Roads Design Report

Roads

Design Report

“Project Name”“Location”

Company Name XXXXXXXXXXXXXXXX

Document Number XXXXXXXXXXXXXXXX

Stage of Design 15%, 30%, 70%, 95%

K Net Number: XXXXXXX (DPTI internal use only)Document Revision: ADocument Date: XXXXX

Original Template: K Net Number: 2238920 (DPTI internal use only)

Master Specification Revision A

Page 2: Memorandum · Web viewCoordination and completion of this document is the responsibility of the lead designer as determined by the project requirements. Input under each heading will

Roads Design Report

Master Specification Revision A

Page 3: Memorandum · Web viewCoordination and completion of this document is the responsibility of the lead designer as determined by the project requirements. Input under each heading will

Roads Design Report

Document Amendment RecordRev Change Description Date Author Checked Approved

XX XX XX XX XX XX

Distribution RecordRev Issued To Date

XX XX XX

Document Acceptance Record Position & Title Name Date Endorsement

Record

Prepared by XX XX XX XX

Consulted

Authorised by XX XX

Document Management To be in read in conjunction of DPTI Master Specification PC-EDM1 Design Management

This document is the Property of the Department of Planning Transport and Infrastructure (DPTI) and contains information that is confidential to DPTI. It must not be copied or reproduced in any way without the written consent of DPTI. This is a controlled document and it will be updated and reissued as approved changes are made.

Template is to be used in accordance with document control.

(Newly created documents from this template must contain the relevant Header and Footer details)

Master Specification Revision A

Page 4: Memorandum · Web viewCoordination and completion of this document is the responsibility of the lead designer as determined by the project requirements. Input under each heading will

Roads Design Report

Coordination and completion of this document is the responsibility of the lead designer as determined by the project requirements. Input under each heading will be required from specialist designers as necessary.

Text provided in italics is for assistance in preparing this report and should where not relevant be removed from the body of the report as it is completed

The Contractor must prepare Design Reports for each technical discipline and each package (where applicable).

A Design Report is a summary of design work undertaken to date must provide details of the following as a minimum:

a) identification of the design review stage of completion that the report describes;

b) identification of each design package that the report relates to;

c) all relevant analysis and calculations for the Works and Temporary Work;

d) the information which has been specified in each applicable Part to be included in the reports (refer to the Clause “Records” in each Part);

e) summary of any changes to the design since the previous issues of the design report;

f) summary of Hold Points released;

g) evidence of any required approvals;

h) outline of the documentation that will be prepared for the operation / maintenance of the Works;

i) outline any processes / procedures for commissioning of the Works.

The level of detail included in the draft Design Reports must be commensurate with the design package and percentage completion of the design.

This design Report should also be accompanied by a completed

a) Design to Survey Compliance Checklist

b) Presentation Review Checklist

c) Electrical Design Presentation and Review Checklist (if required)

Refer to DPTI Master Specification for all relevant design parts: https://www.dpti.sa.gov.au/contractor_documents/masterspecifications

DPTI Technical Standards & Guidelines: https://www.dpti.sa.gov.au/standards

DPTI Operational Instructions: https://www.dpti.sa.gov.au/standards/tass

Master Specification Revision A

Page 5: Memorandum · Web viewCoordination and completion of this document is the responsibility of the lead designer as determined by the project requirements. Input under each heading will

Roads Design Report

Contents

Document Acceptance Record 2Contents 4Design Report 5

1. Introduction 52. Design Basis 63. Integration 104. Status 115. Required Approvals 126. Non-Conforming Design Elements 127. Safe System Assessment 128. Calculations 139. Bus Stop Provisions 1310. Temporary Works 1311. Operation / Maintenance of the Works 1312. Processes / Procedures for Commissioning of the Works 1313. Outstanding Issues 1314. Design verification 1415. Appendix 14

Table 1 - Safety In Design Items................................................................................................................. 5Table 2 - Design Speeds............................................................................................................................. 6Table 3 - Design Vehicle.............................................................................................................................. 6Table 4 - Cross Section Requirements........................................................................................................6Table 5 - Horizontal Alignment Elements....................................................................................................7Table 6 - Vertical Alignment Elements.........................................................................................................7Table 7 - Sight Distance Elements..............................................................................................................7Table 8 - Clear Zones and Safety Barriers..................................................................................................7Table 9 - Pedestrian and Cyclist Widths......................................................................................................8Table 10 - Traffic Impact Statement Reference...........................................................................................8Table 11 – Pipe Drainage (if required).........................................................................................................9Table 12 - Road Safety Audit.......................................................................................................................9Table 13 - Safety In Design....................................................................................................................... 10Table 14 - Sustainability Objectives Example............................................................................................10Table 15 - Hold Points............................................................................................................................... 11Table 16 - Preliminary Design to Detailed Design.....................................................................................11Table 17 - Detailed Design to Final Design...............................................................................................12Table 18 - EDD / Departure (Non-conforming elements)...........................................................................12Table 19 - Outstanding Issues................................................................................................................... 13Table 20 - Designers Verification...............................................................................................................14Master Specification Revision A

Page 6: Memorandum · Web viewCoordination and completion of this document is the responsibility of the lead designer as determined by the project requirements. Input under each heading will

Roads Design Report

Table 21 - Contractors Review.................................................................................................................. 14Table 22 - Independent Design Certification..............................................................................................14Table 23 - DPTI and External Stakeholder................................................................................................14

Master Specification Revision A

Page 7: Memorandum · Web viewCoordination and completion of this document is the responsibility of the lead designer as determined by the project requirements. Input under each heading will

Roads Design Report

Design Report

1. Introduction1.1 Project Background

Location of design (include Latitude/longitudinal coordinates)

Proposal of project

1.2 Design Objectives

Type of Road installation e.g CHR treatment

What is the design trying to treat/remedy?

1.3 Safety In Design

Safety in Design has been considered in accordance with the WHS Act 2012 (Code of Practice “Safe Design of Structures”).

DPTI has the primary duty under the WHS Act to ensure, so far as is reasonably practicable, that workers and other persons are not exposed to health and safety risks arising from the design of new infrastructure. Safe design is the integration of control measures early in the design process to eliminate or, if this is not reasonably practicable, minimise risks to health and safety throughout the life (Construction, Maintenance, Demolition) of the infrastructure being designed.

Safety in Design assessments undertaken during the design development stage of the project has included consideration of the safety issues that might face the constructors, the users (that is, the motoring public and all other road users) and maintenance worker. Location of documentation:

https://www.dpti.sa.gov.au/standards/safety_in_design_guidelines

The development and management of the design must be integrated with the Safety in Design detailed in Part PC-EDM2 Safety Management in Design.

List any matters that have been addressed during the design as per table 1:

Table 1 - Safety In Design ItemsItem Result

Drainage flow pathsDrainage flow paths have been identified and accommodated to minimise the potential for flooding on the roadway and manage scour

Shoulders

Sealed shoulders have been provided to enable a vehicle to stop and pull to the left of the road, as well as providing space for pedestrian movement if required

Batter Slopes Establishing 6:1 batter slopes for errant vehicles

Flat bottom drains Assist errant vehicles in recovery

Master Specification Revision A

Page 8: Memorandum · Web viewCoordination and completion of this document is the responsibility of the lead designer as determined by the project requirements. Input under each heading will

Roads Design Report

1.4 Existing Conditions

Brief description of the existing location and general condition – eg. number of lanes, speed limit, access, type of intersection etc

1.5 Existing Constraints

List any Physical, Heritage, Environmental

1.6 Communications

List any existing services constraints (communications, water, electrical)

1.7 Design Givens and Constraints

List any information/requirements stated in design brief or instructions by project manager

2. Design Basis2.1 Design Speed

Table 2 - Design SpeedsElement Design Speed (km/h) Expected Posted

Speed

Motorway XX XX

On Ramps XX XX

Off Ramps XX XX

DPTI Arterial Roads XX XX

Local Council maintained roadways XX XX

Bicycle Facilities (Shared use path / bike lanes) XX XX

2.2 Design Vehicle

Table 3 - Design VehicleRoad Design Vehicle Checking Vehicle

Motorway XX XX

XX Road XX XX

XX Street XX XX

Local Roads XX XX

2.3 Cross Section Requirements

Table 4 - Cross Section RequirementsElement Number of Lanes Width

Non-Stop Motorway lanes XX XX

Non-Stop Motorway shoulders XX XXMaster Specification Revision A

Page 9: Memorandum · Web viewCoordination and completion of this document is the responsibility of the lead designer as determined by the project requirements. Input under each heading will

Roads Design Report

Element Number of Lanes Width

XX Road XX XX

Turn Lanes (Arterial Roads) XX XX

Bus Route Kerbside lanes XX XX

On-Road Bicycle lanes XX XX

Shared Use Path XX XX

2.4 Horizontal Alignment

Table 5 - Horizontal Alignment ElementsDesign Parameter Parameter / value Design Reference

Minimum curve radius with normal crossfall XX Austroads Part XX

Minimum curve radius with Adverse crossfall XX XX

Rate of Rotation XX XX

Curve widening XX XX

Taper Length XX XX

2.5 Vertical Alignment

Table 6 - Vertical Alignment ElementsDesign Parameter Parameter / value Design Reference

Minimum crest curve K XX Austroads Part XX

Minimum sag curve K XX XX

Minimum longitudinal grade XX XX

2.6 Sight Distances

Table 7 - Sight Distance ElementsDesign Parameter Parameter / value Design Reference

Stopping Sight Distance XX Austroads Part XX

Safe Intersection Sight Distance XX XX

Approach Sight Distance XX XX

2.7 Clear Zones and Safety Barriers

Master Specification Revision A

Page 10: Memorandum · Web viewCoordination and completion of this document is the responsibility of the lead designer as determined by the project requirements. Input under each heading will

Roads Design Report

Table 8 - Clear Zones and Safety BarriersElement Type Classification

Motorway Median Barrier XX XX

Bridges and approaches (including embankments and structure) XX XX

Bridge – Pedestrian Barrier XX XX

Shared Use Path XX XX

Bridge Pier Protection XX XX

2.8 Pedestrian and Cyclist Facilities

Table 9 - Pedestrian and Cyclist WidthsElement Width

On-Road Bicycle lanes

Shared Use Path

Off Road / separated Bicycle lane (1 way)

Footpath

Refer DPTI Master Specification RD-GM-D3 Pedestrian & Cycling facilities

2.9 Over Dimensional Route Requirements

https://www.sa.gov.au/topics/driving-and-transport/heavy-vehicles/operating-a-heavy-vehicle/approved-areas-and-routes-maps

2.10 PBS Requirements

Vehicles Performance Based Standards (PBS) vehicle routes are located on Ravnet. PBS vehicle lengths are located:

https://www.sa.gov.au/topics/driving-and-transport/heavy-vehicles/operating-a-heavy-vehicle/performance-based-standards

The National Heavy Vehicle Regulator administrates the PBS scheme:

https://www.nhvr.gov.au/road-access/performance-based-standards

PBS lane widths are located: https://www.ntc.gov.au/Media/Reports/(C74A08F0-05E4-18B5-213E-7916576341BA).pdf

The selection of the design vehicle must also ensure over dimensional routes and over dimensional vehicles can travel efficiently and safely within the network.

The design of all roads and civil infrastructure shall enable safe and efficient emergency access for ambulance (SAAS), police (SAPOL) and fire (CFS) vehicles to adjacent buildings and facilities

Master Specification Revision A

Page 11: Memorandum · Web viewCoordination and completion of this document is the responsibility of the lead designer as determined by the project requirements. Input under each heading will

Roads Design Report

The over dimensional route must not include any requirements for temporary traffic closures, adjustment of road furniture or contra flow of over dimensional vehicles.

2.11 Over Weight Vehicles

The infrastructure must enable the operation of over-weight vehicles as specified is Austroads and AS5100 the Bridge Design Code.

2.12 Property Access

Project affecting existing property accesses?

2.13 Traffic Control

Table 10 - Traffic Impact Statement ReferenceDocument Number Document Title

XXXXXXX XXXXXXXXXX

Does the project comply to DPTI pavement marking manual: https://www.dpti.sa.gov.au/?a=40257

2.14 Traffic Signals and Ducting

for more complex designs a separate Electrical Services Design Report maybe necessary and is available at http://www.dpti.sa.gov.au/standards/roads-all#roaddesignoutputs

2.15 Street Lighting

Street lighting required for the project?

for more complex designs a separate Electrical Services Design Report maybe necessary and is available at http://www.dpti.sa.gov.au/standards/roads-all#roaddesignoutputs

2.16 Drainage

Table 11 – Pipe Drainage (if required)Design Parameter Parameter / value Design Reference

Minimum longitudinal grade XX Austroads Part XX XX

for more complex drainage designs a separate drainage report maybe necessary as per Drainage Standard Roadworks Stormwater Design – DD 300 available at http://www.dpti.sa.gov.au/standards/roads-all#drainage

2.17 Noise barriers / Walls

List any barriers / noise walls required for the project.

2.18 Land Acquisition/ Clearances / Special Accesses

List any land acquisition required for the project (include drawings within the appendix)

2.19 Services

Master Specification Revision A

Page 12: Memorandum · Web viewCoordination and completion of this document is the responsibility of the lead designer as determined by the project requirements. Input under each heading will

Roads Design Report

Has service depthing been undertaken to confirm that existing services will not impact the proposed works?

2.20 Road Safety Audit

Table 12 - Road Safety AuditDocument Number Document Title

XXXXXXX XXXXXXXXXX

2.21 Environmental Issues

List all aboriginal areas, DAC trees, other environmental constraints

2.22 Pavement Design

Adopted traffic loading, list traffic existing/proposed volumes, vehicle composition

2.23 Structures

Proposed bridges?

2.24 ITS

for more complex designs a separate Electrical Services Design Report maybe necessary and is available at http://www.dpti.sa.gov.au/standards/roads-all#roaddesignoutputs

2.25 Geotechnical

Geotechnical investigations

2.26 Construction Issues

List any known construction issues here

2.27 Safety In Design

Table 13 - Safety In DesignDocument Number Document Title

XXXXXXX XXXXXXXXXX

Refer to: https://www.dpti.sa.gov.au/standards/safety_in_design_guidelines

2.28 Any Assumptions / Clarifications

3. Integration3.1 Digital Engineering

Master Specification Revision A

Page 13: Memorandum · Web viewCoordination and completion of this document is the responsibility of the lead designer as determined by the project requirements. Input under each heading will

Roads Design Report

DPTI encourage the development of digital engineering that use of intelligent design models to satisfy technical handover requirements or Asset Information Requirements that will make up the Asset Information Model.

The development and management of the digital engineering model must be integrated with the Design process and as detailed in Part PC-EDMX Digital Engineering.

3.2 Sustainability in Design

Achieving a positive whole-of-life sustainable outcomes for the project and future generations. Sustainability workshop required?

Table 14 - Sustainability Objectives ExampleSubject Objective Target Initiatives Document Ref

Urban Design

Enhance the amenityof the road corridorand surroundingareas with urbandesign andlandscaping

Enhance amenity of road corridor and surrounding areas with urban design and landscaping.

XXXXXXX

Active Transport

Delivering improvedcycling and walkinginfrastructure where possiblemaximiseneighbourhoodconnectivity

Encourage walkingReducing distanceand barriers;Amenity,Safety and PassiveSurveillance.Improve connectivity.Encourage moresustainable modesof transport to theconstructionworkforce

Dedicated bicyclelanes have beenprovided on XXXX Road

XXXXXXX

Energy Usage

The project design should consider overallenergy efficiency management opportunities in acoordinated approach to minimise life cycleenergy use

Climate Change

4. Status4.1 Hold Points - hold points applicable to this design package.

Master Specification Revision A

Page 14: Memorandum · Web viewCoordination and completion of this document is the responsibility of the lead designer as determined by the project requirements. Input under each heading will

Roads Design Report

Table 15 - Hold PointsHOLD POINT Date Status

XX XX XX

4.2 Hold Points – Changes from previous revision

Table 16 - Preliminary Design to Detailed DesignElement Preliminary Design Detailed Design

XX XX XX

Table 17 - Detailed Design to Final DesignElement Preliminary Design Detailed Design

XX XX XX

5. Required Approvals Any approvals required? List any outstanding approvals

6. Non-Conforming Design Elements Items identified as non-conforming design elements:

Table 18 - EDD / Departure (Non-conforming elements)Document Name/Title Document Ref Status

XXXXXXXXX Aconex/Teambinder/Knet reference Issued to DPTI/Approved?

