7
851 S.W. Sixth Avenue, Suite 1100 Steve Crow 503-222-5161 Portland, Oregon 97204-1348 Executive Director 800-452-5161 www.nwcouncil.org Fax: 503-820-2370 Bruce A. Measure Chair Montana Dick Wallace Vice-Chair Washington Rhonda Whiting Montana W. Bill Booth Idaho James A. Yost Idaho Tom Karier Washington Melinda S. Eden Oregon Joan M. Dukes Oregon August 4, 2010 MEMORANDUM TO: Power Committee FROM: Jeff King SUBJECT: Briefing - Northwest Wind Integration Forum Technical Work Group meeting of July 29/30 A meeting of the Technical Work Group of the Northwest Wind Integration Forum was held on July 29 and 30 in Portland. The purpose was to achieve a better understanding of the practices used to integrate wind and solar power in Denmark, Germany, and Spain - power systems with large and increasing amounts of variable renewables capacity. Five experts with substantial knowledge of Danish, German and Spanish system operations discussed the role of wind in these power systems, institutions and operating practices employed to integrate wind power, and emerging issues as the penetration of variable renewables continues to increase. Unlike the Northwest, these systems are fully restructured, and operated by large, independent, for-profit transmission system operators (TSOs, roughly equivalent to ISOs). However, some of the techniques and operating practices employed could help resolve the challenges of integrating increasing amounts of wind power in the Pacific Northwest. Factors enabling successful integration of intermittent wind and solar capacity in these systems include: Deep, smoothly-functioning, liquid and transparent capacity and energy markets A high degree of geographic diversity of wind and solar installations, substantially dampening generation volatility. Extensive transmission networks with limited congestion and generally strong interties to adjacent TSOs Shared reserves and common business practices among TSOs The workshop agenda and presentations are available on the Council’s website at http://www.nwcouncil.org/energy/Wind/meetings/2010/07/Default.htm . Staff is preparing a summary of the meeting and key observations of relevance to the Northwest. The summary will be supplied to the Committee prior to the webinar. In the webinar, staff will review the summary with a focus on issues of relevance to the Northwest.

MEMORANDUM TO: FROM · W. Bill Booth Idaho James A. Yost Idaho Tom Karier Washington Melinda S. Eden Oregon Joan M. Dukes Oregon August 4, 2010 MEMORANDUM TO: Power Committee FROM:

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: MEMORANDUM TO: FROM · W. Bill Booth Idaho James A. Yost Idaho Tom Karier Washington Melinda S. Eden Oregon Joan M. Dukes Oregon August 4, 2010 MEMORANDUM TO: Power Committee FROM:

851 S.W. Sixth Avenue, Suite 1100 Steve Crow 503-222-5161 Portland, Oregon 97204-1348 Executive Director 800-452-5161 www.nwcouncil.org Fax: 503-820-2370

Bruce A. Measure Chair

Montana

Dick Wallace Vice-Chair Washington

Rhonda Whiting Montana

W. Bill Booth

Idaho

James A. Yost Idaho

Tom Karier Washington

Melinda S. Eden

Oregon

Joan M. Dukes Oregon

August 4, 2010

MEMORANDUM TO: Power Committee FROM: Jeff King SUBJECT: Briefing - Northwest Wind Integration Forum Technical Work Group meeting of July

29/30 A meeting of the Technical Work Group of the Northwest Wind Integration Forum was held on July 29 and 30 in Portland. The purpose was to achieve a better understanding of the practices used to integrate wind and solar power in Denmark, Germany, and Spain - power systems with large and increasing amounts of variable renewables capacity. Five experts with substantial knowledge of Danish, German and Spanish system operations discussed the role of wind in these power systems, institutions and operating practices employed to integrate wind power, and emerging issues as the penetration of variable renewables continues to increase. Unlike the Northwest, these systems are fully restructured, and operated by large, independent, for-profit transmission system operators (TSOs, roughly equivalent to ISOs). However, some of the techniques and operating practices employed could help resolve the challenges of integrating increasing amounts of wind power in the Pacific Northwest. Factors enabling successful integration of intermittent wind and solar capacity in these systems include:

• Deep, smoothly-functioning, liquid and transparent capacity and energy markets

• A high degree of geographic diversity of wind and solar installations, substantially dampening generation volatility.

• Extensive transmission networks with limited congestion and generally strong interties to adjacent TSOs

• Shared reserves and common business practices among TSOs The workshop agenda and presentations are available on the Council’s website at http://www.nwcouncil.org/energy/Wind/meetings/2010/07/Default.htm. Staff is preparing a summary of the meeting and key observations of relevance to the Northwest. The summary will be supplied to the Committee prior to the webinar. In the webinar, staff will review the summary with a focus on issues of relevance to the Northwest.

