HOJA DE METRADOS OBRA:POSTA MEDICA MONGON FORMULA: 01 ESTRUCTURAS Part: Descripcion Und. Ancho Alto Largo Parcial vec. m m m 01.00.00 OBRAS PRELIMINARES 01.01.00 CARTEL DE OBRA UND 1 1 01.02.00 LIMPIEZA DE TERRENO 1 601.13 01.03.00 TRAZO NIVELACION Y REPLANTEO CON WINCHA Y CORDEL 601.13 02.00.00 MOVIMIENTODE TIERRAS 02.01.00 EXCAVACION DE ZANJAS HASTA 1.00 M 2 0.7 1.1 12.65 19.481 0.5 4.3 1.1 26.5 62.673 3.5 0.4 1.1 2.85 4.389 3 0.7 1.1 2 4.62 1.5 0.7 1.1 2.2 2.541 5 1.2 1.1 1.2 7.92 5 1.2 0.45 1.2 3.24 02.02.00 RELLENO CON MATERIAL PROPIO 0.5 3.6 1.24 19 42.408 3.5 0.35 0.4 2.85 1.3965 3 0.35 0.4 2 0.84 1.5 0.35 0.4 0.35 0.0735 5 0.6 0.4 0.6 0.72 5 0.6 0.4 0.6 0.72 0 02.03.00 ACARREO DE MATERIAL EXCEDENTE HASTA D<50 M 1.3 58.706 73.38 03.00.00 OBRAS DE CONCRETO SIMPLE 03.01.00 CONCRETO CIMIENTOS CORRIDOS 1:10 + 30 % PG 2 0.7 0.7 12.65 12.397 4 0.4 0.7 2.85 3.192 4 0.7 0.7 2 3.92 2 0.7 0.7 2.2 2.156 5 1.2 0.8 1.2 5.76 03.02.00 SOLADO PARA ZAPATAS E= 0.10 M 10 1.2 1.2 14.4 03.03.00 CONCRETO SOBRECIMIENTOS CORRIDOS 1:8 + 25 % PM 6 0.15 0.4 2.35 0.846 1 0.15 0.4 3.3 0.198 04.00.00 OBRAS DE CONCRETO ARMADO 04.01.00 ZAPATAS 04.01.01 CONCRETO F'C=175KG/CM2 PARA ZAPATAS 10 1.2 1.2 0.6 8.64 04.01.02 ENCOFRADO ZAÁTAS 10 4.8 0.6 28.8 04.01.03 ACERO EN ZAPATAS FY=42000 KG 89.76 N o N o m 2 m 2 m 3 m 3 m 3 m 3 m 3 m 3 m 3 m 3 m 3 m 3 m 3 m 3 m 3 m 3 m 3 m 3 m 3 m 3 m 3 m 2 m 3 m 3 m 3 m 2

Metrados Posta Mongon

Embed Size (px)

