6030 Bid Addendum Page 1 of 1 Addendum No.: 1 Date Of Addendum: October 22, 2020 CT DAS - 6030 (Rev. 10.05.18) 6000 – Bid Phase Forms CT DAS l Construction Services l Office of Legal Affairs, Policy, and Procurement DSET Training Area State Police Academy 285 Preston Avenue Meriden, CT BI – N – 352 Original Bid Due Date / Time: November 18, 2020 1:00 PM Previous Addendums: None TO: Prospective Bid Proposers: This Addendum forms part of the “Contract Documents” and modifies or clarifies the original “Contract Documents” for this Project dated 8/24/2020. Prospective Bid Proposers shall acknowledge receipt of the total number the Addenda issued for this Project on the space provided on Section 00 41 00 Bid Proposal Form. Failure to acknowledge receipt of the total number the Addenda issued for this Project on the space provided on Section 00 41 00 Bid Proposal Form shall subject Bid Proposers to disqualification. The following clarifications are applicable to drawings and specifications for the project referenced above. Item 1: Please find attached pre-bid meeting presentation, minutes, and attendance log. Item 2: The cutoff date and time for questions is November 4 th 2020 at 3:00pm, after this date and time no additional questions will be allowed. All questions must be emailed (not verbal or by phone) to the consulting Architect/Engineer (David Aria, Email: [email protected]) with copies sent to the DAS/CS Project Manager (Daniel Wagoner, Email: [email protected]) and Construction Manager (N/A, Email: N/A) End of Addendum 1 Mellanee Walton Mellanee Walton, Associate Fiscal Administrative Officer State of Connecticut Department of Administrative Services, Construction Services Office of Legal Affairs, Policy, and Procurement 450 Columbus Boulevard, Suite 1302 Hartford, CT 06103

Mellanee Walton - Connecticut · Pre-Bid Meeting Agenda: DAS Construction Services Office of Legal Affairs, Policy, and Procurement 1.0 Pre-Bid Meeting: 1.1 The Owner, Architect,

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

  • 6030 Bid Addendum

    Page 1 of 1

    Addendum No.: 1 Date Of Addendum: October 22, 2020

    CT DAS - 6030 (Rev. 10.05.18) 6000 – Bid Phase Forms

    CT DAS l Construction Services l Office of Legal Affairs, Policy, and Procurement

    DSET Training Area State Police Academy 285 Preston Avenue

    Meriden, CT BI – N – 352

    Original Bid Due Date / Time: November 18, 2020 1:00 PM

    Previous Addendums: None

    TO: Prospective Bid Proposers: This Addendum forms part of the “Contract Documents” and modifies or clarifies the original “Contract Documents” for this Project dated 8/24/2020. Prospective Bid Proposers shall acknowledge receipt of the total number the Addenda issued for this Project on the space provided on Section 00 41 00 Bid Proposal Form.

    Failure to acknowledge receipt of the total number the Addenda issued for this Project on the space provided on Section 00 41 00 Bid Proposal Form shall subject Bid Proposers to disqualification.

    The following clarifications are applicable to drawings and specifications for the project referenced above.

    Item 1: Please find attached pre-bid meeting presentation, minutes, and attendance log.

    Item 2: The cutoff date and time for questions is November 4th 2020 at 3:00pm, after this date and time no additional questions will be allowed.

    All questions must be emailed (not verbal or by phone) to the consulting Architect/Engineer (David Aria, Email: [email protected]) with copies sent to the DAS/CS Project Manager (Daniel Wagoner, Email: [email protected]) and Construction Manager (N/A, Email: N/A)

    End of Addendum 1

    Mellanee Walton Mellanee Walton, Associate Fiscal Administrative Officer State of Connecticut Department of Administrative Services, Construction Services Office of Legal Affairs, Policy, and Procurement 450 Columbus Boulevard, Suite 1302 Hartford, CT 06103

  • 6020 Bid Phase Meeting Attendance Log

    Page 1 of 1 DAS/CS Project Title: DSET Training Area DAS/CS Project No.: BI-N-352 Meeting Purpose (insert “X” below):

    Date: 10/14/2020 X Pre-Bid Meeting Meeting Start Time: 9:10am Post Bid Review Meeting

    Meeting Location: Virtual Teams Meeting Online Other:

    CT DAS – 6020 (Rev: 09.25.18) 6000 – Bid Phase Forms

    Name Company Email Daniel Wagoner DAS [email protected] David Arai Maier Design Group [email protected] Marc Soucy FEA [email protected] Ernest Domingue FEA [email protected] John Lane FEA [email protected] Robert Cody DESPP [email protected] Sean Carlin Carlin Construction [email protected] Peter Cappellino J.A. Rosa [email protected] Richard Jagoe Tomlinson Hawley Patterson (THP) [email protected] Jonathan Sygrove Sarazin General Contractors [email protected] Roel Legaspi Nosal Builders [email protected] Brian Burdo Zeiss Construction Group [email protected] Patrick Monko LaRosa Building Group [email protected] Mike M.J. Losito Electrical Contractors [email protected] Joe DePaola Pelletier Construction [email protected] Mike Daigle Diversity Construction Group [email protected] John Lipari Construx Co. [email protected] Mike Passeri N&S Electrical [email protected]

  • Pre-Bid Virtual Walk Thru

    DSET Training Area CT State Police Academy, Meriden, CT

    Project No.: BI-N-352

    DAS Representative

    Dan Wagoner

    Agency Representative

    William Youell

    Architect

    David Arai Maier Design Group LLC

    MEP/FP Engineer

    Brian Soucy Facilities Engineering Associates, Inc.

  • SECTION 00 25 13 PRE-BID MEETING AGENDA

    PAGE 1 OF 4

    CT DAS 5000 (Rev. 05.14.18) PROJECT NO. BI-N-352

    Pre-Bid Meeting Agenda: DAS Construction Services Office of Legal Affairs, Policy, and Procurement

    1.0 Pre-Bid Meeting:

    1.1 The Owner, Architect, and Construction Administrator will conduct a Pre-Bid Meeting.

    For the Pre-Bid Meeting Date, Time, and Location see Section 00 11 16 Invitation To Bid for this Specific Bid.

    1.2 Attendance: 1.2.1 General Contractor: Attendance at the Pre-Bid Meeting is strongly encouraged. At the Pre-Bid

    Meeting, all prospective bidders shall sign his or her name on the official roster and list the name and address of the company he or she represents. For MANDATORY Pre-Bid Meetings, this shall be done no later than the designated start time of the Pre-Bid Meeting. Prospective bidders are advised to register early as no attendee will be allowed to register after the advertised start time. Bids submitted by contractors who have not properly registered and attended the MANDATORY Pre-Bid Meeting shall be rejected as non-responsive.

    1.2.2 Subcontractors: Attendance at the Pre-Bid Meeting is recommended.

    1.2.3 Pre-Bid Meeting Sign-in Sheet:

    It is strongly encouraged that all attendees sign the Pre-Bid Meeting Sign-in Sheet.

    1.3 Site/Facility Visit or Walkthrough: Please do not make any Site/Facility Visits without notifying the DAS/CS Project Manager prior to your visit. 1.3.1 A Site/Facility Visit or Walkthrough is scheduled for the Pre-Bid Meeting

    1.3.2 A Site/Facility Visit or Walkthrough is NOT scheduled for the Pre-Bid Meeting

    1.4 Bidder Questions: 1.4.1 Submit written questions to be discussed at the Pre-Bid Meeting a minimum of two (2) Calendar Days

    prior to Pre-Bid Meeting date. See the Invitation to Bid for instructions on submitting questions.

    IMPORTANT NOTE: In accordance with DAS Regulations, no participants in any Selection, Proposal, or Bidding process, including User Agency representative(s), shall communicate with any potential Offeror prior to, during, or upon conclusion of the entire Selection, Proposal, or Bidding procedure, with the exception of information necessary to complete the administrative steps of the Selection process.

    2.0 Pre-Bid Meeting Agenda: The Pre-Bid Meeting Agenda will include a review of topics, as applicable to the Project, which may affect proper preparation and submittal of bids, including, but not limited to, the following:

    2.1 Introduction of Participants: 2.1.1 Architect/Engineer: Maier Design Group LLC

    2.1.2 CA: TBD

    2.1.3 DAS Representative: Daniel Wagoner 2.1.4 Agency Representative: William Youell

  • SECTION 00 25 13 PRE-BID MEETING AGENDA

    PAGE 2 OF 4

    CT DAS 5000 (Rev. 05.14.18) PROJECT NO. BI-N-352

    2.0 Pre-Bid Meeting Agenda (continued):

    2.2 Project Summary: 2.2.1 Summary of Work: See General Requirements Section 01 11 00

    2.2.2 Temporary Facilities and Controls: See General Requirements Section 01 50 00

    2.2.3 Work Sequence: See General Requirements Section 01 11 00

    2.2.4 Contractor Use of Premises: See General Requirements Section 01 11 00

    2.2.5 Project Schedule

    2.2.6 Contract Time

    2.2.7 Liquidated Damages: See General Conditions Section 00 73 13, Articles 1 and 8, and 00 41 00 Bid Proposal Form.

    2.3 Procurement and Contracting Requirements: 2.3.1 Section 00 11 16 – Invitation to Bid

    2.3.2 Section 00 21 13 – Instructions to Bidders

    2.3.3 Section 00 41 00 – Bid Proposal Form

    2.3.4 Section 00 41 10 – Bid Package Submittal Requirements

    2.3.5 Section 00 30 00 – General Statements for Available information

    2.3.6 Division 50 – Project-Specific Available Information

    2.3.7 Bonding

    2.3.8 Insurance

    2.3.9 Bid Security

    2.3.10 Notice of Award

    2.4 Communication During Bidding Period: 2.4.1 Obtaining Bid Documents

    2.4.2 Access to DAS Website, BizNet, and State Contracting Portal

    2.4.3 Bidder's Requests for Information: See General Requirements Sections 01 26 00

    2.4.4 Substitution Procedures (Prior to Bid): See General Requirements Section 01 25 00 & General Conditions Section 00 73 13, Article 15.

    The Owner will consider Pre-Bid Equals or Substitutions Requests, if made fourteen (14) Calendar Days prior to the Bid Due Date. The information on all materials shall be consistent with the information herein.

    2.4.5 Substitutions following Contract Award: See General Requirements Section 01 25 00 & General Conditions Section 00 73 13, Article 15.

    Subject to the Architect or Engineer's determination, if the material or equipment is Equal to the one specified or pre-qualified and the DAS/CS Project Manager's approval of such determination, Substitution of Material or Equipment may be allowed after the Letter of Award is issued, as specified in the Conditions Section 00 73 13, Article 15.

    2.4.6 Addenda Procedures: See Item No. 2.7 of this form

  • SECTION 00 25 13 PRE-BID MEETING AGENDA

    PAGE 3 OF 4

    CT DAS 5000 (Rev. 05.14.18) PROJECT NO. BI-N-352

    2.0 Pre-Bid Meeting Agenda (continued):

    2.5 Contract Considerations: 2.5.1 Allowances: See General Requirements Section 01 20 00

    2.5.2 Unit Prices: See General Requirements Section 01 20 00

    2.5.3 Supplemental Bid: See General Requirements Section 01 23 13 and 00 41 00 Bid Proposal Form.

    2.6 Separate Contracts: 2.6.1 Work by Owner

    2.6.2 Work of Other Contracts

    2.7 Post Pre-Bid Meeting Addendum: 2.7.1 No Interpretations of the meaning of the plans, specifications or other contract documents will be made

    orally at any time. Every bidder request for such interpretation shall be in writing to the awarding authority and to be given consideration shall be received at least fourteen (14) Calendar Days prior to the Bid Due Date. Any and all such interpretations and any supplemental instructions will be in the form of written addenda to the specifications which, if issued, will be posted on the State Contracting Portal.

