Melaka-skema kertas 1

  • Upload
    rea0079

  • View
    217

  • Download
    0

Embed Size (px)

Citation preview

  • 8/8/2019 Melaka-skema kertas 1

    1/5

    SKEMA PEMARKAHAN CATATAN1

    X

    2

    X

    3 i Micrometer 1Mii 24.00mm

    1 x 0.50 0.50mm30 x 0.01 0.30 mm +

    24.80mm 2M4 Robustness // keteguhan

    Strength // kekuatanDuctility // kemuluran

    5 X

    6 A - Threading // Mengulir B - Taper Turning // Melarik penirusanC - Straight Turning // Melarik SelariD - Facing // Melarik Penampan

    7 12

    38 ABCD

    Communication between human and machineCommunication between humansCommunication between machinesCommunication between machines and human

    9 Diod zener

    NPN Transistor

    Variable resistor

    10

    AD

  • 8/8/2019 Melaka-skema kertas 1

    2/5

    B11

    a

    D1

    1M

    D2

    1M

    b Resistor 1Mc Ms 85 T4 1M

    12

    Input - Network card , scannerHard disk nor input or output devices

    1

    3

    X

    X

    14

    a Intake and compression stroke

    b The fuel mixture flows into the cylinder // The exhaust port is closed by thepiston // The fuel mixture (at the upper section of the cylinder) iscompressed // High pressure is produced

    c The exhaust port is closed by the piston15

    Potential EnergyMechanical Energy

    Electrical Energy16

    a B - pumpD - Flow control valve

    2M

    b Water / Fluid from the reservoir will flow into the cylinderThe piston is pushed backwards

    2M

    17

    P1 = P2F = 100 x 10

    0.1 0.5F = 100 x 10 x 0.1

    0.5= 200 N

    1M1M

    1M

    1M1 i Single acting cylinder

  • 8/8/2019 Melaka-skema kertas 1

    3/5

    8ii Double pressure valveiii Shuttle valve

    19

    a iii

    Air PollutionRadioactive Pollution

    b Encouraging the use of catalytic converter for vehicles //Encouraging the use of unleaded petrol //Educate and instill the awareness in society about the importance ofenvironmental conservation //Establishing and enforcing legislations (which involve controlling thedisposal of radioactive waste

    Any 2

    20

    a To involve in the design and monitor the whole construction project onbehalf of the owner

    b Manager manages and oversees the whole proceeding of organization //Engineer prepares engineering design, solves problems regardingconstruction technology and acts as an expert in his field //Architect prepares building or project designs from the architecturalaspects //Quantity surveyor prepares assessment or cost estimation for a project or astage of a project //Land surveyor carries out various land surveying works//Technical Assistant acts as assistant to the engineer //Technician carries out supervising and monitoring work//Draftsman draws plans from various views //Administration staff carries out various works to help the administration

    of the organization //Construction workers carries out work at the construction site

    Any 1 1M

    21

    BC

    22

    Area = (15 x 14) + (22 x 7 x 7)2 x 7

    = 210 + 77= 287 m2

    Cost = 287 x 550= RM 157 850.00

    1M

    1M

    1M

    1M

    23

    i Column

    ii Pad footingiii File

    24

    Engineering survey drawing // site drawing // architectural drawing //Mechanical and Electrical drawing // structural drawing

    Any 4

    25

  • 8/8/2019 Melaka-skema kertas 1

    4/5

    26

    Site line methodCentre line usage method

    27

    X

    28

    ShapeTextureColour

    29

    42

    3130

  • 8/8/2019 Melaka-skema kertas 1

    5/5