Meeting Agenda 11-05-13
(1) Overview (概观 )
(2) Ongoing interview and Data Collection (SEAS) (进行的访谈和数据收集 )
(3) Input sheet update and NN training(GT) (输入更新 )
(4) Ongoing tasks (进行中任务 )
(5) Approaching Dates (日期 )(6) Timeline (时间安排 )
(1) Overview (概观 )
• Previous Week and Current Week:– NN training with simulated data and KPI provided by SEAS. (GT)
(用仿真的数据以及 SEAS提出的输出指标來使用人工神经 )– Input sheet update. (更新输入 )
• Next Week:– Continue NN training using more mathematical models (使用更多的数学模式来训练神经网络 )
– Verification of NN (验证人工神经 )
(2) Ongoing Interview and Data Collection
• SEAS will lead the discussion.– Any updates to be reported.– New update on KPI
(3) NN training
• NN will be trained by creating data and the KPI’s provided by SEAS will be used as the output value. (用仿真的数据以及SEAS提出的输出指标來训练人工神经 )– Check for compatibility (Completed) (检查兼容性 )– Simulate data (Completed) (模拟数据 )– Use a mathematical model (polynomial, exponential etc) to generate output
(In progress) (使用的数学模型 (多项式,指数等 ),以生成输出 )– Train the NN using the simulated data and outputs generated by the
mathematical model (In progress) (用模拟数据以及数学模型模拟输出来训练人工神经 )
– Generate new input and outputs using the mathematical model (In progress) (采用数学模型 ,生成新的输入和输出 )
– Validate the NN using the new inputs and outputs (In progress) (使用新的输入和输出验证人工神经 )
(4) Ongoing Tasks
• NN simulation data generation and simulation. GT (人工神經仿真数据生成和仿真 )
• Input excel update. GT and SEAS (输入Excel更新 )
• Historic data collection and scheduler interviews. SEAS (历史数据收集和采访 )
(5) Approaching Dates
• Interview and historic production data: SEAS (tentative)
• SEAS visit to GT (Confirmation between 11/5- 11/7).
As of 11-05-2013Tasks
Month
August September October November December
Completed Work Plan
Completed Intelligent Matrix
Completed Literature Survey
Ongoing Interview and Data Collection
Completed Selection of ILE modeling methods and case study
Completed Predictive Modeling Module
Delayed SEAS visit
Completed Prognotic Module
Completed Modification of ILE for case study
In progress Modification of ILE for SEAS test bed
GT visit