MEETING AGENDA• 7:00 to 7:15 Review materials and boards
• 7:15 to 7:40 Presenta on of concepts
• 7:40 to 8:10 Group discussion/ Q&A session
• 8:10 to 8:30 View display boards and provide comments
PELICAN RAPIDS COMPLETE STREETS CONCEPT PROJECT
PELICAN RAPIDSCOMPLETE STREETS CONCEPT PROJECT
HIGHWAYS 59 & 108 OPEN HOUSE #3
JULY 18, 2019
PROJECT PURPOSE
• Partnership 4 Health is assis ng the City of Pelican Rapids with a community input process for a complete streets concept for US 59 and MN 108
• These roadways will be reconstructed by MnDOT in 2024. Now is the me to plan for streetscape improvements including sidewalks, street ameni es, pedestrian & bicycle access and parking.
• The project process includes three public mee ngs and prepara on of a nal report
• The project will be completed by September 2019
• The report will be used to apply for grants to o set local cost-sharing.
PELICAN RAPIDS COMPLETE STREETS CONCEPT PROJECT
PROJECT PURPOSE
Photo by Kate Woolever Martinez
MEMBERS OF THE PROJECT ADVISORY COMMITTEE
• Patrick Hollister, PartnerSHIP 4 Health• Don Solga, City of Pelican Rapids• Brent Frasier, City of Pelican Rapids• Ma Strand, business owner• Andrew Johnson, business owner• Jim Shipp, cyclist• Wayne Hurley, West Central Ini a ve• Sarah Wolfe, West Central Ini a ve• Shawn Donais, DNR• Katy Reierson, MnDOT• Jane Butzer, MnDOT• Mary Safgren, MnDOT• Kate Woolever Mar nez, Pelican Rapids Schools and Park Board• Rudy Mar nez, Lakes County Coop• Brian Olson, City of Pelican Rapids• Don Perrin, business owner• Stewart Crosby, SRF• Jonathan Fillmore, SRF
Photo by Kate Woolever Martinez
PROJECT ADVISORY COMMITTEEPELICAN RAPIDS COMPLETE STREETS CONCEPT PROJECT
WHAT WE’VE HEARD
• The roadway project in 2024 is an opportunity to rethink the streetscapes of Pelican Rapids.
• Bikeways need to be marked to separate from pedestrian tra c.
• Bumpouts and a new mid-block crossing are desired.
• Adding vegeta on downtown is desired.
• There is a general preference for combined trail/sidewalk in the downtown area instead of bike lanes.
• Sidewalks and/or trails on both sides of Highway 59 north and south of downtown is desired.
PELICAN RAPIDS COMPLETE STREETS CONCEPT PROJECT
PUBLIC INPUT TO-DATE
PELICAN RAPIDS COMPLETE STREETS CONCEPT PROJECT
PROJECT EXTENTS0.00.0 2525252552 MMMMMMMILILILLIILII EESESESESEESEES NNNOON RTRTTTTTHH
Commercial Land Use
Perham to Pelican Rapids
Regional Trail
Existing Sidewalks
Existing Trails
Parcel Boundary
Pelican Rapids City Limits
Existing On-Street Parking
US 59 north of MN 108 = 126 spaces
US 59 south of MN 108 = 182 spaces
MN 108 east of US 59 = 157 spaces
MN 108 west of US 59 = 96 spaces
Total = 561
Note: Parking total developed by dividing the linear feet of parallel parking by 20 feet. Actual spaces may vary. Existing parking located along MN 108 between NW 3rd Street and NE 5th Street. Existing parking located along US 59 between SE 5th Avenue and NW 5th Avenue.
