Meeting of the Gas Regional Groups under the TEN-E
Regulation Preparation of the 3rd Union list of PCIs
Identification of the "Infrastructure needs"
Brussels, 12 December 2016
Agenda of the meeting
1. Identification of the problems and infrastructure needs
• Presentation of the meeting objectives
• Recapitulation of the "problem → infrastructure need → project" approach
• Framing the needs from the identified problems – general table
• Overview of the needs in each Gas Priority Corridor – regional tables
2. Call for PCI project candidates – presentation & information
3. AOB
Change of venue for the afternoon part After lunch we resume in Auditorium in Breydel building (45 avenue
d'Auderghem – 10 min from here)
Definition of a problem & a need
• Problem – a deficiency in the operation of the energy system in the areas such as security of supply, market integration, competition, and/or sustainability that are (potentially) due to infrastructure shortcomings and that prevent the implementation of a given priority corridor.
• Problems that can be addressed (effectively) by infrastructure, i.e. new transmission, regasification and/or storage capacity. Problems which can be addressed by improved system operation (e.g. better use of existing capacity) and/or optimised application of market and/or technical rules, and/or new legislation, are outside the scope of today's discussion.
• Problems of cross-regional dimension.
• Existence of a problem shall be proven and quantified to an extent possible.
Need - If a PCI type infrastructure could be an adequate solution to address a given problem
Gas Priority Corridors
North-South interconnections Western EU
BEMIP gas North-South interconnections CEE
Southern gas corridor
infrastructure for the transmission of gas from the Caspian Basin, Central Asia, the Middle East and the Eastern Mediterranean Basin to the Union to enhance diversification of gas supply
infrastructure for North-South gas flows to further diversify routes of supply and for increasing short-term gas deliverability
infrastructure to end the isolation of the three Baltic States and Finland and their dependency on a single supplier, to reinforce internal grid infrastructures accordingly, and to increase diversification and security of supplies in the Baltic Sea region
infrastructure for regional connections between and in the Baltic Sea region, the Adriatic and Aegean Seas, the Eastern Mediterranean Sea and the Black Sea, and for enhancing diversification and security of gas supply
Preparation of today's meeting
• Very good exchanges in the RG meetings (October/November 2016)
• Good overview of the energy problems in every Gas Priority Corridor
• Could a PCI-type transmission infrastructure could be a solution to some problems? –> infrastructure needs
• Ultimately: (a) more detailed definition of Priority Corridor
(b) better understanding of the Corridors
(c) where significant impacts
Framing the needs from the identified problems for all Priority Corridors – general table
• "Problems ->Needs" – presentation, questions and discussion one by one
Overview of the problems and needs in every Priority Corridor – individual tables
• Presentation of the individual tables for each Priority Corridor
• Validation of the tables
Structure of today's discussion
12.00
13.00
14.00
15.00
16.00
17.00
18.00
19.00
20.00
Average gas prices Oct15-Sept16 in EUR/MWh
25% above the minimum price paid
Average all MS 16.06
Min all MS 13.71
Max all MS 19.27
125% of min 17.14
Problems and needs per Gas Priority Corridor
- Individual tables for BEMIP, NSI West, NSI East, SGC -
2. Call for PCI candidates
• Launch on 21 December 2016; open until 22 January 2017
• Pre-condition for ENTSOG to start Project Specific CBA
• ENTSOG TYNDP Project Portal • Allocation of a TYNDP project to/part of a PCI
• Administrative information (person in charge of PCI)
• Possibly an update on development status
• Additional information:
- Cross-border character
- Significant contribution to specific policy critieria: (a) market integration, interoperability and system flexibility; (b) security of supply; (c) competition; (d) sustainability
- Need(s) to address – option to pick
• Meeting on the grouping of projects after the closure of the call
Cross-regional mtg G/E Objective: • Agreement on process • Dividing assignments • Draft list of problems
RG and Cross-regional mtgs Objective: Agreement on problems and corresponding infrastructure needs per Region
Gas RG mtgs Objective: Grouping of PCI candidates
[if needed]
RG mtgs (2 per RG) Objective: Assessment of PCI candidates in the framework of what Region needs
RG mtg Objective: Technical level DMB – agree Regional lists
Use of Project Portals of ENTSOs to collect PCI candidates submissions
'16
Sep
Oct
No
v
Dec
'17
Jan
Feb
Mar
Ap
r
May
Jun
July
Au
g
Sep
t
Oct
No
v
Dec
'18
Jan
Feb
Mar
Cross sectoral mtg all RG Gas / EL
RG mtgs - indentification of needs
TYNDP for EL and GAS issued
call for PCI candidates
stakeholder consultation on PCI candidates
RG mtgs Gas - grouping (if needed)
PS CBA run by ENTSOG
PCI candidates to complete PS CBA
RG mtgs - assessment of PCI candidates
RG mtgs - regional lists by the RGs submitted to ACER
ACER opinion
High Level Decision Making Body
COM adoption of Delegated Act (3rd PCI list)
3rd PCI list adopted
Council & EP scrutiny
3rd PCI list enters into force