METHUEN ROTARY RECONSTRUCTION

Rt. 110/113 and I-93 Interchange

1

Agenda • Welcome

• What is this project all about?

• How will the project be built?

• Keeping informed during construction

• Questions and answers

Existing Interchange Configuration Today

2

New Interchange Configuration in 2018

3

East Side Improvements

• Rte. 113 (Lowell St.) will be realigned at Haverhill St. intersection

• Haverhill St. will be improved with additional travel lane and sidewalk

• Existing traffic signals will be upgraded

4

5

East Side Improvements

• New traffic signal at base of I-93 off-ramp at Rte. 113 (No. Lowell St.) intersection

• Rte. 113 will be widened between I-93 SB off-ramp and Albert Street

• New traffic signals at Branch Street/Rte. 113 and Riverside Dr./Rte. 110

6

West Side Improvements

7

West Side Improvements

Project-wide:

New and Upgraded Traffic Signals

8

Former Nursery at 18 Lowell Blvd.

9

Wetland Mitigation at 18 Lowell Blvd.

10

Landscaping

11

Project Manager: Rich Masucci General Superintendent: Jay Balboni Project Superintendent: Jack Flynn

Bridge Superintendent: Mark Richardson Project Engineer: Kevin Hoyt

E.T.& L . CORP. PROJECT TEAM

M E T H U E N I N T E R C H A N G E

E.T.& L. PROJECT TEAM

E.T.& L. RELEVANT EXPERIENCE Sagamore Rotary Sagamore, MA Braintree-Quincy Quincy, MA Canal St. Bridge Lawrence, MA

MASSDOT - SAGAMORE ROTARY INTERCHANGE

Contract Value: $37 Million

Contract Start Date: 2004

Major Work Involved: Replaced Sagamore Bridge

Rotary Reconstructed Rt. 6 below Rt. 3 Constructed a new Rt. 3 bridge Constructed three temporary

bridges on Rt. 3 and Rt. 6

MASSDOT - BRAINTREE-QUINCY ROADWAY RECONSTRUCTION

Contract Value: $15.9 Million

Contract Start Date: 2007

Major Work Involved: Constructed a new on-

ramp for Rt. 3 Northbound Constructed a new on-

ramp with an 800 ft. viaduct bridge

MASSDOT - CANAL STREET BRIDGE LAWRENCE, MA

Contract Value: $9 Million

Contract Start Date: 2011

Major Work Involved: Constructed a new Canal

Street bridge over the Spicket River Widened Canal Street with

new traffic signals installed

Total Project Duration: 4 years Project Start Date: May 2014 Final Completion: June 2018

SCHEDULE OVERVIEW

Stage Durations

Stage 1 June 2014 – April 2015

Stage 2A January 2015 – August 2015

Stage 2B August 2015 – December 2015

Stage 2C December 2015 – July 2016

Stage 3A June 2016 – November 2016

Stage 3B November 2016 – April 2017

Stage 3C April 2017 – August 2017

Stage 4 August 2017 – June 2018

M E T H U E N I N T E R C H A N G E

STAGE 1 2014 2015 2016 2017 2018

Clearing of project site Removal of buildings Removal of existing I-93 median

barrier and paving of median Widening of River Bridge

I-93

June April

M E T H U E N I N T E R C H A N G E

River Bridge

STAGE 1 2014 2015 2016 2017 2018

Installation of new underground Verizon duct banks

Construction of I -93 SB and NB on-ramps – Open to traffic

Partial construction of I -93 NB and SB on and off-ramps

I-93

June April

M E T H U E N I N T E R C H A N G E

I-93 SB on-ramp

I-93 NB on-ramp I-93 SB on-ramp

I-93 SB off-ramp

I-93 NB off-ramp

STAGE 1 2014 2015 2016 2017 2018

Construction of Sound Walls 1 and 2 Reconstruction of Lowell St. (Rt.

113) and Haverhill St. (Rt. 110) - East of rotary

I-93

June April

M E T H U E N I N T E R C H A N G E

Sound Wall 1

Sound Wall 2

STAGE 1 - WETLAND MITIGATION

M E T H U E N I N T E R C H A N G E

STAGE 1 - WETLAND MITIGATION

M E T H U E N I N T E R C H A N G E

I -93 Northbound traffic shifts to West lanes– 3 lanes in each direction

Construction of East portion of new Bridge 040

STAGE 2A 2014 2015 2016 2017 2018

August January

I-93

M E T H U E N I N T E R C H A N G E

Bridge 040

Construction of temporary East

widening of Bridges 017 and 018 Continue construction of I -93 SB on

and off-ramps

STAGE 2A 2014 2015 2016 2017 2018

August January

I-93

M E T H U E N I N T E R C H A N G E

Bridge 017

I-93 SB on-ramp

I-93 SB off-ramp

Bridge 018

I -93 Northbound traffic shifts to newly constructed East lanes – 3 lanes in each direction

Construction of center portion of new Bridge 040

Continue construction of I -93 SB on and off-ramps

STAGE 2B 2014 2015 2016 2017 2018

August December

I-93

M E T H U E N I N T E R C H A N G E

Bridge 040

I-93 SB on-ramp

I-93 SB off-ramp

STAGE 2B

Widening of North Lowell St. – West of I -93

Installation of utilities and paving of Branch St. – West of I -93

2014 2015 2016 2017 2018

August December

I-93

M E T H U E N I N T E R C H A N G E

Branch St.

