Las Angeles County One Gateway Plaza zi3.9zz.z000
Metropolitan Transportation Authority Los Angeles, CA gooiz-2952 metro.net
Metro REVISED
SYSTEMS SAFETY AND OPERATIONS COMMITTEEMay 17, 2012
SUBJECT: TRACTION POWER SUBSTATIONS FOR EXPOSITION LINE PHASE 2AND GOLD LINE FOOTHILL EXTENSION
ACTION: AWARD CONTRACT FOR TRACTION POWER SUBSTATIONS
RECOMMENDATION
Authorize the Chief Executive Officer to award a firm fixed price contract under Bid No.OP39602869 with Balfour Beatty Rail Inc, the lowest responsive and responsible bidderfor 18 Traction Power Substations (TPSS) for an amount not-to-exceed $19,176,024.01inclusive of sales tax and storage fees.
ISSUE
Traction Power Substations are a vital part of the rail system. The stations are placedone mile apart along the alignment. They convert high voltage electricity (alternatecurrent) for the Light Rail Vehicle (LRV) catenary cable power into the necessaryvoltage (direct current) required to run the LRV cars.
As agreed to in the Memorandums of Understanding with the Construction Authorities,Traction Power Substations for the Foothill Extension and Phase 2 of the Expo line willbe purchased by Metro. Funds were identified and reserved to procure and supplysubstations to the construction authorities' contractors. Procurement of substationsunder a combined contract provides economies of scale and uniformity of equipmentbetween rail lines. Standard sub station design and construction will benefit Metro withreduced life-cycle costs for training, maintenance and replacement parts.
DISCUSSION
On January 1, 2012, the Board approved a Master Cooperative Agreement andFunding Agreement with the Foothill Construction Authority that includes TractionPower Substations as items Metro will supply. There are similar requirements in theFunding Agreement Term Sheet for Phase 2 of the Exposition Line. Procurement ofsubstations under a unified contract provides economies of scale and uniformity ofequipment between rail lines.
Traction Power Substations
This contract is for the designing, manufacturing, testing and delivery of 18 TractionPower Substations, including spare parts and special tools. The Contract also includesa schedule of storage fees in the event that one or both projects are not ready toreceive substations when they have been manufactured.
DETERMINATION OF SAFETY IMPACT
Approval of this item will ensure uniformity of equipment manufacture, design andconfiguration across projects, thereby improving the safety of maintenance throughconsistency of operation.
FINANCIAL IMPACT
The funding of $1,134,162 for this project is included in the FY12 budget in cost center3920, Wayside Systems, under project 860301, EXPO Blvd. LRT Construction PhaseII, account 53102 Acquisition of Equipment and in cost center 8510, ConstructionContracts/Procurement, under project 860200, Gold Line Foothill Extension, account50316 Services, Prof and Tech Service.
Since this is a multi-year contract, the project manager and Executive Officer, WaysideSystems will be accountable for budgeting the cost in future years.
Impact to Budget
The funding for this acquisition will come fromMeasure R funds eligible for rail operating and capital.
ALTERNATIVES CONSIDERED
This procurement could be rejected and the funds for substation procurementtransferred back to the two Construction Authorities. However, the time lost insolicitation, bid and selection would be lost and may impact the opening date for theseprojects, or result in higher cost due to accelerated manufacture to make up for losttime.
NEXT STEPS
Following execution of this contract, the vendor will commence manufacturing, withdeliveries scheduled to commence in June 2013.
ATTACHMENTS
A. Procurement SummaryB. Bid Tabulation
Prepared by: Michael J. Harris-Gifford, Executive Officer Wayside Systems
Traction Power Substations
Michelle Lopes Cal weChief Administr Services Officer
Frank AledroChief Op ations Officer
/ ~ ''
Arthur T. LeahyChief Executive Officer
Traction Power Substations
ATTACHMENT A
PROCUREMENT SUMMARY
Traction Power Substations for Expo and Gold Line
1. Contract Number: OP396028692. Recommended Vendor: Balfour Beatt Rail, Inc
3. Type of Procurement (check one): ~ IFB ❑ RFP ❑ RFP—A&E❑ Non-Com etitive ❑Modification ❑Task Order
4. Procurement Dates:A. Issued: Februa 1, 2012B. Advertised/Publicized: Februa 2, 2012
C. Pre-proposal/Pre-Bid Conference: Februar 16, 2012
D. Proposals/Bids Due: Step 1 (Technical Bids) March 12, 2012 and Step
2 (Price Bids) March 28, 2012E. Pre-Qualification Completed: March 30, 2012
F. Conflict of Interest Form Submitted to Ethics: March 29, 2012
G. Protest Period End Date: Ma 22, 2012
5. Solicitations Pickedup/Downloaded:40
Bids/Proposals Received:3
6. Contract Administrator:Lil Lopez
Telephone Number:213-922-4639
7. Project Manager:Michael Harris Gifford
Telephone Number:213-922-3250
A. Procurement Background
This Board action is for aTwo-Step Invitation for Bid (IFB), technically acceptable
and lowest-responsive bid procurement issued in support of Wayside Systems to
acquire up to eighteen standardized Traction Power Sub-Stations (TPSS) for Expo II
and Foothill.
The IFB was issued in accordance with Metro's Acquisition Policy and the contract
type is firm fixed price.
Three amendments were issued during the solicitation phase of this IFB;
• Amendment No. 1 issued on February 17, 2012 clarified revisions to the
performance specification and provided responses to questions;
• Amendment No. 2 issued on February 22, 2012 clarified critical due dates,
revised the performance specification and provided responses to questions;
and,• Amendment No. 3 issued February 24, 2012 clarified revisions to the
performance specification and provided responses to questions.
Traction Power Substations
A pre-bid conference was held on February 16, 2012. A total of three firms attendedthe pre-bid conference, and eight questions were asked.
A total of four technical bids were received under Step One on March 12, 2012. AllStep One technical bids were evaluated, and only firms found to be technicalacceptable were invited to submit Step Two —Price Bids. On March 28, 2012, a totalof three price bids were received under Step Two.
B. Evaluation of Proposals/Bids
A total of four bidders responded to this solicitation. A Source Selection Committeeconsisting of two staff members from Wayside Systems and one from SystemsEngineering was convened and conducted a comprehensive technical and priceevaluation of the bids received.
The bids were evaluated on a pass/fail evaluation criteria based on the minimumqualification requirements defined in the IFB.The evaluation criteria is appropriateand consistent with criteria developed for other, similar equipment procurements.
Of the four technical bids received, three were determined to be technicallyacceptable. The three firms that were deemed technically acceptable are listedbelow in alphabetical order:
1. Balfour Beatty Rail, Inc.2. Powell Electrical Systems, Inc.3. Siemens Industry, Inc.
On March 16, 2012, firms found to be technically qualified were formally invited tosubmit Step Two pricing on March 28, 2012.
Qualifications Summary of Firms Deemed Technically Acceptable:
Balfour Beatty Rail, Inc:
Balfour Beatty Rail, Inc (BBRI) is a rail infrastructure contractor specializing inconstruction and maintenance services for the public and private railroad markets.BBRI's clients are Class 1 and regional/short line railroads, industrial railroads, portsand rail transit authorities. BBRI is part of Balfour Beatty, a global engineering,construction, services and investment organization headquartered in London,England specializing in large infrastructure and building programs. Balfour Beattywas founded in 1909 and is publicly traded on the London Stock Exchange (BBY.L).BBRI is headquartered in Atlanta, Georgia and has several locations in the USincluding a division office in Los Angeles, California.
Traction Power Substations
BBRI has previously contracted with Metro, and has provided satisfactoryperformances. In addition to Metro, BBRI has had contracts with Denver TransitContractors, Elcon Corporation, City of Tucson, and City of Seattle.
Powell Electrical Systems, Inc:
Founded in 1947, Powell Industries, Inc. designs, manufactures and packagesequipment and systems for the distribution, control, generation and management ofelectrical energy and other dynamic processes. Headquartered in Houston, Texas,Powell serves large industrial customers such as oil and gas producers, refineries,petrochemical plants, pulp and paper mills, transportation facilities, and public andprivate utilities.
Powell has previously contracted with Metro, and has provided satisfactoryperformances. In addition to Metro, Powell has had contracts with Long IslandRailroad, Washington Metropolitan Area Transit Authority, and Dallas Area RapidTransit.
Siemens Industry, Inc:
Siemens Corporation is a U.S. subsidiary of Siemens AG, a global leader inelectronics and electrical engineering, operating in the industry, energy, healthcare,and infrastructure and cities sectors. Siemens has been in business for over 160years.
Siemens has previously contracted with Metro, and has provided satisfactoryperformances. In addition to Metro, Siemens has had contracts with BART, Amtrak,Tri County Metropolitan Transportation District, Denver Regional TransportationDistrict, and Dallas Area Rapid Transit.
C. CostlPrice Analysis
The recommended price has been determined to be fair and reasonable basedupon adequate competition and comparison to Metro's Independent Cost Estimate("ICE"). The proposed total NTE for the recommended awardee is $19,176,024.01for the baseline quantities, training, warranty, and optional quantities, whichcompares favorably to Metro's ICE of $36,143,076.13.
Bidder Name Bid Amount
1. Balfour Beatt Rail, Inc. $19,176,024.012. Powell Electrical S stems, Inc. $27,110,530.013. Siemens Indust ,Inc. $19,409,883.79
Traction Power Substations
D. Background on Recommended Contractor
The recommended firm, Balfour Beatty Rail, Inc located in Atlanta, Georgia hasbeen in business for over 100 years, is a leader in the rail infrastructure contractorspecializing in construction and maintenance services for the public and privaterailroad markets. BBRI's clients are Class 1 and regional/short line railroads,industrial railroads, ports and rail transit authorities. BBRI has completed similarprojects with the cities of Seattle, and Tucson.
The Project Manager assigned to this project has 25 years of experience in thetraction power industry. Other key personnel assigned to the project, have over 60years of combined experience in the Traction Power Systems Industry.
E. Small Business Participation
The Diversity and Economic Opportunity Department (DEOD) established a 7%Disadvantaged Business Enterprise (DBE) Anticipated Level of Participation (DALP)for this solicitation. Balfour Beatty Rail Inc. made an 8.76% DBE commitment. TheContractor's, commitment exceeds the goal.
SMALL DALP SMALL DBEBUSINESS 7% BUSINESS 8.76°/aGOAL COMMITMENT
DBE/SBE Subcontractors %Committed1. G&C E uipment Cor oration 8.76%
Total Commitment 8.76%
F. All Subcontractors Included with Recommended Contractor's Proposal
Subcontractor Services Provided1. G&C E ui ment Corporation Sup I Transformers
Traction Power Substations
ATTACHMENT B
CSIOS VUL:
VZN7/lZ
local
au
Bids Opened: 03/28/12
Total 3
Advertisement Date(5): 02/02/'12
Newspaper: Long Beach Press Telegram and LA Sentinel
-
- ---
---
Powell Electrical Systems, Inc.
Siemens Industriy, Inc.
Balfour Beatty Rail. Inc.
Item
No.
Pty
uM
Brio Bid Expo 11
unit Price
Total
Price
Unit Price
Total
Price
Unit Price
Total
Prices
1Clarington TPSS -Design, manufacture, furnish, test, and deliver
standardized Trection Power Sub-Stations (TPSS)
1LM
$x,255,020.00
$1,255,020.
$1,005,835.00
$7,005,835.0
$x,001,578.86
$'1,00'1,578.8
2Selby TPSS -Design, manufacture, furnish, test, and deliver
standardized Traction POwar Substations (TPSS)
1LM
g~,255,020.00
$x,255,020.00
$1,255,020.0
$x,005,835.00
$x,255,020.
$x,005,835.00
$'1,005,835.0
$x,007,576.86
$x,001,578.8
3Sepulveda TPSS -Design, manufactures, famish, test, and deliver
standardized Traction Power Sub-Stations (TPSS)
1LM
$'1,005,835.0
$x,001,578.86
$7,00'1,578.8
4Barrington TPSS -Design, manufacture, famish, test, and deliver
stantlartlized Traction Power Sub- Stations (TPSS)
1LM
g~,255,020.00
$'1,255,020.00
$x,005,835.00
$x,005,835.0
$~,O'15,255.08
$'1,075,255.06
5YarU TPSS -Design, manufacture, furnish, test, and deliver
standardized Traction Power Sub-Stations (TPSS)
1LM
$2,604,2'15.00
$2,604,215.0
$'1,781,808.00
$1,781,808.00
$1,545,375.55
$1,545,375.55
6Clovertield TPSS -Design, manufacture, famish, test, and deliver
standartlized Traction Power Sub-Stations (TPSS)
1LM
$1,'178,440.00
$1,178,440.0
$730,761.00
$730,761.0
$746,862.00
$748,682.00
717 Street TPSS -Design, manufacture, famish, test, antl deliver
standardized TreMion Power SutaStations (TPSS)
1LM
$~,~78,440.00
$7,'178,440.0
$730,787.00
$730,761.0
$746,862.00
$746,862.00
g5 Street T SS - esign, manufacture, famish, test, and tleliver
standardizetl Traction Power SUb-Stations (TPSS)
1LM
$~,~7g,440.00
$~,~78,440.00
$730,76'1.00
$730,76'1.0
$746,862.00
$746,862.00
SubToWI
$'11,'159,6'15.00
§7,997,43.00
§7,806,963.9
Sales TaK 8.76%
$976,466.31
§699,775.21
§883.020.90
Total Bases 6X oil
$'i L.
93£;
.IIH
3.;i
't$$,697,206.2'1
S$,486,974.08
Base Bid Foo
41tf
i1
$x,178,440.00
$'I ,'178,440.00
$730,781.00
~~. $730,781.00
~ $730,76'1.00
$730,781.00
$730,76'i.00
$730,761.00
$736,239.47
$736,239.47
$736,239.47
$x,937,502.05
$736,239.47
1Baldwin TPSS -Design, manufacture, furnish, tes
t, and deliver
standardized Trection Power Sub-Stations (TPSS)
7LM
2Joseph TPSS -Design, manufacture, famish, test, and deliver
standardized Traction Power Sub-Stations (TPSS)
1LM
$1,778,440.00
$1,'178,440.00
$736,239.4
3Los Robles TPSS -Design, manufacture, famish, test, antl tleliver
standartlizatl Traction Power Sub-Stations (TPSS)
1LM
$x,178,440.00
$x,178,440.00
$736,239.4
4YarU TPSS -Design, manufacture, furnish, test, and deliver
standardized Traction Power Sub-Stations (TPSS)
7LM
$2,604,2 5.00
$2,604,2'15.00
$2,798,070.00
$2,798,070.00
$'1,937,502.05
5Bus Center TPSS -Design, manufacture, famish, test, and deliver
standardized Traction Power Sub-Stations (TPSS)
1LM
$1,'178,440.00
$'1,178,440.0
$730,781.00
.$730,761.00
$736,239.47
$736,239.4
6Irwindale TPSS -Design, manufacture, famish, test, antl deliver
standartlized TraMion Power SutaStations (TPSS)
1lM
$x,072,264.00
$1,072,264.00
$659,067.00
$659.067.00
$736,239.47
$736,239.47
7Virginia TPSS -Design, manufacture, furnish, test, and deliver
standartlized Traction Power Substations (TPSS)
1LM
$1,072,264.00
$1,072,264.00
~ $659,067.00
$659,067.00
$736,239.47
$736,239.4
gCitrus TPSS -Design, manufacture, famish, test, and deliver
standardized Traction Power Sub-Stations (TPSS)
1LM
$1,072,264.00
$'1,072,264.00
$659,067.00
$659,067.00
$736,239.47
$736,239.47
SubTotal
$ 0,534,767.00
57.098,3 5.00
57.091,178.3
Sales Tax 8.76%
$921,792.11
E62~,~02.66
E620,478.~0
Total Bash Footh
€13
R11.4G&.v>9..91
$7.7i 9.497.66
$7.71'i B&6.
1
OPTION PftICIlVC+ TWA (2) ADE7ITIONAL Tt~SS
Michilinda TPSS -Design, manufacture, famish, test, antl deliver
standardized Traction Power Sub-Stations (TPSS)
$x,047,720.00
$1,047,720.00
$726,66'1.00
$726,661.0
$746,862.00
$746,862.0
1LM
2Soldano TPSS -Design, manufacture, famish, test, antl deliver
standardized Traction Power Sub-Stations (TPSS)
1LM
$gg1,544.00
$941,544.00.
$655,368.00
$655,368.00
$746,862.00
$746,862.00
SubToUI
$'1,989,264.00
§x,382,029.00
E~,493,724.00
Sales Tax 8.76%
§74,060.60
§20,927.6
5'130,700.85
Total Option 7RSS
$2,63,324.60
$9 ,52,966.5
$1,624.424.85
Item
No.
Qty
UM
OPTiOtJ PRICIN4 TPSS STf.?RACsE FEE
Rate Per
Month
3- Month
Storage
Total EMended
Price
Rate Par
Month
3- Month
Storage
Total EMentled
Price
Rate Per
3- Month
Month
Storage
Total EMended
Price
1Storage Fee - Clarington TPSS
1LM
$0,000.00
$72,000.00
$'I O,000.O
$5,30'1.00
$7,605.00
$5,301.0
$5,500.00
$5,650.00
$5,500.0
2Storage Fee -Selby TPSS
1LM
$10,000.0
$72,000.00
$10,000.00
$5,301.0
$7,605.00
$5,301.0
$5,500.00
$5,650.00
$5,500.0
3Storage Fee-Sepulveda TPSS
1LM
$70,000.0
$2,000,00
$'10,000.00
$5,30.0
$7,605.00
$5,301.0
$5,500.00
$5,850.00
$5,500.0
4Storage Fee -Barrington TPSS
1LM
$10,000.0
$12,000.00
$10,000.00
55,30'1.00
$7,805.00
$5,307.00
$5,500.00
$5,650.00
$5,500.0
5Storage Fee—Yard (EXPO II)TPSS
1LM
$16,000.00
$20,000.00
$'16,000.00
510,801.00
g~5,21'I.00
$10,60'1.00
$1x,000.00
$71,300.00
$'1'1,000.0
6Storage Fee - Clovertield TPSS
1LM
$'10,000.00
$12,000.00
$'10,000.00
$5,301.00
$7,605.00
$5,30.0
$5,500.0
$5,650.00
$5,500.0
7Storage Fee - 17th Street TPSS
1LM
$10,000.00
$72,000.00
$10,000.00
$5,301.00
$7,605.00
$5,301.00
$5,500.0
$5,850.00
$5,500.00
gStorage Fee - 5th Street TPSS
1LM
$10,000.00
$2,000.00
$10,000.00
$5,301.00
$7,605.00
$5,301.0
$5,500.00
$5,650.00
$5,500.00
9Storage Fee -Baldwin TPSS
1LM
$10,000.00
$ 2,000.00
$10,000.00
$5,301.00
$7,605.00
$5,301.0
$5,500.00
$5,850.00
$5,500.0
10
Storage Fea-Joseph TPSS
1LM
$70,000.00
$2,000.00
$70,000.00
$5,30.00
$7,605.00
$5,307.0
$5.500.00
$5,650.00
$5,500.0
~ ~
Storage Fee -Los Robles TPSS
1LM
$10,000.00
$~ 2,000.00
$10,000.00
$5,30'1 .00
$7,605.00
$5,301.0
Y>5,500.00
$5,650.00
$5,500.0
12
Storage Fea-Yard (Foothill)TPSS
7LM
$76,000.00
$20,000.00
$'16,000.00
$10,60'1.00
$~5,21'I.00
$10,601.00
$11,000.00
$1,300.00
$11,000.0
13
Storage Fee -Bus Center TPSS
1LM
$10,000.00
$2,000.00
$'10,000.00
$5,301.0
$7,605.00
$5,30.00
$5,500.0
$5,850.00
$5,500.0
14
Storage Fee - Irvvindale TPSS
1LM
$'10,000.00
$12,000.00
$'10,000.0
$5,307.00
$7,605.00
$5,30'1.0
$5,500.0
$5,650.00
$5,500.00
15
Storages Fea -
Virginia TPSS
1LM
$10,000.0
$2,000.00
$10,000.00
$5,301.0
$7,605.00
$5,301.0
$5,500.0
$5,650.00
$5,500.0
16
Storage Fae -Citrus TPSS
1LM
$10,000.00
$~ 2,000.00
$~ 0,000.00
55,301.00
$7,605.00
$5,301.0
$5,500.00
$5,650.00
$5,500.0
~7
Storage Fee-
Michilinda TPSS
1LM
$10,000.00
$2,000.00
$0,000.00
$5,30.00
$7,605.00
$5,301.00
$5,500.00
$5,650.00
$5,500.0
~g
orage ee- o ano
$12,000.00
$'10,000.00
$7,605.00
$5,30'1 .00
55,650.00
$5,500.00
SubTotal
$'192,000.00
$106,018.00
5710,000.00
Sales Taz 8.76%
5'16,800.00
59.276.68
§8,826.00
Totoai O tion TPSS Stores a Fee
520H,SOO.GO
$116,294.58
yS~9,625,60
i racnon rower ~un
stat
ions
Item
No.
Qty
UM
=~ ~ ~
Unit Pfice ...
~x
$2'1 ,48 .00
Total
Price
$85 924 00
Unit Price
Total
PrlGe
Unit Price
Total
Price
SPARE Pa2ftT8
r a
~' ~~
1Spare ~C feeder circuit breakers
4LM
$'I'
1 239.00
$~q,564.00
$44,956.D
$29,28.00
$2 .,000.00
~•~
$24,000.00
$84000.00
ZSpare cathotle circuit breakers and negative switch assemblies
2LM
$2'1,48'1.00
$42,962.0
$48,000.00
3
Spare AC breaker For 16.34 kV and spare AC breaker for 12 kV
substations. /f tAa clrcuH breaKars a e /dentica/, Yhen a fora/ of
one breaK¢r on/y need be supp/ /eol
1LM
$33,204.00
$33,204.00
$42,777.00
$42,777.00
$'I'1,250.OD
2:
$366,000.00
e $9,000.00
~y
$'195.00
$~,420.00
-~:: $x,050.00
$'12,000.00
$3,000.00
$1,500.00
-'~
$9,000.00
$11,250.00
$366,000.00
$8,000.00
4Mainline rectiFer transformer and one mainline auxiliary
transformer for each type of substation rated voltage Gass
1LM
$435,000.00
$435,000 00
$486,007.00
$47,804.00
$4,574.00
$486,007.00
$95,608.00
5substation rated voltage class and for each ratio
2LM
$10,000.00
$20,000 00
~~6
Diotlas and fuse assemblies per rectrtier
6LM
$5,000.00
$30,000.00
- ?.. - -..
