Medworth EfW CHP Facility Cambridgshire & Norfolk County Council & Fenland District Council Meeting 16th December 2019 MVV Environment Ltd. Development of Energy-from-Waste and Biomass facilities in UK Note: In additional to the 16 th December 2019, this presentation was presented to officers at the Borough Council of King’s Lynn and West Norfolk on the 17 th December 2019 and a further presentation to officers at Norfolk County Council on 27 th January 2020 © MVV Environment Ltd 2019. Not to be reproduced in part or whole without the written consent of MVV Environment Ltd

Medworth EfW CHP Facility › perch › resources › ... · 2020-01-31 · Medworth: The Site Today – Policy Source: Cambridgeshire & Peterborough Site Specific Proposals Plan

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Medworth EfW CHP Facility › perch › resources › ... · 2020-01-31 · Medworth: The Site Today – Policy Source: Cambridgeshire & Peterborough Site Specific Proposals Plan

MVV Energie

Medworth EfW CHP Facility

Cambridgshire & Norfolk County Council & Fenland District Council Meeting16th December 2019MVV Environment Ltd. Development of Energy-from-Waste and Biomass facilities in UK

Note: In additional to the 16th December 2019, this presentation was presented to officers at the Borough Council of King’s Lynn and West Norfolk on the 17th December 2019 and a further presentation to officers at Norfolk County Council on 27th January 2020

© MVV Environment Ltd 2019. Not to be reproduced in part or whole without the written consent of MVV Environment Ltd

Page 2: Medworth EfW CHP Facility › perch › resources › ... · 2020-01-31 · Medworth: The Site Today – Policy Source: Cambridgeshire & Peterborough Site Specific Proposals Plan

MVV Energie2

Agenda

An introduction to MVV

Background

The site today

The proposal

The DCO process

Summary

Questions/discussion

13.12.2019MVV Environment Ltd 1612/2019

We aim to introduce who MVV are and familiarise you with our proposal

© MVV Environment Ltd 2019. Not to be reproduced in part or whole without the written consent of MVV Environment Ltd

Page 3: Medworth EfW CHP Facility › perch › resources › ... · 2020-01-31 · Medworth: The Site Today – Policy Source: Cambridgeshire & Peterborough Site Specific Proposals Plan

MVV Energie 14.02.20195

Introduction to MVVOur Locations

MVV Environment Ltd 16/12/2019

Coal CHP PlantEnergy-from-Waste (EfW)BiomassBiogasWind Energy

District HeatingUtilities

© MVV Environment Ltd 2019. Not to be reproduced in part or whole without the written consent of MVV Environment Ltd

Page 4: Medworth EfW CHP Facility › perch › resources › ... · 2020-01-31 · Medworth: The Site Today – Policy Source: Cambridgeshire & Peterborough Site Specific Proposals Plan

MVV Energie6

MVV Energie AGShareholder structure and key figures

Shareholder structureIn percent

City of Mannheim (indirectly) 50.1

Number of stocks65,907 million

Market capitalizationca. 1.7 billion Euro

16.3 RheinEnergie

28.8 EnBW

Free float 4.8

MVV Environment Ltd 1612/2019© MVV Environment Ltd 2019. Not to be reproduced in part or whole without the written consent of MVV Environment Ltd

Page 5: Medworth EfW CHP Facility › perch › resources › ... · 2020-01-31 · Medworth: The Site Today – Policy Source: Cambridgeshire & Peterborough Site Specific Proposals Plan

MVV Energie7

MVV Energie AG2019 Financial Year

31.01.2020

Key Figures - adjustedEuro million

1 Excluding non-operating measurement item for financial derivatives, excluding structural adjustments for part-time early retirement, excluding restructuring result and including interest income from finance leases

MVV Environment Ltd 1612/2019© MVV Environment Ltd 2019. Not to be reproduced in part or whole without the written consent of MVV Environment Ltd

Page 6: Medworth EfW CHP Facility › perch › resources › ... · 2020-01-31 · Medworth: The Site Today – Policy Source: Cambridgeshire & Peterborough Site Specific Proposals Plan

