Upload
centersquare
View
225
Download
0
Embed Size (px)
Citation preview
8/7/2019 Metra Construction: Montrose Area
1/1
View North
Existing
Sunnyside to Montrose Existing Anticipated
Parking on east side of street 62 spaces 44 spaces (approximately)
Community Green Space 3,317 square feet 12,694 square feet (+283%)
Natural Drainage Area none 3 areas
Montrose to Berteau Existing Anticipated
Parking on east side of street 30 spaces 30 spaces (approximately)
Community Green Space 14,118 square feet 17,061 square feet (+21%)
Natural Drainage Area none none
Area Facts
rendering to come
Proposed
Safety Fence(onRRpropertyline)
Landscape Wall
StormwaterManagement
Areas
The West Ravenswood Corridor Greenway Metra North Line Improvements
Cross Section
Montrose AreaTe use o a continuous high retaining wall to support the new train tracks would result in a narrow green spaceo only ve eet wide. By narrowing Ravenswood Avenue and creating more open space, required slopes up to
the railroad can be created using lower landscape green walls. Te nal community green space will be equalto or exceed the current appearance and width. Sa ety will be improved or drivers and pedestrians with theconversion o Ravenswood Avenue to one-way southbound in this area.
Opportunities exist or sustainable drainage improvements that reduce water runof. Most o the existinglandscape plantings will be removed because they are on railroad property.
Existing
Green Space
Green Space
Landscape Wall
Tra fc Flow Tra fc Flow
Sa ety FenceSa ety Fence
RR Property Line RR Property Line
Existing Train Track
Angled Parking Angled Parking
Proposed
New Train Track
Width of Existing Green SpaceGreen Space
Less pavementmeans less runoff
plus new stormwaterrecapture areas
Railroadhigh wallat end of
blocks only m o n t r o s e A v e n u e
west rAvenswood Avenue
west rAvenswood Avenue
New and widerlandscape plantings
replace existinglandscaping largelyon railroad property
north