Upload
hoanganh
View
231
Download
0
Embed Size (px)
Citation preview
Member Country Report ofMember Country Report ofMember Country Report of Member Country Report of Vietnam for Oil and gas activitiesVietnam for Oil and gas activitiesgg
(2008 year)(2008 year)
October 2009
11
VIETNAM OIL GAS GROUPVIETNAM OIL GAS GROUP(PETROVIETNAM)(PETROVIETNAM)
Head office:
18, Lang Ha Str.,
Ba Dinh District
Hanoi, Vietnam
PhPhone:
84-4-825 2526
Fax:Fax:
84-4-826 5942
Web:
22
Web:
www.pvn.vn
PETROVIETNAM ACTIVITIESPETROVIETNAM ACTIVITIES•• Upstream (E&P)Upstream (E&P)•• Midstream (gas, power)Midstream (gas, power)Midstream (gas, power)Midstream (gas, power)•• Downstream (refinery, petrochemical)Downstream (refinery, petrochemical)•• Fiscal regimesFiscal regimes•• Investment campaignInvestment campaignp gp g
33
UPSTREAM ACTIVITIESUPSTREAM ACTIVITIES(EXPLORATION & PRODUCTION)(EXPLORATION & PRODUCTION)(EXPLORATION & PRODUCTION)(EXPLORATION & PRODUCTION)
44
ExplorationExplorationExplorationExploration
•Until the end of 2008 PVN has signed 64 petroleum contracts•Until the end of 2008, PVN has signed 64 petroleum contracts with 41 still in forces ( in form of Petroleum Sharing Contracts, Business Co-operation Contracts, Joint Operation Contracts and
)Joint Venture).•~443,000 km 2D seismic (38,640 km in 2008) and ~49,000 km2
of 3D acquired (10,890 km2 in 2008).of 3D acquired (10,890 km in 2008).•54 well drilled in 2008 (13 exploration, 14 appraisal and 27 production).T t l h d b f Vi t i d 50 illi t•Total hydrocarbon reserves of Vietnam increased 50 million tons
of oil equivalent.•One licensing round (NCS bid) for 7 blocks: 03, 04-1, 04-2, 19, g ( ) , , , ,20, 21, 22-03 successfully opened by Petrovietnam and more than 20 international oil and gas companies participating in this licensing round
77
licensing round. • 04 new petroleum contracts were signed after that .
OPEN BLOCKS IN NAM CON SONOPEN BLOCKS IN NAM CON SONOPEN BLOCKS IN NAM CON SONOPEN BLOCKS IN NAM CON SON
88
FIELDS HAD PUT INTO PRODUCTION IN 2008FIELDS HAD PUT INTO PRODUCTION IN 2008
10
TRUNG QUỐC
105°E
110°E
LÀO
N
102
106
20°N
Tien Hai
HANOI BASIN
HÀ NỘI
101
-Su Tu Vang:-01 FSO (for Su Tu complex)-01 CPP-Su Tu Vang-Rang Dong pipeline:45km
103
107
108109
104
105
112
114 11
O
THÁI
Hainan Isl.
110
113
111
g g g-Phuong Dong:
-01 WHP-Phuong Dong-Rang Dong pipeline:17km
-Ca Ngu Vang:4 5
116
118-2
119-2
117
118-1119-1
VIỆT
120121
15°N
THÁI LAN
12
Block 15-1: SU TU VANG
-01 WHP-Ca Ngu Vang-Bach Ho pipeline:34km
-Song Doc:-01 WHP
CAM PU CHIA
TNAM
123124125
126127
12815
TP HO CHI MINH
001/9
2
Block 15-2: PHUONG ĐONG
Block 09-2: CA 60000
70000
-01 FPSO
8129
130131132133134 WAB-
21
04-2
03
04-1
04-315-
206 06-
1
15-2
15-115-
3 09-2
16-116-2
09-1
09-3
10
11-1
171819
20
12(W)
11-2
252627
313233
3738
4142434445
52/97
48/95 (B)
10°N
Rong
Bach Ho
Lan DoLan
Dai Hung05-
1A05-3
Joint Historic Wate
rs (1982)
010
202/97
7
46/02
Block 09 2: CA NGU VANG
Block 46/02: SONG DOC10000
20000
30000
40000
50000
Oil
rate
(bbl
/d)
99
135
1
07
08
12(E)
1314
21222324
29
28
30
343536
3940
Tay
0 100K
M
46-
Cai Nuoc
Block 46/02: SONG DOC, NAM CAN, NGOC HIỂN0
10000
Sư Tử Vàng Phương Đông Cá Ngừ Vàng Sông Đốc
Field
FIELDS TO BE PRODUCED IN 2009FIELDS TO BE PRODUCED IN 2009FIELDS TO BE PRODUCED IN 2009FIELDS TO BE PRODUCED IN 2009
105°E
110°E
NHÀ
•• Pearl:Pearl:–– 01 FPSO (shared with fields in 01 FPSO (shared with fields in
block 01&02)block 01&02)–– 01 WHP01 WHP
103
107
10
TRUNG QUỐC
E E
Laos
102
106
20°N
Tien Hai
HANOI BASIN
Hainan
HÀ NỘI
101
–– 01 WHP01 WHP•• NamRongNamRong--ĐoiMoi:ĐoiMoi:
–– 02 WHP02 WHP–– Pipeline to Rong fieldPipeline to Rong field
8109
104
105
112
114 11
5116
117
THÁI LAN
Isl.