MVV Energie

3

10

64

9

5

MVV Umwelt: 50+ year’s experience in EfW2.4 million tons of Waste = 1,300 GWh Electricity + 1,500 GWh Heat

Königs Wusterhausen120,000 tpa

9

Mannheim140,000 tpa

4

Leuna390,000 tpa

10

Mannheim700,000 tpa

3

Flörsheim-Wicker110,000 tpa

5

Ener

gy fr

om W

aste

Pla

nts

Plymouth250,000 tpa

1

Ridham Dock172,000 tpa

2

31.01.20208

21

11

7

8

Liberec96,000 tpa

11

Offenbach250,000 tpa

6

Korbach76,000 tpa

8

Gersthofen90,000 tpa

7

12

Dundee110,000 tpa

12

MVV Environment Ltd 1612/2019© MVV Environment Ltd 2019. Not to be reproduced in part or whole without the written consent of MVV Environment Ltd

Page 7: Medworth EfW CHP Facility › perch › resources › ... · 2020-01-31 · Medworth: The Site Today – Policy Source: Cambridgeshire & Peterborough Site Specific Proposals Plan

MVV Energie 14.02.20199

Medworth: Background the ‘Need‘

• National Policy Statement for Energy (EN-1)

and Renewable Energy (EN-3) identifies a

clear and pressing need to:

• Change the UK’s approach to

energy generation

• Reduce reliance on fossil fuels

• Reduce greenhouse gas emissions

• Promote renewable energy both

‘intermittent’ e.g. solar and

‘dispatchable’ e.g. energy from waste

• Deliver sustainable waste management

• Accord with the waste hierarchy

MVV Environment Ltd 16/12/2019MVV Environment Ltd 1612/2019© MVV Environment Ltd 2019. Not to be reproduced in part or whole without the written consent of MVV Environment Ltd

Page 8: Medworth EfW CHP Facility › perch › resources › ... · 2020-01-31 · Medworth: The Site Today – Policy Source: Cambridgeshire & Peterborough Site Specific Proposals Plan

MVV Energie10

Medworth: Development of UK waste market

31.01.2020

• The current gap between UK residual waste arisings and EfW capacity is estimated to be >15m tpa in 2020

• Most of this is landfilled – the rest is exported

• Landfill remains the last choice in the waste hierarchy

• Energy from waste facilities with capacities in the range of 500,000 tpa are necessary to divert waste from landfill and provide useful energy on an economic basis

• Regional Local Authority Collected Waste (LACW) and residual C&I waste contracts will be re-tendered

• Commercial and industrial waste is also available in the region

Source: Suez, Mind the Gap 2017-2035, 2017

Capacity gap

Capacity balanced

Risk of surplus capacity

Wisbech

MVV Environment Ltd 1612/2019© MVV Environment Ltd 2019. Not to be reproduced in part or whole without the written consent of MVV Environment Ltd

Page 9: Medworth EfW CHP Facility › perch › resources › ... · 2020-01-31 · Medworth: The Site Today – Policy Source: Cambridgeshire & Peterborough Site Specific Proposals Plan

MVV Energie11

Medworth: High Level Summary

31.01.2020

Wisbech

Dundee

Plymouth Ridham

Wisbech

• MVV has an option on a lease for land on Algores Way, Wisbech

• Project is named ‘Medworth’ after the local ward

• MVV propose a 520 ktpa twin-line conventional Energy from Waste Combined Heat and Power Facility

• Commercial operation scheduled for 2025

• Heat and licence exempt power supply is possible in the immediate industrial area

• Provides opportunities for local industry to improve their environmental performance in many areas

MVV Environment Ltd 1612/2019© MVV Environment Ltd 2019. Not to be reproduced in part or whole without the written consent of MVV Environment Ltd

Page 10: Medworth EfW CHP Facility › perch › resources › ... · 2020-01-31 · Medworth: The Site Today – Policy Source: Cambridgeshire & Peterborough Site Specific Proposals Plan

MVV Energie12

Medworth: The Site Today – Location

31.01.2020

• Medworth (shaded area) is a ward of Fenland District Council

• The site is located within an industrial area at the southern edge of Wisbech close to the A47, approximately 2 km from Wisbech town centre

• Site area approx. 3.9 ha

• Current access via existing road (Algores Way)

• Disused railway line runs along west side of site

≈ 2 km

Nestlé

Lamb WestonDel Monte

Lineage

Wisbechtown centre

MVV Environment Ltd 16/12/2019 Source: Google Earth© MVV Environment Ltd 2019. Not to be reproduced in part or whole without the written consent of MVV Environment Ltd

Page 11: Medworth EfW CHP Facility › perch › resources › ... · 2020-01-31 · Medworth: The Site Today – Policy Source: Cambridgeshire & Peterborough Site Specific Proposals Plan

MVV Energie13

Medworth: The Site Today – Policy

Source: Cambridgeshire & Peterborough Site Specific Proposals Plan Document 2012

31.01.2020

• Algores Way Waste Transfer Station

• An operational waste transfer station and aggregates yard

• Operations include, refuse derived fuel (RDF) baling and export to Europe

• Currently permitted to process up to 75,000tpa

• Allocated for future waste management development in the adopted Minerals & Waste Local Plan

• Safeguarded as a waste management facility in the emerging Minerals & Waste Local Plan

MVV Environment Ltd 16/12/2019© MVV Environment Ltd 2019. Not to be reproduced in part or whole without the written consent of MVV Environment Ltd

Page 12: Medworth EfW CHP Facility › perch › resources › ... · 2020-01-31 · Medworth: The Site Today – Policy Source: Cambridgeshire & Peterborough Site Specific Proposals Plan

MVV Energie14 31.01.2020MVV Environment Ltd 16/12/2019

Medworth: The Site Today – Policy

© MVV Environment Ltd 2019. Not to be reproduced in part or whole without the written consent of MVV Environment Ltd

Page 13: Medworth EfW CHP Facility › perch › resources › ... · 2020-01-31 · Medworth: The Site Today – Policy Source: Cambridgeshire & Peterborough Site Specific Proposals Plan

MVV Energie15

Medworth: The Proposal – Basic Facts

31.01.2020

• Moving grate combined heat and power energy from

waste facility

• Residual non-hazardous waste

• Design point 523,500tpa

• Maximum tonnage for EIA assessment 625,600tpa

• 58 megawatts (gross) 53 megawatts (net)

• CHP connection corridor to local businesses

• Grid connection to export electricity

• Site access improvements

• Temporary construction compound

MVV Environment Ltd 16/12/2019© MVV Environment Ltd 2019. Not to be reproduced in part or whole without the written consent of MVV Environment Ltd

Page 14: Medworth EfW CHP Facility › perch › resources › ... · 2020-01-31 · Medworth: The Site Today – Policy Source: Cambridgeshire & Peterborough Site Specific Proposals Plan

MVV Energie

Medworth: The Proposal – Initial Layouts

16 31.01.2020MVV Environment Ltd 16/12/2019© MVV Environment Ltd 2019. Not to be reproduced in part or whole without the written consent of MVV Environment Ltd

x

x

Page 15: Medworth EfW CHP Facility › perch › resources › ... · 2020-01-31 · Medworth: The Site Today – Policy Source: Cambridgeshire & Peterborough Site Specific Proposals Plan

MVV Energie17 31.01.2020MVV Environment Ltd 16/12/2019

Medworth: The Proposal – Initial 3D Model

© MVV Environment Ltd 2019. Not to be reproduced in part or whole without the written consent of MVV Environment Ltd

x

Page 16: Medworth EfW CHP Facility › perch › resources › ... · 2020-01-31 · Medworth: The Site Today – Policy Source: Cambridgeshire & Peterborough Site Specific Proposals Plan

MVV Energie18

Medworth: The Proposal – Aerial View

31.01.2020MVV Environment Ltd 16/12/2019

Source: Google Earth

© MVV Environment Ltd 2019. Not to be reproduced in part or whole without the written consent of MVV Environment Ltd

x

Page 17: Medworth EfW CHP Facility › perch › resources › ... · 2020-01-31 · Medworth: The Site Today – Policy Source: Cambridgeshire & Peterborough Site Specific Proposals Plan

MVV Energie19 31.01.2020

• Two access options

• East access via existing road (Algores Way)

• South access via New Bridge Lane off Cromwell Road

• Disused railway line on west side of site could be used as route for heat and private wire supply to industrial customers

• Grid connection to run eastwards to Elme Hall roundabout and onwards

≈ 2 km

Nestlé

Lamb WestonDel Monte

Lineage

Wisbechtown centre

MVV Environment Ltd 16/12/2019

Medworth: The Proposal – Inputs and Outputs

© MVV Environment Ltd 2019. Not to be reproduced in part or whole without the written consent of MVV Environment Ltd

Page 18: Medworth EfW CHP Facility › perch › resources › ... · 2020-01-31 · Medworth: The Site Today – Policy Source: Cambridgeshire & Peterborough Site Specific Proposals Plan

MVV Energie 31.01.202020

Medworth: The Proposal – Initial Photomontage

Views from Halfpenny Lane, August 2019

MVV Environment Ltd 16/12/2019© MVV Environment Ltd 2019. Not to be reproduced in part or whole without the written consent of MVV Environment Ltd

Page 19: Medworth EfW CHP Facility › perch › resources › ... · 2020-01-31 · Medworth: The Site Today – Policy Source: Cambridgeshire & Peterborough Site Specific Proposals Plan

MVV Energie

≈ 2 km

Nestlé

Lamb WestonDel Monte

Lineage

Wisbechtown centre

21

Medworth: The Proposal - Economic Information

31.01.2020

• £320m investment

• 3 year construction period from Q2 2022

• 40 year life span

• 40 FTE staff

• Mix of commercial, industrial and local authority residual waste contracts

• Possible energy offtakers:

• Nestlé Purina

• Lamb Weston

• Del Monte

• Lineage

MVV Environment Ltd 1612/2019© MVV Environment Ltd 2019. Not to be reproduced in part or whole without the written consent of MVV Environment Ltd

Page 20: Medworth EfW CHP Facility › perch › resources › ... · 2020-01-31 · Medworth: The Site Today – Policy Source: Cambridgeshire & Peterborough Site Specific Proposals Plan

MVV Energie 31.01.202022

400kV Walpole substation

400kV connection corridor

Medworth: The Proposal – Red Line Boundary

MVV Environment Ltd 16/12/2019

Authority boundary

© MVV Environment Ltd 2019. Not to be reproduced in part or whole without the written consent of MVV Environment Ltd

Page 21: Medworth EfW CHP Facility › perch › resources › ... · 2020-01-31 · Medworth: The Site Today – Policy Source: Cambridgeshire & Peterborough Site Specific Proposals Plan

MVV Energie

23

Medworth: The Proposal – Red Line Boundary

MVV Environment Ltd 16/12/2019 © MVV Environment Ltd 2019. Not to be reproduced in part or whole without the written consent of MVV Environment Ltd

Page 22: Medworth EfW CHP Facility › perch › resources › ... · 2020-01-31 · Medworth: The Site Today – Policy Source: Cambridgeshire & Peterborough Site Specific Proposals Plan

MVV Energie

24

Medworth: The Proposal – Red Line Boundary

MVV Environment Ltd 16/12/2019 © MVV Environment Ltd 2019. Not to be reproduced in part or whole without the written consent of MVV Environment Ltd

Page 23: Medworth EfW CHP Facility › perch › resources › ... · 2020-01-31 · Medworth: The Site Today – Policy Source: Cambridgeshire & Peterborough Site Specific Proposals Plan

MVV Energie We inspire with energy.31.01.202025

Nestlé

Lamb Weston

Del Monte

Lineage

Medworth: The Proposal – Red Line Boundary

MVV Environment Ltd 16/12/2019 © MVV Environment Ltd 2019. Not to be reproduced in part or whole without the written consent of MVV Environment Ltd

