Mike BrunsonFebruary 7, 2006
Lean Manufacturing Tour
2006 Santech Industries
Agenda
Product Flow
Material Management
Material Handling
Queue Establishment
Housekeeping
Reduction in Non-Value Added Activities
Old Warehouse Layouts
New Warehouse Layout
2006 Santech Industries
Previous Conditions
Overstock was Scattered
Conveyor was Isolated
Inventory and Pick Stations weren t Together
Auto Baggers were Central to O-Rings Only
Product Log Jams through Kitting
Current Condition
Overstock is stored Over Stock
OVERSTOCK
STOCK
Current Condition
Conveyor is Central to Inventory
STOCK
Current Condition
Pick Stations Located in Highest Volume Areas
STOCK
Current Condition
Auto Baggers Located at End of Conveyor
Conveyor
Auto Bagger
Current Condition
Product Flows through Kitting
Conveyor
Auto Bagger
Product Flow
Kitting
2006 Santech Industries
Previous Conditions
Monthly Inventory of Supply Items
Remote Locations were Used
Current Condition
Bagging Machines Bag Location
Order Point Level Reorder when Pulled
Reorder Queues Established
Bag Location and Control
Current Condition
Oil and Chemicals
Inventory Stored by Product Famlies
Oil and Chemical Storage
2006 Santech Industries
Previous Condition
Dependant on Fork Lifts
Heavy Parts Not Stored Safely
Current Condition
High Moving Items Stored in Reach of Ladder
Current Condition
Gold Zone
2006 Santech Industries
Previous Condition
Kits Piled Up at the End of the Line
Pickers Lost Time Looking for Kits
Current Condition
Beginning of the Kitting Process
Current Condition
The End of the Kitting Process
2006 Santech Industries
Previous Condition
Cluttered
Current Condition
Still Improving
Weekly 5S Audits
2006 Santech Industries
Current Condition
Less Travel
Easier Access
No More Supply Inventories
Several Process Improvements
Better Organization
Current Condition