    2.7.2 Other Bidder Questions

    2.8 Other Agenda Topics and Notes: 2.8.1 Background checks required to enter facility.

    2.8.2

  • SECTION 00 25 13 PRE-BID MEETING AGENDA

    PAGE 4 OF 4

    CT DAS 5000 (Rev. 05.14.18) PROJECT NO. BI-N-352

    3.0 Pre-Bid Meeting Minutes:

    3.1 Recording and Distribution of Pre-Bid Meeting Minutes: 3.1.1 The Construction Administrator is responsible for conducting the Pre-Bid Meeting and will record and

    distribute meeting minutes to attendees and others known by the issuing office to have received a complete set of Procurement and Contracting Documents.

    3.2 Pre-Bid Meeting Minutes as “Available Information” 3.2.1 Minutes of the Pre-Bid Meeting are issued as “Available Information” and do not constitute a modification

    to the Procurement and Contracting Documents. Modifications to the Procurement and Contracting Documents are issued by written Addendum only.

    3.3 Pre-Bid Meeting Sign-in Sheet: 3.3.1 Minutes will include the list of meeting attendees.

    3.4 List of Planholders: 3.4.1 Minutes will include the list of planholders.

    End of Section 00 25 13 Pre-Bid Meeting Agenda

  • DN

    1 2 3 5 6.9 7 9 10

    L

    K

    J.7

    J

    H.3

    H

    G

    SCOPE OF WORK LIMIT LINE

    4

    5' -

    0"5'

    - 0"

    5' -

    0"

    Align

    Huddle AreaA219

    TrainingA220

    DispatchA221

    EquipmentA221.1

    MechanicalA218

    Server / Elec.Telecom

    A214

    N.I.C.

    POSTC OfficeA226

    N.I.C.

    POSTC SecretaryA222

    N.I.C.

    POSTC OfficeA225

    N.I.C.

    POSTC OfficeA224

    N.I.C.

    StairA216

    N.I.C.

    POSTC OfficeA215

    N.I.C.

    POSTC / Field ServicesClassroom #4

    A212

    N.I.C.

    CorridorA200

    N.I.C.

    POSTC / Field ServicesClassroom #1

    A209N.I.C.

    POSTC Open OfficeA217

    N.I.C.

    POSTC StorageA227

    N.I.C.

    LobbyA213

    N.I.C.

    ConnectorA223

    3' - 11 1/2"

    3' - 9 1/2"

    7

    7

    3' - 3 3/4"

    EPP

    UR

    PATS

    UPS

    BYPA

    SS

    SCP

    SCP

    A

    A

    BBBBB

    B

    B B B B B

    CCCC

    C

    C

    C C C C C

    D

    D D

    E

    E

    FF

    H

    H

    H

    H

    H H H H H H H

    H H H H H H H

    H H H H H H H

    H H H H

    F

    F

    F F

    F F

    F F

    F F

    F

    G

    G

    G

    5' - 0"

    8

    8

    JJJ

    FRN 1 Refer to Specifications prior to beginning any work for further information regarding methods and materials.

    FRN 2 Numbered Notes refer to this sheet only unless specifically indicated otherwise.

    FRN 3 Keep all solid furniture at least 6" away from existing baseboard radiator.

    FRN 4 Cable tray shown thus. Refer to A1.02 and MEP drawings for further information.

    FRN 5 Refer to Sheets EP102 and ET102 for electric, voice, and data locations.

    FRN 6 Coordinate all furnitrue with furniture supplier. Verify dimensions in field.

    FRN 7 Justify consoles to left against new wall to keep away from existing baseboard radiator.

    FRN 8 Projector and screen above shown thus.

    FRN 9 All furniture provided by Owner, GC to coordinate installation with Owner's vendor.

    FRN 10 Refer to Sheet A7.01 for Furniture Schedule.

    F U R N I T U R E N O T E S

    KEY PLANArea of construction

    STATE OF CONNECTICUTDEPARTMENT OF ADMINISTRATIVE SERVICES

    drawing prepared by

    descriptiondatemark

    CAD no. project no.

    drawing no.

    approved by

    drawn by

    scale

    date

    drawing title

    R E V I S I O N S

    34 SEQUASSEN ST

    professional seal

    CONNECTICUT STATE POLICE ACADEMYDSET TRAINING AREA

    285 PRESTON AVE, MERIDEN, CT

    Maier Design Group llcHARTFORD,CT As indicated

    SECOND FLOOR FURNITURE PLAN

    19083_DSET_BASE.RVT BI-N-352

    08/24/20

    TMS

    DBA

    I1.03

    SECOND FLOOR FURNITURE PLANSCALE: 1/4"=1'-0" 10 2' 5' 8' 10'

  • daraiPolygon

  • TV

    DN

    1 2 3 5 6.9 7 9 10

    L

    K

    J.7

    J

    H.3

    H

    G

    SCOPE OF WORK LIMIT LINE

    5' -

    0" +

    /-

    16

    16

    1515

    15

    15

    15

    15

    15 15 15 15 15

    14

    14

    13

    12

    12

    10

    7

    147 147

    17

    18

    19 19

    6 3/

    4" +

    /-

    12

    7' - 4 3/4" +/-

    24' - 9 1/2" +/-

    63' -

    4"

    +/-

    22' - 0" +/- 9' - 6" +/-

    8' -

    9 1/

    2" +

    /-

    9' -

    0" +

    /-9'

    - 2

    3/4"

    +/-

    50' - 6" +/-

    43' - 8 3/4" +/-

    D

    D

    D

    D

    D

    D D

    D

    D

    D

    D

    D

    D D D D

    D D

    D

    D

    DD

    X

    X

    X

    X

    D

    XXXX

    X

    X

    X 20

    20

    20

    SCOPE OF WORK LIMIT LINE

    198 SF

    POSTC WorkroomA220

    84 SF

    POSTC VideoStorageA221

    165 SF

    POSTC Reception

    132 SF

    MechanicalA218

    N.I.C.

