Upload
lora-bishop
View
370
Download
37
Embed Size (px)
DESCRIPTION
This is a setting example for MiCOM p442 relay.Only for reference.
Citation preview
FOR REFERENCE ONLY
139 KM0.02897 Ohms0.30720 Ohms0.30856 Ohms0.25697 Ohms1.02230 Ohms1.05410 Ohms4.02683 Ohm
42.70080 Ohm42.89025 Ohm
84.58 Degree35.71883 Ohm142.0997 Ohm146.5202 Ohm
75.86 DegreeZero Sequence Impedence for Protected lineZero Sequence Impedence Angle
Positive sequence impedance per KMZero Sequence Resistance per KMZero Sequence Reactance per KMZero Sequence Impedance per KM
Positive Sequence Impedence for Protected linePositive sequence Impedence angle
Positive Sequence Resistance for Protected linePositive Sequence Reactance for Protected line
Zero Sequence Resistance for Protected lineZero Sequence Reactance for Protected line
DETAILS OF ADJACENT LINE : (NAKODAR - MAKHU)
400kV Rajpura TPPS - Nakodar Line (Main 1) RELAY TYPE : MiCOM P444
DETAILS OF PROTECTED LINE : (RAJPURA TPPS - NAKODAR) Length of protected linePositive Sequence Resistance per KMPositive Sequence Reactance per KM
For 2x700MW Rajpura Thermal Power Plant400kV Line Protection.Rev:0
M/s. Alstom T&D India Limited,19/1, GST Road,
Pallavaram,Chennai - 600043.
53 KM0.02897 Ohm0.30720 Ohm0.30856 Ohm1.53541 Ohm
16.28160 Ohm16.35384 Ohm
84.58 Degree
12.5%315 MVA
2400 KV
63.49 Ohm
31.75 Ohm
2000 Amp1 Amp
400 Kilo Volt
CT & PT DetailsCT PrimaryCT SecondaryPT Primary
NO. OF ICT CircuitsVoltage rating
Impedance when 2 ICT's are connected in the circuit((KV)^2)/(2*MVA) x Percentage impedance
Pos.Seq. Resistance of Adj. Line per KMPos.Seq. Reactance of Adj. Line per KM
Impedance when one ICT is connected in the circuit((KV)^2)/(1*MVA) x Percentage impedance
ICT DETAILSICT impedance ICT rating
Positive Sequence Impedence for adj.line Positive sequence Impedence angle
Length of the adjacent line
Pos.Seq. Impedence of Adj. Line per KMPositive Sequence Resistance for adj.line Positive Sequence Reactance for adj.line
For 2x700MW Rajpura Thermal Power Plant400kV Line Protection.Rev:0
M/s. Alstom T&D India Limited,19/1, GST Road,
Pallavaram,Chennai - 600043.
FOR REFERENCE ONLY
110 Volt0.55
0.811
-12.292 Degree
0.811-12.292 Degree
80% of protected line25% of parallel ICT Impedance
100% of parallel ICT Impedance10% of zone 1 impedence
VALUES
18.872 OhmVALUES
Grounding Factor kg = (Z0/Z1)/(3*Z1)
ZONE SETTING CALCULATIONSZONE 1 80% of Protected line (recommended) ZONE 2
DIST Z4
PT SecondaryCT/PT RatioGROUND FACTOR
DIST Z3 (100 of Protected line +
KZ1,KZ2,KZ3…..PS1Angle KgZONE SETTINGSDIST Z1DIST Z2 (100 of Protected line +
Magnitude of grounding factor Kg =(SQRT((X0-XL)*(X0-XL))+((R0-RL)*(R0-RL)))/ (3*(SQRT(RL*RL)+(XL*XL)))Angle of Grounding factor Kg = (arc Tan((X0-XL/(R0-RL)))-(arcTan(XL/RL))*180*7/22
For 2x700MW Rajpura Thermal Power Plant400kV Line Protection.Rev:0
M/s. Alstom T&D India Limited,19/1, GST Road,
Pallavaram,Chennai - 600043.
28.087 Ohm27.955 Ohm
VALUES
32.584 Ohm32.320 Ohm
1.887 Ohm
2000 Amp
76.982 Ohm
42.340 Ohm25.404 Ohm25.404 Ohm25.404 Ohm33.872 Ohm33.872 Ohm33.872 Ohm
DIST R1,PG(Quad) (80% of RL)
DIST R3 & R4,PG(Quad) (80% of RL)OPERATING TIME DELAY
DIST R2,PG(Quad) (80% of RL)
Load Resistance (RL) in Secondary DIST R1,PP(Quad) (60% of RL) DIST R2,PP(Quad) (60% of RL) DIST R3 & R4,PP(Quad) (60% of RL)
100% of protected line + 50% of TransformerOn comparing the above values, the recommended value is the smallest of all values
10% of Zone 1 ImpedenceRESISTIVE REACH SETTING:
100% of protected line + 50% of Adjacent line
Primary full load current, CTR considered as Full load
Resistance at this current=(0.8*(PT Primary * 10^3) / (1.732) /(1.2*Primary full load current)
ZONE 3 100% of protected line + 100 % of longest line
ZONE 4
100% of protected line + 25% of TransformerOn comparing the above values, the recommended value is the smallest of all values
For 2x700MW Rajpura Thermal Power Plant400kV Line Protection.Rev:0
M/s. Alstom T&D India Limited,19/1, GST Road,
Pallavaram,Chennai - 600043.