Page 2: MEMORANDUM TO: FROM · W. Bill Booth Idaho James A. Yost Idaho Tom Karier Washington Melinda S. Eden Oregon Joan M. Dukes Oregon August 4, 2010 MEMORANDUM TO: Power Committee FROM:

Northwest Power & Conservation Council Power Committee

Summary: Wind Integration Forum Technical Work Group Meeting

Large-scale Wind & Solar Integration Germany, Denmark, Spain

Jeff KingJeff KingAugust 12, 2010

NorthwestPower andConservation

Council

NorthwestPower andConservation

Council8/12/2010 1

European Interconnected System

LV

SN EERUS

UCTE Region*

Synchronous operationwith UCTE Region

Energinet/DK

50Hertz Transmission

PL

GB

IELT

BYRUS

DKDKAsynchronous

DC Link

NL

Amprion

BEPL

CZ

SK

UADE

L

MD

UA

NL

Red Electrica FR CH

AT

HR

RSBA

RO

MD

HU

SI

de Espana

ESPT IT

RS

MK

BA

AL

GR

BGME

GR

DZ

TR

NorthwestPower andConservation

Council

NorthwestPower andConservation

Council8/12/2010 2

DZ TNMA

*ENTSO-E RG Continental Europe

Page 3: MEMORANDUM TO: FROM · W. Bill Booth Idaho James A. Yost Idaho Tom Karier Washington Melinda S. Eden Oregon Joan M. Dukes Oregon August 4, 2010 MEMORANDUM TO: Power Committee FROM:

Each TSO has high % of wind powerEach TSO has high % of wind power

100

8090

100y

(G

W)

WindOth

506070

Ca

pa

city Other

203040

tall

ed C

010

EE n tz et BA W

Inst

REE

Ampri

on

50H

ertz

Energi

net

BPA BA

PNW

NorthwestPower andConservation

Council

NorthwestPower andConservation

Council8/12/2010 3

Features facilitating integration of variable g gresources• Robust day-ahead and intraday power exchange marketsRobust day ahead and intraday power exchange markets

for energy and capacity• Strong interconnections and common business practices g p

among TSOs• Extensive transmission networks + development policy =

hi di ib i f i d d lgeographic distribution of wind and solar• Sophisticated wind forecasting capability

NorthwestPower andConservation

Council

NorthwestPower andConservation

Council8/12/2010 4

Page 4: MEMORANDUM TO: FROM · W. Bill Booth Idaho James A. Yost Idaho Tom Karier Washington Melinda S. Eden Oregon Joan M. Dukes Oregon August 4, 2010 MEMORANDUM TO: Power Committee FROM:

Power system structure centers on the ytransmission system operator

Generation Owners

Other TSOs

Transmission System

Energy & Capacity Exchanges

Transmission System Operator

Distribution Utilities

End-Use Customers

Capacity or energy

FundsDemand response

NorthwestPower andConservation

Council

NorthwestPower andConservation

Council8/12/2010 5

European wind capacity is highly capacity is highly distributed ...

NorthwestPower andConservation

Council

NorthwestPower andConservation

Council8/12/2010 6

Page 5: MEMORANDUM TO: FROM · W. Bill Booth Idaho James A. Yost Idaho Tom Karier Washington Melinda S. Eden Oregon Joan M. Dukes Oregon August 4, 2010 MEMORANDUM TO: Power Committee FROM:

compared to the Northwest... compared to the Northwest

NorthwestPower andConservation

Council

NorthwestPower andConservation

Council8/12/2010 7

Geographic diversity > Moderate ramping g p y p gevents, infrequent production extremes12.000

8.000

10.000

Net annual wind generation

4.000

6.000MW

0

2.000

NorthwestPower andConservation

Council

NorthwestPower andConservation

Council8/12/2010 8

Page 6: MEMORANDUM TO: FROM · W. Bill Booth Idaho James A. Yost Idaho Tom Karier Washington Melinda S. Eden Oregon Joan M. Dukes Oregon August 4, 2010 MEMORANDUM TO: Power Committee FROM:

These systems are not without problemsThese systems are not without problems

• Increasing episodes of over-generationIncreasing episodes of over generation• Increasing frequency of negative wholesale prices• Increasing volatility of wind and solar outputIncreasing volatility of wind and solar output• Transmission congestion• Increasing penetration of uncontrolled generation• Increasing penetration of uncontrolled generation• High wholesale power prices

Wind curtailment

NorthwestPower andConservation

Council

NorthwestPower andConservation

Council8/12/2010 9

RED Electrica wholesale pricesRED Electrica wholesale prices

$120 00

$100.00

$120.00

$/M

Wh

) Capacitypayments

$80.00

pri

ce (

$

Adjustmentservices

$40.00

$60.00

pow

er

Daily andIntra-dayenergy

$20.00

$40.00

ho

lesa

le marketMid-C

$0.002006 2007 2008 2009

Wh

NorthwestPower andConservation

Council

NorthwestPower andConservation

Council8/12/2010 10

Page 7: MEMORANDUM TO: FROM · W. Bill Booth Idaho James A. Yost Idaho Tom Karier Washington Melinda S. Eden Oregon Joan M. Dukes Oregon August 4, 2010 MEMORANDUM TO: Power Committee FROM:

Existing European system characteristics g p yfacilitating variable resource integration• Geographic diversity of windpower developmentGeographic diversity of windpower development• Well-established day-ahead, intraday and real-time

capacity and energy marketsp y gy• Large and/or strongly-interconnected transmission system

operators with compatible business practices

The Northwest can work toward mimicking the attributes of h h i i h f ili i blthese characteristics that facilitate variable resource

integration

NorthwestPower andConservation

Council

NorthwestPower andConservation

Council8/12/2010 11

European initiatives to cope with continued p pvariable resource development• Improved wind and solar forecastingImproved wind and solar forecasting• Transmission reinforcements• Strengthened intertiesg• Increased geographic diversity• Expanded sources of balancing reserves

Flexible generationStorageDemand-response measuresp

• Smart gridMonitor and control distributed wind and solar generationF ilit t d dFacilitate demand-response measures

Not dissimilar from Northwest initiatives!Northwest

Power andConservation

Council

NorthwestPower andConservation

Council8/12/2010 12