MEBT Update

FETS Meeting 2/201207/03/2012

Imperial College

Page 4: MEBT Update FETS Meeting 2/2012 07/03/2012 Imperial College

MEBT Line

Quadrupoles Re-bunching cavities

RF

Q

Fast Chopper Slow Chopper

Chopper beam dumps

Diagnostics beam line with beam dumps

BPM, Steer

Current Monitor Profile

MonitorProfile

MonitorBPM, Steer BPM, Steer

Current Monitor

Example of a quadrupole configuration

Q1 = 16.8 T/m Q5 = 6.5 T/m Q9 = 16.7 T/m C1 = 115 kV

Q2 = -19.9 T/m Q6 = -7.3 T/m Q10 = -10.6 T/m C2 = 63 kV

Q3 = 20.9 T/m Q7 = 6.2 T/m Q11 = 8.9 T/m C3 = 54 kV

Q4 = -18.1 T/m Q8 = -16.6 T/m C4 = 43 kV

Page 5: MEBT Update FETS Meeting 2/2012 07/03/2012 Imperial College

Beam Pipe

• Case 1– 30 mm beam pipe aperture.– Using “design” beam distribution.

Input Distribution

Ex 0.27 Pi.mm.mrad

Ey 0.27 Pi.mm.mrad

Ez 0.34 Pi.mm.mrad

Page 6: MEBT Update FETS Meeting 2/2012 07/03/2012 Imperial College

Beam Pipe

• Case 2– 40 mm beam pipe aperture– Using “design” beam distribution

Page 7: MEBT Update FETS Meeting 2/2012 07/03/2012 Imperial College

Beam Pipe

• Case 3– 30 mm beam pipe aperture– Using FETS RFQ output distribution

Input Distribution

Ex 0.30 Pi.mm.mrad

Ey 0.31 Pi.mm.mrad

Ez 0.49 Pi.mm.mrad

Page 8: MEBT Update FETS Meeting 2/2012 07/03/2012 Imperial College

Beam Pipe

• Case 4– 40 mm beam pipe aperture– Using FETS RFQ output distribution

Page 9: MEBT Update FETS Meeting 2/2012 07/03/2012 Imperial College

Aperture (mm) 30 38

Freq (MHz) 324 324

Q 26539 25536

ZTT (MOhm/m) 10.98 6.65

T 0.61 0.50

Power (kW) 13.54 22.36

Kilp 1.332 1.63

Effective Voltage (kV) 160 160

Bunchers

Page 10: MEBT Update FETS Meeting 2/2012 07/03/2012 Imperial College

Chopper Clarification

• RFQ Distribution• Beam Current• Voltage• Coverage Factor• Safety margins

Page 11: MEBT Update FETS Meeting 2/2012 07/03/2012 Imperial College

Removing End Matching Section?X

30

mm

Y30

m

m

Pha

se12

0 d

eg

Quadrupoles Re-bunching cavities

Fast Chopper Slow Chopper

Chopper beam dumps