Citation preview

Page 1: Metrados Posta Mongon

HOJA DE METRADOS

OBRA:POSTA MEDICA MONGONFORMULA: 01 ESTRUCTURAS

Part: Descripcion Und. Ancho Alto Largo Parcial Total

vec. m m m01.00.00 OBRAS PRELIMINARES01.01.00 CARTEL DE OBRA UND 1 1 1

01.02.00 LIMPIEZA DE TERRENO 1 601.13 601.13

01.03.00 TRAZO NIVELACION Y REPLANTEO CON WINCHA Y CORDEL601.13 601.13

02.00.00 MOVIMIENTODE TIERRAS

02.01.00 EXCAVACION DE ZANJAS HASTA 1.00 M 2 0.7 1.1 12.65 19.481

0.5 4.3 1.1 26.5 62.6725

3.5 0.4 1.1 2.85 4.389

3 0.7 1.1 2 4.62

1.5 0.7 1.1 2.2 2.541

5 1.2 1.1 1.2 7.92

5 1.2 0.45 1.2 3.24104.86

02.02.00 RELLENO CON MATERIAL PROPIO 0.5 3.6 1.24 19 42.408

3.5 0.35 0.4 2.85 1.3965

3 0.35 0.4 2 0.84

1.5 0.35 0.4 0.35 0.0735

5 0.6 0.4 0.6 0.72

5 0.6 0.4 0.6 0.720

46.16

02.03.00 ACARREO DE MATERIAL EXCEDENTE HASTA D<50 M 1.25 58.706 73.38 73.38

03.00.00 OBRAS DE CONCRETO SIMPLE

03.01.00 CONCRETO CIMIENTOS CORRIDOS 1:10 + 30 % PG 2 0.7 0.7 12.65 12.397

4 0.4 0.7 2.85 3.192

4 0.7 0.7 2 3.92

2 0.7 0.7 2.2 2.156

5 1.2 0.8 1.2 5.7627.43

03.02.00 SOLADO PARA ZAPATAS E= 0.10 M 10 1.2 1.2 14.4 14.4

03.03.00 CONCRETO SOBRECIMIENTOS CORRIDOS 1:8 + 25 % PM 6 0.15 0.4 2.35 0.846

1 0.15 0.4 3.3 0.198 1.044

04.00.00 OBRAS DE CONCRETO ARMADO

04.01.00 ZAPATAS

04.01.01 CONCRETO F'C=175KG/CM2 PARA ZAPATAS

10 1.2 1.2 0.6 8.64

8.64

04.01.02 ENCOFRADO ZAÁTAS 10 4.8 0.6 28.8 28.8

04.01.03 ACERO EN ZAPATAS FY=42000 KG 89.76 89.76

No

No

m2

m2

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m2

m3

m3

m3

m2

Page 2: Metrados Posta Mongon

HOJA DE METRADOS

OBRA:POSTA MEDICA MONGON

FORMULA: ESTRUCTURAS

Part: Descripcion Und. Ancho Alto Largo Parcial Total

vec. m m m

04.02.00 SOBRECIMIENTO

04.02.01 CONCRETO F'C=175KG/CM2 SOBRECIMIENTO 2 0.25 0.65 19.5 6.3375

4 0.25 0.5 6.5 3.25

2 0.25 0.65 3.25 1.05625

0

010.64375

04.02.02 ENCOFRADO Y DESENCOFRADO SOBRECIMIENTO

4 0.65 19.5 50.7

8 0.5 6.5 26

4 0.65 3.25 8.4585.15

04.02.03 ACERO EN SOBRECIMIENTO FY=42000 KG 351.49 351.485

04.03.00 COLUMNAS

04.03.01 CONCRETO F'C=210KG/CM2 PARA COLUMNA 12 0.25 2.65 0.25 1.9875

8 0.25 2.50 0.25 1.25

11 0.15 2.3 0.25 0.948754.18625

04.03.02 ENCOFRADO Y DESENCOFRADO COLUMNAS

12 2.65 0.50 15.9

8 2.50 0.50 10

11 2.3 0.50 12.65

38.5504.03.03 ACERO FY=4200 kg/cm2 PARA COLUMNA KG 777.92 777.9204.04.00 VIGAS

04.04.01 CONNCRETO F'C=210KG/CM2 PARA VIGAS 3 0.25 0.35 19.5 5.11875

5 0.25 0.35 6.5 2.84375

7.962504.04.02 ENCOFRADO Y DESENCOFRADO DE VIGAS

3 0.7 19.5 40.95

2 0.7 6.5 9.1

3 0.95 6.5 18.52568.575

04.04.03 ACERO EN VIGAS FY=42000 KG 694.689 694.6904.05.00 ESCALERAS

04.05.01 CONCRETO F'C=210KG/CM2 PARA ESCALERA 1 1.5 3.85 5.7755.78

04.05.02 ENCOFRADO Y DESENCOFRADO DE ESCALERA 2 3.85 7.71.5 12 0.175 3.15

10.8504.05.03. ACERO FY=4200 kg/cm2 PARA ESCALERA KG 51.051 51.051

05.00.00 ESTRUCTURA DE MADERA Y COBERTURAS05.01.00 TIJERAL T-1 L 7.80 M PROM, MOD, TIPOS,CE, SIERRA UND 4 4 405.02.00 CORREAS Y TIRANTES DE MADERA DE 2" X 3" ML 1 424 424