Page 24: Medworth EfW CHP Facility › perch › resources › ... · 2020-01-31 · Medworth: The Site Today – Policy Source: Cambridgeshire & Peterborough Site Specific Proposals Plan

MVV Energie

DCO Process Overview

• Power plants of more than 50 MW gross are

considered as National Significant Infrastructure

Projects

• Planning permission will be given as a Development

Consent Order (DCO)

• Application to the Planning Inspectorate (PINS), which

recommends a decision for the SoS for Business,

Energy and Industrial Strategy to approve or refuse

• The DCO can include “associated development”; for

example access ways, pipelines, and grid connections

• PINS recommends ‘twin tracking’ a DCO application

with an Environmental Permit (EP) application.

31.01.202026 MVV Environment Ltd 16/12/2019© MVV Environment Ltd 2019. Not to be reproduced in part or whole without the written consent of MVV Environment Ltd

Page 25: Medworth EfW CHP Facility › perch › resources › ... · 2020-01-31 · Medworth: The Site Today – Policy Source: Cambridgeshire & Peterborough Site Specific Proposals Plan

MVV Energie

Medworth: DCO Process Overview

• Oct to Dec 2019• Pre-application meeting with PINS • Registration of intention to submit application • Launch dedicated project website • Submit Scoping Report for Environmental Impact Assessment (EIA) • Pre-application meeting with Cambridgeshire CC

• Submit non-statutory Statement of Community Consultation to ‘host authorities’

31.01.202027 MVV Environment Ltd 16/12/2019© MVV Environment Ltd 2019. Not to be reproduced in part or whole without the written consent of MVV Environment Ltd

Page 26: Medworth EfW CHP Facility › perch › resources › ... · 2020-01-31 · Medworth: The Site Today – Policy Source: Cambridgeshire & Peterborough Site Specific Proposals Plan

MVV Energie28

Medworth: DCO Consultation

MVV Environment Ltd 16/12/2019© MVV Environment Ltd 2019. Not to be reproduced in part or whole without the written consent of MVV Environment Ltd

Page 27: Medworth EfW CHP Facility › perch › resources › ... · 2020-01-31 · Medworth: The Site Today – Policy Source: Cambridgeshire & Peterborough Site Specific Proposals Plan

MVV Energie29

MVV Environment

Medworth

Secretary of State

Members of Parliament

Cambridgeshire & Peterborough

Combined Authority

Wisbech Town Council

Key Statutory Consultees

Community Groups

Local Businesses

Local Residents

Action Groups

Fenland District Council

Norfolk County Council

West Norfolk & King’s Lynn

Council

Cambridgeshire County Council

host authorities

Medworth: DCO Stakeholders

MVV Environment Ltd 16/12/2019© MVV Environment Ltd 2019. Not to be reproduced in part or whole without the written consent of MVV Environment Ltd

Page 28: Medworth EfW CHP Facility › perch › resources › ... · 2020-01-31 · Medworth: The Site Today – Policy Source: Cambridgeshire & Peterborough Site Specific Proposals Plan

MVV Energie30

Medworth: Engagement with Cambs & Norfolk CC & Fenland DC

How shall MVV and Cambridgeshire & Norfolk

County Council & Fenland District Council

work together?

MVV Environment Ltd 16/12/2019© MVV Environment Ltd 2019. Not to be reproduced in part or whole without the written consent of MVV Environment Ltd

Page 29: Medworth EfW CHP Facility › perch › resources › ... · 2020-01-31 · Medworth: The Site Today – Policy Source: Cambridgeshire & Peterborough Site Specific Proposals Plan

Ein Unternehmen in derMetropolregion Rhein-Neckar

MVV Environment Ltd.

MVV in the UK: developing and operating resource recovery projects with MVV Umwelt GmbH and MVV Energie AG

© MVV Environment Ltd 2019. Not to be reproduced in part or whole without the written consent of MVV Environment Ltd