FOR REFERENCE ONLY
0.00 Sec0.30 Sec0.75 SEC1.00 SEC
20 % of R35.081 Ohm
20 % of R35.081 Ohm
POWER SWING SETTING:ΔR & ΔXΔR = 10 to 30% of Z3 R3,PPΔR = 10 to 30% of Z3 R3, PP
UNBLOCKING CURRENT THRESHOLDS:Unblocking stages using to trip if any fault when relay blocked on PSB
ΔX = 10 to 30% of Z3 R3, PP ΔX = 10 to 30% of Z3 R3, PP
The three unblocking current thresholds namely, IN>, I2> and Imax should be set above the maximum expected residualcurrent unbalance, the maximum negative sequence unbalance and the maximum expected power swing current.
Value of Imax line = 3 InomNOTE: PSB Block – Zone 2, Zone 3 & Zone 4
IN> 40%I2> 30 %
ZONE 3 OPERATING TIME(t3)ZONE 4 OPERATING TIME(t4)
ZONE 1 OPERATING TIME(t1)ZONE 2 OPERATING TIME(t2)
For 2x700MW Rajpura Thermal Power Plant400kV Line Protection.Rev:0
M/s. Alstom T&D India Limited,19/1, GST Road,
Pallavaram,Chennai - 600043.
I>1 Current setting 3A
EARTHFAULT OVERCURRENT PROTECTIONIN>1 Function IDMT
tI>1 Time delay 1.2 sec
BACK UP OVER CURRENT: Enable Yes
I>3 Current Set 3.00AI>3 Time delay 3sec
DisabledTrip mode 1 pole Z1 , CR ReceivedSWITCH ON TO FAULTSwitch on to fault logic is pre-set in MiCOM P444
Operation on pick up of level detector method and activation of all zones is recommended.This time delay is not having rolein SOTF/TOR logic. Since not possible to block time delay, keep a higher setting as 3 Sec.
Unblocking timer:To be set to 2s typically to un block in case of a prolonged power swing. DISTANCE SCHEMES SETTING Program Mode Standard Scheme
I>4 Status Disabled
Standard Mode PUR Permissive under reach scheme Z1Ext Fail
PSB Allowed to trip – Zone 1
For 2x700MW Rajpura Thermal Power Plant400kV Line Protection.Rev:0
M/s. Alstom T&D India Limited,19/1, GST Road,
Pallavaram,Chennai - 600043.
FOR REFERENCE ONLYV>1 Voltage Set 121 V (110%)
Delta I> 100 mAOVER VOLTAGE PROTECTION:V> Measurement Mode Ph-Ph
VTS I2> & I0> Inhibit 50 mADetect 3P EnabledThreshold 3P U< 10 Volts
V>1 Function DT
DisabledBROKEN CONDUCTOR PROTECTIONI2/I1 ratio 0.20.
VT SUPERVISIONTime Set 60 Sec.
VTS Time Delay 5.000 s (alarm indication time )
IN>1 VTS Block Non DirectionalIN>1 Current set 0.2 AIN>1 Time Delay 1.2 secIN>1 Time VTSIN>2 status
1.2 sec
IN>1 Directional Directional Forward
For 2x700MW Rajpura Thermal Power Plant400kV Line Protection.Rev:0
M/s. Alstom T&D India Limited,19/1, GST Road,
Pallavaram,Chennai - 600043.
V< Operation Any Phase
V<1 Pole Dead Inh Enabled
V<1 Voltage Set (80% of Nominal Voltage) 88 V (80%)V<1 Function DT
V<1 Time Delay 2 sec
V>2 Time Delay 1 sec
V>2 Status EnabledV>2 Voltage Set 154 V (140%)
V>1 Time Delay 2 sec
UNDER VOLTAGE PROTECTION:V< Mode Phase-Phase
V<2 Status EnabledV<2 Voltage Set (70% of Nominal Voltage) 77 V (80%)
Stub Bus Protection (50STB)Relay Type P444
V<2 Time Delay 0.5 sec
Pickup for Stub Bus in secondary 4.0 A
CT Secondary in Amps 1Settings:Stub Bus Enabled
CT Primary in Amps 2000
For 2x700MW Rajpura Thermal Power Plant400kV Line Protection.Rev:0
M/s. Alstom T&D India Limited,19/1, GST Road,
Pallavaram,Chennai - 600043.
FOR REFERENCE ONLYdf/dt>1 Status
F>2 Time delay in sec
Under Frequency Protection
Over Frequency Protection
DF/DT Protection
df/dt>1 Setting in HzEnabled 0.250
1.5F>2 Status EnabledF>2 Setting in Hz
EnabledF<2 Setting in Hz 48
F>1 Status EnabledF>1 Setting in Hz 51.0
0.5
F>1 Time delay in sec
F<1 Status EnabledF<1 Setting in Hz 48.5
50.5
F<1 Time delay in sec 2
F<2 Time delay in sec 0.5
F<2 Status
Frequency Protection:Relay type used P141
For 2x700MW Rajpura Thermal Power Plant400kV Line Protection.Rev:0
M/s. Alstom T&D India Limited,19/1, GST Road,
Pallavaram,Chennai - 600043.
df/dt>1 Time in sec
df/dt>2 Statusdf/dt>2 Setting in Hz
df/dt>2 Dir'n
0.200BothEnabled 0.300
Both
df/dt>1 Dir'n
Note: These settings of Frequency & DF/DT Protection are recommended based on general practice. These settings shall beadjusted if required as per the site conditions.These settings are applicable only if the protections are enabled in P442.
df/dt>2 Time in sec 0.200
For 2x700MW Rajpura Thermal Power Plant400kV Line Protection.Rev:0
M/s. Alstom T&D India Limited,19/1, GST Road,
Pallavaram,Chennai - 600043.