No

No

m3

m3

m3

m3

m3

m2

m2

m2

m3

m3

m3

m2

m2

m2

m3

m3

m2

m2

m2

m3

Page 3: Metrados Posta Mongon

HOJA DE METRADOS

OBRA:POSTA MEDICA MONGON

FORMULA: ESTRUCTURAS

Part: Descripcion Und. Ancho Alto Largo Parcial Total

vec. m m m

No

No

HOJA DE METRADOS

OBRA:POSTA MEDICA MONGONFORMULA: ESTRUCTURAS

Part: Descripcion Und. Ancho Alto Largo Parcial Total

vec. m m m

05.03.00 FRISOS DE MADERA 1" X 12" ML 1 42.4 42.405.04.0 CORREAS MADERA 2" X 3", SOPORTE CIELO RASO ML 1 582 582

05.05.00 CIELO RASO CON TRIPLAY 8.94 18.3 163.602163.602

06.00.00 CUBIERTAS06.01.00. COBERTURA DE CALAMINA GALVANIZADO

2 5.15 21.1 217.33

217.3306.01.00 CUMBRERA DE PLANCHA GALVANIZADA ML 1 21.1 21.107.00.00 MUROS Y TABIQUES DE ALBAÑILERIA

07.01.00 MUROS DE LADRILLO KK DE ARCILLA DECABEZA C/M 6 1.8 0.8 8.64 1:4 X 1.5 CM- 2 1 0.8 1.6

1 1.2 0.8 0.964 0.55 1.85 4.071 13.63 2.25 30.66759 0.9 2.25 18.225

2.5 3.25 2.85 23.1563 87.3188

07.02.00 MUROS DE LADRILLO KK DE ARCILLA DE SOGA C/M

1:4 X 1.5 CM- 6 2.25 2.25 30.375

6 2.25 3.25 43.875

2 2.25 2.1 9.45

4 2.25 2.7 24.3108.00

07.03.00 ELABORACION DE LADRILLO C/A 1:4 (14*24*8 CM) UND 950008.00.00 REVOQUES, ELUCIDOS Y MOLDURAS

08.01.00 TARRAJEO EN INTERIORES Y EXTERIORES C:A 1:5 12 1.8 0.9 19.44

4 1 0.9 3.6

2 1.2 0.9 2.16

8 0.55 1.95 8.58

2 13.63 2.5 68.15

18 0.9 2.5 40.5

5 3.25 3 48.75

12 2.5 2.25 67.5

12 2.5 3.25 97.5

4 2.5 2.1 21

8 2.5 2.7 54 431.18

08.02.00 TARRAJEO DE SUPERFICIE DE COLUMNAS CON 12 2.65 0.50 15.9

CEMENTO ARENA 8 2.50 0.50 10

11 2.3 0.50 12.65

38.5508.03.00 TARRAJEO DE SUPERFICIE DE VIGAS CON

CEMENTO ARENA

3 0.7 19.5 40.95

2 0.7 6.5 9.1

No

No

m2

m2

m2

m2

m2

m2

m3

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m3

m2

m2

m2

m2

m2

Page 4: Metrados Posta Mongon

HOJA DE METRADOS

OBRA:POSTA MEDICA MONGON

FORMULA: ESTRUCTURAS

Part: Descripcion Und. Ancho Alto Largo Parcial Total

vec. m m m

No

No

3 0.95 6.5 18.52568.575

m2

Page 5: Metrados Posta Mongon

HOJA DE METRADOS

OBRA:POSTA MEDICA MONGON

FORMULA: ESTRUCTURAS

Part: Descripcion Und. Ancho Alto Largo Parcial Total

vec. m m m

No

No

HOJA DE METRADOS

OBRA:POSTA MEDICA MONGONFORMULA: ESTRUCTURAS

Part: Descripcion Und. Ancho Alto Largo Parcial Total

vec. m m m08.04.00 DERRAMES ESPESOR 15 CM ml 21 2.50 52.5 52.5

09.00.00 PISOS Y PAVIMENTOS09.01.00 PISOS09.01.01 FALSO PISO DE E=2" MEZCLA 1:8

1 122.54 122.54122.54

09.01.02 PISO DE CEMENTO PÙLIDO Y BRUÑADO, E=2"

1 122.54 122.54

122.5409.01.03 ENCHAPE CERAMICA PARED09.01.04 ENCHAPE CERAMICA PISO

09.02.00 VEREDAS09.02.01 AFIRMADO PARA VERDEDAS09.02.02 CONCRETO E= 4" + SARDINEL PASTA DE CEMENTO

48.30 48.30

48.3009.02.03 ENCOFRADOS Y DESEMCOFRADO DE VEREDAS E= 0.20

ml 1 61.29 61.29 61.2909.03.00 JUNTAS ASFALTICAS 09.03.01 JUNTAS ASFALTICAS E=1" ml 10 1.2 12

ml 12.0010.00.00 CONTRAZOCALOS10.01.00 CONTRAZOCALOS DE CEMENTO SIN COLOREAR H=30 CM ml 1 197.5 197.5 197.5

11.00.00 CARPINTERIA DE MADERA

11.01.00 PUERTA TABLERO MAD. CEDRO REBAJ. 1.20*2.50m 3 2.5 1.2 9

11.02.00 PUERTA TABLERO MAD. CEDRO REBAJ. 0.90*2.50m 3 2.5 0.9 6.75

11.03.00 PUERTA TABLERO MAD. CEDRO REBAJ. 1.00*2.50m 3 2.5 1 7.5

11.04.00 PUERTA TABLERO MAD. CEDRO REBAJ. 0.80*2.50m 4 2.5 0.8 8

11.05.00 PUERTA TABLERO MAD. CEDRO REBAJ. 0.75*2.50m 1 2.5 0.75 1.875

11.06.00 PUERTA TABLERO MAD. CEDRO REBAJ. 1.50*2.5m doble hoja 1 2.5 1.5 3.75 36.87511.07.00 VENTANA DE MADERA CEDRO C/ SEGURIDAD

6 1.8 1.6 17.28

5 0.45 0.55 1.2375

2 1 1.6 3.2

2 1.2 1.69 4.056

1 0.45 1 0.45 26.23

12.00.00 CERRAJERIA12.01.00 BISAGRA ALUMINIZ, DE 4" PESADA EN PUERTAS und 16 3 48 4812.02.00 BIZAGRAS ALUMINIZADAS EN VENTANAS und 16 4 4 412.03.00 CERRADURAS FORTE 2 GOLPES EN PUERTAS und 16 1 16 1612.04.00 MANIJA DE BRONCE PARA PUERTAS und 16 1 16 1612.05.00 CERROJO DE 2" PARA VENTANAS und 16 1 16 1613.00.00 VIDRIOS Y CRISTALES13.01.00 VIDRIOS SEMIDOBLES

p2 6 10.764 1.7 1.5 164.688p2 5 10.764 0.35 0.45 8.47658p2 2 10.764 0.9 1.5 29.0626