110
113
111
6118-2
119-2
7118-1119-1
CAM PU
VIỆTN
120121
123
15°N
LAN
122
N Rồ Đồi CHIANAM
3124125
126127
128129
15-2
15-115-
3 09-16-10°N Bach
Joint Historic Water
TP HO CHI MINH
010
202/97
01/97
Block 01 & 02: PEARLNam Rồng-Đồi
Mồi
Pearl
4000
5000
6000
7000
bbl/d
)
130131132133134
135
WAB-21
04-2
03
04-1
04-315-
206 06-
1
3 09-2
16116-2
09-1
09-3
10
11-1
171819
20
12(W)
11-2
12(E)
21
252627
28
313233343
37383940
4142434445
52/97
48/95 (B)
NRong
Ho
Lan DoLan
Tay
Dai Hung05-
1A05-3
Historic Waters (1982)
2 7
46/02
46Cai
Block 09-3: NAM RONG-ĐOI MOI
1000
2000
3000
Oil
rate
(
1010
07
08
1314
222324
29
30
3536
0
0 100K
M
- Nuoc0
Field
ProductionProduction•• 9 oil and gas producing fields9 oil and gas producing fields•• Crude Oil: 15 MillionTon (~ 350.000 bbl/day)Crude Oil: 15 MillionTon (~ 350.000 bbl/day)•• Natural Gas: 7 5 Billion Cubic MetersNatural Gas: 7 5 Billion Cubic Meters•• Natural Gas: ~ 7.5 Billion Cubic MetersNatural Gas: ~ 7.5 Billion Cubic Meters
1111
Gas Pipeline SystemsGas Pipeline SystemsGas Pipeline SystemsGas Pipeline Systems
Bach HoBach Ho
Nam Con SonNam Con SonSS
1414
South West South West GasGas
Gas Pipeline SystemsGas Pipeline Systems
Under operation:Under operation:
Gas Pipeline SystemsGas Pipeline Systems
pp•• Rang Dong Rang Dong –– Bach Ho Bach Ho –– Phu My Gas Pipeline Phu My Gas Pipeline
System (capacity: 2 billion m3/year).System (capacity: 2 billion m3/year).System (capacity: 2 billion m3/year).System (capacity: 2 billion m3/year).•• Nam Con Son Gas Pipeline (capacity: 7 billion Nam Con Son Gas Pipeline (capacity: 7 billion
m3/year)m3/year)m3/year).m3/year).•• PM3PM3--CAA Gas Pipeline (capacity: 2 billion CAA Gas Pipeline (capacity: 2 billion
m3/year)m3/year)m3/year).m3/year).In preparation stage:In preparation stage:•• Block B & 52B Block B & 52B –– O Mon Gas Pipeline O Mon Gas Pipeline
(capacity: 6 billion m3/year).(capacity: 6 billion m3/year).
1515•• NCS (Block 05.2, 05.3): second pipeline.NCS (Block 05.2, 05.3): second pipeline.
G Fi d P P j tG Fi d P P j t
•• B Ri P St ti 350 MW (EVN)B Ri P St ti 350 MW (EVN)
Gas Fired Power ProjectsGas Fired Power Projects
•• Ba Ria Power Station: 350 MW (EVN).Ba Ria Power Station: 350 MW (EVN).•• Phu My Power Plants: 3500 MW (EVN, BP).Phu My Power Plants: 3500 MW (EVN, BP).•• Ca Mau 1 Power Station: 750 MW (PVN).Ca Mau 1 Power Station: 750 MW (PVN).•• Ca Mau 2 Power Station: 750 MW (PVN).Ca Mau 2 Power Station: 750 MW (PVN).Ca Mau 2 Power Station: 750 MW (PVN).Ca Mau 2 Power Station: 750 MW (PVN).•• Nhon Trach 1 Power Station: 450 MW (PVN).Nhon Trach 1 Power Station: 450 MW (PVN).•• Nhon T ach 2 Po e Station 450 MW (JSC)Nhon T ach 2 Po e Station 450 MW (JSC)•• Nhon Trach 2 Power Station: 450 MW (JSC).Nhon Trach 2 Power Station: 450 MW (JSC).•• Hiep Phuoc Power Plant: 375 MW (BOT).Hiep Phuoc Power Plant: 375 MW (BOT).