    POSTC OfficeA226

    N.I.C.

    POSTC SecretaryA222

    N.I.C.

    POSTC OfficeA224

    N.I.C.

    POSTC OfficeA225

    1947 SF

    POSTC LibraryA219

    N.I.C.

    StairA216

    N.I.C.

    POSTC OfficeA215

    N.I.C.

    ConnectorA223

    N.I.C.

    POSTC Open OfficeA217

    N.I.C.

    POSTC StorageA227

    N.I.C.

    LobbyA213

    127 SF

    Server / Elec.Telecom

    A214

    N.I.C.

    POSTC / Field ServicesClassroom #1

    A209

    N.I.C.

    POSTC / Field ServicesClassroom #4

    A212

    N.I.C.

    CorridorA200

    Demo 1 Refer to Specifications prior to beginning any work for further information regarding methods and materials.

    Demo 2 Numbered Notes refer to this sheet only unless specifically indicated otherwise.

    Demo 3 Dashed lines indicate existing construction to be removed or modified. Exercise care during demolition activities to maintain adjacent spaces and construction designated to remain. Take care during selective demolition not to damage or disturb any items to remain.

    Demo 4 Refer to Fire Protection Second Floor Demolition Plan FD1.02, Mechanical Second Floor Demolition Plan MD1.02, and Electrical Second Floor Demolition Plan ED1.02 regarding demolition of items covered by those trades. Unless specifically noted otherwise, Contractor shall remove all switches and receptacles located in walls scheduled to be removed or furred out back to nearest accessible junction box or fixture housing, assuring power is maintained to other fixtures or receptacles on the same circuit.

    Demo 5 Fire alarm initiation and signaling devices, emergency fixtures and other similar appurtenances located on walls to be removed shall be disconnected and salvaged for reuse per end user and mechanical engineer coordination. Disconnection of any items shall not compromise the integrity and functionality of devices not being removed.

    Demo 6 Proceed with Work in an orderly, careful, safe manner. Remove material as Work progresses, leaving area clean at completion of demolition activities. Take particular care to minimize dust and use temporary partitions or poly "Zip Walls" and construction filters on air handling systems to contain dust and debris.

    Demo 7 All equipment, fixtures, casework or other elements indicated to be removed and not specifically called out to be reused or salvaged are to be disposed of as follows: Where Owner requests items to be retained, Contractor shall return those items to a location (on site) designated by the Owner. Other items shall be appropriately disposed of by Contractor in accordance with the General Conditions.

    Demo 8 Extreme care must be taken to minimize and contain noise, dust and construction debris. Materials may be stored on site at a location to be determined by the Owner, however materials must not exceed beyond the designated area. All materials and equipment required for the work shall be stored or placed so as not to endanger the general public, the Owner's employees and clients, or the contractors own workers.

    Demo 9 The contractor shall provide suitable protection for the general public and their own workers for the duration of the work. Provide and maintain temporary barriers and signage as required to protect people from the demolition areas. No exits shall be blocked, adequate lighting shall be maintained throughout all areas affected by the work, and all existing life safety and security equipment and systems must remain fully operational and accessible. Erect weatherproof enclosures at any exterior openings and provide temporary egress routes as necessary to maintain safety for building occupants.

    Demo 10 Existing Data, Telephone, or Cable TV jack to be removed. Remove cabling back to source.

    Demo 11 Do not blank plate demolished electric, voice, or data outlets in all areas. Remove devices, wiring and boxes complete back to source or nearest junction box and patch and repair walls to match and align with existing.

    Demo 12 Existing thermostat to be removed, refer to MEP/FP demolition drawing for further information.

    Demo 13 New opening in wall shown thus. Coordinate dimensions with new partition layout. Existing wall construction assumed to be 5/8" GWB, 6" metal stud with 2" sound attenuation blanket, 5/8" GWB. Refer to Wall Type M.

    Demo 14 Remove existing finishes in work area and prepare surfaces to recieve new finishes, typical. Refer to Finish Plan for further direction.

    Demo 15 Remove existing window shades entire length complete including mounting hardware and brackets, typical.

    Demo 16 Remove GWB only on walls shown thus. Take care not to damage existing studs.

    Demo 17 Remove existing baseboard radiator cover as necessary to allow for new wall construction. Do not damage hydronic piping, Trim cover for a neat clean fit (hem all cut edges) after wall is built for a tight fit. Coordinate with Construction Plan A1.02 and MEP drawings.

    Demo 18 Remove existing baseboard radiator cover this section. Coordinate removal with location of new wall on A1.02.

    Demo 19 Existing floor monuments to be removed. Refer to Detail 6/A8.02 for further information.

    Demo 20 Remove column enclosure, do not damage column.

    D E M O L I T I O N N O T E S :

    D E M O L I T I O N K E Y

    Existing construction to remain shown thus, typical. Refer to Finish Plans and Notes for any required preparation or repairs.

    Selective portions of existing construction to be removed or modified shown thus, typical.

    Existing door and frame to be removed complete shown thus, typical. (Remove existing frames unless noted otherwise.)