No

No

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

Page 6: Metrados Posta Mongon

HOJA DE METRADOS

OBRA:POSTA MEDICA MONGON

FORMULA: ESTRUCTURAS

Part: Descripcion Und. Ancho Alto Largo Parcial Total

vec. m m m

No

No

p2 2 10.764 1.1 1.6 37.889p2 1 10.764 0.35 0.9 3.39063 243.51

Page 7: Metrados Posta Mongon

HOJA DE METRADOS

OBRA:POSTA MEDICA MONGON

FORMULA: ESTRUCTURAS

Part: Descripcion Und. Ancho Alto Largo Parcial Total

vec. m m m

No

No

HOJA DE METRADOS

OBRA:POSTA MEDICA MONGONFORMULA: ESTRUCTURAS

Part: Descripcion Und. Ancho Alto Largo Parcial Total

vec. m m m

14.00.00 PINTURA

14.01.00 PINTURA EN MUROS INTERIORES EXT. Y DERRAMES 12 1.8 0.9 19.44

LATEX 4 1 0.9 3.6

2 1.2 0.9 2.16

8 0.55 1.95 8.58

2 13.63 2.5 68.15

18 0.9 2.5 40.5

5 3.25 3 48.75

12 2.5 2.25 67.5

12 2.5 3.25 97.5

4 2.5 2.1 21

8 2.5 2.7 54

12 2.65 0.50 15.9

8 2.50 0.50 10

11 2.3 0.50 12.65

3 0.7 19.5 40.95

2 0.7 6.5 9.1

3 0.95 6.5 18.525 538.30514.02.00 PINTURA EN CIELO RASO AL TEMPLE

122.54 122.5122.54

14.03.00 PINTURA EN CONTRAZOCALOS CON ESMALTE 1 0.3 197.5 59.2559.25

14.04.00 PINTURA ESMALTE EN CARPINTERIAS 2 36.875 73.75 73.7515.00.00 INSTALACIONES ELECTRICAS15.01.00 SALIDA PARA CENTROS DE LUZ und 17 1715.02.00 SALIDA PARA TOMACORRIENTE DOBLE und 27 2715.03.00 SALIDA PARA BRAQUET und 2 215.04.00 CAJA DE PASE GAlVANIZADA, LIVIANA 4X4X3" und 1 116.00.00 TABLEROS Y CUCHILLAS16.01.00 TABLERO GENERAL 2X15A,2X20A, 2X60A und 1 116.02.00 INTERRUPTOR THERMOMAGNETICO 2X20A und 2 216.03.00 INTERRUPTOR THERMOMAGNETICO 2X15A und 1 1

17.00.00 ARTEFACTOS17.01.00 ARTEFACTO PARA FLUORECENTE INC. LAMPARA und 16 1617.02.00 ARTEFACTO BRAQUETE DIRIGIBLE, 01 LAMPARA und 2 2

18.00.00 OTROS18.01.00 SISTEMA DE AGUA DE LLUVIA18.01.01 TUB. DE BAJADADA Y DISTRIBUCION PVC D= 3" ml 14 1418.01.02 CANALETA DE F°G° 1/8" 200mm x 200mm x 150 mm ml 39 3918.02.00 CUNETA DE PISO18.02.01 EXCAVACION MANUAL18.02.02 REFINE DE CUNETA18.02.03 CONCRETO F'C= 175 KG/CM2

No

No

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m3

m2

m2

m2

m2

m2

m2

m2

m2

m2

Page 8: Metrados Posta Mongon

HOJA DE METRADOS

OBRA:POSTA MEDICA MONGON

FORMULA: ESTRUCTURAS

Part: Descripcion Und. Ancho Alto Largo Parcial Total

vec. m m m

No

No

19.00.00 INTALACIONES SANITARIAS19.01.00 INSTALACIONES DESAGUE19.01.01 SALIDA DE DESAGUE PTO 17 1719.01.02 SALIDA DE VENTILACION,PVC2" PTO 4 4

Page 9: Metrados Posta Mongon

HOJA DE METRADOS

OBRA:POSTA MEDICA MONGON

FORMULA: ESTRUCTURAS

Part: Descripcion Und. Ancho Alto Largo Parcial Total

vec. m m m

No

No

HOJA DE METRADOS

OBRA:POSTA MEDICA MONGONFORMULA: ESTRUCTURAS

Part: Descripcion Und. Ancho Alto Largo Parcial Total

vec. m m m19.01.03 TUBERIA DE DESAGUE PVC SAL 2" ML 25.4 25.419.01.04 TUBERIA DE DESAGUE PVC SAL 4" ML 35.5 35.519.01.05 SUMIDERO DE BRONCE, 2" UND 5 519.01.06 REGISTRO ROSCADO 4" UND 4 419.01.07 CAJA DE REGISTRO 12X 24 TAPA DE CONCRETO UND 5 519.02.00 INSTALACIONES DE AGUA FRIA19.02.01 SALIDA DE AGUA FRIA PVC pto 11 1119.02.02 TUBERIA PVC CLASE 10 1/2" ml 52 5219.02.03 VALVULA COMPUERTA BRONCE und 5 519.01.04 GRIFO DE CIERRE RAPIDO DE 1/2" und 1 1

20.00.00 APARATOS20.01.00 INODORO TANQUE BAJO und 7 420.03.00 LAVATORIO LOSA BLANCA C/ACCESORIOY 1 LLAVE und 4 420.04.00 LAVATORIO DE COCINA DE FIBRA DE VIDRO und 1 120.04.00 LAVATORIO DE COCINA DE FIBRA DE VIDRO und 1 1

21.00.0 PRUEBAS DE CONCRETO21.01.00 ENSAYOS DE DISEÑO DE MESCLA und 1 121.02.00 ENSAYOS DE RESISTENCIA DEL CONCRETO und 3 322.00.00 PLACA RECORDATORIA22.01.00 PLACA RECORDATORIA und 1 123.00.00 LIMPIEZA FINAL DE OBRA23.01.00 LIMPIEZA FINAL DE OBRA GLB 1 1

No

No

Page 10: Metrados Posta Mongon

HOJA DE METRADOS DEL ACEROOBRA: POSTA MONGON (CONTRUC.)FORMULA: 01 -

Partida Descripcion Und. Parcial Parcial TOTAL

veces piezas 1/4'' 3/8'' 1/2'' 5/8'' 3/4'' 1'' ml Kg kgZAPATAS

1.1 1/2" 10 8 1.1 88 89.7689.76

VIGAS DE CIMENTACION

3/8" 2 4 20.8 166.4 96.512175.112

1/4" 2 131 1.2 314.4 78.6

3/8" 4 4 7.54 120.64 69.9712144.9712

1/4" 10 25 1.2 300 75

3/8" 2 4 3.8 30.4 17.63231.402

1/4" 2 27 1.02 55.08 13.77

TOTAL = 351.49

COLUMNASc-1

1/2" 20 4 4.6 368 375.36 467.36

1/4" 20 20 0.92 368 92.00

c-1

3/8" 10 4 6.95 278 283.56 310.56

1/4" 10 20 0.54 108 27.00

TOTAL = 777.92ACERO VIGAS

1/2" 3 5 19.8 297 302.94401.265

1/4" 15 23 1.14 393.3 98.325

1/2" 6 5 7.54 226.2 230.724293.424

1/4" 10 22 1.14 250.8 62.7

TOTAL = 694.689

No No LONGITUDES x f

No

3.90

0.15 0.15

0.09

0.34

7.24

0.15 0.15

0.18

0

3.50

0.15 0.15

0.18

0.32

4.35

0.20

0.25

4.35

0.20

0.25

0.170.17

10.68

0.15 0.15

5.75

0.15 0.15

19.5

0.15 0.15

0.18

0.32

4.15

0.20

0.25

0.180.18

4.15

0.20

0.25

0.180.09

19.58

0.15 0.15

7.24

0.15 0.15

0.180.29

0.180.29

Page 11: Metrados Posta Mongon

HOJA DE METRADOS

OBRA: CERCO PERIMETRICOFORMULA: 05

Part: Descripcion Und. Ancho Alto Largo Parcial Total

vec. m m m

01.00.00 OBRAS PRELIMINARES

01.01.00 LIMPIEZA DE TERRENO 1 0.6 24.5 14.7 14.701.02.00 TRAZO NIVELACION Y REPLANTEO CON WINCHA Y CORDEL

0.6 24.5 14.7 14.702.00.00 MOVIMIENTODE TIERRAS

02.01.00 EXCAVACION DE ZANJAS HAST 1.00 m 1 1.2 0.6 25.4 18.28818.29

02.02.00 RELLENO CON MATERIAL PROPIO 1 0.35 0.4 25.4 3.5563.556

02.03.00 ACARREO DE MATERIAL EXCEDENTE HASTA D<50 M 1 14.732 14.732

03.00.00 OBRAS DE CONCRETO SIMPLE03.01.00 CONCRETO CIMIENTOS CORRIDOS 1:10 + 30 % PG

1 0.8 0.6 25.4 12.19212.192

04.00.00 OBRAS DE CONCRETO ARMADO04.01.00 SOBRECIMIENTO04.01.01 CONCRETO F'C=175KG/CM2 PARA SOBRECIMIENTO

1 1.6 0.25 25.4 10.1610.16

04.01.02 ENCOFRADO Y DESENCOFRADO D SOBRECIMIENTO 1 0.65 2 25.4 33.02

33.02

04.01.03 ACERO EN SOBRECIMIENTO FY=42000 KG 711.10 711.1004.02.0 COLUMNAS

04.02.01 CONCRETO F'C=210KG/CM2 PARA COLUMNA 27 0.25 2.3 0.25 3.88125

3.904.02.02 ENCOFRADO Y DESENCOFRADO COLUMNAS

10 0.55 2.30 12.65 12.65

04.02.03 ACERO FY=4200 kg/cm2 PARA COLUMNA KG 130.50 130.505.00.00 MUROS Y TABIQUES DE ALBAÑILERIA

05.01.00 MUROS DE LADRILLO KK DE ARCILLA DE SOGA C/M 8 2.5 3.11 62.2 1:4 X 1.5 CM-

62.206.00.00 REVOQUES, ELUCIDOS Y MOLDURAS

06.01.00 TARRAJEO EN INTERIORES Y EXTERIORES 8 1.5 3.11 37.3237.32

No

No

m2

m2

m3

m3

m3

m3

m3

m2

m3

m2

m2

m2

Page 12: Metrados Posta Mongon