Gas fired plants supply 40% total electricity of VietnamGas fired plants supply 40% total electricity of Vietnam
1616
p pp y yp pp y y
DOWNSTREAM ACTIVITIESDOWNSTREAM ACTIVITIESDOWNSTREAM ACTIVITIESDOWNSTREAM ACTIVITIES(REFINING/PETROCHEMICAL)(REFINING/PETROCHEMICAL)( / )( / )
1717
REFINERIES PROJECTSREFINERIES PROJECTSREFINERIES PROJECTSREFINERIES PROJECTS
•• Dung Quat Refinery (Ref. No.1), under active Dung Quat Refinery (Ref. No.1), under active implementation, estimated put into operation implementation, estimated put into operation in the end of 2009 (PVN 100%, EPC, in the end of 2009 (PVN 100%, EPC, Contractor: Technip).Contractor: Technip).p)p)
•• Nghi Son Refinery/Petrochemical Complex Nghi Son Refinery/Petrochemical Complex (Ref No 2): J/V signed 07 Apr 2008 (PVN(Ref No 2): J/V signed 07 Apr 2008 (PVN(Ref. No. 2): J/V signed 07 Apr 2008 (PVN, (Ref. No. 2): J/V signed 07 Apr 2008 (PVN, KPI, Idemitsu Kosan, Mitsui Chemical)KPI, Idemitsu Kosan, Mitsui Chemical)S th R fi (R f N 3) U d t dS th R fi (R f N 3) U d t d•• Southern Refinery (Ref. No. 3): Under study Southern Refinery (Ref. No. 3): Under study stage. (Joint venture will be selected)stage. (Joint venture will be selected)
1818
Refineries and Petrochemical Refineries and Petrochemical Projects LocationProjects Location
Refinery No. 2 Refinery No. 2
( 2010( 2010--2015)2015)
jj
(( ))
Refinery No. 1 Refinery No. 1
(2009)(2009)
Southern Southern Refinery/Chemical Refinery/Chemical
ComplexComplexComplexComplex
(2011(2011--2015)2015)
Phu My FertilizerPhu My Fertilizer
Cama Fertili erCama Fertili er
Phu My FertilizerPhu My Fertilizer
( 2004)( 2004)
Camau FertilizerCamau Fertilizer
( 2012)( 2012)
1919
PETROCHEMICAL PROJECTS PETROCHEMICAL PROJECTS Fertilizer PlantsFertilizer Plants
•• Phu My Fertilizer Plant :Phu My Fertilizer Plant :Phu My Fertilizer Plant Phu My Fertilizer Plant :Phu My Fertilizer Plant :--Capacity: 740.000 tons of Capacity: 740.000 tons of
Urea/year; (30% Domestic Urea/year; (30% Domestic Demand)Demand)
Phu My Fertilizer Plant
Demand).Demand).--Operation since September Operation since September
2004.2004.•• Camau Fertilizer Plant :Camau Fertilizer Plant :
--Capacity 800,000 tons of Capacity 800,000 tons of Urea/yearUrea/yearUrea/year.Urea/year.--EPC contract signed 06 May EPC contract signed 06 May 2008.2008.
•• Southern Petrochemical Complex Southern Petrochemical Complex (PVN, Vinachem,TPC, VSCG (PVN, Vinachem,TPC, VSCG Chem): J/V signed 13 March 2008Chem): J/V signed 13 March 2008
2020
Chem): J/V signed 13 March 2008 Chem): J/V signed 13 March 2008 (operation expected 2011).(operation expected 2011).