PELICAN RAPIDS COMPLETE STREETS CONCEPT PROJECT
MN 108 WEST OF 3RD STREET NW
SECTION LOCATION MAP
EXISTING
PELICAN RAPIDS COMPLETE STREETS CONCEPT PROJECT
MN 108 WEST OF 3RD STREET NW
SOUTHNORTH
PROPOSED
PELICAN RAPIDS COMPLETE STREETS CONCEPT PROJECT
MN 108 WEST OF 3RD STREET NW
SOUTHNORTH
PELICAN RAPIDS COMPLETE STREETS CONCEPT PROJECT
MN 108 WEST OF 3RD STREET NW
MN 108 / 1ST AVE NW
3RD
ST N
W
PELICAN RAPIDS COMPLETE STREETS CONCEPT PROJECT
MN 108 BETWEEN 3RD STREET NW & US 59
SECTION LOCATION MAP
EXISTING
PELICAN RAPIDS COMPLETE STREETS CONCEPT PROJECT
MN 108 BETWEEN 3RD STREET NW & US 59
SOUTHNORTH
PROPOSED
PELICAN RAPIDS COMPLETE STREETS CONCEPT PROJECT
MN 108 BETWEEN 3RD STREET NW & US 59
SOUTHNORTH
PELICAN RAPIDS COMPLETE STREETS CONCEPT PROJECT
MN 108 BETWEEN 3RD STREET NW & US 59
MN 108 / 1ST AVE NW
1ST S
T NW
2ND
ST N
W
PELICAN RAPIDS COMPLETE STREETS CONCEPT PROJECT
MN 108 BETWEEN US 59 & 6TH STREET NE
SECTION LOCATION MAP
EXISTING
PELICAN RAPIDS COMPLETE STREETS CONCEPT PROJECT
MN 108 BETWEEN US 59 & 6TH STREET NE
SOUTHNORTH
PROPOSED
PELICAN RAPIDS COMPLETE STREETS CONCEPT PROJECT
MN 108 BETWEEN US 59 & 6TH STREET NE
SOUTHNORTH
PELICAN RAPIDS COMPLETE STREETS CONCEPT PROJECT
MN 108 BETWEEN US 59 & 6TH STREET NE
MN 108 / E MILL
1ST S
T SE
2 1/
2 ST S
E
PELICAN RAPIDS COMPLETE STREETS CONCEPT PROJECT
MN 108 EAST OF 6TH STREET NE
SECTION LOCATION MAP
PELICAN RAPIDS COMPLETE STREETS CONCEPT PROJECT
MN 108 EAST OF 6TH STREET NE
SOUTHNORTH
EXISTING
PELICAN RAPIDS COMPLETE STREETS CONCEPT PROJECT
MN 108 EAST OF 6TH STREET NE
SOUTHNORTH
PROPOSED
PELICAN RAPIDS COMPLETE STREETS CONCEPT PROJECT
MN 108 EAST OF 6TH STREET NE
MN 108 / E MILL
7TH
ST N
E
PELICAN RAPIDS COMPLETE STREETS CONCEPT PROJECT
US 59 SOUTH OF 5TH AVENUE SE
SECTION LOCATION MAP
PELICAN RAPIDS COMPLETE STREETS CONCEPT PROJECT
US 59 SOUTH OF 5TH AVENUE SE
EASTWEST
EXISTING
PELICAN RAPIDS COMPLETE STREETS CONCEPT PROJECT
US 59 SOUTH OF 5TH AVENUE SE
EASTWEST
PROPOSED
PELICAN RAPIDS COMPLETE STREETS CONCEPT PROJECT
US 59 SOUTH OF 5TH AVENUE SE
6TH AVE SW
PELICAN RAPIDS COMPLETE STREETS CONCEPT PROJECT
US 59 BETWEEN 5TH AVE SE & 3RD AVE SE
SECTION LOCATION MAP
PELICAN RAPIDS COMPLETE STREETS CONCEPT PROJECT
US 59 BETWEEN 5TH AVE SE & 3RD AVE SE
EXISTING
EASTWEST
PELICAN RAPIDS COMPLETE STREETS CONCEPT PROJECT
US 59 BETWEEN 5TH AVE SE & 3RD AVE SEUS 59 BETWEEN 5TH AVE SE & 3RD AVE SE
EASTWEST
PROPOSED