HOJA DE METRADOS DEL ACEROOBRA: SSHH SAHUACHUCOFORMULA: 01 -

Partida Descripcion Und. Parcial Parcial TOTAL

veces piezas 1/4'' 3/8'' 1/2'' 5/8'' 3/4'' 1'' ml Kg kgVIGAS DE CIMENTACION

3/8" 1 8 25.4 203.2 117.856 117.86

3/8" 1 52 19.67 1022.84 593.2472 593.25

TOTAL = 711.10COLUMNAS

3/8" 10 6 2.5 150 84.00 130.50

1/4" 10 15 1.24 186 46.50

TOTAL = 130.50VIGAS

3/8" 3 4 26.2 314.4 182.352224.672

1/4" 8 23 0.92 169.28 42.32

TOTAL = 224.67

No No LONGITUDES x f

No

4.35

0.20

0.25

0.17

0.180.13

4.20

0.20

0.25

0.18

0.180.13

3.90

0.15 0.15

0.09

0.34

25.4

0.15 0.15

0.18

0.18

Page 13: Metrados Posta Mongon

HOJA DE METRADOS

OBRA: MURO DE CONTENCION - mongonFORMULA: 03

Part: Descripcion Und. Ancho Alto Largo Parcial Total

vec. m m m01.00.00 MURO DE CONTENCION

01.01.00 LIMPIEZA DE TERRENO MANUAL 1 19.5 1.85 36.075

2 1.925 1.85 7.1225 43.1975

01.02.00 TRAZO NIVELACION Y REPLANTEO 1 19.5 1.85 36.075

2 1.925 1.85 7.1225 43.1975

01.03.00 EXCAVACION DE ZANJAS 1 19.5 1 1.85 36.075

2 1.925 1.4 1.85 9.971546.05

01.04.00 RELLENO Y COMPACTADO CON MATERIAL PROPIO 1 1.4 2.5 19.5 68.25

2 1.4 2.5 1.925 13.47581.73

01.05.00 ENCOFRADO Y DESENCOFRADO PANTALLA DE MURO 2 2.5 0.25 1.25

2 2.5 19.50 97.5

2 0.4 19.50 15.6

2 1.85 0.40 1.48

2 0.4 3.5 2.8

4 3.25 2.5 32.5 151.13

01.06.00 CONCRETO F'C=210KG/CM2 PANTALLA DE MURO 1 19.5 2.5 0.25 12.1875

1 1.85 20 0.40 14.8

2 2.5 0.25 3.25 4.0625

2 0.4 1.85 1.93 2.849 33.899

01.07.00 ACERO FY=4200 kg/cm2 KG 2556.00 2556.0001.08.00 TARRAJEO DE MUROS DE CONCRETO

1 2.5 0.25 0.625

1 2.5 19.50 48.75

2 3.25 2.5 16.2565.625

01.09.00 PINTURA EN MUROS CON ESMALTE M2 1.9 26 49.40 49.4001.10.00 JUNTAS DE EXPANSION TEKNOPOR (MUROS) M2 15.00 15.00

No

No

m2

m2

m2

m2

m3

m3

m3

m3

m2

m2

m2

m2

m2

m2

m3

m3

m3

m3

m2

m2

m2

Page 14: Metrados Posta Mongon

HOJA DE METRADOS

OBRA: POZO DE PERCOLACION Y TANQUE SEPTICO-MONGONFORMULA: 04

Part: Descripcion Und. Ancho Alto Largo Parcial Total

vec. m m m01.00.00 POZO DE PERCOLACION01.01.00 TRABAJOS PRELIMINARES

01.01.01 LIMPIEZA DE TERRENO MANUAL 1 2.4 3.14 4.5216 4.5216

01.01.02 TRAZO Y REPLANTE PRELIMINAR 1 2.4 3.14 4.5216 4.521601.02.00 MOVIMIENTODE TIERRAS

01.02.01 EXCAVACION DE ZANJAS 1 2.4 4.82 3.14 21.7941

21.79

01.02.02 RELLENO CON MATERIAL PROPIO 1 1.8 0.21 3.14 0.53411

0.53

01.02.03 ACARREO DE MATERIAL EXCEDENTE HASTA L= 30 M 1 21.260 21.260

01.03.00 OBRAS DE CONCRETO SIMPLE01.03.01 CONCRETO CIMIENTOS CORRIDOS 1:10 + 30 % PG

1 0.4 0.3 5.024 0.60288 0.60288

01.03.02 ENCOFRADO Y DESENCOFRADO 1 0.4 5.024 2.0096 2.0096

01.04.00 OBRAS DE CONCRETO ARMADO01.04.01 CONCRETO F'C=175KG/CM2

1 0.25 0.2 5.495 0.27475

1 3.15 0.25 0.25 0.19688

1 2.4 0.15 3.14 0.67824

1 0.1 0.25 2.198 0.05495 1.2001.04.02 ENCOFRADO Y DESENCOFRADO

1 0.2 5.495 1.0991 3.5 0.25 0.875

1.974

01.04.03 ACERO FY=42000 KG 1 56.304 56.304KG 1 39.715 39.7152KG 1 20.498 20.50 116.52

01.05.00 MUROS Y TABIQUES DE ALBAÑILERIA

01.05.01 MUROS DE LADRILLO DE ARCILLA 24X12X9 CABEZA / 1.5 C 1 2.8 5.495 15.386 15.38601.05.02 ELABORACION DE LADRILLO C/A1:4 UND 96001.06.00 FILTRO DE GRABA

