry Repairs at Exterior Entrances and Site Work - Old Main LACEY THALER REILLY WILSON ARCHITECTURE & PRESERVATION LLP

Design - Fee Schedule 266,000.00 63,382.01

Replace Roofs - Smiley Arts, College Theater, Dorsky Museum and Faculty Office Building

MDSZERBATY ASSOCIATES ARCHITECTURE LLC

Design - Fee Schedule 538,000.00 0.00

Information Technology System Master Plan C & S ENGINEERS INC Design - Program Study 284,605.00 0.003 Total Projects 1,088,605.00 63,382.01

Replace AHUs Campus Center F, I, K Wings SETTY & ASSOCIATES LTD PC Design - Fee Schedule 1,839,100.00 590,167.96Addition and Rehab Natural Sciences Building BSA LIFESTRUCTURES OF NEW YORK LLC Design - Fee Schedule 2,368,555.00 1,826,430.86Replace Roof - Student Union Building LACEY THALER REILLY WILSON

ARCHITECTURE & PRESERVATION LLPDesign - Fee Schedule 754,000.00 0.00

3 Total Projects 4,961,655.00 2,416,598.82

Rehabilitate Alumni Hall LACEY THALER REILLY WILSON ARCHITECTURE & PRESERVATION LLP

Design - Fee Schedule 2,233,881.00 1,015,029.22

Rehabilitate Alumni Hall GENESYS ENGINEERING PC Design - Commissioning 110,119.00 3,185.00

Replace Windows and Roof - Netzer Admin & Morris Complex LOMONACO & PITTS ARCHITECTS PC Design - Fee Schedule 431,519.00 232,749.23

Interior Renovations Various Buildings LOMONACO & PITTS ARCHITECTS PC Design - Fee Schedule 271,000.00 116,563.93

Energy Master Plan OBRIEN & GERE ENGINEERS INC Design - Program Study 248,367.00 236,917.86Update Facilities Master Plan CHIANG OBRIEN ARCHITECTS DPC Design - Program Study 599,746.00 0.00Site Accessibility Upgrades M J ENGINEERING AND LAND SURVEYING P C Design - Fee Schedule 997,000.00 0.00

7 Total Projects 4,891,632.00 1,604,445.24

Total SUNY New Paltz

Total SUNY Cortland

Renovation Moore Hall for Student Life

SUNY New PaltzMasonry Repairs at Exterior Entrances and Site Work - Old Main

SUNY Fredonia

SUNY GeneseoRenovate Milne Library

Program & Phasing Study for New Academic SpaceTotal SUNY Fredonia

Rehabilitate Plaza Maytum/Reed/McEwen

Total Buffalo State College

Rehab Natural Sciences Building

Buffalo State CollegeRenovate Classroom BuildingCampus Space & Classroom Utilization Study

SUNY CortlandUpgrade Site Lighting - Campus wideAbate & Renovate 2nd Floor - Miller Building

Reconstruct Plaza, Roads & Utilities - College Circle & College Drive

Total SUNY Geneseo

Replace Roofs - Smiley Arts, College Theater, Dorsky Museum and Faculty Office BuildingInformation Technology System Master Plan

Replace Electrical Switchgear and AHU's - Campus Center

Replace Roof - Student Union Building

Total Old Westbury

Energy Master PlanUpdate Facilities Master PlanSite Accessibility Upgrades

Old Westbury

Total College at Oneonta

Interior Renovations Various Buildings

College at OneontaRehabilitate Alumni Hall

Replace Windows and Roof - Netzer Admin & Morris Complex

Comprehensive CollegesProject Name

Page 5 of 30

Page 6: Measurement Record of Operations and Accomplishments 2020 …

Report AState University Construction Fund Projects In Planning

As of September 30, 2020* Projects in Planning have a design contract that has been awarded to a consultant for the development of contract drawings for the proper construction and completion of the project. As of the date of this report, these projects do not yet have a construction contract associated with them.

All projects listed were let by the State University Construction Fund.

Contract Title Vendor Name Contract Type Est. Value Expend LTD

Replace/Reconstruct Terracotta - Sheldon Hall JOHN G WAITE ASSOCIATES ARCHITECT PLLC Design - Fee Schedule 1,352,000.00 462,900.31

Renovate Hewitt Hall CANNON DESIGN ARCHITECTURE AND ENGINEERI NG, P.C.

Design - Fee Schedule 6,783,000.00 2,311,417.93

Update Facilities Master Plan - Oswego JMZ ARCHITECTS AND PLANNERS PC Design - Program Study 149,487.00 92,024.283 Total Projects 8,284,487.00 2,866,342.52

Repair Masonry Kehoe, Yokum, Angell, Myers and Feinberg. DODGE CHAMBERLIN LUZINE WEBER ASSOCIATES ARCHITECTS LLP

Design - Fee Schedule 9,867.10 9,867.10

Repair Masonry Kehoe, Yokum, Angell, Myers and Feinberg. MOSAIC ASSOCIATES ARCHITECTS DPC Design - Fee Schedule 504,132.90 209,747.11

Install Turf Field at the Field House DODGE CHAMBERLIN LUZINE WEBER ASSOCIATES ARCHITECTS LLP

Design - Fee Schedule 43,853.21 43,853.21

Install Turf Field at the Field House MOSAIC ASSOCIATES ARCHITECTS DPC Design - Fee Schedule 322,309.16 147,842.71Upgrade Mechanical System for Performing Arts - Myers Hall MCFARLAND-JOHNSON INC Design - Fee Schedule 443,967.72 57,345.69

Renovate Nursing Lab and Electrical Panel Upgrade Hawkins Hall

DODGE CHAMBERLIN LUZINE WEBER ASSOCIATES ARCHITECTS LLP

Design - Fee Schedule 3,529.88 3,529.88

Renovate Nursing Lab and Electrical Panel Upgrade Hawkins Hall

MOSAIC ASSOCIATES ARCHITECTS DPC Design - Fee Schedule 94,573.04 34,016.03

Replace Catch Basins MCFARLAND-JOHNSON INC Design - Fee Schedule 110,000.00 0.00Construct Storage Building MOSAIC ASSOCIATES ARCHITECTS DPC Design - Fee Schedule 126,098.14 10,428.39Reconstruct Kehoe Parking Lot & Walks M J ENGINEERING AND LAND SURVEYING P C Design - Fee Schedule 144,364.67 96,188.29

10 Total Projects 1,802,695.82 612,818.41

Replace Roofs - Hosmer and Snell Halls, Crane Music Center LOMONACO & PITTS ARCHITECTS PC Design - Fee Schedule 221,000.00 0.00

Academic Planning & Partial Update Facilities Master Plan 2018 LACEY THALER REILLY WILSON ARCHITECTURE & PRESERVATION LLP

Design - Program Study 364,444.00 205,758.02

Crane Music Complex - Master Plan Implementaion Study CANNON DESIGN ARCHITECTURE AND ENGINEERI NG, P.C.

Design - Program Study 640,000.00 286,817.96

3 Total Projects 1,225,444.00 492,575.98

Install Backflow Prevention and Pump Station M J ENGINEERING AND LAND SURVEYING P C Design - Fee Schedule 331,000.00 126,593.24

Install Backflow Prevention M J ENGINEERING AND LAND SURVEYING P C Design - Program Study 35,985.00 31,364.55

Rehab HVAC - Visual Arts Building LIZARDOS ENGINEERING ASSOCIATES PC Design - Fee Schedule 3,740,064.00 224,451.54Rehabilitate Administration Building KLIMENT HALSBAND ARCHITECTS LLP Design - Fee Schedule 1,371,000.00 91,939.66Electrical Feeder Study - Campus Wide RMF ENGINEERING INC PC Design - Program Study 77,842.00 8,469.68Rehab Masonry - Campus Centers North and South, Museum LOMONACO & PITTS ARCHITECTS PC Design - Fee Schedule 1,015,000.00 55,006.95

6 Total Projects 6,570,891.00 537,825.6252 Total Projects 44,868,820.41 12,618,383.10

SUNY OswegoReplace/Reconstruct Terracotta - Sheldon Hall

Renovate Hewitt Hall

Total SUNY Potsdam

Reconstruct Kehoe Parking Lot & Walks

SUNY PotsdamReplace Roofs - Hosmer and Snell Halls, Crane Music Center

Academic Planning & Partial Update Facilities Master Plan 2018

Total SUNY OswegoSUNY PlattsburghRepair Masonry - Kehoe Administration Building and Feinberg Library

Renovate Field House

Crane Music Complex - Master Plan Implementaion Study

Total SUNY Plattsburgh

Total Purchase College

Upgrade Mechanical System for Performing Arts - Myers Hall

Renovate Nursing Lab and Electrical Panel Upgrade Hawkins Hall

Replace Catch Basins

Comprehensive CollegesProject Name

Construct Storage Building

Update Facilities Master Plan - Oswego

Rehab HVAC - Visual Arts BuildingRehabilitate Administration BuildingElectrical Feeder Study - Campus WideRehab Masonry - Campus Centers North and South, Museum

Purchase CollegeInstall Backflow Prevention and Pump Station

Total Comprehensive Colleges

Page 6 of 30

Page 7: Measurement Record of Operations and Accomplishments 2020 …

Report AState University Construction Fund Projects In Planning

As of September 30, 2020* Projects in Planning have a design contract that has been awarded to a consultant for the development of contract drawings for the proper construction and completion of the project. As of the date of this report, these projects do not yet have a construction contract associated with them.

All projects listed were let by the State University Construction Fund.

Contract Title Vendor Name Contract Type Est. Value Expend LTD

Update Facilities Master Plan Study KIDENEY ARCHITECTS PC Design - Program Study 354,544.00 340,060.65Campus Wide Site Utility Rehab - Phase 1 C & S ENGINEERS INC Design - Fee Schedule 2,200,800.00 161,230.60Rehabilitate Pioneer Track and Field M J ENGINEERING AND LAND SURVEYING P C Design - Fee Schedule 475,000.00 181,758.05

3 Total Projects 3,030,344.00 683,049.30

Update Facilities Master Plan CHIANG OBRIEN ARCHITECTS DPC Design - Program Study 142,014.00 133,899.24Replace Switchgear and Electrical Panels - Wicks and MacArthur Halls

PATHFINDER ENGINEERS & ARCHITECTS LLP Design - Fee Schedule 331,000.00 108,674.54

Upgrade French Hall Plaza M J ENGINEERING AND LAND SURVEYING P C Design - Fee Schedule 175,795.00 97,774.51

Replace Mechanical Systems Study - French Hall PATHFINDER ENGINEERS & ARCHITECTS LLP Design - Program Study 57,750.00 52,126.00

4 Total Projects 706,559.00 392,474.29

Renovate Bouck Hall - Bookstore & Related Student Life JMZ ARCHITECTS AND PLANNERS PC Design - Fee Schedule 333,000.00 184,660.39Renovate Bouck Hall - Bookstore & Related Student Life GENESYS ENGINEERING PC Design - Commissioning 47,754.88 0.00

2 Total Projects 380,754.88 184,660.39

Upgrade Building Management Systems - Various Buildings HESNOR ENGINEERING ASSOCIATES PLLC Design - Fee Schedule 426,000.00 217,842.78

Renovate North Hall for Admissions and UPD DODGE CHAMBERLIN LUZINE WEBER ASSOCIATES ARCHITECTS LLP

Design - Fee Schedule 304,196.40 304,196.40

Renovate North Hall for Admissions and UPD GENESYS ENGINEERING PC Design - Commissioning 58,215.90 540.00

Renovate North Hall for Admissions and UPD MOSAIC ASSOCIATES ARCHITECTS DPC Design - Fee Schedule 204,803.60 2,464.76Repair Masonry and Replace Windows - Evenden Hall LOTHROP ASSOCIATES LLP Design - Fee Schedule 443,000.00 253,126.27Construct Artificial Turf Field C & S ENGINEERS INC Design - Fee Schedule 283,000.00 137,698.81

