MEGA LIFT IRRIGATION PROJECT
ANNUAL ACTIVITIES REPORT 2016-17
FOR
CLUSTER – VIII & XII
EXECUTIVE ENGINEER, MEGA LIFT PROJECTS, KEONJHAR
Project Overview Introduction to the scheme:-
The programme has been launched by Govt. of Odisha during 2011-12 for providing irrigation to
the farmers in the upland areas by lifting water from river and Reservoir, which could not be
irrigated by normal means of flow irrigation.
It is proposed to take up 174 No mega lift schemes covering command area of 2,14,270 ha. and
grouped into 15 clusters as per the pre-feasibility study done during 2011.The first phase has been
taken up in 2012-13 and the second phase comprising schemes like Cluster-VI, VIII, XI is likely to
be completed in a period of 30 months i.e.by June- 2018.Now DPR for 8 clusters have been
prepared which contains 102 schemes. Out of which work has been started in five Clusters
i.e.Cluster VII, IX, X, XII & XIII in the district of Ganjam, Sundergarh, Keonjhar, Mayurbhanj,
Jharsuguda & Nuapada after administrative approval by Govt. of Odisha and following tendering
process.
Site selection priorities:-
Projects having irrigation command area 500-2000 ha are taken up under the scheme.
The schemes are proposed in 23 districts, which lie in the following river basins i.e. Vansadhara,
Indravati, Tel, Mahanadi, Brahmani, Baitarani, Burhabalanga, Deo, Sankh, Koel, Ib, Basundhara,
Ichha and Safei of Odisha.
Besides, some schemes have been identified in the periphery of Hirakud and Rengali reservoirs.
These schemes have been grouped into 15 clusters to facilitate tendering, execution and power
connectivity point of view.
Project Overview Funding arrangement:- The schemes are being funded either by the State Government or under RIDF/NABARD.
Institutional arrangement:- Head of the Project is- PD-cum-CE,PMU,Megalift Projects, Bhubaneswar. For smooth implementation of Mega Lift Project, a Project Management Unit (PMU) is created
under the Deptt. of Water Resources. The Chief Engineer, Mega Lift Projects(PMU),is heading the
unit as Project Director-cum-Chief Engineer, PMU,Megalift Projects. This office is functioning at:
Plot No-A-8/2, Bhoi Nagar, Bhubaneswar-751022.
S.E., Mega Lift Circle, Bhubaneswar is also now functioning in the above premises since its
creation in 2016-17.
Project components:- Detail survey and design.
Civil works like intake well, pump house, delivery chamber, Distribution Network, residential
building, approach roads etc.
Procurement and installation of electro-mechanical systems like pump, motor, transformer,
overhead crane and control panel etc.
Power system connectivity along with switchyard.
Rising main supplying water from the pump house to the delivery chamber.
Distribution system including distribution main, minors consisting of pipe line network.
Operation and Maintenance.
MEGA LIFT IRRIGATION PROJECT
ANNUAL ACTIVITIES REPORT 2016-17
FOR
CLUSTER – VIII ( Total 13 nos. of schemes in the district of Angul, Deogarh & Sundergarh)
EXECUTIVE ENGINEER,
MEGA LIFT PROJECTS, KEONJHAR
Cluster VIII – Job Synopsis Execution of 13 nos. of Lift Irrigation schemes with intake points in Brahmani River having
Command Area between 500Ha. to 2000Ha. in Cluster No. VIII in the districts of Angul, Deogarh
and Sundergarh including its distribution network, up to 20 Ha Chak having total planned
Culturable Command Area of 16,200 Ha. On “EPC-Turn Key” basis including power system
connectivity and Operation & Maintenance of commissioned scheme for Five years.
• EPC Contractor : M/s. Larsen & Toubro Ltd.
• Agreement Value : ₹ 343.98 Cr
(Part-I Works : ₹ 339.43 Cr)
(Part-II O& M : ₹ 4.55 Cr)
• Date of Commencement : 21.12.2015
• Stipulated Date of Completion : 30 Months (20.06.2018)
• No. of Schemes : 13 (8 no. Reservoir and 5no. River)
• District Covered : Angul (1 Scheme)
: Deogarh (9 Schemes)
: Sundergarh (3 Schemes)
• Proof Engineering Consultant (PEC) : M/s. Aarvee Associates
• Project Management Consultant (PMC) : M/s. TÜV SÜD South Asia Pvt. Ltd.
• Third Party Inspection Agency (TPIA) : M/s. SGS India Pvt. Ltd. & M/s. CIPET
Location Map
CLUSTER VIII
WATER SOURCE:
River : Brahmani
Reservoir : Rengali
Sundergarh
Deogarh
Angul
Barkote
Cluster VIII – Scheme & District wise Details
S No Scheme CCA (Ha.) District
1 Bandhakani 1100 Ha Angul 2 Baghamari 1000 Ha Deogarh 3 Kandhal 1700 Ha Deogarh 4 Bhulkabahal 1000 Ha Deogarh 5 Daunra 1200 Ha Deogarh 6 Baliroi 1050 Ha Deogarh 7 Masinta 1650 Ha Deogarh 8 Bhatsingh 1150 Ha Deogarh 9 Kulsura 1750 Ha Deogarh
10 Khajurikhaman 1500 Ha Deogarh 11 Satakuta 600 Ha Sundergarh 12 Biritola 1500 Ha Sundergarh 13 Jangla 1000 Ha Sundergarh
Total 16200 Ha
7%
74%
19%
CCA in Ha.
Angul Deogarh Sundergarh
PUMP HOUSE
SUMP
SG
Pump House
Intake Well
NGL
RCC Pipe
VT Pump
Mega Lift Irrigation Project
Intake Conduit
HFL
Schematic Diagram for the functioning of Megalift System-1
Flow Diagram Pump House to Distribution Network
Pump
House
Delivery
Chamber
Rising
Main
Distribution
Network Schematic Diagram for the functioning of Megalift System-2
Intake Well
MSDSS
PUMP HOUSE (PH)
DELIVERY CHAMBER (DC)
Overall Layout For Mega Lift Irrigation BCL- (Broad Conceptual Layout)
BCL(A):-Intake well, Intake conduit, PH, Rising Main, DC. BCL(B):-DISNET
BCL Part(A) BCL Part(B)
Delivery Chamber
Main Line
Distribution Network
Distribution Network Distribution Network
Outlet
Creation of New Ayacut ( Irrigation potential ) under Megalift
Pump House Location across three Districts of Cluster-VIII
Biritola
Baliroi
Bandhakani
Bhatsingh
Daunra
Bhulkabahal
Bhagmari
Khajurikaman
Masinta
Satkuta
Khandal
Jangala
BARKOTE
KHAMAR
BANOI
Kulsura
DEOGARGH
PALLAHARA
NH 23
RENGALI RESERVOIR
Way To TALCHER 26.592km
10km
PUMP HOUSE LOCATION
SOURCE SUB-STATION(220/33KV)
MSDSS LOCATION
ROAD
11KV LINE 138.201KM
33KV LINE
NH215
MSDSS 4
MSDSS 5
RENGALI SUBSTATION(220/33 KV)
MSDSS 2
MSDSS 1
MSDSS 3
BARKOTE SUBSTATION(220/33 KV)
MSDSS 7
BANOI SUBSTATION(220/33 KV)
MSDSS 6
MAHULIDIHA SUBSTATION(33/11 KV)
14.102km 47.351km
36.357km
13.799km UR+6- 2
UR+6- 2
UR+6- 2
UR+6- 2
HX+3 4nos
HX+3- 2
UR+6 08 Nos
HX+3 06 Nos
MSDSS LOCATION, Cluster-VIII
Transmission Line & Power Connectivity to P.H. Location from Energy Source.
