Methods to increase productivity (or how to survive jumping in to executing phase) Damir Pleško Project Manager 30-May-17 1

Methods to increase productivity · Methods to increase productivity Space-time Cost-time-scope continuum •Point in time determination •Earned value, Planed value, Schedule variance

  • Upload
    others

  • View
    5

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Methods to increase productivity · Methods to increase productivity Space-time Cost-time-scope continuum •Point in time determination •Earned value, Planed value, Schedule variance

Methods to increase productivity(or how to survive jumping in to executing phase)

Damir PleškoProject Manager

30-May-17 1

Page 3: Methods to increase productivity · Methods to increase productivity Space-time Cost-time-scope continuum •Point in time determination •Earned value, Planed value, Schedule variance

Message from our sponsorFor easier tracking of lectures…

30-May-17 3

Page 4: Methods to increase productivity · Methods to increase productivity Space-time Cost-time-scope continuum •Point in time determination •Earned value, Planed value, Schedule variance

Methods to increase productivityExample from real life

30-May-17 4

Page 5: Methods to increase productivity · Methods to increase productivity Space-time Cost-time-scope continuum •Point in time determination •Earned value, Planed value, Schedule variance

Methods to increase productivityFirst steps

• First focus on what the project’s outcomes should be

• Allocate people playing key roles on the project and ask questions

• Do not mess with things that are working well

30-May-17 5

Page 6: Methods to increase productivity · Methods to increase productivity Space-time Cost-time-scope continuum •Point in time determination •Earned value, Planed value, Schedule variance

Methods to increase productivityHow to use „the same question” investigation method

• First focus on what the project’s outcomes should be

• Allocate people playing key roles on the project and ask questions

• Do not mess with things that are working wellQ1 Q2 Q3 Q4 Q5 Q6 Q7 Q8 Q9 Q10

Team Leader 1

Team Leader 2

Team Leader 3

Team Member 1

Team Member 2

Team Member 3

Team Member 4

Team Member 5

Team Member 6

30-May-17 6

Page 7: Methods to increase productivity · Methods to increase productivity Space-time Cost-time-scope continuum •Point in time determination •Earned value, Planed value, Schedule variance

Methods to increase productivitySpace-time Cost-time-scope continuum

• Point in time determination

• Earned value, Planed value, Schedule variance etc.

• Cost management• People

• Licences

• Other

30-May-17 7

Page 8: Methods to increase productivity · Methods to increase productivity Space-time Cost-time-scope continuum •Point in time determination •Earned value, Planed value, Schedule variance

Methods to increase productivityCalculation based on Estimated Time and Accuracy

• Original Estimate - The original estimate of the total amount of time it would take to complete this issue.

• Estimated Time Remaining - The current estimate of the remaining amount of time it would take to complete this issue.

• Time Spent - The amount of time spent on the issue. This is the aggregate amount of time which has been logged against this issue.

• Accuracy- The accuracy of the original estimate compared to the current estimate for the issue. It is the difference between the sum of the Time Spent and Estimated Time Remaining fields, and the Original Estimate field.

30-May-17 8

Page 9: Methods to increase productivity · Methods to increase productivity Space-time Cost-time-scope continuum •Point in time determination •Earned value, Planed value, Schedule variance

Methods to increase productivityWorking breakdown structure

• Is a deliverable-oriented grouping of projectelements

• Is created by those doing the work• Contains 100% of the work defined by the scope

or contract and captures all deliverables• Defines the context of the project, clarifies the

work and communicates project scope to all stakeholders

• Is expressed as a chart or outline, providing a graphical or textual breakdown

• Arranges all major and minor deliverables and is constructed so that each level of decomposition contains 100% of the work in the parent level

• Should contain at least 2 levels

30-May-17 9

Page 10: Methods to increase productivity · Methods to increase productivity Space-time Cost-time-scope continuum •Point in time determination •Earned value, Planed value, Schedule variance

Methods to increase productivityWhat we can learn about collocation from the books

30-May-17 10

Page 11: Methods to increase productivity · Methods to increase productivity Space-time Cost-time-scope continuum •Point in time determination •Earned value, Planed value, Schedule variance

Methods to increase productivityWhat we learned by examples

• Improved Team work

• Improved People skills and competencies

• Motivated Employees

• Improved overall project performance

30-May-17 11

Page 12: Methods to increase productivity · Methods to increase productivity Space-time Cost-time-scope continuum •Point in time determination •Earned value, Planed value, Schedule variance

Methods to increase productivityBenefits of few collocaton sessions and mentoring

30-May-17 12

Page 13: Methods to increase productivity · Methods to increase productivity Space-time Cost-time-scope continuum •Point in time determination •Earned value, Planed value, Schedule variance

Methods to increase productivityMathematical model - Germany

30-May-17 13

Page 14: Methods to increase productivity · Methods to increase productivity Space-time Cost-time-scope continuum •Point in time determination •Earned value, Planed value, Schedule variance

Methods to increase productivityChoice is on us – is it?

• Procedure simplification• Following procedures• One for all • Avoid re-work

30-May-17 14

Page 15: Methods to increase productivity · Methods to increase productivity Space-time Cost-time-scope continuum •Point in time determination •Earned value, Planed value, Schedule variance

Methods to increase productivityTime to sprint away

Q1 Q2 Q3 Q4 Q5 Q6 Q7 Q8 Q9 Q10

Team Leader 1

Team Leader 2

Team Leader 3

Team Member 1

Team Member 2

Team Member 3

Team Member 4

Team Member 5

Team Member 6

30-May-17 15

Page 16: Methods to increase productivity · Methods to increase productivity Space-time Cost-time-scope continuum •Point in time determination •Earned value, Planed value, Schedule variance

W

Methods to increase productivity„Open” communication model

Customer4Customer3Customer2Customer1

Team1 Team2 Team3

• Redundancy• Not transparent• Loss of Information• Wrong expectations

S

O T

Team4 Team5 Team6

30-May-17 16

Page 17: Methods to increase productivity · Methods to increase productivity Space-time Cost-time-scope continuum •Point in time determination •Earned value, Planed value, Schedule variance

S

Methods to increase productivityCommunication model using the system

Team6Team5Team4

Customer4Customer3Customer2Customer1

Team1 Team2 Team3

• No Redundancy• Transparent• Information visible to all• All on one place

W

TO

30-May-17 17

Page 18: Methods to increase productivity · Methods to increase productivity Space-time Cost-time-scope continuum •Point in time determination •Earned value, Planed value, Schedule variance

Methods to increase productivityPM tools used for the system in Altima and Verso

• Solution Manager (SAP)• https://support.sap.com/en/solution-manager.html

• Jira (Atlassian)• https://www.atlassian.com/software/jira

30-May-17 18

Page 19: Methods to increase productivity · Methods to increase productivity Space-time Cost-time-scope continuum •Point in time determination •Earned value, Planed value, Schedule variance

• http://www.planview.com/

30-May-17 19

Methods to increase productivityRecommendation for the system

Page 20: Methods to increase productivity · Methods to increase productivity Space-time Cost-time-scope continuum •Point in time determination •Earned value, Planed value, Schedule variance

Methods to increase productivityKaizen

+

30-May-17 20

Page 21: Methods to increase productivity · Methods to increase productivity Space-time Cost-time-scope continuum •Point in time determination •Earned value, Planed value, Schedule variance

Hvala na paž[email protected]