    KEY PLANArea of construction

    STATE OF CONNECTICUTDEPARTMENT OF ADMINISTRATIVE SERVICES

    drawing prepared by

    descriptiondatemark

    CAD no. project no.

    drawing no.

    approved by

    drawn by

    scale

    date

    drawing title

    R E V I S I O N S

    34 SEQUASSEN ST

    professional seal

    CONNECTICUT STATE POLICE ACADEMYDSET TRAINING AREA

    285 PRESTON AVE, MERIDEN, CT

    Maier Design Group llcHARTFORD,CT As indicated

    SECOND FLOOR DEMOLITION PLAN

    19083_DSET_BASE.RVT BI-N-352

    08/24/20

    TMS

    DBA

    AD1.02

    SECOND FLOOR DEMOLITION PLANSCALE: 1/4"=1'-0" 10 2' 5' 8' 10'

    daraiOval

  • SCALE:

    MEMBRANECURED EPDM

    3" MIN.

    FLASH ALL OUTSIDE CORNERSPER DETAIL U-15-C OR PS-15-F (SEE NOTES)

    OR CURED EPDM FLASHING

    SPLICE TAPE

    PLATE MAX. 12" O.C.

    EPDM MEMBRANE

    3" (75 mm) EPDM

    METAL FLASHING (BY OTHERS)

    EXISTING ROOF INSULATIONBACK AS NECESSARY TO INSTALL NEW CURB.EXISTING EPDM MEMBRANE, PEAL

    SEAM FASTENING

    EPDM NEOPRENE BONDING ADHESIVE

    NOTES:

    1. POLYMER SEAM PLATES ARE REQUIRED IN LIEU OF SEAM FASTENINGPLATES FOR MECHANICALLY-FASTENED ROOFING SYSTEMS OVERSTEEL DECKS.

    2. IF VERTICAL SPLICE IS NOT LOCATED AT CORNER, 6" WIDEPRESSURE-SENSITIVE ELASTOFORM FLASHING MUST BE CENTEREDOVER FIELD SPLICE AT ANGLE CHANGE.

    3. FASTENING PLATES MAY BE INSTALLED VERTICALLY.

    4. APPLY PRIMER PRIOR TO INSTALLING SPLICE TAPE.

    5. SPLICE ADHESIVE MAY BE USED IN LIEU OF SPLICE TAPE.

    6. LAP SEALANT IS REQUIRED ON CUT EDGES OF REINFORCEDMEMBRANE.

    STEEL DECKEXISTING

    CURB FLASHINGN.T.S.

    SCALE:

    CONDENSING UNIT PIPING DETAIL-DUCTLESS SPLIT SYSTEMSN.T.S.

    FLASH TO EXISTINGROOFINGWEATHERTIGHT.MAINTAIN EXISTING ROOFWARRANTY.

    ROOF

    ANCHOR UNIT SUPPORTFEET TO SUPPORT RAIL2x4 NAILER. (TYP.)

    STRUT SUPPORTATTACHED AT EXTENDEDEND OF EQUIPMENTSUPPORT RAILS FORELECTRICALDISCONNECT SWITCH BYDIV. 26.

    SIDE WIND BAFFLE

    FRONT WIND BAFFLE

    CONDENSING UNIT (CU)

    EXISTING ROOFINSULATION

    EXISTING STEELROOF DECK

    TOP VIEW OF PIPE CURBASSEMBLY SHOWING CAPAND 5 BOOT PACKAGE

    CONTROL WIRING IN LFMCBY BAS/MECH. CONTRACTOR

    POWER TO CONDENSING UNIT BY E.C.

    POWER TO INDOOR AC UNIT BY E.C.

    PIPE CURB ASSEMBLY PATE MODELPCC-5, 12"HIGH, 15"x15"O.D.

    REFRIGERANT LIQUID &SUCTION LINE SET

    TO WALL MOUNTEDINDOOR EVAPORATORUNIT AC-##.

    PATE EQUIPMENT SUPPORTRAILS STYLE ES-2, 18" HIGH,2'-0" LENGTH. (TYP.)

    SERVICE DISCONNECTSWITCH BY DIV. 26

    RLRS

    NOTES:

    1. INSTALL LOW AMBIENT WIND BAFFLES IN ACCORDANCEWITH MANUFACTURER'S INSTRUCTIONS.

    2. ROOF PRODUCTS BASED ON PATE OR EQUAL BYCONN-FAB OR THYCURB.

    3. DETAIL TYPICAL FOR AC-1/CU-1; AC-2/CU-2 AND AC-3/CU-3.

    18"

    12"

    LAP SEALANT

    FLASH CURB INTO ROOF

    EXISTING EPDMMEMBRANE

    PRESSURE SENSITIVE EPDMCURB WRAP WITH FACTORYAPPLIED TAPE. SET OVERBONDING ADHESIVE.TERMINATE UNDER METALCURB AP. FLASH ALLOUTSIDE CORNERS.

    FASTENER AT 12" O.C. MAX.

    FASTENER ANDSEAM FASTENINGPLATE AT 12" O.C.

    FLASHING AT ROOFRAILS IS IDENTICAL TOCURB BOX ASSEMBLY.

    RL

    RS

    1 2 3 5 6.9 7 9 10

    L

    K

    J.7

    J

    H.3

    H

    G

    1A4.01

    2A4.01

    3

    3

    3

    4

    6

    TYP.

    2

    A1.03

    Roof 1 Refer to Specifications prior to beginning any work. Conflicts between the drawings and the specifications shall be brought to the attention of the Architect immediately.

    Roof 2 Numbered notes refer to this sheet only unless specifically indicated otherwise.

    Roof 3 Refer to Mechanical Drawings for further informtation on equipment, equipment layout, and details regarding new equipment installation.

    Roof 4 Existing roof hatch show thus to remain.

    Roof 5 Any roofing work shall be completed by a roofing contractorauthorized by Carlisle (existing membrane manufacturer) to perform warranty approved work.

    Roof 6 Refer to Detail 8/A7.01 for further information on top of conduit enclosure.