MSDSS- Main Step Down Distribution Sub-station
S No Description of Work UoM Quantity
1 Pump House No 13
2 Intake Well No 13
3 Delivery Chamber No 13
4 MSDSS No 7
5 DSS No 13
6 Rising Main Pipe (MS) Km 39.3
7 Distribution Line (DI) Km 166.5
8 Distribution Line (HDPE) Km 230
9 Intake Pipe (RCC) Km 3.5
Major Scope of the Project, Cluster- VIII
S. No. Description of Work UoM Quantity
10 VT Pumps No 44
11 EOT Cranes No 13
12 Sluice Gates No 13
13 Transmission Line Km 140
14 Excavation Cum 2058656
15 Concreting Cum 29735
16 Shuttering Sqm 109289
17 Reinforcement MT 2478
18 Structural Fabrication MT 183
19 Pipe Painting Sqm 257920
Major Scope of the Project, Cluster- VIII
a) Cumulative Expenditure Till FY 2016-17
S No FY 2015-2016 FY 2016-2017 Total
1 24,15,54,454/- 1,63,37,45,573/- 1,87,53,00,027/-
Original works expenditure details to EPC Contractor ( M/s L&T Ltd),
Cluster- VIII
b) Consultancy Charges in FY- 2016-17 i. PEC- M/s Aarvee Associates - 1,55,84,170/- ii. PMC- M/s TUV-SUD South Asia Pvt. Ltd. - 53,13,223/- iii. TPIA- M/s SGS India Pvt. Ltd. - 54,62,607/-
PRESENT STATUS, Cluster- VIII Pump House Delivery Chamber Intake well MSDSS
Scope – 13 No’s Scope – 13 No’s Scope – 13 No’s Scope – 7 No’s
Present Status: 4 No’s – PH Sump Well Wall Lift in progress. 1 No’s – Raft in progress. 4 No’s – PH Excavation in progress. 4 No’s - 70% Excavation completed.
Present Status: 5 No’s Completed. 4 No’s Wall in
progress. 4 No’s Excavation
under progress.
Present Status: 4 No’s will be started
by Dec’17 & Balance 9 No’s will be started in Mar’18
Present Status: 7 MSDSS Control
Room, Foundations & Cable trenches work in progress.
MS Pipe DI Pipe HDPE Pipe
Scope – 39.3 Km Scope – 166.5 Km Scope – 230 Km
Present Status: 17.4 Km laying completed. MS Pipe Laying works stopped due to crop cultivation & monsoon.
Present Status: 85 Km laying completed. DI Pipe Laying works stopped due to crop cultivation & monsoon.
Present Status: 39 Km laying completed. HDPE Pipe Laying works stopped due to crop cultivation & monsoon.
SCHEME WISE PRESENT STATUS, Cluster- VIII Name of
Schemes CCA Ha.
DC Pump House MS Pipe
Ach./Scope in km
DI Pipe Ach./Scope
in km
HDPE Pipe Ach./Scope
in km MSDSS
Bandhakani 1100 Completed 70% Excavation
Completed
52% 0.66/1.3
33% 4.5/13
0% 0/14
-
Baliroi 1050 Completed 70% Excavation
Completed
64% 2/3.2
55% 5/9
11% 2/18 MSDSS-3:
80% Completed
Daunra 1200 Excavation In
Progress Excavation Completed
96% 5.5/6
79% 9.3/12
50% 7.5/15
Bhatsingh 1150 Completed 70% Excavation
Completed
0% 0/3
71% 7.8/11
50% 9/18 MSDSS-2:
33% Completed
Bhulkabahal 1000 4/16 wall lifts
completed Excavation In Progress
20% 0.5/2.5
42% 3.5/8
0% 0/15
Baghamari 1000 Excavation In
Progress PCC & Raft In Progress
68% 0.5/0.7
50% 5.8/12
0% 0/10
MSDSS-1: 64%
Completed
SCHEME WISE PRESENT STATUS, Cluster- VIII Name of
Schemes CCA Ha
Delivery Chamber
Pump House MS Pipe
Ach./Scope in km
DI Pipe Ach./Scope
in km
HDPE Pipe Ach./Scope
in km MSDSS
Kulsura 1750 4/8 wall lifts completed
Excavation In Progress 65% 2.5/4
64% 12.7/20