6 Total Projects 1,719,215.90 915,869.02

Rehabilitate Roosevelt Hall Ph. 1 PLAN A ARCHITECTURE & DESIGN PLLC Design - Fee Schedule 2,259,000.00 1,507,019.99Construct Infrastructure Transportation & Security Center (2020) RICHARD MCELHINEY ARCHITECTS Design - Fee Schedule 297,000.00 24,012.77

Replace Mechanical Systems- Lupton Hall M E ENGINEERING PC Design - Fee Schedule 839,020.00 350,282.12Replace Windows Lupton Hall LACEY THALER REILLY WILSON

ARCHITECTURE & PRESERVATION LLPDesign - Fee Schedule 674,000.00 447,434.18

Rehab Sinclair Hall for Academic Surge Space JMZ ARCHITECTS AND PLANNERS PC Design - Fee Schedule 1,285,000.00 169,452.86Study - Greenhouse Conditions Assessment LACEY THALER REILLY WILSON

ARCHITECTURE & PRESERVATION LLPDesign - Program Study 113,460.00 37,456.31

Investigate and Repair Facades at Gleeson and Laffin Halls HESNOR ENGINEERING ASSOCIATES PLLC Design - Fee Schedule 724,000.00 65,595.42

Construct School of Applied Social Sciences URBAHN ARCHITECTS PLLC URBAHN ARCHITECTS

Design - Fee Schedule 3,232,000.00 2,309,318.26

8 Total Projects 9,423,480.00 4,910,571.91

Technology CollegesProject Name

Total SUNY Canton

Total SUNY Cobleskill

Total Alfred State College

Total Farmingdale State Coll

Replace Mechanical Systems- Lupton HallReplace Windows Lupton Hall

SUNY CobleskillRenovate Bouck Hall - Bookstore & Related Student Life

SUNY CantonUpdate Facilities Master Plan

Repair Masonry and Replace Windows - Evenden TowerConstruct Artificial Turf Field

Total SUNY Delhi

SUNY Delhi

Renovate North Hall for Admissions and UPD

Upgrade Building Management Systems - Various Buildings

Rehab Sinclair Hall for Academic Surge Space Phase 1 of 2Study - Greenhouse Conditions Assessment

Investigate and Repair Facades at Gleeson and Laffin Halls

Construct School of Applied Social Sciences

Farmingdale State CollRehabilitate Roosevelt HallConstruct Infrastructure Transportation & Security Center (2020)

Replace Switchgear and Electrical Panels - Wicks and MacArthur Halls

Upgrade French Hall Plaza

Replace Mechanical Systems Study - French Hall

Alfred State CollegeUpdate Facilities Master Plan StudyCampus Wide Site Utility Rehab - Phase 1Rehabilitate Pioneer Track and Field

Page 7 of 30

Page 8: Measurement Record of Operations and Accomplishments 2020 …

Report AState University Construction Fund Projects In Planning

As of September 30, 2020* Projects in Planning have a design contract that has been awarded to a consultant for the development of contract drawings for the proper construction and completion of the project. As of the date of this report, these projects do not yet have a construction contract associated with them.

All projects listed were let by the State University Construction Fund.

Contract Title Vendor Name Contract Type Est. Value Expend LTD

Renovate Vander Clute Hall & Heritage Hall for Student Union JMZ ARCHITECTS AND PLANNERS PC Design - Fee Schedule 885,000.00 744,647.66

Repair Stone Facade and Masonry at Fort Schuyler DODGE CHAMBERLIN LUZINE WEBER ASSOCIATES ARCHITECTS LLP

Design - Fee Schedule 8,113.38 8,113.38

Repair Stone Facade and Masonry at Fort Schuyler MOSAIC ASSOCIATES ARCHITECTS DPC Design - Fee Schedule 304,886.62 77,380.423 Total Projects 1,198,000.00 830,141.46

Academic Planning & Partial Update Facilities Master Plan 2018 LOMONACO & PITTS ARCHITECTS PC Design - Program Study 473,267.78 417,594.59

Renovate Educational Opportunity Center - Syracuse CHIANG OBRIEN ARCHITECTS DPC Design - Fee Schedule 1,085,031.00 0.00Renovate Educational Opportunity Center - Syracuse CHIANG OBRIEN ARCHITECTS DPC Design - Program Study 330,575.00 202,568.04

3 Total Projects 1,888,873.78 620,162.6329 Total Projects 18,347,227.56 8,536,929.00

Contract Title Vendor Name Contract Type Est. Value Expend LTD

Rehab Plaza - 5th Floor South HOLT ARCHITECTS PC Design - Fee Schedule 588,418.29 276,692.16Exterior Preservation 2019 - Plaza Building LOMONACO & PITTS ARCHITECTS PC Design - Fee Schedule 515,000.00 42,956.12Update Development Study PERKINS & WILL ARCHITECTS PC Design - Program Study 27,456.47 27,456.47

3 Total Projects 1,130,874.76 347,104.753 Total Projects 1,130,874.76 347,104.75

149 Total Projects 130,331,894.35 41,275,213.18

University-Wide

Total Morrisville State Coll

Maritime CollegeRenovate Vander Clute Hall & Heritage Hall for Student Union

Repair Stone Facade and Masonry at Fort Schuyler

Technology CollegesProject Name

Update to Development Plan - System Administration

Total Technology Colleges

Morrisville State CollAcademic Planning & Partial Update Facilities Master Plan 2018

Renovate Educational Opportunity Center - Syracuse

Total Maritime College

Total University-Wide

Projects in Planning Grand Total

Project NameSystem AdministrationRehab Plaza - 5th Floor SouthExterior Preservation 2019 - Plaza Building

Total System Administration

Page 8 of 30

Page 9: Measurement Record of Operations and Accomplishments 2020 …

Contract Title Vendor Name Contract Type Est. Value Expend LTD

Upgrade Central Plant DIGESARE MECHANICAL INC Construction - Full Service 9,980,245.28 4,918,359.00

Upgrade Central Plant - SUCF GILBANE BUILDING COMPANY Design - Construction Management

499,030.00 244,508.00

Construct ETEC Building - 2020 SKANSKA USA BUILDING INC Design - Construction Management

496,081.07 496,081.07

Commissioning Services Construct ETEC Research Building & Parking Structure

M E ENGINEERING PC Design - Commissioning 436,737.75 173,112.12

Construct ETEC Building - 2020 CONSIGLI CONSTRUCTION NY LLC Construction - Full Service 116,331,807.59 74,015,210.00

Construct ETEC Building - 2020 JERSEN CONSTRUCTION GROUP LLC Construction - Full Service 3,973,079.11 3,973,079.11

Install Electrical Ductbank KINGSLEY ARMS INC Construction - Full Service 6,454,888.45 6,454,888.45

CM Construct ETEC Building - 2020 TURNER CONSTRUCTION COMPANY Design - Construction Management

7,439,295.00 4,713,335.96

Renovate Lecture Center BUNKOFF GENERAL CONTRACTORS INC Construction - Full Service 2,038,092.06 2,038,092.06

CM Renovate Lecture Center GILBANE BUILDING COMPANY Design - Construction Management

899,571.00 534,862.32

Renovate Lecture Center LC1 LC2 BUNKOFF GENERAL CONTRACTORS INC Construction - Full Service 7,964,509.55 6,010,637.00

Renovate Lecture Center Phase III HORIZON ENGINEERING ASSOCIATES LLP Design - Commissioning 29,863.00 0.00

Renovate Schuyler Building - Phase II BUNKOFF GENERAL CONTRACTORS INC Construction - Full Service 5,672,052.00 5,162,596.00

Schuyler Building Phase III - Exterior Renovations VMJR COMPANIES LLC Construction - Full Service 2,419,417.00 1,992,352.00

Renovate Schuyler Building - Phase II GILBANE BUILDING COMPANY Design - Construction Management

948,916.80 0.00

15 Total Projects 165,583,585.66 110,727,113.09

Renovate Science II - Phase 1 Physics Wing FAHS CONSTRUCTION GROUP INC Construction - Full Service 18,269,428.18 15,056,749.00

1 Total Project 18,269,428.18 15,056,749.00

South Campus Fire Alarm Replacement - Abbott Library OCONNELL ELECTRIC COMPANY INC Construction - Full Service 980,962.98 695,816.50

Replace Fire Alarm Systems North Campus - Phase I FREY ELECTRIC CONSTRUCTION CO INC Construction - Full Service 3,295,313.02 3,295,313.02

North Campus PH II Replace Fire Alarm Replacement GOODWIN ELECTRIC CORPORATION Construction - Full Service 3,469,392.93 3,469,392.93

Replace Fire Alarm Systems North Campus PH III WEYDMAN ELECTRIC INC Construction - Full Service 2,179,150.97 2,179,150.97

Replace Fire Alarm Systems, Clemens Hall FERGUSON ELECTRIC CONSTRUCTION Construction - Full Service 3,260,198.94 3,250,104.00

Replace Fire Alarms, Biomedical Education Building North Campus

CIR ELECTRICAL CONSTRUCTION CORPORATION

Construction - Full Service 1,165,297.13 1,165,297.13

Replace Fire Alarm Systems North Campus FERGUSON ELECTRIC CONSTRUCTION Construction - Full Service 2,986,378.00 528,907.00

Total Binghamton University

University CentersProject Name

Binghamton UniversityTotal University at Albany

Construct ETEC Building - 2020

Renovate Lecture Center

Renovate Schuyler Building - Phase II

Report BState University Construction Fund Projects In Construction

As of September 30, 2020* Projects in construction have a construction contract that has been awarded to a contractor for the completion of the project. All projects listed were let by the State University Construction Fund.

Univ. Buffalo - NorthReplace Fire Alarm Systems North Campus

Renovate Science II - Phase 1 Physics Wing

University at AlbanyUpgrade Central Plant - SUCF

Page 9 of 30

Page 10: Measurement Record of Operations and Accomplishments 2020 …

Report BState University Construction Fund Projects In Construction

As of September 30, 2020* Projects in construction have a construction contract that has been awarded to a contractor for the completion of the project. All projects listed were let by the State University Construction Fund.

Contract Title Vendor Name Contract Type Est. Value Expend LTD

Replace Fire Alarm Systems Knox Hall North Campus WEYDMAN ELECTRIC INC Construction - Full Service 265,039.78 265,039.77

Natural Science Complex Fire Alarm Remediation CIR ELECTRICAL CONSTRUCTION CORPORATION

Construction - Full Service 2,168,962.80 1,688,896.00

Rehabilitate Exterior Envelope & Structure - Center For the Arts (CFA)

RODEMS CONSTRUCTION CO INC Construction - Full Service 12,110,009.91 9,421,128.00

CFA Replace North Stair and Plaza Deck RODEMS CONSTRUCTION CO INC Construction - Full Service 7,072,506.44 7,072,506.44

Replace Roof - Center For the Arts (CFA) ELMER W DAVIS INC Construction - Full Service 2,271,482.21 2,271,482.21

12 Total Projects 41,224,695.11 35,303,033.97

Renovate Townsend Hall -Interior Renovation RODEMS CONSTRUCTION CO INC Construction - Full Service 6,798,324.53 5,948,098.00

Renovate Townsend Hall-Phase 1 Abatement, Demolition and Exterior Improvements

RODEMS CONSTRUCTION CO INC Construction - Full Service 1,928,019.09 1,927,957.00

Replace Roofs Cary, Farber and Sherman Annex JAMESON ROOFING COMPANY INC Construction - Full Service 5,118,321.21 2,484,605.00

3 Total Projects 13,844,664.83 10,360,660.00

Expand and Upgrade Flax Pond Hatchery - Phase 1 Building Work

BOILERMATIC WELDING INDUSTRIES INC Construction - Full Service 5,154,440.29 4,594,508.00

Expand and Upgrade Flax Pond Hatchery GUTH DECONZO CONSULTING ENGINEERS PC Design - Commissioning 72,878.00 17,612.50