    R O O F N O T E S :

    KEY PLANArea of construction

    STATE OF CONNECTICUTDEPARTMENT OF ADMINISTRATIVE SERVICES

    drawing prepared by

    descriptiondatemark

    CAD no. project no.

    drawing no.

    approved by

    drawn by

    scale

    date

    drawing title

    R E V I S I O N S

    34 SEQUASSEN ST

    professional seal

    CONNECTICUT STATE POLICE ACADEMYDSET TRAINING AREA

    285 PRESTON AVE, MERIDEN, CT

    Maier Design Group llcHARTFORD,CT As indicated

    ROOF PLAN

    19083_DSET_BASE.RVT BI-N-352

    08/24/20

    TMS

    DBA

    A1.03

    ROOF PLANSCALE: 1/4"=1'-0" 10 2' 5' 8' 10'

    2

    3

  • URP, 16

    EXISTING CP2 PANEL

    EXISTING PP2 PANEL

    CONDUIT UP

    TO 2ND FLR

    NEW 2-1/2" CONDUIT

    ABOVE CEILING FROM

    MSB1 TO NEW ATS

    PROVIDE POWER FROM CU-1

    ON ROOF. SEE DETAIL FOR

    MORE INFORMATION

    NEW PULL BOX

    MOUNTED TO STEEL

    NOTE: FIRESTOP ALL PENTRATIONS

    THRU RATED ASSEMBLIES

    EXISTING MSB1

    NEW 2-1/2"" CONDUIT

    ABOVE CEILING TO NEW

    ATS

    EXISTING CONTROL PANEL

    EXISTING PBB PANEL

    EXISTING CONTROL PANEL

    BUILDING

    CONTROLS

    WKST

    NOTE: FIRESTOP ALL PENTRATIONS

    THRU RATED ASSEMBLIES

    9 10

    K

    J.7

    J

    H.3

    H

    G

    H.3

    H

    G

    KEY NOTES:

    REFEED EXISTING LIGHT FIXTURE FROM EPP. REWIRE EXISTING LIGHTING

    CIRCUIT TO MAINTAIN CIRCUIT CONTINUITY AND OPERATION OF EXISTING

    LIGHTING CIRCUIT.

    FIXTURE IS POWERED BY EXISTING PANEL PP2, CKT #2. INTERCEPT CIRCUIT

    AND PROVIDE NEW CIRCUITRY TO POWER FROM EPP. REMOVE EXISTING

    ABANDONED CONDUIT, WIRING AND BOXES AND MAKE SAFE EXISTING

    PANELBOARD.ENCLOSURE.

    PROVIDE NEW SURFACE MOUNTED RECEPTACLE FOR OWNER'S EQUIPMENT.

    COORDINATE LOCATION IN FIELD WITH OWNER.

    PROVIDE POWER FOR EXISTING SECURITY EQUIPMENT. EXISTING SECURITY

    EQUIPMENT IS POWERED VIA SURFACE MOUNTED WIREWAY. PROVIDE

    POWER TO WIREWAY VIA HARDWIRE CONNECTION FROM NEW JUNCTION

    BOX AND DEDICATED BRANCH CIRCUIT FROM PANEL INDICATED.

    COORDINATE SIZE AND LOCATION OF PULL BOXES IN THE FIELD AND PER

    CODE.

    PROVIDE NEW 3-POLE CIRCUIT BREAKER IN EXISTING SWITCHBOARD MSB1

    FOR ATS NORMAL POWER. SEE RISER DIAGRAM FOR MORE INFORMATION.

    EXISTING FIRE ALARM CONTROL PANEL FED FROM MSB1. INTERCEPT

    BRANCH CIRCUIT AND PROVIDE NEW CIRCUITRY TO POWER FROM EPP.

    REMOVE EXISTING ABANDONED CONDUIT, WIRING AND BOXES AND MAKE

    SAFE EXISTING SWITCHBOARD ENCLOSURE.

    EXISTING BUILDING CONTROLS (EMS) PANELS FED FROM PBB PANELBOARD..

    INTERCEPT BRANCH CIRCUIT AND PROVIDE NEW CIRCUITRY TO POWER

    FROM EPP. REMOVE EXISTING ABANDONED CONDUIT, WIRING AND BOXES

    AND MAKE SAFE EXISTING PANELBOARD ENCLOSURE.

    EXISTING BUILDING CONTROL (EMS) WORKSTATION. PROVIDE NEW

    SURFACE MOUNTED OUTLET AS INDICATED.

    BI-N-352

    128 Garden Street, Farmington, CT 06032

    1/4" = 1'-0"

    BI-N-352

    MEP

    BTS

    ELECTRICAL FIRST FLOOR SERVER/TELECOM POWER PLAN

    SCALE: 1/4"=1'-0"

    20 2' 5' 8' 10'

    ELECTRICAL FIRST FLOOR MAIN ELECTRICAL POWER PLAN

    SCALE: 1/4"=1'-0"

    10 2' 5' 8' 10'

    8/24/20

  • URP, 16

    EXISTING CP2 PANEL

    EXISTING PP2 PANEL

    CONDUIT UP

    TO 2ND FLR

    NEW 2-1/2" CONDUIT

    ABOVE CEILING FROM

    MSB1 TO NEW ATS

    PROVIDE POWER FROM CU-1

    ON ROOF. SEE DETAIL FOR

    MORE INFORMATION

    NEW PULL BOX

    MOUNTED TO STEEL

    NOTE: FIRESTOP ALL PENTRATIONS

    THRU RATED ASSEMBLIES

    EXISTING MSB1

    NEW 2-1/2"" CONDUIT

    ABOVE CEILING TO NEW

    ATS

    EXISTING CONTROL PANEL

    EXISTING PBB PANEL

    EXISTING CONTROL PANEL

    BUILDING

    CONTROLS

    WKST

    NOTE: FIRESTOP ALL PENTRATIONS

    THRU RATED ASSEMBLIES

    9 10

    K

    J.7

    J

    H.3

    H

    G

    H.3

    H

    G

    KEY NOTES:

    REFEED EXISTING LIGHT FIXTURE FROM EPP. REWIRE EXISTING LIGHTING

    CIRCUIT TO MAINTAIN CIRCUIT CONTINUITY AND OPERATION OF EXISTING

    LIGHTING CIRCUIT.