0% 0/20 MSDSS-4:
52% Completed
Khajurikhaman 1500 1/12 wall lifts In
Progress 50% Excavation Completed
0% 0/3
28% 5.2/19
0% 0/21
Satakuta 600 Completed 2/8 Sump Wall lifts
Completed
62% 0.7/1
96% 2.8/2.9
98% 10.2/10.4
-
Birtola 1500 Completed 8/8 Sump Wall lifts
Completed
84% 2.5/3
30% 3.5/12
32% 7.5/23
MSDSS-7: 71%
Completed
Kandhal 1700 7/12 wall lifts
completed 30% Excavation Completed
0% 0/5
57% 11/20
0% 0/25
MSDSS-5: 56%
Completed Masinta 1650 Excavation In
Progress 2/7 sump well wall lifts
completed
82% 2.5/3
36% 7/19
9% 2/22
Jangla 1000 1/13 wall lifts
completed
3/7 sump well wall lifts completed
0% 0/4
81% 6.6/8
7% 1/17
MSDSS-6: 28%
Completed
PROGRESS PHOTOGRAPHS, Cluster- VIII Pump House Works
Birtola Satakuta Masinta
Kulsura Baghamari Jangla
PROGRESS PHOTOGRAPHS, Cluster- VIII Pump House Works
Bhukhabahal Bhatsingh
Baliroi
Daunra
Bandhakani Khajurikhaman Kandhal
PROGRESS PHOTOGRAPHS, Cluster- VIII Delivery Chamber Works
BALIROI BIRTOLA SATAKUTA BANDHAKANI
PROGRESS PHOTOGRAPHS, Cluster- VIII Pipe Laying Works
MS PIPE DI PIPE HDPE PIPE
PROGRESS PHOTOGRAPHS, Cluster- VIII MSDSS Control Room Building Works
PROGRESS PHOTOGRAPHS , Cluster- VIII Pole Erection & Tower Foundation
TL & RE Visit
Sub Collector,Deogarh visit for convincing to local people for
Baghmari Scheme.
DIGNITARY PHOTOGRAPHS VISITING CLUSTER- VIII SITES
SE & EE Visit
Meeting convened for sensitizing local people regarding benefits of Baghmari
Scheme,Deogarh.
PD-cum-CE, SE, EE, PMC & PEC Visit
PD-cum-CE, SE, EE, PMC & PEC Visit
MEGA LIFT IRRIGATION PROJECT
ANNUAL ACTIVITIES REPORT 2016-17
FOR
CLUSTER – XII
EXECUTIVE ENGINEER, MEGA LIFT PROJECTS, KEONJHAR
( Total 16 nos. of schemes in the district of Sundergarh & Jharsuguda)
Cluster XII – Job Synopsis Execution of 16 nos. of Lift Irrigation Schemes with intake points in Ibb, Sapei and Basundhara river having
Command area between 500Ha. to 2000 Ha. in Cluster No.XII in the district of Sundergarh and Jharsuguda including
its distribution network, up to 4 Ha Chak having total planned Culturable Command Area of 21,300 Ha. on “EPC –
Turn Key” basis including power system connectivity and Operation & Maintenance of complete commissioned
schemes for five years.
• EPC Contractor : M/s L&T Ltd.
• Agreement Value : ₹ 594.99 Cr
(Part-I Works : ₹ 588.59 Cr)
(Part-II O& M : ₹ 6.40 Cr)
• Date of Commencement : 26.12.2016
• Stipulated Date of Completion : 30 Months (25.06.2019)
• No. of Schemes : 16 (3 River)
• District Covered : Sundergarh (15 Scheme)
: Jharsuguda (1 Schemes)
• Proof Engineering Consultant (PEC) : M/s. WAPCOS Ltd.
• Project Management Consultant (PMC) : M/s. MMIPL Ltd.
• Third Party Inspection Agency (TPIA) : M/s. SGS India Pvt. Ltd. & M/s. CIPET
Project Overview - Geographical Location in the state of Odisha Cluster-XII
Bhubaneswar
Cluster XII
12
CL
CL CL
CL
CL
CL
CL
Project Location, Cluster- XII
CLUSTER –XII No of Schemes -16
Cluster XII – Scheme & District wise Details
4%
96%
CCA in Ha.
Jharsuguda-800 Ha Sundergarh-20500 Ha
SL NO. SCHEME NAME DISTRICT CCA
(Ha.)