PETROVIETNAM BUSINESS HIGHLIGHTSPETROVIETNAM BUSINESS HIGHLIGHTSNoNo Norm of ItemNorm of Item UnitUnit 20072007 20082008
11 Crude oil productionCrude oil production Million TonMillion Ton 15.9115.91 151515.9115.91 151522 Gas productionGas production BCMBCM 6.866.86 7.57.533 Urea FertilizerUrea Fertilizer TonTon 767,000767,000 740,000740,00044 LPGLPG TonTon 308,000308,000 474,000474,00055 CondensateCondensate TonTon 80,00080,000 72,00072,00066 RevenueRevenue Billion VNDBillion VND 213,400213,400 280,050280,0506A6A -- Foreign CurrencyForeign Currency Billion USDBillion USD 8.88.8 11.1511.1566 VNDVND Billi VNDBilli VND6B6B -- VNDVND Billion VNDBillion VND 72,59772,597 95,97595,97577 Contribution to state Contribution to state
budgetbudgetBillion USDBillion USD ~5.4~5.4 ~7.250~7.250
2121
Fiscal regimesFiscal regimesFiscal regimesFiscal regimes
•• The Government of Vietnam and Petrovietnam are The Government of Vietnam and Petrovietnam are continuously improving the petroleum contract’s terms continuously improving the petroleum contract’s terms and incentive conditions to attract more investment.and incentive conditions to attract more investment.
•• Forms of Cooperation: PSC, JOC, BCC,JV…Forms of Cooperation: PSC, JOC, BCC,JV…Forms of Cooperation: PSC, JOC, BCC,JV…Forms of Cooperation: PSC, JOC, BCC,JV…•• PSC (Production Sharing Contract) selected as the PSC (Production Sharing Contract) selected as the
basic frame for petroleum contract basic frame for petroleum contract -- FlexibilityFlexibility-- FlexibilityFlexibility-- CompetitivenessCompetitiveness
•• JOC (Joint Operating Company) is an extended type ofJOC (Joint Operating Company) is an extended type ofa PSC, applied for most prospective blocks/areasa PSC, applied for most prospective blocks/areas
-- JOC will be the OperatorJOC will be the Operator-- All parties shall participate in operatorshipAll parties shall participate in operatorshipAll parties shall participate in operatorshipAll parties shall participate in operatorship
•• Forms of E&P project bidding : International Forms of E&P project bidding : International Competitive Bidding & Direct Negotiation.Competitive Bidding & Direct Negotiation.
2222
LEGAL FRAMEWORK FOR PETROLEUM ACTIVITIES IN VIETNAMLEGAL FRAMEWORK FOR PETROLEUM ACTIVITIES IN VIETNAM
•• Investment Law in Vietnam (2006).Investment Law in Vietnam (2006).•• PETROLEUM LAW (1993, amended 2000).PETROLEUM LAW (1993, amended 2000).•• Decree 48/2000/NDDecree 48/2000/ND--CP Guidance of Petroleum Law.CP Guidance of Petroleum Law.•• Decree 34/2001/NDDecree 34/2001/ND--CP Upstreams Project Biding Regulation.CP Upstreams Project Biding Regulation.•• Law on Corporate Income Tax.Law on Corporate Income Tax.•• Law on Valued Added Tax.Law on Valued Added Tax.Law on Valued Added Tax.Law on Valued Added Tax.•• Law on Import and Export Tax.Law on Import and Export Tax.•• Law on Environmental Protection.Law on Environmental Protection.•• Customs Formalities for Import and Export CommoditiesCustoms Formalities for Import and Export Commodities•• Customs Formalities for Import and Export Commodities.Customs Formalities for Import and Export Commodities.•• Regulations on Foreign Exchange Management.Regulations on Foreign Exchange Management.•• Law on Insurance.Law on Insurance.•• Labour LawLabour Law•• Labour Law.Labour Law.•• Other Laws and Regulations relating to InterOther Laws and Regulations relating to Inter--Government Government
Agreements on Tax.Agreements on Tax.
2323
Forms of E&P project biddingForms of E&P project biddingForms of E&P project biddingForms of E&P project biddingCompetitive Bidding:Competitive Bidding:p gp g
In compliance with PV exploration plan.In compliance with PV exploration plan.Time frame: Set by PetroVietnamTime frame: Set by PetroVietnam
Licensing Round:Licensing Round:Licensing Round:Licensing Round:•• Widely announcedWidely announced•• Usually for large area(s) covering many blocksUsually for large area(s) covering many blocks
Limited Bidding:Limited Bidding:•• Invitation sent to limited number of qualified Invitation sent to limited number of qualified
companiescompaniescompaniescompanies•• Usually for a single block/acreage.Usually for a single block/acreage.
Direct NegotiationDirect Negotiation::In special case, wIn special case, when open block is not yet included in competitive hen open block is not yet included in competitive bidding plan and there is only one company interested in.bidding plan and there is only one company interested in.Time frame: any timeTime frame: any time
2424