Grid Technology CERN IT Department CH-1211 Geneva 23 Switzerland www.cern.ch/ DB CF CF GT Middleware Update GDB, 9 th June 2010 Maria Alandes Pradillo, CERN

Middleware Update

Embed Size (px)

DESCRIPTION

Middleware Update. GDB, 9 th June 2010 Maria Alandes Pradillo, CERN. Contents. Interim gLite release process gLite 3.2/SL5 releases gLite 3.1/SL4 releases. Interim gLite release process. EGEE project finished on April 2010 EMI project started on May 2010 - PowerPoint PPT Presentation

Citation preview

Page 1: Middleware Update

Grid Technology

CERN IT Department

CH-1211 Geneva 23

Switzerlandwww.cern.ch/

it

DBCFCFGT

Middleware Update

GDB, 9th June 2010

Maria Alandes Pradillo, CERN

Page 2: Middleware Update

CERN IT Department

CH-1211 Geneva 23

Switzerlandwww.cern.ch/

it

GT Contents

• Interim gLite release process

• gLite 3.2/SL5 releases

• gLite 3.1/SL4 releases

Page 3: Middleware Update

Grid Technology Interim gLite release process

• EGEE project finished on April 2010• EMI project started on May 2010• Until EMI (and EGI) are able to take care of the releases

there is a transition period where:– WLCG is the driving force behind the gLite releases until EMI takes

over– We will try to keep LCG and EMI related work as much aligned as

possible

• How long ?

– The first EMI release is scheduled for March-April 2011

Middleware Update - M. Alandes Pradillo

Page 4: Middleware Update

Grid Technology Interim gLite release process

– Well defined and documented:• https://twiki.cern.ch/twiki/bin/view/EGEE/DevelopersGuide

• https://twiki.cern.ch/twiki/bin/view/EGEE/ProdInt

– Task tracker in Savannah where we will keep the progress of gLite developments

• http://bit.ly/22we3i

– Francesco Giacomini is the gLite Release Manager and runs weekly EMT meetings

– Maria Alandes collects feedback for WLCG priorities and presents progress in the Tier1 Coordination meetings:

https://twiki.cern.ch/twiki/bin/view/EGEE/LCGprioritiesgLite

– CERN keeps on preparing the releases (repository and web pages)• Announced using EGEE broadcast + LCG-rollout

• Although no release notes are now produced for SR -> minimise efforts

– YAIM should be transfered from CERN to INFN (Cristina Aiftimei)

Middleware Update - M. Alandes Pradillo

Page 5: Middleware Update

Grid Technology gLite 3.2/SL5 releases

• Released to Production– Update 13. Announced on 07.06.2010

• APEL– New node type to be able to release glite-APEL without the

need of using a MON box, which is a node type not supported anymore in gLite 3.2.

– It introduces ActiveMQ as the new transport mechanism.• LB 2.0.12

– Bug fixes needed by WMS• CREAM 1.6.1

– Urgent release to include a fix in the util_java package affecting CAs with “emailaddress” in their DN (BUG:67302)

– Release notes:• http://glite.web.cern.ch/glite/packages/R3.2/sl5_x86_64/updates.asp#3.2_Update_13

Middleware Update - M. Alandes Pradillo

Page 6: Middleware Update

Grid Technology Upcoming gLite 3.2/SL5 releases

Middleware Update - M. Alandes Pradillo

• Under development– FTS/FTA/FTM 2.2.4 has been certified– WN 3.2.8 in certification

• Released to Staged rollout– BDII -> PATCH:4057

• New site BDII node type• Supports Glue 2.0• Meets Fedora and Debian Packaging guidelines

– DPM and LFC 1.7.4• Several patches:

– DPM_disk -> PATCH:4133

– DPM_mysql -> PATCH:3970

– LFC_mysql -> PATCH:4035

– LFC_oracle -> PATCH:4132

• Multiple bug fixes, in particular worth mentioning:– RFIO improvements to better handle analysis jobs (BUG:56166) – Bulk lookup of SURLs (BUG:60796)

Page 7: Middleware Update

Grid Technology gLite 3.1/SL4 releases

Middleware Update - M. Alandes Pradillo

• Released to Production– Update 64. Announced on 03.06.2010

• FTS 2.2.4

– Released directly to production after succesful testing at CERN and TRIUMF that have deployed and tested the new version for more than one week

• BDII including a missing dependency

– Release notes:http://glite.web.cern.ch/glite/packages/R3.1/updates.asp#3.1_Update_64 (32bits)

http://glite.web.cern.ch/glite/packages/R3.1/x86_64/updates.asp#3.1_Update_64 (64 bits)

• New lcg-vomscerts– lcg-vomscerts 5.9.0-1 includes the new certificate for

voms.cern.ch to be active on 14th of June– Directly included in the gLite repositories and announced to

the sites on 08.06.2010

Page 8: Middleware Update

Grid Technology Upcoming gLite 3.1/SL4 releases

• Under development– WMS 3.2.14 is now in certification– GFAL/lcg_utils 1.11.15 in certification

• Open issue: support for gLite 3.1– Before the end of EGEE a survey was carried out to understand

how many sites were still using gLite 3.1• http://indico.cern.ch/getFile.py/access?contribId=3&resId=1&materialId=0&confId=93897

• No final decision was taken

– From the SL4 roadmap http://www.scientificlinux.org/news/archive/roadmap-sl4 :• SL 4.0-4.8 : Obsolete in October 2010 • SL 4.9 : Minimal support (security only) until February 2012

– We would like to reduce the effort on gLite 3.1 but we need some official list of what needs to be supported

Middleware Update - M. Alandes Pradillo