7
Megalift Sdn Bhd | Tel: +603 3375 2200-07 | Email: [email protected] Follow Us | www.facebook.com/Megalift | Megalift Sdn Bhd | @MegaliftMalaysia NEWSLETTER | VOLUME 8 | 2018

Megalift – To be the premier project logistics service provider ......Megalift Yard in Port Klang Cordstrap & CILT’s 2018 Awareness Campaign Thanks to Cordstrap and The Chartered

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Megalift – To be the premier project logistics service provider ......Megalift Yard in Port Klang Cordstrap & CILT’s 2018 Awareness Campaign Thanks to Cordstrap and The Chartered

Megalift Sdn Bhd | Tel: +603 3375 2200-07 | Email: [email protected] Us | www.facebook.com/Megalift | Megalift Sdn Bhd | @MegaliftMalaysia

NEWSLETTER | VOLUME 8 | 2018

Page 2: Megalift – To be the premier project logistics service provider ......Megalift Yard in Port Klang Cordstrap & CILT’s 2018 Awareness Campaign Thanks to Cordstrap and The Chartered

Track 4A - 1,440 MW Combined Cycle Power Plant PROJECT

Track 4A is a new power plant located in Pasir Gudang, Johor that’s expected to achieve scheduled commercial operation on 1st July 2020. We have been entrusted as the logistics partner to deliver a total of nine shipments within a year, comprising cargoes of different structures, sizes and weights. Among the largest cargoes that we have moved so far are:

Cargo: Right Side Casing AssemblyDimension: L34.00 m x W3.40 m x H1.75 mWeight: 40 ton each

Page 3: Megalift – To be the premier project logistics service provider ......Megalift Yard in Port Klang Cordstrap & CILT’s 2018 Awareness Campaign Thanks to Cordstrap and The Chartered

Jimah East 2 x 1000 MW Coal Fired Power Plant PROJECT

Arrival of barge at Jimah port and preparing for RORO

Rolling the transformer off the barge

Transporting to installation site

Installed to final on-base position

Scope: Barging from Port Klang to Jimah jettyCargo: TransformerDimension: L12.60 m x W8.10 m x H7.57 mWeight: 480 ton each

Page 4: Megalift – To be the premier project logistics service provider ......Megalift Yard in Port Klang Cordstrap & CILT’s 2018 Awareness Campaign Thanks to Cordstrap and The Chartered

Expansion of Rubber Production Plant in Singapore PROJECT

Scope: Transport and RORO in Port Klang, barging to Jurong Port, SingaporeCargo: Pressure Vessel Storage Tank Dimension:L15.60 m x W7.14 m x H7.50 mWeight: 68.50 ton

The other cargoes are two Blending Tanks (46 ton each) and smaller storage tanks (16 ton and 16.5 ton respectively).

Page 5: Megalift – To be the premier project logistics service provider ......Megalift Yard in Port Klang Cordstrap & CILT’s 2018 Awareness Campaign Thanks to Cordstrap and The Chartered

Delivery to Pengerang Integrated Petroleum Complex PROJECT

Scope: Receiving from Johor port and transport to PengerangCargo: Loading Arm (4 units)Dimension:L22.00 m x W3.20 m x H3.40 mWeight: Between 25 to 30 ton

Transport of Mock-up Rail Car

Scope: Transport from Port Klang to Terengganu (450 km)Cargo: Mock-up Rail CarDimension:L19.50 m x W3.12 m x H3.375 mWeight: 9 ton

Page 6: Megalift – To be the premier project logistics service provider ......Megalift Yard in Port Klang Cordstrap & CILT’s 2018 Awareness Campaign Thanks to Cordstrap and The Chartered

Megalift Yard in Port Klang

Cordstrap & CILT’s 2018 Awareness Campaign

Thanks to Cordstrap and The Chartered Institute of Logistics & Transport for inviting our CEO, Mr. Adrian Tan for sharing about Megalift and project logistics as well as several real cases that we had been involved in. Cord-strap and CILT co-organised the event to introduce some of cordstrap’s latest products and create awareness of safety which is a crucial aspects in logistics.

Page 7: Megalift – To be the premier project logistics service provider ......Megalift Yard in Port Klang Cordstrap & CILT’s 2018 Awareness Campaign Thanks to Cordstrap and The Chartered

Activities within the MTML Group

Bowling Tournament at Sunway Mega Lanes

MTML Runners at PJ Half Marathon