Master Specification Revision A

Page 15: Memorandum · Web viewCoordination and completion of this document is the responsibility of the lead designer as determined by the project requirements. Input under each heading will

Roads Design Report

The Austroads Guide to Road design provides NDD (normal design domain). The use of design parameters outside NDD is classified as a design departure and requires approval by the Engineering Authority for the Commissioner of Highways

The EDD/ design departures guideline should be also read in conjunction with Brownfield/Greenfield Austroads Supplement Guide

The EDD / design departure procedure / supplement guide are located:

https://www.dpti.sa.gov.au/standards/road_design_outputs

7. Safe System Assessment Safe System Assessment is a tool that has been developed to provide a measure of the extent to

which a road infrastructure project aligns with Safe System principles and the ultimate objective of eliminating fatal and serious injuries from crashes on the road network. DPTI has developed guidelines which specify when a Safe System Assessment should be conducted and to provide guidance on the assessment process. The DPTI safe system guidelines should be used in conjunction with Austroads ‘Safe System Assessment Framework’.

The DPTI guide and assessment is located in the link below. The assessment will be required for all projects (except SSA’s are optional for projects under <$2M but requires documentation of how the project has considered safe system principles.)

https://www.dpti.sa.gov.au/standards/road_design_outputs

Safe System Assessment Guideline (internal use): Knet 13551921

Safe System Assessment (internal use): Knet 13551920

8. Calculations Provide any calculations here

9. Bus Stop Provisions Bus stops are to be in accordance with the “PTOP Bus Stop Management Operational

Guidelines”.

Route Assessment Guidelines: https://www.sa.gov.au/__data/assets/pdf_file/0010/43300/Route_Assessment_Guidelines_for_13_7m_long_bus.pdf

Bus Bays, shelters and pads are located: https://www.dpti.sa.gov.au/standards/roads-all

10. Temporary Works Minimum traffic requirements

Temporary traffic modelling

Master Specification Revision A

Page 16: Memorandum · Web viewCoordination and completion of this document is the responsibility of the lead designer as determined by the project requirements. Input under each heading will

Roads Design Report

Access during construction

Temporary Pavement

Traffic Signage

11. Operation / Maintenance of the Works List any Maintenance in Design assessments (if required)

Maintenance regime (if required)

12. Processes / Procedures for Commissioning of the Works

13. Outstanding Issues List any outstanding issues on the project - pending items, required confirmations, outstanding

RFIs

Table 19 - Outstanding IssuesNo Issue Description

1 xx xx

2 xx xx

3 xx xx

4 xx xx

5 xx xx

14. Design verification14.1 Designers Verification

Table 20 - Designers VerificationDesign Issue Comments Sheet Number Certificate Number

Aconex / Teambinder / Knet Number of stored information

Aconex / Teambinder / Knet Number of stored information

14.2 Contractors Review

Table 21 - Contractors ReviewDesign Issue Comments Sheet Number Certificate Number

Aconex / Teambinder / Knet Number of stored information

Aconex / Teambinder / Knet Number of stored information

Master Specification Revision A

Page 17: Memorandum · Web viewCoordination and completion of this document is the responsibility of the lead designer as determined by the project requirements. Input under each heading will

Roads Design Report

14.3 Independent Design Certification

Table 22 - Independent Design CertificationDesign Issue Comments Sheet Number Certificate Number

Aconex / Teambinder / Knet Number of stored information

Aconex / Teambinder / Knet Number of stored information

14.4 DPTI and External Stakeholder

Table 23 - DPTI and External StakeholderDesign Issue Comments Sheet Number Certificate Number

Aconex / Teambinder / Knet Number of stored information

Aconex / Teambinder / Knet Number of stored information

15. Appendix15.1 Vehicle Turning Paths

15.2 Land Acquisition

15.3 Sight Distance Checks / Reports

15.4 Aquaplaning Reports

15.5 Over Dimensional Route Analysis Sketches (if required)

15.6 Copy of Road Safety Audit Findings

15.7 Geotechnical Investigations

15.8 Pavement Treatment

15.9 List any other items here………..

Master Specification Revision A