1
Metal Crusher Plant Technical Requirements: Supply bearing capacity under machine foundations and buildings as well as prevention of liquefaction in an earthquake. Quality Control Testing: Electronic Cone Penetration Tests (CPTs), supported by digital process data from Vibro rigs, supplemented by full-scale load embankment trials and evidence from dug out columns. Project Location: Seattle, WA Main Contractor: Seattle Construction Company Client: Seattle Iron & Metal Works Project period Jan 1999 Method Applied: Wet Top Feed Stone Columns near existing buildings and Dry Bottom Feed Stone Columns in remaining zones. All columns to 15.2 m (50 ft) depth. Average column diameter 0.91 m (3.0 ft) Betterground GmbH Hassenham 8 D-84419 Schwindegg Germany Tel: +49-8082-2713135 Tel: +49-89-76776194-0 Fax: +49-89-76776194-20 Email: [email protected] Web: www.betterground.com

Metal Crusher Plant - betterground

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Metal Crusher Plant - betterground

Metal Crusher Plant

Technical Requirements:

Supply bearing capacity under machine foundations and buildings as well as prevention of liquefaction in an earthquake.

Quality Control Testing:

Electronic Cone Penetration Tests (CPTs), supported by digital process data from Vibro

rigs, supplemented by full-scale load embankment trials and evidence from dug out columns.

Project Location:

Seattle, WA

Main Contractor:

Seattle Construction

Company

Client:

Seattle Iron & Metal Works

Project period

Jan 1999

Method Applied:

Wet Top Feed Stone Columns

near existing buildings and

Dry Bottom Feed Stone

Columns in remaining zones.

All columns to 15.2 m (50 ft)

depth.

Average column diameter

0.91 m (3.0 ft)