    FIXTURE IS POWERED BY EXISTING PANEL PP2, CKT #2. INTERCEPT CIRCUIT

    AND PROVIDE NEW CIRCUITRY TO POWER FROM EPP. REMOVE EXISTING

    ABANDONED CONDUIT, WIRING AND BOXES AND MAKE SAFE EXISTING

    PANELBOARD.ENCLOSURE.

    PROVIDE NEW SURFACE MOUNTED RECEPTACLE FOR OWNER'S EQUIPMENT.

    COORDINATE LOCATION IN FIELD WITH OWNER.

    PROVIDE POWER FOR EXISTING SECURITY EQUIPMENT. EXISTING SECURITY

    EQUIPMENT IS POWERED VIA SURFACE MOUNTED WIREWAY. PROVIDE

    POWER TO WIREWAY VIA HARDWIRE CONNECTION FROM NEW JUNCTION

    BOX AND DEDICATED BRANCH CIRCUIT FROM PANEL INDICATED.

    COORDINATE SIZE AND LOCATION OF PULL BOXES IN THE FIELD AND PER

    CODE.

    PROVIDE NEW 3-POLE CIRCUIT BREAKER IN EXISTING SWITCHBOARD MSB1

    FOR ATS NORMAL POWER. SEE RISER DIAGRAM FOR MORE INFORMATION.

    EXISTING FIRE ALARM CONTROL PANEL FED FROM MSB1. INTERCEPT

    BRANCH CIRCUIT AND PROVIDE NEW CIRCUITRY TO POWER FROM EPP.

    REMOVE EXISTING ABANDONED CONDUIT, WIRING AND BOXES AND MAKE

    SAFE EXISTING SWITCHBOARD ENCLOSURE.

    EXISTING BUILDING CONTROLS (EMS) PANELS FED FROM PBB PANELBOARD..

    INTERCEPT BRANCH CIRCUIT AND PROVIDE NEW CIRCUITRY TO POWER

    FROM EPP. REMOVE EXISTING ABANDONED CONDUIT, WIRING AND BOXES

    AND MAKE SAFE EXISTING PANELBOARD ENCLOSURE.

    EXISTING BUILDING CONTROL (EMS) WORKSTATION. PROVIDE NEW

    SURFACE MOUNTED OUTLET AS INDICATED.

    BI-N-352

    128 Garden Street, Farmington, CT 06032

    1/4" = 1'-0"

    BI-N-352

    MEP

    BTS

    ELECTRICAL FIRST FLOOR SERVER/TELECOM POWER PLAN

    SCALE: 1/4"=1'-0"

    20 2' 5' 8' 10'

    ELECTRICAL FIRST FLOOR MAIN ELECTRICAL POWER PLAN

    SCALE: 1/4"=1'-0"

    10 2' 5' 8' 10'

    8/24/20

  • ROOF

    NOTES:

    1. EXISTING INFORMATION SHOWN IS BASED ON CURSORY FIELD

    SURVEY AND IS PROVIDED HERE FOR CONTRACTORS

    REFERENCE ONLY. CONTRACTOR SHALL FIELD VERIFY

    EXISTING CONDITIONS PRIOR TO BID AND COMMENCEMENT OF

    WORK.

    2. COORDINATE WITH OWNER'S REPRESENTATIVE FOR

    SCHEDULE CUT-OVERS, TIE-INS, ENERGIZING EQUIPMENT AND

    TEMPORARY POWER INTERRUPTIONS THAT ARE REQUIRED

    FOR THESE TASKS. SUBMIT METHOD OF PROCEDURES (mop)

    FOR OWNER AND ENGINEERS' REVIEW AND APPROVAL (3)

    WORKING DAYS PRIOR TO TASK SCHEDULES.

    3. CONTRACTOR SHALL MAINTAIN CIRCUIT CONTINUITY TO ALL

    EXISTING DEVICES AND EQUIPMENT TO REMAIN.

    2ND FLOOR

    EPP UPS URP PP3 CP3

    PP2 CP2 ATSEX

    SWBD

    MSB1 MSB2

    AC

    CHILLER

    MAIN ELECTRICAL

    ROOM

    EQUIPMENT

    YARD

    TX

    1ST FLOOR

    EX

    GENERATOR

    ATS

    NEW

    50kW GENERATOR

    NORTH LAWN

    DSET

    EQUIPMENT

    A221.1

    SERVER/ELEC

    TELECOM

    A214

    SERVER/

    TELECOM

    225A

    KEY NOTES:

    PROVIDE 400AF/350AT, 3P, 208V CIRCUIT BREAKER. CIRCUIT

    BREAKER SHALL BE RATED FOR 42KA AT 208V.

    ROUTE CONTROL WIRE IN SEPARATE CONDUITS FROM POWER

    WIRE. REFER TO SECTIONS AND DETAILS.

    SEE DUCTBANK SECTION ON EP3.01 AND DETAILS FOR MORE

    INFORMATION.

    EQUIPMENT FURNISHED BY OWNER AND INSTALLED BY

    CONTRACTOR. REFER TO SPECIFICATIONS FOR FURTHER

    INFORMATION.

    200A 200A

    MCB

    20KW 100A

    MCB

    BYPASS

    (1 SET) 3-300KCMIL,

    1-300KCMIL N, 1#2 GND, 4"C

    3#1+1#1 N+1#8

    GND, 1-1/2"C

    3#4/0 +1#4/0 N+ 1#4

    GND, 2 1/2"C

    NEW

    GENERATOR

    CONNECTION BOX

    3#4/0 +1#4/0 N+ 1#4

    GND, 2 1/2"C

    NEW SUB

    BASE TANK

    GENERATOR

    COMMUNICATION

    AND MONIOTRING

    S/T

    LOAD BANK SHUT TRIP

    SIGNAL, (4) #12 AWG.,

    START SIGNAL TO

    GENERATOR CONNECTION

    BOX (4) #12 AWG., AND

    START SIGNAL TO

    GENERATOR (4) #12 AWG.

    N.C.

    N.O. N.O.

    GENERATOR AUXILLARY POWER.

    COORDINATE WITH GENERATOR

    MANUFACTURER

    200A

    3#4 +1#4 N+ 1#8

    GND, 1 1/4"C

    TO ANNUNCIATOR AND

    EMS

    BI-N-352

    128 Garden Street, Farmington, CT 06032

    BI-N-352

    MEP

    BTS

    ELECTRICAL POWER DIAGRAM

    SCALE: N.T.S.

    1

    8/24/20

    AS SHOWN

  • Pre-Bid Virtual Walk Thru

    Q&A

  • I

    I J____:_.,; I

    I

  • Present Attendee CompanyDaniel Wagoner DASDavid Arai Maier Design GroupErnest Domingue FEAJohn Lane FEARobert Cody DESPPSean Carlin Carlin ConstructionPeter Cappellino J.A. RosaRichard Jagoe Tomlinson Hawley Patterson (THP)Jonathan Sygrove Sarazin General ContractorsRoel Legaspi Nosal BuildersBrian Burdo Zeiss Construction GroupPatrick Monko LaRosa Building GroupMike M.J. Losito Electrical ContractorsJoe DePaola Pelletier ConstructionMike Daigle Diversity Construction GroupJohn Lipari Construx Co.Mike Passeri N&S Electrical

    BI-N-352 DSET Training AreaMDG Project No. 2019.083Meeting Minutes for October 14, 2020Virtual Pre-Bid Walk Through/Presentation

    Attendance Sheet Only, Meeting Minutes begin on next sheet…

    34 Sequassen Street, Hartford, CT 06106 / Tel: 860.293.0093 / Fax: 860.293.0094

  • BI-N-352 DSET Training AreaMDG Project No. 2019.083Meeting Minutes for October 14, 2020Virtual Pre-Bid Walk Through/Presentation

    New Business:Item No. Action By Item

    001 RECORD GENERAL10/14/2020 The Virtual Pre-bid Walk Through began at approximately 9:05 AM. Dan W made

    introductions to the project team and reviewed the Pre-Bid Meeting agenda with all attendees.The DAS Representative is Daniel WagonerThe Architect is David Arai, Maier Design GroupThe MEP/FP Engineer is Brian Soucy, Facilities Engineering AssociatesThe Agency Representatives are Robert Cody (DESPP) and William Youell (DSET)

    002 RECORD BID DUE DATE AND RFI'S10/14/2020 Bid Due Date is November 18, 2020

    RFI Deadline is November 4, 2020. Any and all RFI's, including any questions asked by bidders during the walk-through, shall be submitted in writing to the Architect and the DAS Representative.

    012-03 RECORD LIQUIDATED DAMAGES10/14/2020 Liquidated Damages shall be as described in General Conditions Section 00.73.13

    Articles 1 and 8 and 00.41.00 Bid Proposal Form.

    012-03 RECORD ACCESS TO SITE10/14/2020 No site visits will be allowed to the project site during bidding due to COVID-19

    precautions. The awarded GC will be granted limited card access to the building with restrictions timed to allowable work hours.

    012-03 RECORD SECURITY CLEARANCE10/14/2020 Division 50.00.00 contains specific background check and security clearance

    information for the project. ALL people on-site need to comply with these regulations and the GC will need to carry the costs for background checks and security clearances in their bid.

    012-03 RECORD SUMMARY OF WORK10/14/2020 David A revieweed the summary of work and presented a series of floor plans and

    photographs of the existing conditions to the bidders. The presentation will be provided to all attendees as a PDF.

    34 Sequassen Street, Hartford, CT 06106 / Tel: 860.293.0093 / Fax: 860.293.0094

  • 012-03 RECORD QUESTIONS & ANSWERS10/14/2020 There were a few questions posed but bidders are reminded that no responses are

    officical unless submitted in writing and that any questions posed during the meeting must be resubmitted to DAS and the Architect for an official response.

    012-03 RECORD CLOSING10/14/2020 The Virtual Pre-bid Walk Through ended at approximately 9:45.

    End of Pre-Bid MinutesThese minutes are respectfully submitted as the author’s best interpretation of the items and events discussed. Discrepancies, errors, omissions and misinterpretations should be brought to the attention of Maier Design Group so that these minutes may be amended for the permanent record.

    34 Sequassen Street, Hartford, CT 06106 / Tel: 860.293.0093 / Fax: 860.293.0094

    6030 Bid Addendum 1Item 1:Item 2:

    6020 Bid Phase Meeting Attendance LogBI-N-352 PRE-BID PRESENTATIONEXISTING PHOTO KEY.pdfSheetsA1.02 - SECOND FLOOR CONSTRUCTION PLANA1.03 - ROOF PLANA2.02 - SECOND FLOOR REFLECTED CEILING PLANA4.01 - SECTIONSA5.01 - INTERIOR ELEVATIONSA7.01 - SCHEDULESA8.01 - WALL TYPES AND DETAILSAD1.02 - SECOND FLOOR DEMOLITION PLANAD2.02 - SECOND FLOOR REFLECTED CEILING DEMOLITION PLANG1 - CODE REVIEWG2 - EGRESS PLAN AND INFORMATIONI1.02 - SECOND FLOOR FINISH PLANI1.03 - SECOND FLOOR FURNITURE PLANT1 - TITLE