I -93 Southbound traffic shifts to median– 3 lanes in each direction

Construction of Western (final) portion of new Bridge 040

Complete construction of I -93 SB off-ramp – Open to traffic

STAGE 2C 2014 2015 2016 2017 2018

December July

I-93

M E T H U E N I N T E R C H A N G E

Bridge 040

I-93 SB off-ramp

Continue construction of I -93 SB on-ramp

Construction of temporary I-93 NB and SB on and off ramps

Reconstruction of Rt. 110/113 - West of rotary

Reconstruction of Bolduc St., Riverside Dr., and N. Lowell St.

STAGE 2C 2014 2015 2016 2017 2018

December July

I-93

M E T H U E N I N T E R C H A N G E

I-93 SB on-ramp

Temp. I-93 SB on-ramp

Temp. I-93 NB off-ramp

Bolduc St.

Riverside Dr.

Complete construction of I -93

SB on-ramp – Open to traffic Demolition of Western portion

of Bridges 017 and 018

STAGE 3A 2014 2015 2016 2017 2018

July November

I-93

M E T H U E N I N T E R C H A N G E

Bridge 017

Bridge 018 I-93 SB on-ramp

Complete construction of storm water basins

Construction of I -93 NB off-ramp – Open to traffic

STAGE 3A 2014 2015 2016 2017 2018

July November

I-93

M E T H U E N I N T E R C H A N G E

I-93 NB off-ramp

Storm water basin

Storm water basin

I -93 Southbound traffic shifts to West and final alignment

Demolition of center portion of Bridge 017 and 018

STAGE 3B 2014 2015 2016 2017 2018

November April

I-93

M E T H U E N I N T E R C H A N G E

Bridge 017

Bridge 018

I -93 Northbound traffic shifts West onto median

Demolition of Eastern portion of Bridges 017 and 018

Complete construction of I -93 NB off-ramp – Open to Traffic

STAGE 3C 2014 2015 2016 2017 2018

I-93

M E T H U E N I N T E R C H A N G E

Bridge 017

Bridge 018

I-93 NB off-ramp

April August

Remove temporary I-93 median paving and install concrete median barrier

Final paving and striping of I -93

STAGE 4 2014 2015 2016 2017 2018

August June

I-93

M E T H U E N I N T E R C H A N G E

TRAFFIC FLOW DURING CONSTRUCTION

M E T H U E N I N T E R C H A N G E

STAGE 1 2014 2015 2016 2017 2018

I-93 Traffic Open to Local Traffic

I-93 Breakdown lane closed

M E T H U E N I N T E R C H A N G E

June April

NB SB

STAGE 2A, 2B, 2C 2014 2015 2016 2017 2018

April July

I-93 Traffic Open to Local Traffic

New I-93 SB on-ramp open

New I-93 NB on-ramp open

M E T H U E N I N T E R C H A N G E

NB SB

I-93 Breakdown lane closed

STAGE 3A 2014 2015 2016 2017 2018

July November

Rotary Eliminated

I-93 Traffic Open to Local Traffic

New I-93 NB off-ramp open

New I-93 SB off-ramp open

M E T H U E N I N T E R C H A N G E

NB SB

I-93 Breakdown lane closed

STAGE 3B, 3C 2014 2015 2016 2017 2018

November August

I-93 Traffic Open to Local Traffic

New I-93 SB on-ramp open

M E T H U E N I N T E R C H A N G E

NB SB

Rotary Eliminated I-93 Breakdown lane closed

STAGE 4 2014 2015 2016 2017 2018

August June

I-93 Traffic Open to Local Traffic

New I-93 NB off-ramp open

M E T H U E N I N T E R C H A N G E

NB SB

Rotary Eliminated I-93 Breakdown lane closed

Vincent DeAngelo, Resident Engineer 978-682-3151

[email protected]

Dan Fielding Legislative Liaison, Government & Community Affairs

857-368-8959 [email protected]

Also contact Dan to be added to the project distribution database

Website: http://methuenrotary.mhd.state.ma.us/

TO SUBMIT COMMENTS OR REQUEST MORE INFORMATION, PLEASE CONTACT: