Metrology of the Stave250 Assembly Jig. (Tim). What do we need to measure?. Procedure. Measure PH2 and define as (0,0) 4 point: DIA=0.043 / CIRC=0.001 Measure PH1 and define PH2-PH1 as primary axis 4 point: DIA = 0.063 / CIRC=0.001 Distance PH1-PH2 = 1247.520 - PowerPoint PPT Presentation

Citation preview

Page 1: Metrology of the Stave250 Assembly Jig

Metrology of the Stave250 Assembly Jig

(Tim)

Page 2: Metrology of the Stave250 Assembly Jig

What do we need to measure?

Page 3: Metrology of the Stave250 Assembly Jig

Procedure• Measure PH2 and define as (0,0)

– 4 point: DIA=0.043 / CIRC=0.001

• Measure PH1 and define PH2-PH1 as primary axis– 4 point: DIA = 0.063 / CIRC=0.001– Distance PH1-PH2 = 1247.520

• Measure front edge of 14 Vee-blocks at 4 points along length (See plot) and reconstruct line of best fit– Y=-42.228 + 1.5738x10-4 X

• Measure Tooling ball – (1248.586,-119.685): DIA=8.207 / CIRC=0.011

Page 4: Metrology of the Stave250 Assembly Jig

Vee Blocks

-200 0 200 400 600 800 1000 1200 1400-43

-42.75

-42.5

-42.25

-42

-41.75

-41.5

-41.25

-41

f(x) = 0.000157382449975012 x − 42.2282247148167R² = 0.538518351391159

Position along jig (0 = PH2) (mm)

Dist

ance

from

(PH2

-PH

1)

Page 5: Metrology of the Stave250 Assembly Jig

CAD Analysis

Page 6: Metrology of the Stave250 Assembly Jig

CAD Analysis

Page 7: Metrology of the Stave250 Assembly Jig

Comparison with SmartScope• Procedure

– Mount jig on Smartscope & reconstruct lines along the edges of the Vee blocks (sub-stage illumination). Construct datum axis

– Measure tooling ball as a composite of 3 sub-circles• Diameter = 8.209 / CIRC = 0.0186

– Measure PH1 as a composite of 3 sub-circles• Diameter = 0.0287 / CIRC = 0.0015

– Measure distance from Tooling ball to PH1 parallel to Vee-block datum axis• 1.0765 – Diameter/2 = -3.028

– Measure PH1 offset to Vee-block axis• 42.040

Page 8: Metrology of the Stave250 Assembly Jig

Vee-blocks (CMM vs SmartScope)

-200 0 200 400 600 800 1000 1200 1400-0.5

-0.25

0

0.25

0.5

-0.5

-0.25

0

0.25

0.5

CMM (Corr)SmartScope

Position along jig (0 = PH2) (mm)

Dist

ance

from

(PH2

-PH1

)

Resid

ual (

Smar

tsco

pe)

Page 9: Metrology of the Stave250 Assembly Jig

CMM Survey with Back-lighting

• Pin-holes and tooling ball measured with back-lighting to try and improve measurement– Hi-tec torch (Wifi/3G enabled)

• Results– Pin-holes • 0.028 / 0.030 mm with 4-point circularity of 0.001mm

– Tooling ball• 8.205mm with 20-point circularity of 0.025mm

Page 10: Metrology of the Stave250 Assembly Jig

Comparison of CMM Vee-block alignments

-200 0 200 400 600 800 1000 1200 1400-42.5

-42.3

-42.1

-41.9

-41.7

-41.5

Back-lit SurveyFront-lit Survey

Position along jig (0 = PH2) (mm)

Dist

ance

from

(PH2

-PH1

)

Page 11: Metrology of the Stave250 Assembly Jig

Survey with 4mm dowels (CMM#3)• 4mm dowels

held into Vee blocks with tool-makers clamps.

• Inner edge of dowels reconstructed using back illumination via reflection from aluminium.

Page 12: Metrology of the Stave250 Assembly Jig

Comparison of Vee-block surveys

• NB 4mm dowel data offset by +3.40 mm

-200 0 200 400 600 800 1000 1200 1400-42.5

-42.3

-42.1

-41.9

-41.7

-41.5

Back-lit Survey

Front-lit Survey

4mm dowels

Position along jig (0 = PH2) (mm)

Dist

ance

from

(PH2

-PH1

)

Page 13: Metrology of the Stave250 Assembly Jig

SummaryParameter CMM CMM #2 CMM#3 SmartScope

Ref Offset Y1 42.032 42.036 45.472 42.040

Ref Offset Y2 42.228 42.229 45.649

Dim Y1 to Y2 1247.520 1247.522 1247.522

Ref Offset X1 3.053 3.057 3.055 3.028