$27,444.00
$~,~70.00
$x,420.00
$x,050.00
$24,000.00
$3,000.00
7Ten percent spare fuses per substation for all
types antl sizes
used
1LM
$4,000.00
$4,000.00
$10,595.00
$ 0,595.00
8 9 1 O
11
Ten percent spare LEDs par substation for all
types used
AC voltage class protection relays of each type
DC protective relay of each type per substation
DC surge arrestors for feeder breakers, cathode and negative
breakers
1 2 1 3
LM
LM
LM
LM
$750.00
$8,000.00
$6,200.00
$375.00
$750.00
$16,000.00
$662.00
$5,293.00
$662.00
$'10,586.00
$6,200 00
$1,'125.00
$93,235.00
$93,235.Oo
$298.00
$894.00
$4,500.00
$'18,000.00
~2
~r con
i ion~ng uni s o eac
ype
$6,400.00
$2,800.00
$9,237.00
$'18,474.00
$860,366.00
Sub Total
5687.966.00
5680,390.00
Sales TaX 8.76%
E60,~96.94
$76,282.03
560,784.'13
Total S are Farts
$7d8,'iS1.9
$936,64F3.(s;z
S~3'1,'774.93
Item
No.
Qty
UM
Unit Pric
Total
Price
l sn
it Pnce
Total
Price
Unit Pric¢
$3,000.00
Total
Pflce
$3,000.00
u¢'aeCiul TpO1s
~~~
1Relay Calibration test set
7Set
$23,'10000
$13,'1 UU.
()c]
~ $6o,99a.00
860.994 )c
)
2
Relay Calibretion software and hardware for both A/C and DC
breakers inGuding laptop computer, associated intertaca cables
and connection
2Set
$4,400.00
$S,800.0o
83,292.00
$6,584.DO
$3,000.00
$6,000.00
3
development software for local annunciation panel Human
Machine Intertace (HMI) with associated software. Laptop
mputar including substation network troubleshooting software
and associated hardware
2Set
$5,573.00
$~ ~,~46.00
$6,585.00
$13,'170.00
$3,000.00
$6,000.00
4
Complete simulation packages of substation components control
and communication modules inGUding development packages
license software and associated source code for control ladder
logic
2Pkg
$27,53.00
$55,062.00
$9,754.00
$39,508.oa
$2,500.00
$5,000.00
5Simulation tools for substation Transfer Trip (TT) system antl
Emergency Trip System (ETS)
2Set
$3,752.00
$7,504.00
$13,69.00
$26,338.00
$1,500.00
$3,000.00
6Set of breaker test equipment, breaker calibration tools, breaker
lift
ing device and breaker grounding device
18
Set
ncludad
$0.00
$3,292.00
$59,256.00
$4,800.00
$266,400.D0
7
Transformer Turned Ration Tester (TTR), Digital Low Resistance
Ohmmeter (DLRO), Power Quality Analyzer and FLIR infrared
camera model P660 or batter, and UV Corona Detection camera
2Set
$30,000.00
$260,000.00
$99,080.00
$~98,~60.00
g~3~,240.00
$262,480.00
Bub Total
$366,6'12.00
5404,0'10.00
§66'1,860.00
Sales Tax 8.76%
§3'1,991.06
$36,360.88
S4B.28B-60
To4Et! Special Tools
$357,603.06
5aas,aea.as
y6O0,'168.60
TCJTAL SASE BIQ EXRQ tl
$A 2,'136,578'#.81
ffi8,697.206.21
$S,b88.974.A9
Tt?TAL BAuE B7D FSYOTMILL
$11,466,569.17
$7,7A 9,417.68
$?,711,BSi5.44
TOTAL OPTION PR€CBMG '['WQ (2 ,ApD131¢NAt TPSS
$2,763,32.6.60
$9,502,966.6
$1,82q.,g2q.,Bfs
T43TAL OPTIL7T7 PRIGENG 'i7PSS uT{dPtAGE FEE
$248,£ipc1.00
$978,284.68
S?19,625A42
7l7TgL SPARE PARTS
$748,961,3
$836,648.03
$631,774,93
'fCD'T/dL SFTECId0.L 700L3
$397.S03.O5
$439,360,88
~soa,7as+.so
G42RWCd 1"CJ7HL
$27,190,630,01
$19,409,983.79
$i 9,K 76,024.pi
hereby certify
as being the lowest responsive, responsible bidder and recommend the award to them for total price, including sales tax, of
Date
Trac
tion
Power Sub
stat
ions
Signature