PELICAN RAPIDS COMPLETE STREETS CONCEPT PROJECT
US 59 BETWEEN 5TH AVE SE & 3RD AVE SE
4TH AVE SE
PELICAN RAPIDS COMPLETE STREETS CONCEPT PROJECT
US 59 BETWEEN 3RD AVE SE & 2ND AVE NE - DOWNTOWN
SECTION LOCATION MAP
PELICAN RAPIDS COMPLETE STREETS CONCEPT PROJECT
US 59 BETWEEN 3RD AVE SE & 2ND AVE NE - DOWNTOWN
EASTWEST
EXISTING
PELICAN RAPIDS COMPLETE STREETS CONCEPT PROJECT
US 59 BETWEEN 3RD AVE SE & 2ND AVE NE - DOWNTOWN
EASTWEST
PROPOSED
PELICAN RAPIDS COMPLETE STREETS CONCEPT PROJECT
US 59 BETWEEN 3RD AVE SE & 2ND AVE NE - DOWNTOWN
EASTWEST
PROPOSED- SECOND OPTION
PELICAN RAPIDS COMPLETE STREETS CONCEPT PROJECT
US 59 BETWEEN 3RD AVE SE & 2ND AVE NE - DOWNTOWN
Y
RAPID FLASHING BEACON
PELICAN RAPIDS COMPLETE STREETS CONCEPT PROJECT
SECTION LOCATION MAP
US 59 BETWEEN 2ND AVE NE & COUNTY ROAD 9
PELICAN RAPIDS COMPLETE STREETS CONCEPT PROJECT
US 59 BETWEEN 2ND AVE NE & COUNTY ROAD 9
EXISTING
EASTWEST
PELICAN RAPIDS COMPLETE STREETS CONCEPT PROJECT
EASTWEST
US 59 BETWEEN 2ND AVE NE & COUNTY ROAD 9
PROPOSED
PELICAN RAPIDS COMPLETE STREETS CONCEPT PROJECT
US 59 BETWEEN 2ND AVE NE & COUNTY ROAD 9
5TH AVE NE
US 59
/ N
BROA
DWAY
PELICAN RAPIDS COMPLETE STREETS CONCEPT PROJECT
US 59 NORTH OF COUNTY ROAD 9
SECTION LOCATION MAP
PELICAN RAPIDS COMPLETE STREETS CONCEPT PROJECT
US 59 NORTH OF COUNTY ROAD 9
EASTWEST
EXISTING
PELICAN RAPIDS COMPLETE STREETS CONCEPT PROJECT
US 59 NORTH OF COUNTY ROAD 9
EASTWEST
PROPOSED
PELICAN RAPIDS COMPLETE STREETS CONCEPT PROJECT
US 59 NORTH OF COUNTY ROAD 9
POTENTIAL ROUNDABOUT
OPEN HOUSE
#1
OPEN HOUSE
#2
OPEN HOUSE
#3
CITYCOUNCIL
APRIL 25Lake Region Electric Coop
May 23Lake Region Electric Coop
WE ARE HERE
2019 JULY 18High School
September 10City Hall
Kick-off /Gather Info(February)
Develop Concept
Alternatives
DraftConcept
Plans
PELICAN RAPIDS COMPLETE STREETS CONCEPT PROJECT
PROJECT SCHEDULE | NEXT STEPS
PELICAN RAPIDSCOMPLETE STREETS CONCEPT PROJECT
HIGHWAYS 59 & 108 OPEN HOUSE #3
JULY 18, 2019
PELICAN RAPIDS COMPLETE STREETS CONCEPT PROJECT
GENERAL BIKE FACILITIES
BIKE LANES
BUFFERED BIKE LANES
MULTI-USE TRAIL SEPARATED BY DITCH
MULTI-USE TRAIL SEPARATED BY CURB AND BOULEVARDBIKE LANE ABOVE CURB
BIKE LANE ABOVE CURB
PELICAN RAPIDS COMPLETE STREETS CONCEPT PROJECT
BIKE RACKS
PEDESTRIAN RAMPS
BOULEVARD PLANTINGS STREET TREES AND PAVERS CENTER MEDIAN LANDSCAPE
TRASH RECEPTACLE & BENCH
STREET LIGHT BANNERSPATIO SEATING & RAISED PLANTERS
SIDEWALK SEATING
GENERAL STREETSCAPE ITEMS