Mechanical Systems Upgrade Life Sciences FRAMAN MECHANICAL INC Construction - Full Service 14,046,096.31 13,971,955.32

Commissioning - Mech Sys Upgrd Life Sci OLA CONSULTING ENGINEERS PC Design - Commissioning 130,175.00 114,350.11

CM Services - Mech Sys Upgrd Life Sci JACOBS PROJECT MANAGEMENT CO Design - Construction Management

1,279,042.85 1,222,707.64

5 Total Projects 20,682,632.45 19,921,133.5736 Total Projects 259,605,006.23 191,368,689.63

Contract Title Vendor Name Contract Type Est. Value Expend LTD

Harder Hall HVAC Upgrades SAVARINO COMPANIES LLC Construction - Full Service 7,688,002.32 6,048,701.00

Update/Replace HVAC Components - Harder Hall CJ BROWN ENERGY & ENGINEERING PC Design - Commissioning 49,780.00 16,287.36

2 Total Projects 7,737,782.32 6,064,988.36

Rehab Mechanical Systems- Isolation & Operating Rooms UHB LIRO PROGRAM & CONSTRUCTION MANAGEMENT PE PC

Design - Construction Management

945,400.00 56,700.00

Rehab Mechanical Systems- Isolation & Operating Rooms UHB GENESYS ENGINEERING PC Design - Commissioning 141,812.00 3,655.00

Replace Main Cooling Tower - UHB DYNAMIC US INC Construction - Full Service 5,458,713.26 5,145,219.00

Replace Main Cooling Tower - UHB GENESYS ENGINEERING PC Design - Commissioning 49,290.00 26,834.86

Total Stony Brook University

Replace Roofs Cary, Farber and Sherman Annex

Total Univ. Buffalo - South

Total Univ. Buffalo - North

Rehabilitate Exterior Envelope & Structure - Center For the Arts (CFA)

Total University Centers

SUNY DownstateRehab Mechanical Systems- Isolation & Operating Rooms UHB

Replace Main Cooling Tower - UHB

Alfred CeramicsUpdate/Replace HVAC Components - Harder Hall

Total Alfred Ceramics

Replace Fire Alarm Systems North Campus

University CentersProject NameUniv. Buffalo - North

Other DoctoralProject Name

Stony Brook UniversityExpand and Upgrade Flax Pond Hatchery

Mechanical Systems Upgrade Life Sciences

Renovate Townsend HallUniv. Buffalo - South

Page 10 of 30

Page 11: Measurement Record of Operations and Accomplishments 2020 …

Report BState University Construction Fund Projects In Construction

As of September 30, 2020* Projects in construction have a construction contract that has been awarded to a contractor for the completion of the project. All projects listed were let by the State University Construction Fund.

Contract Title Vendor Name Contract Type Est. Value Expend LTD

Demolish Admin Trailers RUSSO DEVELOPMENT ENTERPRISES INC Construction - Full Service 974,974.00 778,434.00

JOCS- Install ceiling access panels- 5th fl VOLMAR CONSTRUCTION INC Construction - JOCS 61,084.02 61,023.00Upgrade HVAC Systems BSB HM HUGHES CO INC Construction - Full Service 27,139,905.79 24,851,010.40

Upgrade HVAC Systems BSB ACS SYSTEM ASSOCIATES INC Construction - Full Service 3,398,782.39 3,398,782.39

Upgrade HVAC Systems BSB LO SARDO GEN CONTRS INC Construction - Full Service 7,553,648.10 7,514,889.00

Upgrade HVAC Systems BSB JACOBS PROJECT MANAGEMENT CO Design - Construction Management

684,935.00 548,588.21

Upgrade HVAC Systems BSB JACOBS PROJECT MANAGEMENT CO Design - Construction Management

1,013,580.67 1,013,580.67

JOCS-Partial Surveillance Work Package VOLMAR CONSTRUCTION INC Construction - JOCS 192,886.69 192,886.69JOCS New Academic Building School of Public Health - Busway End Cable Tap Box

VOLMAR CONSTRUCTION INC Construction - JOCS 1,242.24 1,242.24

JOCs BSB Fire pump feed relocation and re-commissioning VOLMAR CONSTRUCTION INC Construction - JOCS 42,969.93 42,329.00

Construction Manager - Various Projects 14A18 JACOBS PROJECT MANAGEMENT CO Design - Construction Management

963,736.79 928,223.94

Replace Boilers BSB DYNAMIC US INC Construction - Full Service 65,067,807.81 64,950,412.00

Replace Boilers BSB JACOBS PROJECT MANAGEMENT CO Design - Construction Management

2,422,461.00 2,291,268.08

Replace Boilers BSB GILBANE BUILDING COMPANY Design - Construction Management

1,298,720.60 1,298,720.60

JOCS Chiller #1 VOLMAR CONSTRUCTION INC Construction - JOCS 111,794.68 111,906.36JOCs Boiler Project -South Campus Condensate Piping Change VOLMAR CONSTRUCTION INC Construction - JOCS 86,475.39 0.00

20 Total Projects 117,610,220.36 113,215,705.44

Renovate Marshall Hall WENDEL WD ARCHITECTURE ENGINEERING SURVEYING & LANDSCAPE ARCHITECTURE PC

Design - Commissioning 196,406.00 50,352.29

Renovate Marshall Hall LECHASE CONSTRUCTION SERVICES LLC Design - Construction Management

1,686,648.00 0.00

Renovate Marshall Hall MURNANE BUILDING CONTRACTORS Construction - Full Service 2,175,173.00 358,170.00

JOCS: Renovate 4th Floor Labs Illick Hall UPSTATE COMPANIES I LLC Construction - JOCS 350,663.31 210,068.004 Total Projects 4,408,890.31 618,590.29

Rehab Building Systems Mech Ph 2 ACS SYSTEM ASSOCIATES INC Construction - Full Service 7,507,464.97 6,009,597.00

Rehab Electrical Ssystems CRC ASSOCIATES INC Construction - Full Service 9,215,591.39 9,215,591.39

Rehab Building Systems Mech Ph 1 C D E AIR CONDITIONING CO Construction - Full Service 5,460,820.37 5,460,820.36

Construction Manager for 41059 & 41060 THE MCKISSACK GROUP INC Design - Construction Management

741,930.00 716,544.17

Total SUNY ESF

Total SUNY Downstate

Renovate Marshall Hall

Replace Boilers BSB

SUNY ESF

College of OptometryRehab Building Systems

Construction Manager- Various Projects 14A18, 14B03, 14B33, 14B44

Demolish Admin Trailers

Study - UHB-Risk Management for Building Water Systems

Other DoctoralProject NameSUNY Downstate

Upgrade HVAC Systems BSB

Page 11 of 30

Page 12: Measurement Record of Operations and Accomplishments 2020 …

Report BState University Construction Fund Projects In Construction

As of September 30, 2020* Projects in construction have a construction contract that has been awarded to a contractor for the completion of the project. All projects listed were let by the State University Construction Fund.

Contract Title Vendor Name Contract Type Est. Value Expend LTD

Commissioning for 41056 SYSKA HENNESSY GROUP INC Design - Commissioning 7,163.30 7,163.30

Rehab Building Systems Bid Pkg 07 ANDREW VELEZ CONSTRUCTION INC Design - Construction Management

575,430.00 505,762.68

Rehab Building Systems Bid Pkg 08 ANDREW VELEZ CONSTRUCTION INC Design - Construction Management

732,842.00 558,546.37

7 Total Projects 24,241,242.03 22,474,025.27

CM - Construct Health and Wellness Center THE WHITING-TURNER CONTRACTING COMPANY INC

Design - Construction Management

5,273,867.72 607,489.68

Construct Health and Wellness Center WENDEL WD ARCHITECTURE ENGINEERING SURVEYING & LANDSCAPE ARCHITECTURE PC

Design - Commissioning 922,287.96 138,984.95

JOCS -New H&W Site Preparation UPSTATE COMPANIES I LLC Construction - JOCS 823,675.85 823,675.85JOCS Parking Lot Booth UPSTATE COMPANIES I LLC Construction - JOCS 73,105.03 73,105.03JOCS Pave Parking Lot UPSTATE COMPANIES I LLC Construction - JOCS 105,199.09 105,199.09Construct Health and Wellness Center NORTHLAND ASSOCIATES INC Construction - Full Service 5,024,739.72 4,227,170.00

6 Total Projects 12,222,875.37 5,975,624.6039 Total Projects 166,221,010.39 148,348,933.96

Contract Title Vendor Name Contract Type Est. Value Expend LTD

Reconstruct Iroquois Drive ACCADIA SITE CONTRACTING INC Construction - Full Service 2,984,481.50 2,981.50

Reconstruct Iroquois Drive Phase 1 MARK CERRONE INC Construction - Full Service 2,169,489.21 2,067,734.00

Reconstruct Central Heating Plant DV BROWN & ASSOCIATES INC Construction - Full Service 12,077,162.10 5,124,623.00

Replace Steam Line - Moot to Savage Halls MARK CERRONE INC Construction - Full Service 792,058.27 792,058.27

Reconstruct Central Heating Plant BUFFALO CONSTRUCTION CONSULTANTS INC Design - Construction Management

1,699,558.00 784,044.98

Replace Turf and Track at Coyer Field OCCHINO CORP Construction - Full Service 1,525,523.00 1,121,645.00

Replace Turf and Track at Coyer Field - Turf Replacement OCCHINO CORP Construction - Full Service 1,085,264.30 1,075,064.30

Renovate Science Building - Bldg. 15, Phase II LP CIMINELLI INC Construction - Full Service 21,078,139.93 21,078,139.93

Renovate Science Building No. 15, Building Addition MANNING SQUIRES HENNIG CO INC Construction - Full Service 23,994,800.83 21,643,935.00

Commissioning Agent, Renovate Science 15 Phase II HORIZON ENGINEERING ASSOCIATES LLP Design - Commissioning 483,809.80 370,538.69

Construction Management Sci Bldg PhaseII TURNER CONSTRUCTION COMPANY Design - Construction Management

999,829.40 999,829.40

CM Renovate Science Building - Bldg. 15, Phase III TURNER CONSTRUCTION COMPANY Design - Construction Management

1,693,194.00 0.00

Renovate Science Building - Bldg. 15, Phase III MARK CERRONE INC Construction - Full Service 5,142,865.73 5,142,865.73

13 Total Projects 75,726,176.07 60,203,459.80Total Buffalo State College

Total Upstate Medical Univ.

Buffalo State CollegeReconstruct Iroquois Drive

Construct Health and Wellness CenterUpstate Medical Univ.

Total Other Doctoral

Comprehensive CollegesProject Name

Total College of Optometry

Rehab Building SystemsCollege of Optometry

Other DoctoralProject Name

Renovate Science Building - Bldg. 15, Phase II

Reconstruct Central Heating Plant

Replace Turf and Track at Coyer Field

Page 12 of 30

Page 13: Measurement Record of Operations and Accomplishments 2020 …

Report BState University Construction Fund Projects In Construction

As of September 30, 2020* Projects in construction have a construction contract that has been awarded to a contractor for the completion of the project. All projects listed were let by the State University Construction Fund.

