Upload
rea0079
View
217
Download
0
Embed Size (px)
Citation preview
8/8/2019 Melaka-skema kertas 1
1/5
SKEMA PEMARKAHAN CATATAN1
X
2
X
3 i Micrometer 1Mii 24.00mm
1 x 0.50 0.50mm30 x 0.01 0.30 mm +
24.80mm 2M4 Robustness // keteguhan
Strength // kekuatanDuctility // kemuluran
5 X
6 A - Threading // Mengulir B - Taper Turning // Melarik penirusanC - Straight Turning // Melarik SelariD - Facing // Melarik Penampan
7 12
38 ABCD
Communication between human and machineCommunication between humansCommunication between machinesCommunication between machines and human
9 Diod zener
NPN Transistor
Variable resistor
10
AD
8/8/2019 Melaka-skema kertas 1
2/5
B11
a
D1
1M
D2
1M
b Resistor 1Mc Ms 85 T4 1M
12
Input - Network card , scannerHard disk nor input or output devices
1
3
X
X
14
a Intake and compression stroke
b The fuel mixture flows into the cylinder // The exhaust port is closed by thepiston // The fuel mixture (at the upper section of the cylinder) iscompressed // High pressure is produced
c The exhaust port is closed by the piston15
Potential EnergyMechanical Energy
Electrical Energy16
a B - pumpD - Flow control valve
2M
b Water / Fluid from the reservoir will flow into the cylinderThe piston is pushed backwards
2M
17
P1 = P2F = 100 x 10
0.1 0.5F = 100 x 10 x 0.1
0.5= 200 N
1M1M
1M
1M1 i Single acting cylinder
8/8/2019 Melaka-skema kertas 1
3/5
8ii Double pressure valveiii Shuttle valve
19
a iii
Air PollutionRadioactive Pollution
b Encouraging the use of catalytic converter for vehicles //Encouraging the use of unleaded petrol //Educate and instill the awareness in society about the importance ofenvironmental conservation //Establishing and enforcing legislations (which involve controlling thedisposal of radioactive waste
Any 2
20
a To involve in the design and monitor the whole construction project onbehalf of the owner
b Manager manages and oversees the whole proceeding of organization //Engineer prepares engineering design, solves problems regardingconstruction technology and acts as an expert in his field //Architect prepares building or project designs from the architecturalaspects //Quantity surveyor prepares assessment or cost estimation for a project or astage of a project //Land surveyor carries out various land surveying works//Technical Assistant acts as assistant to the engineer //Technician carries out supervising and monitoring work//Draftsman draws plans from various views //Administration staff carries out various works to help the administration
of the organization //Construction workers carries out work at the construction site
Any 1 1M
21
BC
22
Area = (15 x 14) + (22 x 7 x 7)2 x 7
= 210 + 77= 287 m2
Cost = 287 x 550= RM 157 850.00
1M
1M
1M
1M
23
i Column
ii Pad footingiii File
24
Engineering survey drawing // site drawing // architectural drawing //Mechanical and Electrical drawing // structural drawing
Any 4
25
8/8/2019 Melaka-skema kertas 1
4/5
26
Site line methodCentre line usage method
27
X
28
ShapeTextureColour
29
42
3130
8/8/2019 Melaka-skema kertas 1
5/5