1 Chichinda Jharsuguda 800
2 Bileigarh-1 Sundergarh 2000
3 Bileigarh-2 Sundergarh 2000
4 Bharatpur Sundergarh 700
5 Semina-1 Sundergarh 2000
6 Semina-2 Sundergarh 2000
7 Bandhapali Sundergarh 1300
8 Amasaranga Sundergarh 1400
9 Badkachhar Sundergarh 1200
10 Teleimalti Sundergarh 1000
11 Bargaon Sundergarh 700
12 Phulbari Sundergarh 1200
13 Dainidihi Sundergarh 2000
14 Katingdihi Sundergarh 2000
15 Ghoghar Sundergarh 500
16 Kusumara Sundergarh 500
Total 21300
River
Intake
Pipe
Pump
House
Intake
Well
Rising
Main
Substation
Transmission
Lines
Outlet
Management
System
Distribution Network
till 4 Ha Chak
Branch Line
CCA varying from
500 to 2000 Ha
Minors
Typical Schematic Diagram - Cluster XII in the District of Sundergarh & Jharsuguda.
Showing Pressure Networks operated through SCADA.
S No Description of Work UoM Quantity
1 Pump House No 16
2 Intake Well No 16
3 MSDSS No 8
4 DSS No 16
5 Distribution Main Pipe (DI) Km 223
6 Distribution Line (HDPE) Km 914
7 Intake Pipe (RCC) Km 1.5
8 VT Pumps No 56
9 EOT Cranes No 16
10 Sluice Gates No 16
11 Transmission Line Km 95
12 Excavation Cum 561168
13 Concreting Cum 27327
14 Shuttering Sqm 126703
15 Reinforcement MT 2632
16 Structural Fabrication MT 185
Major Scope of the Project , Cluster-XII
Cumulative Expenditure Till FY 2016-17
S No FY 2015-2016 FY 2016-2017 Total
1 - 21,78,00,000 21,78,00,000
Original works expenditure details to EPC Contractor (M/s L&T Ltd), Cluster -XII
PRESENT STATUS, Cluster-XII
Pump House Intake well MSDSS
Scope – 16 No’s Scope – 16 No’s Scope – 8 No’s
Present Status: Survey Work in Progress.
Present Status: Survey Work in Progress.
Present Status: Survey Work in Progress.
DI Pipe HDPE Pipe RCC Pipe
Scope – 223 Km Scope – 914 Km Scope – 1.5 Km
Present Status: 102Km pipe received at site.
Present Status: 197 Km pipe received at site.
Present Status: Procurement in progress.
SCHEME WISE PRESENT STATUS, Cluster-XII
SL NO. SCHEME NAME DISTRICT CCA
(Ha.) STATUS
1 Chichinda Jharsuguda 800
Survey work in progress.
2 Bileigarh-1 Sundergarh 2000
3 Bileigarh-2 Sundergarh 2000
4 Bharatpur Sundergarh 700
5 Semina-1 Sundergarh 2000
6 Semina-2 Sundergarh 2000
7 Bandhapali Sundergarh 1300
8 Amasaranga Sundergarh 1400
9 Badkachhar Sundergarh 1200
10 Teleimalti Sundergarh 1000
11 Bargaon Sundergarh 700
12 Phulbari Sundergarh 1200
13 Dainidihi Sundergarh 2000
14 Katingdihi Sundergarh 2000
15 Ghoghar Sundergarh 500
16 Kusumara Sundergarh 500
Total 21300
PROGRESS PHOTOGRAPHS, Cluster-XII Survey Work in Progress
Survey works by L&T Staff Rechecking of Survey works by AE & AEE
PROGRESS PHOTOGRAPHS, Cluster-XII Survey Work in Progress
Survey works by L&T Staff & Rechecking the Same by AE & AEE
Office Address :-
O/o Executive Engineer, Megalift Projects, At/Po-Kashipur,
Keonjhar - 758001
e-mail id - [email protected]
Divisional Office Setup at Keonjhar :-
Assistant Executive Engineer – 3Nos
Assistant Engineer – 1No.
Supporting Staff – Sr. Clerk, Data Entry Operator and
Peon-cum-Messenger