Contract Title Vendor Name Contract Type Est. Value Expend LTD

Regional Center Rochester ALLIED BUILDERS INC Construction - Full Service 9,852,628.54 9,852,628.54

Construct Regional Center Statewide-Suffolk County J ANTHONY ENTERPRISES INC Construction - Full Service 13,066,081.45 12,996,128.45

Commissioning Regn Centr Rochester CJ BROWN ENERGY & ENGINEERING PC Design - Commissioning 67,554.41 67,554.41

808BU Construct Regional Centers Statewide GILBANE BUILDING COMPANY Design - Construction Management

587,651.90 587,651.90

JOCS Selden 2nd Floor Fit-Out VOLMAR CONSTRUCTION INC Construction - JOCS 985,677.69 856,291.005 Total Projects 24,559,593.99 24,360,254.30

Rehabilitate Exterior - Reed Library SAVARINO COMPANIES LLC Construction - Full Service 2,730,193.00 1,401,279.00

Houghton Hall 1st and 2nd Floor Fitout SAVARINO COMPANIES LLC Construction - Full Service 16,765,589.84 11,565,773.00

Renovate Surge For Exercise Science PERRY CONSTRUCTION GROUP INC Construction - Full Service 741,973.23 741,973.23

Renovate Houghton Hall - Demo/Abatement & Envelope RESETARITS CONSTRUCTION CORPORATION Construction - Full Service 5,451,220.78 5,440,217.00

Renovate Houghton Hall BUFFALO CONSTRUCTION CONSULTANTS INC Design - Construction Management

663,800.00 509,954.40

Renovate Houghton Hall WENDEL WD ARCHITECTURE ENGINEERING SURVEYING & LANDSCAPE ARCHITECTURE PC

Design - Commissioning 156,123.20 55,126.83

Renovate Houghton Hall WENDEL WD ARCHITECTURE ENGINEERING SURVEYING & LANDSCAPE ARCHITECTURE PC

Design - Commissioning 77,366.00 2,747.50

7 Total Projects 26,586,266.05 19,717,070.96

Reconstruct Mechanical Room & Pool at Merritt & Schrader Halls

MANNING SQUIRES HENNIG CO INC Construction - Full Service 2,946,969.03 1,257,010.00

Reconstruct Mechanical Room & Pool at Merritt & Schrader Halls

CJ BROWN ENERGY & ENGINEERING PC Design - Commissioning 21,065.00 6,590.88

Renovate Sturges & Fraser Halls, Phase 1 BUFFALO CONSTRUCTION CONSULTANTS INC Design - Construction Management

888,460.00 0.00

Renovate Sturges & Fraser Halls, Phase 1 WENDEL WD ARCHITECTURE ENGINEERING SURVEYING & LANDSCAPE ARCHITECTURE PC

Design - Commissioning 135,218.00 0.00

Replace Roof at Welles Hall NEW BRITAIN ROOFING CO INC Construction - Full Service 2,031,111.27 1,559,921.27

5 Total Projects 6,022,823.30 2,823,522.15

Exterior Rehab Various Buildings BAST HATFIELD CONSTRUCTION LLC Construction - Full Service 3,828,191.37 3,098,399.00

Exterior Rehab Various Buildings - Phase 1 - Roofs NUA CONSTRUCTION CORP Construction - Full Service 689,035.50 689,035.50

Upgrade Lecture Center Mechanical System DANIEL OCONNELLS SONS INC Construction - Full Service 8,810,356.56 3,562,631.00

Total SUNY Fredonia

Exterior Rehab Various Buildings

Renovate Sturges & Fraser Halls, Phase 1

Total SUNY GeneseoSUNY New Paltz

Upgrade Lecture Center Mechanical System

SUNY Geneseo

Total Empire State College

Replace Roof at Welles Hall

Construct Regional Centers Statewide

SUNY FredoniaRehabilitate Exterior - Reed Library

Renovate Houghton Hall

Reconstruct Mechanical Room & Pool at Merritt & Schrader Halls

Comprehensive CollegesProject NameEmpire State College

Page 13 of 30

Page 14: Measurement Record of Operations and Accomplishments 2020 …

Report BState University Construction Fund Projects In Construction

As of September 30, 2020* Projects in construction have a construction contract that has been awarded to a contractor for the completion of the project. All projects listed were let by the State University Construction Fund.

Contract Title Vendor Name Contract Type Est. Value Expend LTD

Replace Roof - Rehabilitate 4th Floors Student Union BAST HATFIELD CONSTRUCTION LLC Construction - Full Service 6,469,631.17 6,456.00

Repair Replace Facade, Fine Arts Building VMJR COMPANIES LLC Construction - Full Service 4,724,720.00 4,720.00

5 Total Projects 24,521,934.60 7,361,241.50

Replace Roofs, Natural Science & Clark Center ICON CONTRACTING GROUP INC Construction - Full Service 2,502,575.00 1,638,426.00

JOCs Complete Remaining Roofing Work VOLMAR CONSTRUCTION INC Construction - JOCS 675,103.43 0.00Renovation of Library/Academic Space - Stage 2 FRATELLO CONSTRUCTION CORP Construction - Full Service 10,056,519.47 9,955,586.00

Renovation of Library/Academic Space Phase I MINELLI CONSTRUCTION CO INC Construction - Full Service 13,536,780.00 12,139,498.00

Commissioning Agent - Renovate Library OLA CONSULTING ENGINEERS PC Design - Commissioning 155,193.00 140,036.91

Construction Manager Library Rehabilitation, Stage 1 JACOBS PROJECT MANAGEMENT CO Design - Construction Management

547,938.89 547,938.89

Renovation of Library/Academic Space JACOBS PROJECT MANAGEMENT CO Design - Construction Management

804,686.66 804,686.66

JOCS (Backcharge) - Library Incomplete Work Stage 1 VOLMAR CONSTRUCTION INC Construction - JOCS 215,972.76 203,271.00JOCS Library VOLMAR CONSTRUCTION INC Construction - JOCS 89,958.87 67,631.00JOC Backcharge VOLMAR CONSTRUCTION INC Construction - JOCS 251,757.51 0.00

10 Total Projects 28,836,485.59 25,497,074.46

Rehabilitate West Dormitory Drive for Pedestrian Safety FAHS CONSTRUCTION GROUP INC Construction - Full Service 2,134,509.38 1,860,402.00

Renovate Hunt Union- West for Applied Learning LECHASE CONSTRUCTION SERVICES LLC Construction - Full Service 4,456,187.00 3,742,117.00

Construct New Emergency Services Building MURNANE BUILDING CONTRACTORS Construction - Full Service 5,652,647.00 1,727,482.00

Construct New Emergency Services Building GENESYS ENGINEERING PC Design - Commissioning 59,957.00 10,781.43

Rehabilitate Elevators Milne Library ANDREW R MANCINI ASSOC INC Construction - Full Service 947,646.70 259,228.70

5 Total Projects 13,250,947.08 7,600,011.13

Replace Roof Sibley Hall TITAN ROOFING INC Construction - Full Service 3,269,243.98 2,959,804.00

Renovate Memorial Hall MLB CONSTRUCTION SERVICES LLC Construction - Full Service 11,626,463.85 1,374,935.69

Renovate Memorial Hall GENESYS ENGINEERING PC Design - Commissioning 83,353.60 862.50

JOCS - Construction - Masonry Memorial Hall UPSTATE COMPANIES I LLC Construction - JOCS 1,020,923.90 820,335.00HTHW Generator Replacement - Phase 2 ALL STATE CONSTRUCTION & BOILER INC Construction - Full Service 7,416,382.97 6,431,991.00

HTHW Generator Replacement Phase I FRANK LILL & SON INC Construction - Full Service 10,450,293.00 10,438,195.00

6 Total Projects 33,866,661.30 22,026,123.19

Total Old Westbury

Renovation of Library/Academic Space

Total SUNY New Paltz

Total SUNY Plattsburgh

Rehabilitate Elevators Milne Library

Replace Roof - Rehabilitate 4th Floors Student Union

Repair Replace Facade, Fine Arts Building

Total College at Oneonta

HTHW Generator Replacement

SUNY PlattsburghReplace Roof Sibley Hall

Renovate Memorial Hall

Repair Masonry Memorial Hall

Comprehensive CollegesProject Name

College at OneontaRehabilitate West Dormitory Drive for Pedestrian Safety

Renovate Hunt Union- West for Applied Learning

Construct New Emergency Services Building

Old WestburyReplace Roofs Natural Sci. & Clark Ctr.

SUNY New Paltz

Page 14 of 30

Page 15: Measurement Record of Operations and Accomplishments 2020 …

Report BState University Construction Fund Projects In Construction

As of September 30, 2020* Projects in construction have a construction contract that has been awarded to a contractor for the completion of the project. All projects listed were let by the State University Construction Fund.

Contract Title Vendor Name Contract Type Est. Value Expend LTD

Renovate Student Union, Bldg. No 29 MURNANE BUILDING CONTRACTORS Construction - Full Service 7,313,984.68 4,733,582.00

Construct Addition, Renovate Bishop Hall., Bldg. No. 009C NORTHLAND ASSOCIATES INC Construction - Full Service 21,478,996.54 21,457.54

Construct Addition, Renovate Bishop Hall., Bldg. No. 009C GENESYS ENGINEERING PC Design - Commissioning 89,918.40 940.00

3 Total Projects 28,882,899.62 4,755,979.54

Rehab HTHW System Phase 2 ALL STATE CONSTRUCTION & BOILER INC Construction - Full Service 2,711,709.00 1,230,559.00

Piping and Valve Replacement MARIC PLUMBING & HEATING INC Construction - Full Service 2,344,555.21 2,344,261.00

Rehab HTHW System - Box Tunnel Piping Replacement MARIC MECHANICAL INC Construction - Full Service 3,475,919.45 3,299,802.00

Rehab HTHW System Phase 2 HORIZON ENGINEERING ASSOCIATES LLP Design - Commissioning 37,056.92 23,063.08

JOCS - HTHW Commons Service VOLMAR CONSTRUCTION INC Construction - JOCS 856,574.72 285,564.00Replace Exterior Windows & Doors PAC & Natural Science Buildings

L HOLZNER ELECTRIC COMPANY Construction - Full Service 2,319,968.65 1,684,998.00

Site Improvements for ADA Accessibility Ph1 MONTESANO BROS INC Construction - Full Service 8,562,061.40 5,943,862.40

Site Improvements for ADA Accessibility Ph1 JACOBS PROJECT MANAGEMENT CO Design - Construction Management

497,116.00 376,665.78

JOCS Olde Walkways VOLMAR CONSTRUCTION INC Construction - JOCS 578,680.10 523,234.00Renovate/Construct Center for Integrated Technology Learning WORTH CONSTRUCTION CO INC Construction - Full Service 32,828,593.80 30,549,881.00

Building Systems Commissioning Services- CITL Project 29402 LORING CONSULTING ENGINEERS INC Design - Commissioning 249,952.00 249,862.49

29847 CM - Center for Integrated Tech learning HILL INTERNATIONAL INC Design - Construction Management

1,978,300.00 1,978,128.87

JOCS CITL Hi-Volt Elec. Dct Bank & Sewer VOLMAR CONSTRUCTION INC Construction - JOCS 181,901.72 166,999.00JOCS CITL Tube Steel-Per Bulletin 34 VOLMAR CONSTRUCTION INC Construction - JOCS 152,870.72 145,082.00JOCS Future Miscl. VOLMAR CONSTRUCTION INC Construction - JOCS 34,951.92 34,951.92JOCS Backcharge VOLMAR CONSTRUCTION INC Construction - JOCS 191,958.77 35,802.00JOCS Miscl. Additional Work VOLMAR CONSTRUCTION INC Construction - JOCS 161,384.22 139,318.00JOCs Install New Fan VOLMAR CONSTRUCTION INC Construction - JOCS 14,422.41 14,108.00Commissioning Services for HVAC Dance Renovation OLA CONSULTING ENGINEERS PC Design - Commissioning 17,580.91 17,580.91

HVAC Renovations - Dance Building Air Handlers/Rehab Ducts B&B CONTRACTING GROUP LLC Construction - Full Service 7,382,276.90 6,042,977.77

CM HVAC Renovations - Dance Building LIRO PROGRAM & CONSTRUCTION MANAGEMENT PE PC

Design - Construction Management

362,000.00 252,437.76

21 Total Projects 64,939,834.82 55,339,138.9880 Total Projects 327,193,622.42 229,683,876.01

Total SUNY Potsdam

Total Comprehensive Colleges

SUNY PotsdamRenovate Student Union, Bldg. No 029

Construct Addition, Renovate Bishop Hall., Bldg. No. 009C

Project Name

Total Purchase College

Replace Exterior Windows & Doors PAC & Nat Sci

Site Improvements for ADA Accessibility Ph1

Rehab HTHW System Phase 2Purchase College

HVAC Renovations - Dance Building

Renovate/Construct Center for Integrated Technology Learning

Comprehensive Colleges

Page 15 of 30

Page 16: Measurement Record of Operations and Accomplishments 2020 …

Report BState University Construction Fund Projects In Construction

As of September 30, 2020* Projects in construction have a construction contract that has been awarded to a contractor for the completion of the project. All projects listed were let by the State University Construction Fund.