01.06.01 FILTRO DE GRAVA 5.50 5.50 5.5001.06.02 TUBERIA UPVC 6" ML 22.10 22.10 22.10

01.06.03 CODO PVC DE 6" UND 1.00 1

02.00.00 TANQUE SEPTICO02.01.00 TRABAJOS PRELIMINARES

02.01.01 TRAZO Y REPLANTE PRELIMINAR 1 3 2 6 602.02.00 MOVIMIENTO DE TIRRRAS

02.02.01 EXCAVACION MANUAL 1 3 1.5 2 9 902.03.00 OBRAS DE CONCRETO SIMPLE

02.03.01 SOLADO F'C= 100GK/CM2 E=4" 1 3 2 6 602.04.00 OBRAS DE CONCRETO ARMADO

02.04.01 CONCRETO F'C=175KG/CM2

2 0.15 1.5 3 1.35

3 0.15 1.5 1.7 1.1475

2 1.7 0.15 1.7 0.867

2 0.85 0.15 1.7 0.4335

3.80

02.04.02 ENCOFRADO Y DESENCOFRADO 4 1.4 3 16.8

6 1.4 1.7 14.28

1 1.7 1.7 2.89

1 0.85 1.7 1.445 18.615

02.04.03 ACERO FY=42000 KG 1 8.8 8 0.56 39.424KG 1 10 4.667 0.56 26.1333KG 1 6.8 12 0.56 45.696KG 1 1.7 8 0.56 7.616KG 1 2 4.667 0.56 5.22667KG 1 4 2.75 0.56 6.16 130.256

02.05.00 REBOQUES ENLUCIDOS Y MOLDURAS

02.05.01 TARRAJEO C/ IMPERMEABILIZANTE MEZCLA 1:1, E= 1.5 2 1.4 3 8.44 1.4 1.7 9.52

No

No

m2

m2

m3

m3

m3

m3

m2

m3

m3

m3

m3

m2

m2

m3

m2

m3

m2

m3

m3

m3

m3

m2

m2

m2

m2

m2

Page 15: Metrados Posta Mongon

1 1.7 1.7 2.891 0.85 1.7 1.445 22.255

Page 16: Metrados Posta Mongon

HOJA DE METRADOS

OBRA: CISTERNA Y TANQUE ELVADO-MONGONFORMULA: 02

Part: Descripcion Und. Ancho Alto Largo Parcial Total

vec. m m m01.00.00 TANQUE CISTERNA01.01.00 TRABAJOS PRELIMINARES

01.01.01 LIMPIEZA DE TERRENO MANUAL 1 1.5 2 3 3

01.01.02 TRAZO Y REPLANTEO PRELIMINAR 1 1.5 2 3 301.02.00 MOVIMIENTO DE TIERRAS

01.02.01 EXCAVACION MANUAL 1 1.5 2 2 6 6

01.02.02 RELENO CON MATERIAL PROPIO 1 0.53 0.5301.02.03 ACARREO DE MATERIAL EXCEDENTE01.03.00 OBRAS DE CONCRETO SIMPLE01.03.01 SOLADO F'C= 100GK/CM2 1 1.5 2 3 301.04.00 OBRAS DE CONCRETO ARMADO