Contract Title Vendor Name Contract Type Est. Value Expend LTD

Hinkle Library - Exterior Repair SAVARINO COMPANIES LLC Construction - Full Service 3,574,729.16 3,193,794.00

Replace Roofs - Orvis, Ag Science, Huntington and Pioneer LECHASE CONSTRUCTION SERVICES LLC Construction - Full Service 3,156,153.00 1,155,882.00

2 Total Projects 6,730,882.16 4,349,676.00

Renovations to Dana Hall NORTHERN TIER CONTRACTING INC Construction - Full Service 8,123,172.06 4,285,807.90

Demolition and Infrastructure Upgrades - Dana Hall NORTHERN TIER CONTRACTING INC Construction - Full Service 2,515,667.00 2,378,580.00

Renovations to Dana Hall GENESYS ENGINEERING PC Design - Commissioning 82,016.00 11,735.35

3 Total Projects 10,720,855.06 6,676,123.25

Upgrade Mechanical, Electrical and Plumbing Systems Champlin Hall

FAHS CONSTRUCTION GROUP INC Construction - Full Service 8,899,592.70 7,654,480.00

Upgrade Facilities Complex LECHASE CONSTRUCTION SERVICES LLC Construction - Full Service 7,250,545.30 1,217,906.00

Upgrade Facilities Complex GUTH DECONZO CONSULTING ENGINEERS PC Design - Commissioning 55,202.00 5,832.00

3 Total Projects 16,205,340.00 8,878,218.00

Renovate Farnsworth Hall-South/Thurston Surge Space ANDREW R MANCINI ASSOC INC Construction - Full Service 2,968,426.46 2,407,349.20

JOCS - New Cage Wash Equipment Purchase and Partial Install (Syracuse Region)

UPSTATE COMPANIES I LLC Construction - JOCS 864,663.80 863,800.00

Renovate Farnsworth Hall GUTH DECONZO CONSULTING ENGINEERS PC Design - Commissioning 133,871.00 18,508.00

JOCS - New Cage Wash Equipment Partial Install Part II (Syracuse Region)

UPSTATE COMPANIES I LLC Construction - JOCS 324,457.13 324,133.00

4 Total Projects 4,291,418.39 3,613,790.20

Replace Roofs Various Buildings SEA BREEZE GENERAL CONSTRUCTION INC Construction - Full Service 1,562,561.00 1,401,860.00

1 Total Project 1,562,561.00 1,401,860.00

Replacement of Underground Utilities and Site Enhancements CCI COMPANIES INC Construction - Full Service 9,016,612.84 7,997,226.45

Reconstruct South Circle Road SMITH SITE DEVELOPMENT LLC Construction - Full Service 3,142,693.55 1,674,303.55

Construct Alternative Energy Building NORTHLAND ASSOCIATES INC Construction - Full Service 15,485,146.68 1,603,415.86

Replace Roofs at Charlton and STUAC, Bldg. Nos, 45 and 08 NORTHLAND ASSOCIATES INC Construction - Full Service 3,338,335.00 2,688,610.00

4 Total Projects 30,982,788.07 13,963,555.8617 Total Projects 70,493,844.68 38,883,223.31

Total SUNY Canton

Upgrade Facilities Complex

Hinkle Library - Exterior Repair

SUNY Canton

Replace Roofs - Orvis, Ag Science, Huntington and Pioneer

Total Alfred State College

Renovations to Dana Hall

Project NameAlfred State College

Total Technology Colleges

Upgrade Mechanical, Electrical and Plumbing Systems Champlin Hall

Reconstruct South Circle Road

Construct Alternative Energy Building

Total Morrisville State Coll

Replace Roofs at Charlton and STUAC, Bldg. Nos, 45 and 08

Maritime College

Morrisville State CollReplacement of Underground Utilities and Site Enhancements

Total SUNY Delhi

Replace Roofs Various Buildings

Total Maritime College

SUNY DelhiRenovate Farnsworth Hall

Total SUNY Cobleskill

SUNY Cobleskill

Technology Colleges

Page 16 of 30

Page 17: Measurement Record of Operations and Accomplishments 2020 …

Report BState University Construction Fund Projects In Construction

As of September 30, 2020* Projects in construction have a construction contract that has been awarded to a contractor for the completion of the project. All projects listed were let by the State University Construction Fund.

Contract Title Vendor Name Contract Type Est. Value Expend LTD

Rehab Plaza 1st Floor South - Plaza BUNKOFF GENERAL CONTRACTORS INC Construction - Full Service 2,581,049.00 2,030,132.00

1 Total Project 2,581,049.00 2,030,132.001 Total Project 2,581,049.00 2,030,132.00173 Total Projects 826,094,532.72 610,314,854.91

Project NameSystem Administration

Total System AdministrationTotal University-Wide

Construction in Progress Grand Total

University-Wide

Rehab Plaza 1st Floor South - Plaza

Page 17 of 30

Page 18: Measurement Record of Operations and Accomplishments 2020 …

Contract Title Vendor Name Contract Type Est. Value Expend LTD

Renovate Lecture Center Sub-Basement MLB CONSTRUCTION SERVICES LLC Construction - Full Service 5,223,921.70 5,223,921.70

Renovate Health Center AOW ASSOCIATES INC Construction - Full Service 10,544,840.12 10,216,521.67

Renovate Health Center TURNER CONSTRUCTION COMPANY Design - Construction Management

269,640.00 269,640.00

Renovate Health Center Parking Management Trailer AOW ASSOCIATES INC Construction - Full Service 922,141.22 922,141.22

Renovate Building 27 CONSIGLI CONSTRUCTION NY LLC Construction - Full Service 30,643,736.12 28,733,743.00

Renovate Building 27- Business Administration GILBANE BUILDING COMPANY Design - Construction Management

1,281,190.00 1,112,916.72

Replace Exterior Doors Uptown - Phase 1 FLOWER CITY GLASS CO OF NY LLC Construction - Full Service 2,426,563.14 2,001,201.83

7 Total Projects 51,312,032.30 48,480,086.14

Site Utility Upgrade - Electrical Distribution Ph 5 NELCORP ELECTRICAL CONTRACTING CORP Construction - Full Service 2,484,926.00 2,474,926.00

Construct School of Pharmacy FAHS CONSTRUCTION GROUP INC Construction - Full Service 34,621,864.51 34,621,864.51

Construct School of Pharmacy LECHASE CONSTRUCTION SERVICES LLC Design - Construction Management

1,166,816.00 1,142,560.72

Construct School of Pharmacy Site Demolition REGIONAL ENVIRONMENTAL DEMOLITION INC Construction - Full Service 136,949.81 136,949.81

JOCS-Fencing CUTTING EDGE GRP LLC Construction - JOCS 101,351.83 101,351.835 Total Projects 38,511,908.15 38,477,652.87

Replace Electrical Service - Cooke and Hochstetter FERGUSON ELECTRIC CONSTRUCTION Construction - Full Service 3,843,383.00 3,629,838.00

Replace Roof, Beane Service and Helm Warehouse S & L ROOFING & SHEETMETAL INC Construction - Full Service 2,528,838.31 2,283,422.90

Renovate 5th Floor Cooke & Hochstetter Ph1 SAVARINO COMPANIES LLC Construction - Full Service 11,634,842.00 11,624,842.00

SMBS Construction Manager- School of Medicine & Biomedical Sciences

GILBANE LIRO A JOINT VENTURE Design - Construction Management

11,500,672.00 11,172,969.61

SMBS Commissioning BO FACILITY DYNAMICS ENGINEERING Design - Commissioning 904,839.31 904,839.31

New Schl. Med/Biomed Ph 1 LP CIMINELLI INC Construction - Full Service 59,960,539.35 59,706,682.15

The School of Medicine & BioMedical Sciences – Shell & Fitout LP CIMINELLI INC Construction - Full Service 241,472,908.68 241,331,827.00

7 Total Projects 331,846,022.65 330,654,420.97

HSC Deck Rehab ZHN CONTRACTING CORPORATION Construction - Full Service 15,933,820.36 15,933,820.36

CM MART New Beds & Support Tower LIRO-STRUCTURE A JOINT VENTURE Design - Construction Management

4,922,684.38 4,922,684.38

Commissioning Services-MART/New Beds and Support Tower RMF ENGINEERING INC PC Design - Commissioning 1,612,290.00 1,293,652.80

MRI STALCO CONSTRUCTION INC Construction - Full Service 2,583,444.66 2,583,444.66

Renovate Health Center

Stony Brook - HSC

Total Binghamton University

Total University at Albany

HSC Deck Rehab

New Medical & Res Trans & Bed Tower

Site Utility Upgrade - Electrical Distribution Ph 5

Construct School of Pharmacy

Binghamton University

Univ. Buffalo - NorthReplace Electrical Service and Emergency Power Equipment- Cooke/Hochstetter

Total Univ. Buffalo - North

University CentersProject Name

Report CState University Construction Fund Projects Completed

As of September 30, 2020* Completed projects include those that have been accepted for beneficial occupancy, meaning that the project can be occupied and used for the purposes for which it was intended. All projects listed were let by the State University Construction Fund.

Renovate Building 27

Replace Exterior Doors Uptown - Phase 1

University at AlbanyRenovate Sub-Basement Lecture Center South

Replace Roofs Beane Service and Helm Warehouse

Renovate Cooke/Hochsetter Ph1

School of Medicine & Biomedical Sciences New Building Downtown - Phase 1

Page 18 of 30

Page 19: Measurement Record of Operations and Accomplishments 2020 …

Report CState University Construction Fund Projects Completed

As of September 30, 2020* Completed projects include those that have been accepted for beneficial occupancy, meaning that the project can be occupied and used for the purposes for which it was intended. All projects listed were let by the State University Construction Fund.

Contract Title Vendor Name Contract Type Est. Value Expend LTD

Early Site Package G & M EARTH MOVING INC Construction - Full Service 4,197,349.20 4,197,349.20

Core and Shell EW HOWELL CO INC Construction - Full Service 162,292,879.75 160,753,615.98

Fit-Out EW HOWELL CO INC Construction - Full Service 153,050,509.61 145,770,232.00

New Medical & Res Trans & Bed Tower L&H SIGNS INC Construction - Full Service 472,634.16 405,922.16

New Medical & Res Trans & Bed Tower 328A1 LIRO PROGRAM & CONSTRUCTION MANAGEMENT PE PC

Design - Construction Management

13,412,669.24 13,318,983.75

JOCS Flooring Changes to MART 5th & 6th fl. VOLMAR CONSTRUCTION INC Construction - JOCS 218,752.53 218,752.53Rehab Walkway Campus Underpass VANGUARD CONSTRUCTION & DEVELOPMENT

CORPConstruction - Full Service 2,762,340.58 2,762,340.58

11 Total Projects 361,459,374.47 352,160,798.40

Rehab Old Chem Classroom Bldg #02 J KOKOLAKIS CONTRACTING INC Construction - Full Service 24,749,027.90 24,749,027.90

Commissioning for Old Chem Classroom Bld HORIZON ENGINEERING ASSOCIATES LLP Design - Commissioning 79,093.56 71,783.35

CM Services Old Chem, ESS Rehabs LIRO PROGRAM & CONSTRUCTION MANAGEMENT PE PC

Design - Construction Management

2,234,024.00 2,201,386.94

ESS Bldg Exterior Rehab KENSTAR CONSTRUCTION CORP Construction - Full Service 4,302,456.48 4,055,457.48

New Computer Science Building MPCC CORP Construction - Full Service 33,414,161.78 33,414,161.78

CM Services - New Comp Science Bldg URS CORPORATION-NY Design - Construction Management

3,179,100.00 2,890,215.75

Commissioning - New Computer Science HORIZON ENGINEERING ASSOCIATES LLP Design - Commissioning 83,388.39 83,388.39

Student Union Rehab EW HOWELL CO INC Construction - Full Service 65,449,808.54 64,996,617.45

Student Union Rehab JACOBS PROJECT MANAGEMENT CO Design - Construction Management

2,689,680.00 2,582,431.24

Replacement of Electric Trans Feeders ELECNOR HAWKEYE LLC Construction - Full Service 18,724,803.10 18,724,803.10

Feeder Replacement BO - 7 Duct Banks ELDOR CONTRACTING CORP Construction - Full Service 17,233,878.66 17,233,878.66

Replacement Elec Feeders ELDOR CONTRACTING CORP Construction - Full Service 17,785,316.55 17,785,316.55

Roof Replacement Grad Chemistry Bldg A & J CONSTRUCTION OF NY INC Construction - Full Service 2,900,433.54 2,591,914.55

13 Total Projects 192,825,172.50 191,380,383.1443 Total Projects 975,954,510.07 961,153,341.52

Contract Title Vendor Name Contract Type Est. Value Expend LTD

Infill Projects - Various Buildings LECHASE CONSTRUCTION SERVICES LLC Construction - Full Service 9,593,784.20 9,593,784.20

Commissioning-McMahon Infill Project BERGMANN ASSOCIATES ARCHITECTS ENGINEERS LANDSCAPE ARCHITECTS SURVEYORS DPC

Design - Commissioning 125,223.66 125,223.66

2 Total Projects 9,719,007.86 9,719,007.86

Project Name

Infill Projects - Various Buildings

ESS Bldg Exterior Rehab

Rehab Walkway Campus Underpass

Total Stony Brook - HSCStony Brook University

Total University Centers

Stony Brook - HSC New Medical & Res Trans & Bed Tower

Rehab Old Chem Classroom Bldg #02

University CentersProject Name

Roof Replacement Grad Chemistry Bldg

New Computer Science Building

Student Union Rehab

Replacement of Electric Trans Feeders

Alfred Ceramics

Total Alfred Ceramics

Other Doctoral

Total Stony Brook University

Page 19 of 30

Page 20: Measurement Record of Operations and Accomplishments 2020 …

Report CState University Construction Fund Projects Completed

As of September 30, 2020* Completed projects include those that have been accepted for beneficial occupancy, meaning that the project can be occupied and used for the purposes for which it was intended. All projects listed were let by the State University Construction Fund.

Contract Title Vendor Name Contract Type Est. Value Expend LTD

JOCS Infusion Center VOLMAR CONSTRUCTION INC Construction - JOCS 393,510.12 372,269.00JOCS Modifcations to Infusion Center VOLMAR CONSTRUCTION INC Construction - JOCS 16,164.15 14,534.00Provide Additional Electrical Power-BSB SAJIUN ELECTRIC INC Construction - Full Service 7,398,426.04 7,295,456.00

CM Provide Additional Electrical Power-BSB JACOBS PROJECT MANAGEMENT CO Design - Construction Management

632,049.09 632,049.09

HVAC Upgrade, University Hospital DYNAMIC US INC Construction - Full Service 10,400,693.30 10,400,693.30

HVAC Upgrade, University Hospital - Basement and Sub-Basement

ACS SYSTEM ASSOCIATES INC Construction - Full Service 4,139,449.31 4,139,449.31

JOCS-UHB Penthouse waterproofing VOLMAR CONSTRUCTION INC Construction - JOCS 666,468.80 666,468.80JOCS Additional Concrete Work VOLMAR CONSTRUCTION INC Construction - JOCS 117,120.00 117,120.00New Academic Building School of Public Health TUTOR PERINI CORPORATION Construction - Full Service 73,291,945.00 68,445,380.00

Construction Manager for School of Public Health GILBANE BUILDING COMPANY Design - Construction Management

7,398,953.99 6,770,032.71

Commissioning - School of Public Health GENESYS ENGINEERING PC Design - Commissioning 131,975.00 98,461.50

JOCS -Emergency Power and Column Covers VOLMAR CONSTRUCTION INC Construction - JOCS 264,464.20 264,464.20JOCS Admissions HVAC (T006222) VOLMAR CONSTRUCTION INC Construction - JOCS 108,353.25 108,353.25JOCS Admissions HVAC (T006472) VOLMAR CONSTRUCTION INC Construction - JOCS 39,291.25 39,291.25JOCs Adding Heat Trace 80700-08/T006472 VOLMAR CONSTRUCTION INC Construction - JOCS 126,464.34 0.00Replace Roof BSB DIMITRI ENTERPRISES INC Construction - Full Service 1,463,074.61 1,450,199.48

16 Total Projects 106,588,402.45 100,814,221.89

Gateway Building MURNANE BUILDING CONTRACTORS Construction - Full Service 18,273,964.71 17,697,033.02

Gateway Building - Foundations, Steel & Sitework MURNANE BUILDING CONTRACTORS Construction - Full Service 3,645,275.98 3,338,982.98

Building Commissioning - Gateway Bldg GENESYS ENGINEERING PC Design - Commissioning 185,789.05 185,789.05

Construction Manager - Gateway Building TURNER CONSTRUCTION COMPANY Design - Construction Management

1,537,926.73 1,537,926.73

4 Total Projects 23,642,956.47 22,759,731.78

Renovate Lower Lobby M & J ELECTRICAL CONTRACTORS CORP Construction - Full Service 2,582,359.78 2,556,953.00

CM Services - Renovate Lower Lobby ELLANA INC Design - Construction Management

359,680.00 353,695.00

Renovate 10th floor for Pediatric Clinic ALL-CON CONTRACTING CORP Construction - Full Service 2,584,296.72 2,205,565.00

3 Total Projects 5,526,336.50 5,116,213.00

Reconstruct Various Roadways and Parking CENTRAL PAVING INC Construction - Full Service 1,236,545.20 1,107,335.20

Reconstruct Various Roadways and Parking CENTRAL PAVING INC Construction - Full Service 825,444.85 730,065.85

397A5 JOCS CUTTING EDGE GRP LLC Construction - JOCS 593,673.08 593,673.083 Total Projects 2,655,663.13 2,431,074.13

Total SUNY ESF

Total SUNY Polytech

Total SUNY Downstate

Rehab for New Adult Infusion Unit UHB

New Academic Building School of Public Health

Provide Additional Electrical Power-BSB

HVAC Upgrade, University Hospital

Renovate Lower Lobby

Reconstruct Various Roadways and Parking

Renovate Bio-Chemistry Lab JOC

Total College of Optometry

Gateway Building

SUNY Polytech

Replace Roof BSB

SUNY ESF

Renovate 10th floor for Pediatric Clinic

College of Optometry

SUNY Downstate

Other DoctoralProject Name

Page 20 of 30

Page 21: Measurement Record of Operations and Accomplishments 2020 …

Report CState University Construction Fund Projects Completed

As of September 30, 2020* Completed projects include those that have been accepted for beneficial occupancy, meaning that the project can be occupied and used for the purposes for which it was intended. All projects listed were let by the State University Construction Fund.

Contract Title Vendor Name Contract Type Est. Value Expend LTD

New Academic Building BETTE & CRING LLC Construction - Full Service 32,997,371.41 32,997,371.41

Construction Manager - New Academic Building THE WHITING-TURNER CONTRACTING COMPANY INC

Design - Construction Management

1,300,619.59 1,300,619.59

Commissioning Services– New Academic Building GENESYS ENGINEERING PC Design - Commissioning 168,877.59 168,877.59

3 Total Projects 34,466,868.59 34,466,868.5931 Total Projects 182,599,235.00 175,307,117.25

Contract Title Vendor Name Contract Type Est. Value Expend LTD

Renovate Exterior Facade & Perimeter Heating System at Allen Hall

SAVARINO COMPANIES LLC Construction - Full Service 7,065,520.00 7,002,399.00

Replace Emergency Generators, Campus Wide SCHULER-HAAS ELECTRIC CORP Construction - Full Service 3,157,996.00 3,033,371.00

2 Total Projects 10,223,516.00 10,035,770.00

Selective Renovations - Butler Library RODEMS CONSTRUCTION CO INC Construction - Full Service 16,041,596.57 15,709,144.00

Bid 01- Selective Renovations - Butler Library GILBANE BUILDING COMPANY Design - Construction Management

43,590.00 43,590.00

Bid 03 - Selective Renovations - Butler Library GILBANE BUILDING COMPANY Design - Construction Management

379,474.68 379,474.68

JOCS - Temporary Heating Unit Rental Procurement KIRCHER CONSTRUCTION INC Construction - JOCS 211,298.09 211,298.09Upgrade Mechanical Systems for Safety at Upton Hall SICOLI CONSTRUCTION SERVICES INC Construction - Full Service 4,960,977.02 4,656,835.00

5 Total Projects 21,636,936.36 21,000,341.77

Renovate Park Center Facade WELLIVER MCGUIRE INC Construction - Full Service 11,539,804.28 11,496,179.00

1 Total Project 11,539,804.28 11,496,179.00

Renovate 3 Union Avenue VMJR COMPANIES LLC Construction - Full Service 2,444,680.24 2,203,395.50

Rehab Envelope 111 West BAST HATFIELD CONSTRUCTION LLC Construction - Full Service 2,038,265.23 2,032,757.00

Interior Rehab & Lighting 111 West Avenue BAST HATFIELD CONSTRUCTION LLC Construction - Full Service 982,700.10 956,119.10

3 Total Projects 5,465,645.57 5,192,271.60

Replace Windows Rockefeller Arts SAVARINO COMPANIES LLC Construction - Full Service 1,426,215.79 1,406,542.00

1 Total Project 1,426,215.79 1,406,542.00

Reconstruct Site Electric & Steam Infrastructure at Sturges Quad Area

CONCRETE APPLIED TECHNOLOGIES CORP Construction - Full Service 11,062,948.13 11,024,717.45

JOCS New Steam Lines KIRCHER CONSTRUCTION INC Construction - JOCS 930,652.72 930,490.69Replace Roofs - Various Buildings GENERAL ROOFING CONTRACTORS LLC Construction - Full Service 2,809,356.00 2,799,356.00

3 Total Projects 14,802,956.85 14,754,564.14

Total Empire State College

Total Other DoctoralTotal Upstate Medical Univ.

Total Buffalo State College

Comprehensive CollegesProject Name

Replace Roofs - Various Buildings

Total SUNY Geneseo

SUNY Fredonia

Reconstruct Site Electric & Steam Infrastructure at Sturges Quad Area

Replace Windows Rockefeller Arts

Total SUNY FredoniaSUNY Geneseo

Renovate Exterior Facade & Perimeter Heating System at Allen Hall

Replace Emergency Generators, Campus Wide

Total SUNY Brockport

SUNY CortlandRenovate Park Center Facade

Total SUNY Cortland

Renovate 3 Union Avenue

Selective Renovations - Butler Library

Upgrade Mechanical Systems for Safety at Upton Hall

Buffalo State College

Empire State College

SUNY Brockport

Rehab Envelope 111 West

Interior Rehab & Lighting, 111 West Ave

Upstate Medical Univ.New Academic Building

Other DoctoralProject Name

Page 21 of 30

Page 22: Measurement Record of Operations and Accomplishments 2020 …

Report CState University Construction Fund Projects Completed

As of September 30, 2020* Completed projects include those that have been accepted for beneficial occupancy, meaning that the project can be occupied and used for the purposes for which it was intended. All projects listed were let by the State University Construction Fund.

Contract Title Vendor Name Contract Type Est. Value Expend LTD

Replace HTHW line to Old Library C B STRAIN A DIVISION OF DYNAMICSYSTEM INC

Construction - Full Service 615,643.03 608,568.70

Construct Athletic Center FIDELITY & GUARANTY INS CO Construction - Full Service 22,079,788.54 21,798,545.60

Replace High Temperature Hot Water Lines NORTHERN CONSTRUCTION SVC LLC Construction - Full Service 5,302,621.36 5,302,621.36

Replace High Temperature Hot Water PHASE I MEGRANT CORPORATION Construction - Full Service 2,452,139.64 2,452,139.64

Replace HTHW - Phase II MEGRANT CORPORATION Construction - Full Service 3,605,617.02 3,605,617.02

Upgrade Site Electric Distribution System M SCHER & SON INC Construction - Full Service 5,010,575.57 4,838,952.00

Upgrade Electric Distribution - Phase I M SCHER & SON INC Construction - Full Service 4,656,598.38 4,656,598.38

Renovate Building 1 - Old Main PIAZZA BROTHERS INC Construction - Full Service 28,366,183.95 28,366,183.95

Building Commissioning - Old Main GENESYS ENGINEERING PC Design - Commissioning 93,809.35 96,574.13

Construction Manager for Old Main HILL INTERNATIONAL INC Design - Construction Management

127,978.60 127,978.60

JOC for canopy repair CUTTING EDGE GRP LLC Construction - JOCS 43,906.86 43,906.86Library Renovation Sojourner Truth Library PIAZZA INC Construction - Full Service 1,908,311.41 1,908,311.41

Replace Roof - Sojourner Truth Library MARPAT CONSTRUCTION CORP Construction - Full Service 845,834.99 845,834.99

Construction Manager- Library Renovation Sojourner Truth Library

HILL INTERNATIONAL INC Design - Construction Management

171,303.72 171,303.72

Library Renovation Sojourner Truth Library MEYER CONTRACTING CORP Construction - Full Service 10,010,979.98 9,945,010.00

JOCS M36 Conference Rm Conversion UPSTATE COMPANIES I LLC Construction - JOCS 290,300.01 290,300.01New Science Building NIRAM INC Construction - Full Service 36,878,410.60 35,960,993.60

Construction Manager - New Science Building THE WHITING-TURNER CONTRACTING COMPANY INC

Design - Construction Management

2,212,713.21 2,212,713.21

Commissioning - New Science Building OLA CONSULTING ENGINEERS PC Design - Commissioning 199,832.65 193,254.61

JOCS Stone Wall & Campus Sign VOLMAR CONSTRUCTION INC Construction - JOCS 102,624.52 81,091.00Wooster Building Renovations APS CONTRACTING INC Construction - Full Service 28,756,148.42 26,582,142.00

Commissioning - Wooster Renovation OLA CONSULTING ENGINEERS PC Design - Commissioning 188,400.00 178,761.04

Construction Manager - Wooster Renovation JACOBS PROJECT MANAGEMENT CO Design - Construction Management

2,457,392.79 2,435,044.45

JOCS - Wooster Campus Lounge Fit Out CUTTING EDGE GRP LLC Construction - JOCS 129,611.48 129,611.48JOCS- Sidewalks At Wooster UPSTATE COMPANIES I LLC Construction - JOCS 76,387.31 76,387.31JOCS- Complete Change Order & Punchlist UPSTATE COMPANIES I LLC Construction - JOCS 317,949.06 317,631.44JOCs Complete Crestron System VOLMAR CONSTRUCTION INC Construction - JOCS 48,978.93 41,835.00JOCS - Repair Water Infiltration at Resnick Bridge VOLMAR CONSTRUCTION INC Construction - JOCS 26,215.19 24,880.00Renovate Locker Rooms, Elting Athletic Complex, Building No. 5 BCI CONSTRUCTION INC Construction - Full Service 4,205,201.00 4,192,561.89Renovate Locker Rooms, Elting Athletic Complex, Building No. 5

New Science Building

Wooster Building Renovations

Library Renovation Sojourner Truth Library

Upgrade Site Electric Distribution System

Renovate Building 1 - Old Main

SUNY New PaltzReplace HTHW line to Old Library

Construct Athletic Center

Replace High Temperature Hot Water Lines

Comprehensive CollegesProject Name

Page 22 of 30

Page 23: Measurement Record of Operations and Accomplishments 2020 …

Report CState University Construction Fund Projects Completed

As of September 30, 2020* Completed projects include those that have been accepted for beneficial occupancy, meaning that the project can be occupied and used for the purposes for which it was intended. All projects listed were let by the State University Construction Fund.

Contract Title Vendor Name Contract Type Est. Value Expend LTD

Rebuild Generator #3 - Central Heating Plant TROY BOILER WORKS INC Construction - Full Service 836,530.70 836,530.70

JOCS - Startup Generator #3 DOW ELECTRIC INC Construction - JOCS 61,503.44 61,503.4431 Total Projects 162,079,491.71 158,383,387.54

Replace Roofs at Campus Center STATEWIDE ROOFING INC Construction - Full Service 2,385,523.00 2,375,523.00

Replace Electrical Substation No. 45 HINCK ELECTRICAL CONTRACTOR INC Construction - Full Service 1,295,358.06 1,295,358.06

Rehabilitate Campus Ring Road Phase 1 PIONEER LANDSCAPING & ASPHALT PAVING INC

Construction - Full Service 1,963,819.86 1,854,211.00

JOCS - New Surface Parking Lot - Phase 1A VOLMAR CONSTRUCTION INC Construction - JOCS 2,471,591.46 2,471,591.464 Total Projects 8,116,292.38 7,996,683.52

Repair Masonry - Hunt Union/Alumni Hall GANEM CONTRACTING CORPORATION Construction - Full Service 2,193,341.15 2,166,395.00

Rehab Roofs Various Buildings RSI ROOFING INC Construction - Full Service 686,440.29 679,588.29

Replace Water Mains - East Dorm Drive WINN CONSTRUCTION SERVICES INC Construction - Full Service 505,342.50 500,086.50

Site Improvements & Safety Upgrades Hunt Union Parking - Water Lines & Bugbee rd

FAHS CONSTRUCTION GROUP INC Construction - Full Service 2,812,790.00 2,777,494.00

Rehabilitate Physical Science Building, Bldg no. 0025 FAHS CONSTRUCTION GROUP INC Construction - Full Service 28,048,577.38 28,048,577.38

Construction Manager - Rehab Physical Science II LECHASE CONSTRUCTION SERVICES LLC Design - Construction Management

518,072.26 518,072.26

Replace HVAC Equipment - Hunt College Union EVANS MECHANICAL INC Construction - Full Service 4,415,773.36 4,405,458.00

Upgrade Plumbing/HVAC Systems - Bugbee Hall ANDREW R MANCINI ASSOC INC Construction - Full Service 5,192,092.91 5,192,092.91

8 Total Projects 44,372,429.85 44,287,764.34

Rehab Tyler Hall Phase II PAC & ASSOCIATES OF OSWEGO INC Construction - Full Service 10,952,344.40 10,914,530.00

CLOSED JOC Electrical Work, Contract # T006067 CUTTING EDGE GRP LLC Construction - JOCS 54,535.48 54,535.48JOCS - Waterman Theater Reheat Coil UPSTATE COMPANIES I LLC Construction - JOCS 71,783.71 71,783.71Tyler Hall Rehab 1 BETTE & CRING LLC Construction - Full Service 24,286,822.56 24,275,513.00

Commissioning Services for Tyler Hall Rehab Phase I (Project 10351)

GENESYS ENGINEERING PC Design - Commissioning 119,028.79 119,028.79

5 Total Projects 35,484,514.94 35,435,390.98

Performing Arts Building NORTHLAND ASSOCIATES INC Construction - Full Service 43,627,599.62 43,627,599.62

Construction Manager - Performing Arts Building GILBANE BUILDING COMPANY Design - Construction Management

1,619,973.38 1,619,973.38

Commissioning - Performing Arts Building GENESYS ENGINEERING PC Design - Commissioning 94,044.82 94,044.82

Upgrade HVAC/Labs Stowell Hall NORTHLAND ASSOCIATES INC Construction - Full Service 9,305,506.74 9,305,506.74

Commissioning - Upgr HVAC/Labs Stowell GENESYS ENGINEERING PC Design - Commissioning 83,205.00 41,499.31

Total Old Westbury

Old Westbury

Total College at Oneonta

Site Improvements & Safety Upgrades Hunt Union Parking - Water Lines & Bugbee rdRehabilitate Physical Science Building, Bldg no. 0025

Total SUNY OswegoSUNY Potsdam

Total SUNY New Paltz

Performing Arts Building

Upgrade HVAC/Labs Stowell Hall

Replace Water Mains - East Dorm Drive

Rehab Tyler Hall Phase II

Tyler Rehab-Lower Level & Partial Main

Rebuild Generator #3 - Central Heating Plant

SUNY Oswego

Replace HVAC Equipment - Hunt College Union

Upgrade Plumbing/HVAC Systems - Bugbee Hall

College at OneontaRepair Masonry - Hunt Union/Alumni Hall

Rehab Roofs Various Buildings

Comprehensive CollegesProject NameSUNY New Paltz

Rehabilitate Campus Ring Road Phase 1

Construct New Surface Parking Lots Phase 1

Replace Roofs at Campus Center

Replace Electrical Substation No. 45

Page 23 of 30

Page 24: Measurement Record of Operations and Accomplishments 2020 …

Report CState University Construction Fund Projects Completed

As of September 30, 2020* Completed projects include those that have been accepted for beneficial occupancy, meaning that the project can be occupied and used for the purposes for which it was intended. All projects listed were let by the State University Construction Fund.

Contract Title Vendor Name Contract Type Est. Value Expend LTD

Renovate Timerman Hall NORTHERN TIER CONTRACTING INC Construction - Full Service 5,895,113.22 5,895,113.22

Renovate Timerman Hall PTL CONTRACTING CORP Construction - Full Service 592,065.47 403,482.00

Rehab Kellas Hall, Bldg 25 MURNANE BUILDING CONTRACTORS Construction - Full Service 6,855,101.25 6,738,104.80

Construct New Child Care Center BETTE & CRING LLC Construction - Full Service 4,632,079.45 4,583,491.45

9 Total Projects 72,704,688.95 72,308,815.34

Rehab Diesel Generator NORTHEAST GENERATOR COMPANY Construction - Full Service 3,108,440.34 3,108,440.34

Rehab & Enclose PAC Elevator BJB CONSTRUCTION CORPORATION Construction - Full Service 893,452.56 878,573.30

Roof Replacement Campus Center North SEA BREEZE GENERAL CONSTRUCTION INC Construction - Full Service 1,649,591.94 1,604,017.00

Replace Roof at Bookstore - JOCs VOLMAR CONSTRUCTION INC Construction - JOCS 10,697.69 10,687.00JOCS New Bookstore Roof- Part 2 VOLMAR CONSTRUCTION INC Construction - JOCS 498,889.39 449,798.00Renovation of Humanities - Bldg. 41 NIRAM INC Construction - Full Service 34,706,370.44 34,374,604.60

Commissioning - Renovate Humanities Bldg 41 LORING CONSULTING ENGINEERS INC Design - Commissioning 249,634.00 246,918.82

Construction Management Services Renovation of Humanities Building 41

PAVARINI MCGOVERN LLC Design - Construction Management

1,653,682.59 1,653,682.59

Performing Arts Center Roof Replacement USA GENERAL CONTRACTORS CORP Construction - Full Service 2,443,640.20 2,443,640.20

Rehabilitate Exteriors / Dining Hall and Physical Education NIRAM INC Construction - Full Service 9,384,955.58 9,344,447.00

Rehabilitate Exterior Dining Hall CALADRI DEVELOPMENT CORP Construction - Full Service 2,685,130.45 2,685,130.45

Construction Management Services- Exter Rehabilitation Dining & Phys Ed Bldgs

THE MCKISSACK GROUP INC Design - Construction Management

745,584.80 745,227.42

JOCS- Dining Hall Signage & Vestibule Mats CORBEX INC Construction - JOCS 69,095.03 69,095.03Rehabilitate Plaza Exterior Pathways FOURMEN CONSTRUCTION INC Construction - Full Service 2,174,733.36 1,973,332.33

Rehabilitate Plaza Exterior Pathways Phase I MPCC CORP Construction - Full Service 5,928,213.96 5,928,213.96

JOCS Phase 2 VOLMAR CONSTRUCTION INC Construction - JOCS 212,284.07 188,714.00Rehabilitate Exteriors - Various Buildings NIRAM INC Construction - Full Service 3,362,480.12 3,332,358.00

Rehabilitate Exteriors - Various Buildings SIBA CONTRACTING CORP Construction - Full Service 615,117.50 615,117.50

18 Total Projects 70,391,994.02 69,651,997.5490 Total Projects 458,244,486.70 451,949,707.77

Construct New Child Care Center

Renovate Timerman Hall

Rehab Kellas Hall, Bldg 25

Total SUNY Potsdam

Total Comprehensive Colleges

Rehabilitate Exteriors - Various Buildings

Total Purchase College

Performing Arts Center Roof Replacement

Rehabilitate Exteriors / Dining Hall and Physical Education

Rehabilitate Plaza Exterior Pathways

Roof Replacement Campus Center North

Replace Roof at Bookstore - JOCs

Renovation of Humanities - Bldg. 41

Purchase CollegeRehab Diesel Generator

Rehab & Enclose PAC Elevator

Comprehensive CollegesProject NameSUNY Potsdam

Page 24 of 30

Page 25: Measurement Record of Operations and Accomplishments 2020 …

Report CState University Construction Fund Projects Completed

As of September 30, 2020* Completed projects include those that have been accepted for beneficial occupancy, meaning that the project can be occupied and used for the purposes for which it was intended. All projects listed were let by the State University Construction Fund.

Contract Title Vendor Name Contract Type Est. Value Expend LTD

Construct Student Activities Center LECHASE CONSTRUCTION SERVICES LLC Construction - Full Service 1,450,817.37 1,450,817.37

Install Satellite Boilers - Phase 3B LANDRY MECHANICAL CONTRACTORS Construction - Full Service 1,964,374.41 1,964,374.41

Install Satellite Boilers - Phase 3 JOHN W DANFORTH COMPANY Construction - Full Service 2,018,157.14 2,018,157.14

JOCs - Meter Install and Valve Replacement - Various Buildings KIRCHER CONSTRUCTION INC Construction - JOCS 189,446.26 189,446.26

Install Emergency Generator Systems - Various Buildings KIRCHER CONSTRUCTION INC Construction - Full Service 2,306,046.74 2,235,773.00

Upgrade HVAC Huntington Administration JOHN W DANFORTH COMPANY Construction - Full Service 2,042,434.39 2,032,434.00

JOCs - Miscellaneous Items at SLC KIRCHER CONSTRUCTION INC Construction - JOCS 91,556.47 91,465.007 Total Projects 10,062,832.78 9,982,467.18

Rehabilitate Exterior Envelope Dana Hall NORTHERN TIER CONTRACTING INC Construction - Full Service 3,687,719.04 3,687,719.03

Renovate Chaney Hall Phase 2 BLACK HORSE GROUP LLC Construction - Full Service 7,012,409.40 7,002,126.76

2 Total Projects 10,700,128.44 10,689,845.79

Upgrade Electrical Distribution System NELCORP ELECTRICAL CONTRACTING CORP Construction - Full Service 2,810,289.48 2,800,124.00

Upgrade Switchgear at Main Campus Substation MOHAWK VALLEY UTILITY CONSTRUCTION CORP

Construction - Full Service 1,944,598.66 1,944,598.66

Renovate Bouck Theater, Gym and Lobby HOOSICK VALLEY CONTRACTORS INC Construction - Full Service 4,509,339.84 4,509,339.84

Upgrade Mechanical and Plumbing Systems Prentice Hall FAHS CONSTRUCTION GROUP INC Construction - Full Service 5,022,971.95 4,975,472.00

Center for Agriculture and Natural Resources J KOKOLAKIS CONTRACTING INC Construction - Full Service 39,279,995.60 38,655,840.60

Center for Agriculture and Natural Resources - Commissioning Services

GENESYS ENGINEERING PC Design - Commissioning 195,863.00 171,898.80

Construction Manager Scheduling Services TURNER CONSTRUCTION COMPANY Design - Construction Management

38,079.60 38,079.60

7 Total Projects 53,801,138.13 53,095,353.50

Replace Emergency Generators NELCORP ELECTRICAL CONTRACTING CORP Construction - Full Service 3,136,729.00 3,126,729.00

Replace Emergency Generators Various Buildings, Phase 2 NELCORP ELECTRICAL CONTRACTING CORP Construction - Full Service 808,668.86 679,069.90

Upgrade Building Fire Alarms including Carbon Monoxide Detectors - Various Building

NELCORP ELECTRICAL CONTRACTING CORP Construction - Full Service 913,276.75 855,634.75

Replace Boilers & Chillers, Various Buildings WILKINS MECHANICAL INC Construction - Full Service 1,227,564.34 1,217,541.00

Replace Roofs- Various Buildings MID-STATE INDUSTRIES LTD Construction - Full Service 663,325.66 663,325.66

5 Total Projects 6,749,564.61 6,542,300.31

Replace Roofs- Various Buildings

Total SUNY Delhi

Replace Boilers & Chillers, Various Buildings

Total SUNY Cobleskill

Upgrade Electrical Distribution System

Install Emergency Generator Systems - Various Buildings

SUNY DelhiReplace Emergency Generators

Upgrade Building Fire Alarms including Carbon Monoxide Detectors - Various Building

Renovate Bouck Hall Theater, Gym and Lobby

Upgrade Mechanical and Plumbing Systems Prentice Hall

Center for Agriculture and Natural Resources

Total SUNY Canton

Technology Colleges

Total Alfred State College

Project NameAlfred State College

Upgrade HVAC Huntington Administration

Student Leadership Center - Remaining Construction

SUNY CantonRehabilitate Exterior Envelope Dana Hall

SUNY Cobleskill

Renovate Chaney Hall Phase 2

Construct Student Activities Facility

Install Satellite Boilers - Phase 3

Page 25 of 30

Page 26: Measurement Record of Operations and Accomplishments 2020 …

Report CState University Construction Fund Projects Completed

As of September 30, 2020* Completed projects include those that have been accepted for beneficial occupancy, meaning that the project can be occupied and used for the purposes for which it was intended. All projects listed were let by the State University Construction Fund.

Contract Title Vendor Name Contract Type Est. Value Expend LTD

Knapp Hall Renovation - Phase 1 (Exterior Shell & Sitework) ALL-CON CONTRACTING CORP Construction - Full Service 2,664,513.85 2,462,475.00

Reconfigure Loop Road / Rehabilitate Parking Lots and Landscaping

LASER INDUSTRIES Construction - Full Service 6,413,859.25 6,413,859.25

Bunche Plaza Improvements CONDOS BROTHERS CONSTRUCTION CORP Construction - Full Service 1,725,367.63 1,718,057.63

Construct School of Business STALCO CONSTRUCTION INC Construction - Full Service 19,492,065.54 19,492,065.55

Commissioning Agent- New Business School OLA CONSULTING ENGINEERS PC Design - Commissioning 149,619.40 149,532.07

Construction Manager, New Business Bldg and Conklin Hall Rehabilitation

JACOBS PROJECT MANAGEMENT CO Design - Construction Management

2,320,396.95 2,320,396.95

JOCS Provide Refuge Area VOLMAR CONSTRUCTION INC Construction - JOCS 47,589.54 47,589.54Rehabilitate Conklin Hall STALCO CONSTRUCTION INC Construction - Full Service 10,726,882.17 10,726,882.17

Rehab Conklin Hall, Phase 1 CNA ENTERPRISES INC Construction - Full Service 1,674,202.53 1,674,202.53

Commissioning Agent- Rehab Conklin Hall OLA CONSULTING ENGINEERS PC Design - Commissioning 93,925.00 85,666.73

10 Total Projects 45,308,421.86 45,090,727.42

Water System Improvements, Phase 2B BANCKER CONSTRUCTION CORP Construction - Full Service 1,951,997.05 1,745,458.00

Water System Improvements, Phase 2 G & M EARTH MOVING INC Construction - Full Service 1,463,812.35 1,463,812.35

Rehab/Upgrade HVAC Systems Various Bldgs EX AIR INC Construction - Full Service 4,092,913.83 4,092,913.83

Commissioning - Upgrade/ Rehab HVAC Various Buildings SYSKA HENNESSY GROUP INC Design - Commissioning 89,850.00 82,392.64

Replace Roofs, Various Buildings RISING SUN CONSTRUCTION LLC Construction - Full Service 1,953,079.00 1,936,726.00

Replace Roof - Marvin Tode Building DIMITRI ENTERPRISES INC Construction - Full Service 1,200,287.00 1,094,469.00

Replace Roof - Marvin Tode Building AHURA CONSTRUCTION MANAGEMENT INC Construction - Full Service 121,667.55 121,667.55

7 Total Projects 10,873,606.78 10,537,439.37

Rehabilitate Electric Feeder and Distribution System RIDLEY ELECTRIC COMPANY INC Construction - Full Service 11,734,020.00 11,688,820.00

Rehabilitate Dairy Complex Digester WILKINS MECHANICAL INC Construction - Full Service 881,072.00 872,232.00

Replace MTHW Water Lines & Sitework, Whipple to STUAC BURRELLS EXCAVATING INC Construction - Full Service 2,498,913.00 2,362,662.00

3 Total Projects 15,114,005.00 14,923,714.0041 Total Projects 152,609,697.60 150,861,847.57

Contract Title Vendor Name Contract Type Est. Value Expend LTD

Mechanical Systems Upgrade Ph 2 DIGESARE MECHANICAL INC Construction - Full Service 821,730.91 821,730.91

Abate Basement Crawlspace SUNSHINE ENVIRONMENTAL SERVICES INC Construction - Full Service 183,118.94 181,454.60

Total Technology Colleges

University-Wide

System AdministrationMechanical Systems Upgrade Ph 2

Project Name

Total Morrisville State Coll

Morrisville State CollRehabilitate Electric Feeder and Distribution System

Rehabilitate Dairy Complex Digester

Replace MTHW/Water Lines & Sitework, Whipple to STUAC

Total Maritime College

Water System Improvements, Phase 2

Rehab/Upgrade HVAC Systems Various Bldgs

Replace Roofs, Various Buildings

Rehabilitate Conklin Hall

Maritime CollegeTotal Farmingdale State Coll

Renovate Knapp Hall, Phase 1

Rehabilitate Roadways/Walkways/ Landscaping

Construct School of Business

Farmingdale State Coll

Technology CollegesProject Name

Page 26 of 30

Page 27: Measurement Record of Operations and Accomplishments 2020 …

Report CState University Construction Fund Projects Completed

As of September 30, 2020* Completed projects include those that have been accepted for beneficial occupancy, meaning that the project can be occupied and used for the purposes for which it was intended. All projects listed were let by the State University Construction Fund.

Contract Title Vendor Name Contract Type Est. Value Expend LTD

Interior Rehab - SUNY Plaza Center Tower Floors 6-12 SANO-RUBIN CONSTRUCTION SERVICES LLC Construction - Full Service 4,177,784.61 3,970,173.00

Interior Rehab - SUNY Plaza Building Towers SANO-RUBIN CONSTRUCTION SERVICES LLC Construction - Full Service 1,117,671.56 1,117,671.56

Replace Federal Building Windows FLOWER CITY GLASS CO OF NY LLC Construction - Full Service 1,457,505.05 1,442,190.75

5 Total Projects 7,757,811.07 7,533,220.825 Total Projects 7,757,811.07 7,533,220.82210 Total Projects 1,777,165,740.44 1,746,805,234.93

Replace Federal Building Windows

Interior Rehab - SUNY Plaza Building Towers

Total System AdministrationTotal University-Wide

Completed Projects Grand Total

University-WideProject NameSystem Administration

Page 27 of 30