01.04.01 CONCRETO F'C=175KG/CM2

2 0.12 1.5 2 0.72

2 0.12 1.5 1.2 0.432

2 1.76 0.12 1.26 0.532221.68

01.04.02 ENCOFRADO Y DESENCOFRADO 4 1.5 2 12

2 1.5 1.2 3.6

1 1.76 1.26 2.2176

5.8176

01.04.03 ACERO FY=42000 KG 1 7 7.68 0.56 30.1056KG 1 8 6.667 0.56 29.8667KG 1 7 6 0.56 23.52

83.4923

01.04.04 TARRAJEO C/ IMPERMEABILIZANTE MEZCLA 1:1, E= 1.5 4 1.5 2 122 1.5 1.2 3.61 1.76 1.26 2.2176

17.817601.05.00 CAJA DE REBOSE01.05.01 CAJA DE REGISTRO 60*30 CM C/TAPA DE CONCRETO UND 1 1

01.06.00 VALVULAS Y ACCASORIOS01.06.01 VALVULAS VARIAS Y ACCESORIOS(CISTERNA) GLB 1 1

02.00.00 TANQUE ELEVADO02.01.00 SOPORTE DE TANQUE ELEVADO DE CONCRETO ARMADO

02.01.01 CONCRETO F'C=175KG/CM2 P/ ZAPATA- COL. -VIGAS Y LOSA

1 1 0.4 1 0.4

1 0.3 0.3 3.2 0.288

1 1.2 0.15 1.5 0.27

0.96

02.01.02 ENCOFRADO Y DESENCOFRADO 1 1 3 3

1 1.2 1.5 1.8

1.8

02.01.03 ACERO FY=42000 KG 1 2.6 13.5 0.56 19.656KG 1 4.2 4 1.02 17.136KG 1 4.2 4 0.56 9.408KG 1 0.9 8 0.56 4.032

50.23202.02.00 REBOQUES ENLUCIDOS Y MOLDURAS

02.02.01 TARRAJEO C/ MEZCLA 1:4, E= 1.5 1 1 3 31 1.2 1.5 1.8

4.802.03.00 TANQUE ELEVADO ROTOPLAST CAP. 1100 LT 02.03.01 TANQUE ELEVADO ROTOPLAST CAP. 1100 LT INC ACCESORIOS UND 1 1 1

02.04.00 VALVULAS Y ACCESORIOS02.04.01 VALVULAS VARIAS Y ACCESORIOS (TANQUE ELEVADO) GLB 1 1 1

No

No

m2

m2

m3

m3

m3

m3

m3

m2

m2

m2

m2

m2

m3

m3

m3

m2

m2

m2

Page 17: Metrados Posta Mongon

HOJA DE METRADOS

OBRA: CAMARA DE DISTRIBUCION- SAHUACHUCOFORMULA: 01 ESTRUCTURAS

Part: Descripcion Und. Ancho Alto Largo Parcial Total

vec. m m m

07.00.00 TRABAJOS PRELIMINARES

07.01.00 TRAZO Y REPLANTE PRELIMINAR 1 0.8 0.8 0.64 0.64

07.02.00 EXCAVACION MANUAL 1 0.8 0.8 0.7 0.0896 0.0896

07.03.00 CONCRETO F'C=175KG/CM2

1 0.1 0.7 3.2 0.2241 0.1 0.8 0.8 0.0641 0.1 0.8 0.7 0.056

0.3407.04.00 ENCOFRADO Y DESENCOFRADO

2 0.7 3.2 4.484 0.8 0.1 0.322 0.8 0.7 1.12 5.92

07.05.00 ACERO FY=42000 KG 1 4.704 4.704KG 1 7.168 7.168KG 1 3.584 3.58 15.46

07.06.00 TARRAJEO C/ IMPERMEABILIZANTE MEZCLA 1:1, E= 1.5 1 0.6 3 1.81 0.7 0.7 0.492 0.7 0.6 0.84 3.1

No

No

m2

m3

m3

m2

m2

Page 18: Metrados Posta Mongon

HOJA DE METRADOS

OBRA: MURO DE CONTENCION DE CERCO- mongonFORMULA: 03

Part: Descripcion Und. Ancho Alto Largo Parcial Total

vec. m m m01.00.00 MURO DE CONTENCION

01.01.00 LIMPIEZA DE TERRENO MANUAL 1 1.5 25.4 38.138.1

01.02.00 TRAZO NIVELACION Y REPLANTEO 1 1.5 25.4 38.138.1

01.03.00 EXCAVACION DE ZANJAS 1 1.5 1.2 25.4 45.72

45.72

01.04.00 RELLENO Y COMPACTADO CON MATERIAL PROPIO 1 1.05 0.8 25.4 21.336

21.34

01.05.00 ENCOFRADO Y DESENCOFRADO PANTALLA DE MURO 2 1.7 25.40 86.36

2 0.4 25.40 20.32

106.68

01.06.00 CONCRETO F'C=210KG/CM2 PANTALLA DE MURO 1 0.7 0.2 25.40 3.556

1 0.4 1.5 25.40 15.24

18.796

01.07.00 ACERO FY=4200 kg/cm2 KG 1090.39 1090.3901.08.00 TARRAJEO DE MUROS DE CONCRETO

1 0.8 25.40 20.32

20.32

01.09.00 PINTURA EN MUROS CON ESMALTE M2 0.8 25.4 20.32 20.3201.10.00 JUNTAS DE EXPANSION TEKNOPOR (MUROS) ML 1.70 1.70

No

No

m2

m2

m3

m3

m2

m2

m3

m3

m2

Page 19: Metrados Posta Mongon

HOJA DE METRADOS DEL ACEROOBRA: SSHH SAHUACHUCOFORMULA: 01 -

Partida Descripcion Und. Parcial Parcial TOTAL

veces piezas 1/4'' 3/8'' 1/2'' 5/8'' 3/4'' 1'' ml Kg kgmuro de contencion

3/8" 56.44 1 2.6 146.75556 85.118 85.12

5/8" 16.93 1 2.6 44.026667 68.682 68.68

5/8" 16.93 1 0.8 13.546667 21.133 21.13

5/8" 16.93 1 0.5 8.4666667 13.208 13.21

3/8" 6.296 1 25.4 159.92593 89.56 89.56

3/8" 6.296 1 25.4 159.92593 89.56 89.56

1/2" 115 1 2 230.90909 235.53 235.52731/2" 141 1 2 282.22222 287.87 287.86671/2" 115 1 1.5 173.18182 176.65 176.64551/2" 115 1 0.8 92.363636 23.091 23.09091

TOTAL 1090.39